5998--Automatic & Rollup Doors Repairs & Replacement
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- 36C24223R0087
- Agency
- Veterans Integrated Service Network 2 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
Notice text
THIS IS NOT A REQUEST FOR PROPOSAL. This pre-solicitation notice is for Solicitation Number 36C24223R0087 for Door Repair and Replacement at the VA New Jersey Healthcare Systems (NJHCS) Lyons Campus.
This requirement shall be a 100% Service-Disabled Veteran Owned Small Business Set-Aside (SDVOSB). As a result, all responsible SDVOSB's may submit a quote, which will be considered by the agency. This project is classified under NAICS Code 236220 and has a size standard of $45.0 Million.
Statement of Work
Title of Project: Remove/Replace/Repair automatic, and rollup doors at the Lyons VA Medical Center, 151 Knollcroft Road Lyons, N.J. 07939
Scope of Work: The contractor shall remove and replace the main entrance doors at Bldg.143, and remove and replace Bldg.7 East Ramp Entrance door. Labor and Material necessary to accomplish the services as described in the statement of work (SOW),
SERVICES TO BE PROVIDED UNDER THIS SCOPE OF WORK.
Building 143 Ground Level South Wing Outside Slider Replacement
1.Vendor will remove and dispose of one (1) existing damaged door, frame and hardware.
Furnish and install one (1) glass and aluminum door and frame complete including:
Dark Bronze Anodized Finish
SO-SX-SX-SO configuration
Breakout Door Package
Narrow Stile Construction
¼ Clear Tempered Glazing
Two (2) Motion Sensors
Two (2) Doorway Holding Beams
Electronic Locking
Aluminum Threshold
Building 143 Ground Level South Wing Inner Slider Replacement
1.Vendor will remove and dispose of one (1) existing damaged door, frame and hardware.
Furnish and install one (1) glass and aluminum door and frame complete including:
Dark Bronze Anodized Finish
SO-SX-SX-SO configuration
Breakout Door Package
Narrow Stile Construction
¼ Clear Tempered Glazing
Two (2) Motion Sensors
Two (2) Doorway Holding Beams
Electronic Locking
Aluminum Threshold
Bldg. 7 East Wing Ramp Entrance Replacement
2.Vendor will remove and dispose of the existing damaged door, frame and hardware completely. Furnish and install one (1) 16GA galvanneal steel frame and one (1) 18GA galvanneal steel Everline Strongdor door complete including:
Ball Bearing Non-Removable Pin Hinges
Heavy Duty Closer Device
24 x 32 Visible Glass With Wired Safety Glazing
36 x 36 Transom Glass
Baked Enamel Rim Exit Device
Escutcheon Entrance Function Lever-Trim
12 H Stainless Steel Kickplate
Perimeter Door-Stop Weatherstripping
Door-Bottom Brush Sweep
Aluminum Threshold
Door to be top capped
Unit to be sealed to existing surroundings
Prefinished gray with high-performance Industrial coating, no further finishing or painting is required
HUT13 Door 1
3.Vendor will remove and dispose damaged LH bottom length of door track.
Furnish and install new LH bottom length of door track complete.
Furnish and install new door bottom weatherseal and retainer complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Building 13 - Rolling Steel Door #1
4.Vendor will remove and dispose of damaged emergency pull rope.
Furnish and install new emergency pull rope complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation
Building 15 - Rolling Steel Door #1
5.Vendor will furnish and install new LH & RH black clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Building 15 - Rolling Steel Door #3
6. Vendor will remove and dispose of damaged bottom bar, safety edge, and junction box.
Furnish and install new bottom bar, safety edge, and junction box complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
Building 15 - Rolling Steel Door #4
7.Vendor will remove and dispose of damaged coil cord.
Furnish and install new 2-wire coil cord complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
Grounds - Rolling Steel Door #3
8.Vendor will furnish and install new LH & RH black clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Grounds - Rolling Steel Door #3
9.Vendor will furnish and install new LH & RH black clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Grounds - Rolling Steel Door #5
10.Vendor will remove and dispose of damaged bottom bar.
Furnish and install new bottom bar with rubber seal complete.
Furnish and install new LH & RH black clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Grounds - Rolling Steel Door #6
11.Vendor will remove and dispose of damaged bottom bar.
Furnish and install new bottom bar with rubber seal complete.
Furnish and install new LH & RH black clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Circle 1 - Rolling Steel Door #2
12.Vendor will re-anchor and secure RH door track to wall with wall anchors complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Building 143 - Rolling Steel Door # 1
13.Vendor will remove and dispose of damaged door operator.
Furnish and install new door hoist operator complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
ROLLING STEEL DOORS Boiler Room Door 1
14.Vendor will remove and dispose of damaged RH weatherseal.
Furnish and install new RH clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 2
15.Vendor will furnish and install new LH & RH clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 3
16.Vendor will furnish and install new RH clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 4
17.Vendor will furnish and install new 2-wire coil cord complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 5
18.Vendor will furnish and install new 2-wire coil cord complete.
Make all necessary mechanical and electrical connection
Cycle door to check for safe and proper operation.
Boiler Room Door 6
19.Vendor will remove and dispose of damaged safety edge and coil cord.
Furnish and install new stick-on safety edge and coil cord complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 7
20.Vendor will remove and dispose of damaged safety edge and coil cord.
Remove and dispose of damaged keyed 3 push button station.
Furnish and install new stick-on safety edge and coil cord complete.
Furnish and install new keyed 3 push button station complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operations.
Boiler Room Door 8
21.Vendor will remove and dispose of damaged safety edge and coil cord.
Furnish and install new stick-on safety edge and coil cord complete.
Make all necessary mechanical and electrical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 9
22.Vendor will furnish and install new LH & RH clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Boiler Room Door 10
23.Vendor will furnish and install new LH & RH clip-on weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
PEDESTRIAN DOORS
Bldg. 3 West Wing Loading Dock Automatic Double Door
24.Vendor will furnish and install screw on brush seal for one (1) pair of automatic double doors complete.
Make all necessary mechanical connections.
Cycle doors to check for safe and proper operation.
Bldg. 4 Basement Level South Wing Automatic Double Door
25.Vendor will remove and dispose of damaged weatherseal on existing automatic double doors.
Furnish and install new slide on weatherseal on existing automatic double doors complete.
Make all necessary mechanical connections.
Cycle doors to check for safe and proper operation.
Bldg. 143 South Wing Outer Entrance Sliding Door
26.Vendor will assess and diagnose issues with door activation for up to 1.5 hours.
Attempt to repair door with materials on hand.
Determine what additional materials are needed for repairs (if necessary)
Bldg. 143 North Wing Loading Dock Double Doors
27.Vendor will remove and dispose of damaged hinges.
Remove and dispose of damaged LH, RH, and bottom weatherstripping.
Furnish and install new full face continuous hinges on both doors complete.
Furnish and install new KH, RH, and bottom weatherstripping complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Bldg. 135 East Wing Inner Double Doors
28.Vendor will remove and dispose of damaged hinges.
Remove and dispose of damaged LH, RH, and bottom weatherstripping.
Furnish and install new full face continuous hinges on both doors complete.
Furnish and install new KH, RH, and bottom weatherstripping complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Bldg. 135 1st Floor Central Wing Double Doors
29.Vendor will remove and dispose of damaged hinges.
Remove and dispose of damaged LH, RH, and bottom weatherstripping.
Furnish and install new full face continuous hinges on both doors complete.
Furnish and install new KH, RH, and bottom weatherstripping complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Bldg. 135 1st Floor 1A117 Entrance Patio Sliding Door
30.Vendor will remove and dispose of damaged weatherseal.
Furnish and install new slide-in weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Bldg. 135 1st Floor West Wing 1C Unit Entrance Sliding Door
31.Vendor will remove and dispose of damaged weatherseal.
Furnish and install new slide-in weatherseal complete.
Make all necessary mechanical connections.
Cycle door to check for safe and proper operation.
Performance Period: The contractor shall complete the work required under this SOW within 45 day of this award unless otherwise directed by the Contracting Officer (CO). Hours of work are to be between 7:00am and 4:30 pm on normal weekdays. Work on Federal Holidays is excluded from this
Type of Contract: Firm-Fixed-Price.
All other details and information shall be contained in the solicitation which shall be posted on sam.gov.
The solicitation will be released on or about June 8, 2023 . The response submittal address, date and time will be included in the solicitation. This project requires bonding, and all responses/submissions shall be electronic; faxed or hand delivered proposals will not be accepted. All prospective bidders must be currently registered in sam.gov and be registered and verified as a SDVOSB in www.vip.vetbiz.va.gov at the time of offer submission and before award of this procurement.
THIS IS NOT A REQUEST FOR PROPOSAL
Attachments
| File | Type | Posted |
|---|---|---|
| 36C24223R0087.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 5998--Automatic & Rollup Doors Repairs & Replacement | Solicitation | |
| 5998--Automatic & Rollup Doors Repairs & Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity