5-Ton Electric ARC Furnace
Closed Solicitation Posted
- Solicitation number
- W519TC25RA021
- Agency
-
ACC Rock Island
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333248 All Other Industrial Machinery Manufacturing
- Place of performance
- Rock Island, Illinois 61299, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Contracting Command Rock Island Arsenal is procuring comprehensive services for a 5-ton Electric Arc Furnace replacement project at the Rock Island Arsenal Joint Manufacturing and Technology Center. The procurement encompasses detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, and training for one 5-ton Electric Arc furnace with an option for a second unit. Supporting equipment includes a bag house dust collection system, compressed air and argon storage tanks, and a 5-ton AOD system, along with demolition and removal of the existing furnace. The contract will be evaluated using a Lowest Price Technically Acceptable (LPTA) source selection process, with technical factors including contractor experience and compliance with requirement documents. A mandatory site visit is scheduled for August 27, 2025, with contractors required to pre-register and obtain installation access badges, and proposal submissions are due by September 22, 2025.
This procurement is set aside specifically for Women-Owned Small Businesses (WOSB) under NAICS code 333248 with a size standard of 750 employees, indicating the government's commitment to supporting small business participation. The contract structure is Firm-Fixed-Price with delivery estimated for November 30, 2026 for the base furnace and November 30, 2027 for the optional second unit. The solicitation requires comprehensive documentation including 16 distinct data items covering installation drawings, maintenance manuals, environmental compliance data, and pre-shipment testing reports, all to be submitted 30-60 days prior to equipment delivery. All work will be performed at Rock Island Arsenal in Rock Island, Illinois, with quotes remaining valid for one full year. The extensive Contract Data Requirements List demonstrates the technical complexity and precision required for this specialized metallurgical equipment installation project.
Notice text
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.
Files
| File | Type | Posted |
|---|---|---|
| Solicitation - W519TC25RA021.pdf | ||
| Exhibit A 24309 CDRL Contractor Large Furnaces.docx | DOCX document | |
| Attachment 0001 RIPD E4000 24309 dated 27 Jun 25.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| 5-Ton Electric ARC Furnace | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Deep Pit Furnace | ACC Rock Island | Total Small Business | |
| NG SEW-electrical components | ACC Rock Island | Total Small Business | |
| Gear shaper repair | ACC Rock Island | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity