The Department of the Air Force Air Combat Command seeks renovation of Building 2340 at Nellis AFB, with proposals due September 3, 2026. The procurement is set aside for Total Small Business.

Place of performance is Nellis AFB, Nevada. The scope includes complete demolition and replacement of existing male and female restrooms with modernized full bathroom facilities, installation of new epoxy flooring in designated areas, upgrade of lighting to LCD fixtures where necessary, interior wall painting, and completion of all remaining work to present a clean, neat, and professional appearance per the Statement of Work. The period of performance for installation and testing is 120 days. A mandatory site visit takes place August 12, 2026 at 0900 AM PDT at Building 2340's main entrance; contractors without base access must submit base pass requests by July 30, 2026 at 2:00 PM PDT. The contractor shall provide all personnel, equipment, tools, and supervision necessary to complete the work. Evaluation uses lowest price, technically acceptable criteria. Questions should be directed to william.vance.6@us.af.mil or justin.woosley@us.af.mil, with answers provided via solicitation amendment. NAICS 236220, Commercial and Institutional Building Construction; PSC Z2JZ, Repair or Alteration of Miscellaneous Buildings.

Notice text

5 versions

Update #5 · Latest ·

The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/12/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 09/03/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.

Update #4 ·

The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/12/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 9/03/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.

Update #3 ·

The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/12/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/27/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.

Update #2 ·

The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/12/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/26/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.

Update #1 ·

The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/13/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/26/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.

Similar open opportunities

Opportunity Agency Set-aside Responses due
USBC Tenant Improvement Services, Reno, NV Nevada 89509, United States · NAICS 236220 — Total Small Business
FY27 MACC Shaw Air Force Base, Poinsett Weapons Range, Wateree Recreation Facility, and other multiple mini-mute sites, not to include Military Family Housing, as requirements arise. Shaw AFB, South Carolina 29152, United States · NAICS 236220 Air Combat Command Total Small Business
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Armed Forces Recruiting Building 25 Tenant Improvement and Renovation Project- Sources Sought Notice Lakewood, Colorado 80226, United States · NAICS 236220 — No set-aside
2027-2034 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC) Wright-Patterson Air Force Base 45433 · NAICS 236220 AFLCMC Wright Patterson AFB Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity