5 ton hoist withflatwheeled trolley
Closed Solicitation Posted
- Solicitation number
- W911S226U2212
- Agency
-
MICC Fort Drum
Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Place of performance
- McAlester Army Ammunition Plant, 1 C-Tree Road, Building 6, McAlester, OK 74501 74501
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Drum is soliciting proposals for the procurement of a 5-ton hoist with a flat-wheeled trolley system. The equipment must meet specific design and performance specifications, including a 5-ton capacity with a maximum lift height of 28 feet 6 inches, hoist lift speed of 26 feet per minute, and trolley speed of 60 feet per minute, powered by a 7.5 kilowatt hoist motor and dual 0.55 kilowatt trolley motors operating on 230-volt, three-phase, 60-hertz electrical supply. Key requirements include closed-loop vector VFD control for the hoist, sensorless vector VFD control for the trolley, CMAA Class D rating for standard indoor service, and advanced safety features such as load floating capability at zero hertz speed, 100% dynamic braking, overweight protection with 3% accuracy motor current sensing, and adjustable electronic encoder limits. The solicitation specifies that every item listed in the general requirements section must be addressed in the offeror's proposal for it to be considered responsive. The proposal deadline is November 13, 2025, with the solicitation having been posted on November 6, 2025.
This procurement is designated as a Total Small Business set-aside, limiting competition to qualified small business concerns. The equipment will be delivered to 1 C Tree Road, Building 4, in McAlester, Oklahoma 74501, and the approximate weight of the hoist system is 1,080 pounds. The solicitation does not specify a particular incumbent contractor or current supplier, indicating this may be an initial procurement or replacement of aging equipment at the Army installation. While no explicit award value or budget range is disclosed in the solicitation notice, the specific technical requirements and delivery location suggest this is a tailored procurement for operational needs at the Fort Drum location. The procurement falls under NAICS code 333923 for overhead traveling crane, hoist, and monorail system manufacturing, and is classified under PSC code 3950 for winches, hoists, cranes, and derricks.
Notice text
Purchase Description for 5-ton Detroit Hoist or equivalent.1.General Requirements This section provides the design specification requirements for 5-ton Detroit hoist. Note: Every item listed in this section shall be accounted for in the offeror?s proposal for it to be considered (see section 6.). a) 5 Ton hoist, b) flat wheel trolley tread c)For suspension / Mount Monorail d) Capacity 5.00 Ton e) Reeving | Lift 2PD | 28 FT-6 IN f) Hoist Lift Speed 26.00 FPM Maximum g) Hoist Motor 7.5KW h) Hoist Control Closed-loop vector VFD control i) Trolley Speed 60.00 FPM Max j) Trolley Motor2 @ .55KW k) Trolley Control Sensorless vector VFD control l) Power Supply Electric |230VAC-3PH-60HZ +-5% m) CMAA Class | Atmosphere | Location n) Class D | Standard |Indoor Service o) Approximate Weight 1080.00 lbs p) High efficiency, 4-pole, AC squirrel cage, inverter duty hoist brake motor. q) High service factor helical-bevel hoist gearbox featuring precision ground gearing. r) Dual drive trolley featuring rotating axle design, both sides of hoist driven for uniform tracking. s) Long life, self-locking trolley worm gearbox featuring precision ground and hardened gears (trolley brake optional). t) Wheel blocks featuring integral shock absorbing rubber bumpers and drop lugs / rail sweeps. u) Premium grade graphite ductile iron wheels for superior hardness, durability and reduced friction. v)Hoist- Closed loop flux vector drive with motor torque proving AND brake slip detection safety functions. w) Hoist - Load floating at 0hz speed control for precise positioning and stopping without motor brake fatigue. x) Hoist - 100% dynamic braking with thermally1eachprotected metal cane resistor. y) Hoist - Over-weight protection using motor current sensing within 3% accuracy through the VFD. z) Hoist - Adaptive automatic auto speed function to increase high speed up to 90Hz based on loading conditions (enabled upon request). aa) Hoist - Adjustable upper and lower electronic encoder limits and secondary mechanical upper limit. bb) Trolley - Open loop frequency drive with dynamic braking. 2.Specific Requirements This section provides specific requirements for the 5-ton hoist requested. a) Trolley must be designed to accommodate an 8.50 IN wide flat style beam .Proposal, Reviews, Drawings, Documentation, and Data 1. Prior to Award DETAILEDDESCRIPTION REQUIRED PRIOR TO AWARD: MCAAP personnel will validate and verify/approve the offeror?s proposal before award is granted. To meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item. The offeror?s description submittal shall account for each one of the required product features located in this qualifying statement, and shall do so clearly, and in the same order as listed on this qualifying statement. The description shall also clearly portray/describe how each item will function. If qualifying on an equivalent basis, proposal should list in detail where the proposed item is equivalent to the model/item requested and any non-equivalencies must be explained. Enough information must be provided so that the government technical reviewer can verify equivalency. An offeror?s opinion that their product is equivalent is not sufficient. Conceptual drawings that are not detail as built drawings shall be provided as part of the detailed description. Drawing must provide overall height, width, and length dimensions. It shall depict the locations of key components to include base plate spacing and anchor pattern, hook height, overhead clearance, clearance span, and distance between columns. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s)should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase. Generic statements from the offeror stating they can provide the requested item DO NOT constitute a valid proposal. 2. After Award Reviews After an award, the contractor shall provide the government with, at minimum, a 30% progress/status update, a 60% progress/status update, a 90% progress/status update, and a notification when the item is shipped. If there are any unforeseen delays the government contract officer should be notified immediately. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these progress/status updates. The progress/status updates shall take the form of design reviews as necessitated by the procurement type and determined by government personnel. The design resign reviews shall have the minimum listed requirements below: 3. Acceptance Review Upon shipment of components to MCAAP, an acceptance review by government personnel will be conducted. If the system or its components are found to be unacceptable, those components shall be shipped back to the contractor/manufacturer for repair and/or replacement. It is the sole purview of the MCAAP Engineering personnel to waive the necessity of these reviews. 4. Finalized Drawings and Data The contractor shall provide two (2) complete sets of as-built reproducible drawings/data. The drawings/data shall include, at minimum, the requirements of the paragraph above. One (1) complete hard copy set of finalized drawings/data shall be provided with the equipment. The other will be in electronic format. The format must be capable of being read as .dwg or .dxf for 2-Ddata and Solid Works (.sld prt, .sld asm) format or STEP (.stp) format for 3-D data. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment. 5. Operational, Maintenance, and Parts Manuals The contractor shall furnish under this purchase description two (2) sets of operational, maintenance, and parts manuals as necessitated by the equipment. The manuals shall be specific (not canned statements about the system in general) to the system supplied. There shall be a brief description concerning the purpose of the specific equipment supplied and the rated operating capacities. The manuals shall contain a complete parts list to include (at minimum) all information necessary (manufacturer?s name, address, phone number, P/N, S/N, size, model number, type, etc.) to re-order the part if necessary. The manuals shall include all preventative maintenance procedures/schedules specific to the equipment supplied. These manuals shall be applicable to the equipment provided only and shall include all safety precautions/warnings associated with the operation. All manuals shall be authorized for reproduction and distribution to end users of the equipment. One (1) set of hard copy versions of the manuals shall be provided with the equipment. One (1) set of the manuals shall be electronic in form (on CD) and must be capable of being read in either a .pdf ora .doc? format. Quality Assurance Provisions 6. Responsibility for Inspection Unless otherwise specified in the contract or purchase description the contractor is responsible for the performance of all inspection requirements specified herein. Except as other wise specified the contractor may use their own facilities or any commercial laboratory acceptable to the government. The government reserves the right to witness or separately perform any of the inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. The contractor shall notify the contracting officer at least 15 working days prior to shipment so a government representative(s) can make arrangements to be present to perform an acceptance inspection if necessary. Final acceptance of the contract shall be the responsibility of the government contracting officer. 7. Quality Management Contract or must show proof of internal quality management system in accordance with MIL-I-45208A, ISO 9001: 2000 or an equivalent quality assurance program. The contractor shall certify and maintain substantiating evidence that the product meets the provided drawing specification, and quality assurance requirements. This includes manufacture and welding requirements. The manufacturer may use their own inspection facility or any commercial facility agreeable to the government. The government reserves the right to witness the inspections of all components of this system for conformity of specifications. Warranty Contractor shall provide a warranty against defective material, parts, and workmanship for a period no less than 1 year from the final commissioning date.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Service vehicle lift | MICC Fort Drum | Total Small Business | |
| Repair/Replace Overhead Cranes on Fort Drum | MICC Fort Drum | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity