4320-01-086-6793 Parts Kit, Ground HOP
Closed Solicitation Posted
- Solicitation number
- W56HZV21R0178
- Agency
-
TACOM Life Cycle Management Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336992 Military Armored Vehicle, Tank, and Tank Component Manufacturing
- PSC
- 4320 Power And Hand Pumps
Notice details come from SAM.gov. Updated .
Notice text
11 versions
Update #11 · Latest ·
Contract Specialist changed.
Amendment 0004 issued: Solicitation closing date extended until 22 July 2022.
----------------------------------------------------------------------------------------------------------------------
Amendment 0003 issued: Solicitation closing date extended until 19 June 2022 pending answers to questions about TDP.
Issue: NOR GDLX1058 Removing "Donaldson Co" as the sole source provider for #12304872
Government Response: GDLX1058 did not remove Donaldson as the Approved Source of Supply of 12304872. It updated the part finish and identification markings, but did not remove Donaldson as the sole Approved Source of Supply.
Issue: Part number 12310885 Service Indicator Kit is obsolete with no replacement part number.
Government Response: ECP TACV3036, approved 27Sept2007, updated 12310885, Service Indicator Kit, to include Engineered Product Corp (CAGE 59150) as an Approved Source of Supply.
Issue:Can specific items be quoted with some left out and still able to be awarded.
Government Response: The US Army is requesting the NSN 4320-01-086-6793, which is the full Ground Hop Kit. We buy to the NSN and not to parts to kit ourselves.
----------------------------------------------------------------------------------------------------------------------
Amendment 0002 issued: Solicitation closing date extended until 8 April 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Amendment 0001 issued: Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #10 ·
Contract Specialist changed.
Amendment 0003 issued: Solicitation closing date extended until 19 June 2022 pending answers to questions about TDP.
Issue: NOR GDLX1058 Removing "Donaldson Co" as the sole source provider for #12304872
Government Response: GDLX1058 did not remove Donaldson as the Approved Source of Supply of 12304872. It updated the part finish and identification markings, but did not remove Donaldson as the sole Approved Source of Supply.
Issue: Part number 12310885 Service Indicator Kit is obsolete with no replacement part number.
Government Response: ECP TACV3036, approved 27Sept2007, updated 12310885, Service Indicator Kit, to include Engineered Product Corp (CAGE 59150) as an Approved Source of Supply.
Issue:Can specific items be quoted with some left out and still able to be awarded.
Government Response: The US Army is requesting the NSN 4320-01-086-6793, which is the full Ground Hop Kit. We buy to the NSN and not to parts to kit ourselves.
----------------------------------------------------------------------------------------------------------------------
Amendment 0002 issued: Solicitation closing date extended until 8 April 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Amendment 0001 issued: Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #9 ·
Contract Specialist changed.
Amendment 0002 issued: Solicitation closing date extended until 8 April 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Amendment 0001 issued: Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #8 ·
Contract Specialist changed.
-----------------------------------------------------
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Amendment 0001 issued: Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #7 ·
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Amendment 0001 issued: Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #6 ·
TDP Issue #1:
Issue: Notice of Revision (NOR) “NOR_TACV6089_DSD” for PN: 12284862 calls for the replacement of PN: 12284944 with PN: 12324264 but the TDP does not include drawing 12324264.
Government Response: the drawing package for 12324264, which contains 3 drawings, is available in SAM as an attached, which requires an Explicit Access request.
--------------------------------------------------------------------------------------------------------------
Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #5 ·
Solicitation closing date extended until 07 January 2022 pending answers to questions about TDP.
----------------------------------------------------------------------------------------------------------------------
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #4 ·
November 4 2021 - 3 drawings are added per NOR ACV6089_DSD. Please request access to "NOR ACV6089 drawings 12324264 12344589 12344590".
-------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #3 ·
Drawing 12324264 Rev E is added. NOR_TACV6089_DSD for part number 12284862 states to replace p/n 12284944 with p/n 12324264. Drawing 12324264 was not included in the TDP and is uploaded here. If you received access to the TDP before 03 November 2021 and did not receive a DoD SAFE link, you will need to request access to this drawing.
---------------------------------------------------------------------------------------------------------------------------------------------------
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #2 ·
Solicitation is posted
07 October 2021: The solicitation is posted. The TDP is Explicit Access only. Download the TDP and the TDP has updated drawings/NORs.
Update #1 ·
07 October 2021 = Synopsis is posted. Download the TDP. The TDP has updated drawings.
Files
| File | Type | Posted |
|---|---|---|
| W56HZV21R0178_0004.pdf | ||
| W56HZV21R0178_0003.pdf | ||
| W56HZV21R0178_0002.pdf | ||
| W56HZV21R0178-0001.pdf | ||
| W56HZV21R0178.pdf | ||
| Attachment 0003 First-Article-Waiver-Worksheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| 4320-01-086-6793 Parts Kit, Ground HOP | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity