Advance Brake Fade Warning System and Test for Wheeled Vehicles
Closed Solicitation Posted
- Solicitation number
- A15-072
- Agency
-
PEO CSCSS
Acquisition Support Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic A15-072
Component: ARMY
Command: PEO CS&CSS
Phase: SBIR Program Phase I Action
Technology Areas: Ground Sea
Keywords: STOPPING; BRAKING; MOUNTAIN; DYNAMIC TEST; TEST FACILITY; LABORATORY TEST; ROAD TEST; HEAT TRANSFER
Objective:
Develop road and laboratory tests to safely quantify brake temperatures for severe mountain environments. These new tests will enable evaluation of light, medium, and heavy tactical vehicles to operate in these environments. The PEO has identified removing this gap in vehicle performance evaluation as very important due to the recent strategy of upgrading armor, and therefore weight, on existing tactical vehicles. Safety of testing on the road requires development of appropriate sensors and algorithms to accurately predict dangerous levels of brake fade to provide advance warning to the test operator. Advance warning system must be comprehensive regarding sources of brake fade and adaptable to vehicle and brake system types.
Description:
Product Director, Light Tactical Vehicles (PD-LTV) Engineering requires a road test that adequately identifies the brake fade performance of its vehicles in a severe mountain environment. The HMMWV has been up-armored to meet mission requirements. The additional weight has resulted in performance concerns with the legacy brake system. However, the scope of this project is not limited to Light Tactical Vehicles, but medium and heavy military wheeled vehicles as well, such as Mine Resistant Ambush Protected (MRAP) vehicles, Army M915 line hauler, and Heavy Equipment Transporter (HET). Brake system types vary considerably among these vehicles including disk and drum; inboard and outboard; air, air over hydraulic, and hydraulically actuated; S-cam, single wedge, and double wedge applied.
Safely testing brake systems of these vehicles on a public mountain road with steep descent will require advance sensing and brake fade warning capability. Because the test is intended to measure brake temperatures and brake fade, the advance warning system cannot prematurely recommend aborting the procedure. It is expected that in the development of an advance brake fade warning system that the potential sources for the brake fade (e.g. fluid temperature for hydraulic systems, pad/lining temperature, pad wear, pneumatic and mechanical effects), and changes in the conditions of these factors, would need to be monitored. These system states could be compared to brake pedal force, grade of descent, vehicle speed, and other parameters as necessary to accurately predict if and when the vehicle may not have sufficient reserve to stop. It is conceivable with sufficient research that the level of sensing may be reduced and system adaptation to unique vehicles simplified. This research project must determine the appropriate sensing techniques and algorithms, and may require capability to learn and adapt to the characteristics of the specific vehicle on which it is implemented.
Existing mountain braking performance assessments ATPD-2354A and ATPD-2383 are laboratory brake component tests that mimic the Jennerstown Mountain Highway Brake System Test defined in US Army Developmental Test Command (DTC) Test Operations Procedure (TOP) 2-2-608 with a prescribed number of repeated decelerations on a mountain grade. The existing tests were found to not sufficiently identify the limitations of the HMMWV brake system. A road test measuring and quantifying performance in a realistic severe mountain descent brake fade challenge needs to be defined. A new lab test procedure and data processing based upon and correlated to the mountain descent braking road test is also to be delivered. Ultimately brake system hardware is to be developed that enables the HMMWV to successfully meet the requirements identified by an Integrated Product Team for performance in the road and lab test that are developed.
It is assumed that the severity of the test environment should be at least be equivalent to the MRAP Family of Vehicles (FoV) Capability Production Document (CPD) requirement that was developed to meet the needs of the warfighter in Afghanistan. This CPD requirement states that the vehicle should safely stop at GVW (threshold)/GVWR (objective) after descending a 10 mile long, 6% grade at an average speed of 45 mph. Because there are no U.S. Government road test facilities that have the grade and distance characteristics to evaluate this, it is necessary to investigate the characteristics of public roadways as potential braking performance evaluation sites.
Potential evaluation sites have already been identified and documented in a previous TARDEC study. This study consisted of identifying and evaluating test procedures and test sites utilized by automobile manufacturers, Nevada Automotive Test Center, Aberdeen Test Center, and the University of Michigan Transportation Research Institute. Potential mountain road test venues documented by R&R Publishing were examined for severity by estimating the brake temperatures resulting from the length and grade of the road, and the speed limit using a fundamental analysis documented by UMTRI. The severity of these roads was compared to the estimated temperature from executing the MRAP CPD requirement. The report, "Mountain Braking Test Venue Study,” recommends several mountain road candidates for evaluation as test sites based upon estimated brake temperature and safety considerations. These venues will be considered for this SBIR project as they present the severe mountain descent environment that the PEO is interested in evaluating performance of its vehicles.
Phase I:
Preliminary Brake Fade Warning Device and Mountain Descent Test Venue Selection
Deliverables: 1. Preliminary brake fade advance warning system that, with some safety margin, determines that the vehicle must be stopped immediately due to only having sufficient capacity to stop once. 2. Definition of preliminary road test procedure, including sensors and data acquisition, to evaluate severe mountain descent environment brake temperatures on four mountain descent test venues identified by a Government Integrated Product Team (IPT) prior to contract award. 3. Evaluation of preliminary test procedure with two vehicles identified by the Government IPT on the four test venues referenced in deliverable 2 to determine severity as measured by brake temperatures, repeatability of results, and robustness to test operator variation. 4. Down selection to two road test venue locations for evaluation and demonstration of preliminary brake fade warning device and road test procedure that meet the mountain descent braking severity required by Government Integrated Product Team (IPT).
Detail: Prior to selection of the contractor, the Government will assemble and convene a meeting of an IPT to make decisions and recommendations to define the direction of the project. The scope of the project defined in this proposal is sufficient for perspective contractors to determine Phase I and II costs. Prior to selection of a contractor, the IPT will select four mountain highway venues and two vehicles for use in the development of a preliminary brake fade warning device and Mountain Descent Braking road test. The contractor will have the option to include other vehicles to help develop the advance brake fade warning system for other vehicle applications. This could help ensure applicability of the advance brake warning system to vehicle or brake system types otherwise not represented for which the contractor wants to market the product. The IPT will also make recommendations on test procedure prior to contractor selection to be subsequently discussed and agreed upon with the selected contractor.
Although the contractor will have a primary Government SBIR project point of contact (POC), this IPT will identify appropriate contacts and communication links to address any questions the contractor may have regarding the project. The IPT will initially consist of representatives from TARDEC Analytics, TARDEC Physical Simulation and Test, Program Executive Office (PEO) Combat Support & Combat Service Support (CS & CSS) to include PD-LTV and possibly JLTV and MRAP, and the Army Test and Evaluation Center (ATEC). Any post-award IPT meetings will include participation by the contractor.
Prior to involvement by the contractor, decisions on the following issues will be made by the IPT to ensure consistent and definitive mountain highway braking venue evaluation results: • Selection of four mountain descent brake fade evaluation venues from among the sites identified as having greatest potential in the Government report, “Mountain Braking Test Venue Study” or others proposed by the IPT. Sites previously identified include: o SR-190, Townes Pass to Death Valley, CA o Pikes Peak Highway, Cascade, CO o AZ-260, AZ-87 to Camp Verde, AZ o US-395, Bishop Grade, CA o I-80 from Parley’s Summit, Parley's Canyon, UT o AZ-68 from Kingman to Bullhead City, AZ o CA 168 from Prather to Shaver Lake, Fresno, CA o I-68 EB from MD-546, Frostburg, MD o US 421 SB from the Parkway, Deep Gap, NC • The IPT would consider whether test site proximity to APG and YPG is a priority. • Determine four vehicles that will be used for Phase II evaluation of the brake fade warning device, and road and lab test procedures. o These should be determined based upon variety in vehicle Gross Vehicle Weight and brake system types including disk and drum; inboard and outboard; air, air over hydraulic, and hydraulically actuated; S-cam, single wedge, and double wedge application. o Consideration should include, but not be limited to these vehicle lines: the Oshkosh Family of Heavy Tactical Vehicles (FHTV) Heavy Equipment Transporter (HET), the Army M915 line haul truck, the Oshkosh MaxxPro Recovery Vehicle (MRV), the Navistar Defense MaxxPro MRAP, the Oshkosh MRAP All-Terrain Vehicle (M-ATV), and AM General HMMWV. • From the four vehicles selected for Phase II evaluation, select and obtain two test vehicles for preliminary fade warning device, road test, and data processing development in Phase I.
Prior to involvement by the contractor, the following issues will be discussed by the IPT and recommendations recorded. Once the contractor has been selected, the IPT will meet with the contractor to discuss and come to a final decision on these issues to ensure consistent and definitive mountain highway braking venue evaluation results: • What parameter information is sufficient to determine safe capacity to stop o Consider assumptions about changes in environment (e.g. changes in grade or ambient temperature) o Maximum brake pedal pressure available from operator • Define vehicle ballast, occupant, fuel level condition for road test • Identify tire and brake pad/shoe wear states and allowable range for test • What vehicle performance assessment is performed before/after each venue evaluation o Coastdown (SAE J1247 section 6 and figure 14) o Brake Effectiveness (SAE J1247 sections 5.4/5.6 and figures 4/6) • What and when brake temperatures are recorded • Number of test event repeats • Limits on speed control (straight and in turns) • Deceleration rate approaching turns • Transmission gear • Number of test drivers • Number of nominal vehicle speeds • Data to be recorded
A mountain braking road test scenario ideally should not include artificially inserted brake applies to increase brake temperature as this reduces real world validity. Worst case realistic scenarios for high brake temperatures may likely be steep grades of sufficient length that can be traversed at a constant speed. It is conceivable that brake applications due to curves or other impediments could be spaced such that brake temperature is increased, but seems unlikely. More likely the real world frequency of braking for turns during a descent would decrease brake temperature as a result of decreasing average speed.
The contractor will conduct trial road test runs with the two preselected vehicles to develop a preliminary test development procedure at the four preselected sites. The test procedure should be evaluated to determine test to test variability and sensitivity to driver variability. Procedure should result in realistic severe mountain descent brake temperatures that are robust to typical driver-to-driver and test-to-test variability. The relationship of brake temperatures to ambient temperature should be understood and considered in the development of this preliminary procedure. Robustness of the advance brake fade warning system to different sources of fade should be explored.
Phase II:
Complete Brake Fade Warning Device and Mountain Braking Road and Lab Tests Development
Deliverables: 1. Demonstration of advance brake fade warning system on four vehicles that were selected by the Government prior to Phase I along with any others the contractor recommends to include. The advance warning system shall, with some safety margin, determine that an emergency vehicle stop must be initiated within 30 s due to only having sufficient capacity to stop once in the current environment. It must be robust to brake degradation as effected by fluid fade, mechanical fade, friction fade, and other causes. Two of the four vehicles will be those utilized in Phase I.
2. Road testing of the four vehicles on the two mountain descent test venues referenced in deliverable 4 of Phase I with test course definition to include elevation, latitude, and longitude coordinates sufficient to support laboratory and computer modeling.
3. Laboratory test procedure that provides peak temperatures that correlate to the road test procedure within 10 percent for the four vehicles selected by the Government. The lab test and correlation will be based upon one of the two venues in deliverable 2 as decided by the IPT.
4. Documentation of final road and lab test procedures, including hardware definition and specification, sensors, data acquisition and processing, and all specifications necessary to construct a laboratory to execute the lab test.
5. Complete report on how road test and lab test were developed to include quantification of test variation based upon typical input variation such as driver input and ambient conditions for the road test, and air flow and other ambient conditions for the lab test. Report should describe how test variation is minimized by following the road and lab test procedures and rely upon the testing conducted on the four vehicles selected by the Government.
6. A complete set of specifications for construction of a laboratory to execute the final mountain descent braking test.
7. All materials purchased or developed to support this SBIR project will be the property of the U.S. Government.
Brake Fade Warning Device: The warning device should be highly visible and audible by the driver to attract immediate attention. It must warn of impending brake system degradation due to pad/lining and rotor/drum temperature, brake fluid boiling, insufficient remaining pad/lining thickness, excessive pad to rotor, and lining to drum clearance, and any other brake degradation sources the contractor identifies that could cause imminent loss of brake system ability to stop the vehicle in the current environment. Brake fade prediction algorithm should utilize warning system specific sensors and data available from the vehicle CAN bus as necessary. The warning device must warn the driver at least 30 s prior to potential brake function loss such that there is sufficient capacity for one complete stop in the current environment. These demonstrations shall take place on the two road test venues down selected during Phase I and utilized in Phase II testing. The demonstrations must show the warning device alerts the driver to impending brake function loss (as described above) due to overheated pads or linings, rotors or drums, and excessive brake fluid temperature.
Mountain Braking Road Test Development: Using the information gained in Phase I, testing of a range of tactical wheeled military vehicles should commence to finalize the road test procedure, data acquisition, and data processing. Test development shall include the four vehicles determined by the IPT prior to Phase I to encompass a range of military vehicle sizes and brake system types to ensure compatibility, adaptability, and robustness. The contractor will have the option to include other vehicles to assist in development of the advance brake fade warning system for other vehicle applications. This could help ensure applicability of the advance brake warning system to vehicle or brake system types otherwise not represented for which the contractor wants to market the product. Each vehicle will be tested with new Original Equipment Manufacturer (OEM) brake fluid (hydraulic systems), new pads and/or linings burnished to the manufacturer’s procedure, and all other brake system components within OEM specification. These vehicles will be tested on the two road test venues determined in Phase I. The final road test definition shall be based upon the one location selected by the IPT upon review of the road test results on the two venues tested in Phase II. The U.S. Government shall provide the vehicles, but shipping will be the responsibility of the contractor and meet any applicable U.S. Government shipping requirements.
Mountain Braking Lab Test Development: A logical and desired conclusion for a mountain braking test is to conduct the procedure in a laboratory where the environment and inputs are tightly controlled to provide more consistent results than a road test. Once the road test has been defined as proposed including one specific mountain braking venue as selected by the IPT from the two evaluated in this phase, the IPT shall be reconvened to answer contractor’s questions regarding the development of a mountain descent braking laboratory test. Considerations need to be given as to whether or not such a test should be conducted on a full vehicle, a brake subsystem, or both. For laboratory test development, the mountain road braking test should be conducted on the four vehicles utilized in the Phase II road testing. These vehicles will have been identified prior to Phase I. Lab test development should include a study of correlation to road test results of these vehicles. The laboratory test shall result in peak brake lining temperatures and, for hydraulic and air-over-hydraulic systems, brake fluid temperatures for each axle within 10 percent of those measured on the road test it emulates. Brake fluid temperatures will be measured at the master cylinder (hydraulic systems) and each wheel cylinder. Ambient and initial brake lining temperatures shall be the same as for the road test or otherwise factored into the calculation of the peak temperatures. The contractor will demonstrate this correlation based upon statistics for multiple runs of the road and lab tests as specified in the test procedures.
A complete set of specifications for construction of a laboratory to execute the final mountain descent braking test that is documented for Phase II will be provided by the contractor.
Phase III:
Further develop and demonstrate capability of advance brake fade warning that robustly includes all forms of brake fade and can be adapted to a variety of automotive vehicles from heavy commercial trucks and semi-tractor trailers to light trucks and SUVs. Trailer towing at a vehicle’s Gross Combination Weight Rating offers a significant challenge to brake systems and safety could be substantially enhanced with an advance brake fade warning system. Develop and demonstrate capability of upgraded brake system for U.S. Army up-armored tactical vehicle. It is recommended that the contractor consider the ability to retrofit the HMMWV and/or M-ATV vehicles as these are in wide use within the military and offer significant sales opportunities.
PD LTV has identified the need to explore and implement new technology to improve performance in severe mountain braking environments. PD-LTV would benefit from a contractor’s development of new brake technology for a light tactical vehicle to meet performance requirements for mountain descent braking. These technologies include Electronic Brake Distribution, alternative pad materials, caliper & rotor redesign, and in-board and out-board brake system configurations. Of these technologies, PD LTV indicated their recommendation for Phase III focus would be to advance the state of the art for brake pad material solutions in particular for the uparmored HMMWV.
The ability to execute the laboratory test procedure developed by this SBIR may require a new or unique laboratory facility according to the laboratory specifications provided by the contractor in Phase II.
Files
| File | Type | Posted |
|---|---|---|
| A15-072.pdf |