3GEN FLIR LRIP B-KIT Technical and Engineering Services
Closed Pre-Solicitation Posted
- Solicitation number
- W909MY23C0004
- Agency
-
ACC Aberdeen Proving Ground
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Place of performance
- Fort Belvoir, Virginia 22060, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Army Contracting Command-Aberdeen Proving Ground is conducting market research to identify potential sources capable of manufacturing and delivering Third Generation Forward Looking Infrared (3GEN FLIR) B-Kit systems under Low-Rate Initial Production (LRIP) and Full Rate Production (FRP) contracts for the US Army Product Manager Ground Sensors. The B-Kit comprises common assemblies including optics, circuit card assemblies, and integration with a Government Furnished Dewar Cooler Bench, designed to detect threats at greater distances across mid-wave and long-wave infrared bands through four fields of view. To be considered technically responsive, sources must have a fully qualified B-Kit and Thermal Receiver Unit (TRU) that has either completed final System Verification Review and Functional Configuration Audit or can demonstrate with data that their design meets all requirements specified in the technical documents. Contractors must possess SECRET clearance at minimum and demonstrate compliance with Arms Export Control Act restrictions, as foreign participation is excluded. Responses to this Request for Information are due by 4:00 PM EST on August 27, 2025, with white papers limited to twenty pages addressing detailed questions about company capabilities, production capacity, execution plans, and cost estimates.
This opportunity does not utilize any set-aside designations and is open to all qualified contractors meeting the technical and security requirements. No current contractors or incumbents are specifically named in the notice, though the solicitation references previous related work under RFI # W909MY-22-C-0023. The notice does not specify award values or budget ranges, requesting only Rough Order of Magnitude cost estimates for various quantity bins ranging from 10-25 units up to 200+ units, along with non-recurring engineering costs for setup and qualification. The timeline expectations include detailed execution plans from theoretical contract award through delivery, encompassing first article production, contractor qualification testing, and transition to full production phases. Small business respondents are specifically asked about their ability to sustain operations without payment for 90 calendar days and whether they can maintain small business status for at least three years under NAICS code 334511.
Notice text
The Army Contracting Command-Aberdeen Proving Ground (ACC-APG) Belvoir Division is conducting market research on behalf of the US Army Product Manager Ground Sensors, in accordance with Federal Acquisition Regulation (FAR) Part 10. The purpose of this Market Research is to identify potential sources that have the skills, experience, knowledge, and capabilities required to manufacture and deliver Third Generation Forward Looking Infrared (3GEN FLIR) B-Kit under Low-Rate Initial Production (LRIP) and Full Rate Production (FRP) contracts.
The 3GEN FLIR B-Kit comprises a set of common assemblies, including the Dewar Cooler Bench (DCB) (provided as Government Furnished Equipment (GFE), optics (afocal, imager), and circuit card assemblies (CCAs). The B-Kit optics collect radiation in the Mid-Wave (MW) and Long-Wave (LW) infrared bands across four fields of view and focuses it onto a staring Focal Plane Array housed in the DCB. The B-Kit components are intended to be interchangeable Shop Replaceable Units to maximize economies of scale like the 2nd Generation Forward Looking Infrared (2GF) B-Kit. The 3GEN FLIR B-Kit provides the ability to detect threats at greater distances under a full spectrum of conflict and battlefield conditions. 3GEN FLIR enhances the platform's effectiveness and survivability by providing greater situational awareness promoting combat effectiveness and reducing fratricide. The B-Kit is also integrated into the Thermal Receiver Unit (TRU) as a sub-assembly which includes a Personality Module CCA, Electromagnetic Interference Filter, afocal guard, and electrical flexes mounted in the TRU mechanical bench.
The TRU, B-Kit sub-assemblies, electronic modules, and the DCB, defined under RFI # W909MY-22-C-0023, will be integrated into sight systems for subsequent integration onto host vehicle platforms. The B-Kit provider will be responsible for integrating the GFE DCB into their B-Kit design. The DCB will be provided as GFE to the B-Kit provider for final integration and testing. The B-Kit and TRU components are currently defined by the following technical documents:
- MIL-PRF-A3381791 - 3GEN FLIR B-Kit Performance Specification Low-Rate Initial Production (LRIP)
- MIL-PRF-A3381789 - CPS FDE Performance Specification LRIP
- MIL-PRF-A3381787 – Performance Specification for the 3GEN FLIR Thermal Receiver Unit (TRU) LRIP
- MIL-PRF-A3381783 - 3GEN FLIR Dewar Cooler Bench (DCB) Mechanical Drawing
- A3315467 - CPS FLIR Design Envelope Drawing
- A3381792 - 3GEN FLIR B-Kit Interface Control Document LRIP
- A3347070 - Interface Control Document for the 3GEN FLIR Thermal Receiver Unit (TRU)
- A3381780 - Interface Control Drawing, Thermal Receiver Unit, 3GEN FLIR
- MIL-PRF-A3381785 - Performance Specification for the DCB LRIP
- MIL-PRF-A3381784 - DCB Interface Control Document (ICD) LRIP
To be considered technically responsive, sources must have a fully qualified B-Kit and TRU that has either completed the final System Verification Review (SVR) and Functional Configuration Audit (FCA) or where the supplier can demonstrate with data that their design meets all the requirements in the technical documents defined above. Sources must be willing to provide these results, if requested, to verify that the Contractor’s B-Kit and TRU functional baseline meet the requirements as defined by the LRIP versions of the B-Kit and TRU Performance Specifications, ICDs and Mechanical Drawings.
The documents listed above are Distribution D restricted. The documents are authorized for use by the Department of Defense (DoD) and U.S. DoD contractors only. These documents also contain technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. These documents will be disseminated in accordance with provisions of DoD Directive 5230.25.
Companies or organizations may request copies of these documents by providing their Point of Contact information listed below to Jennifer Health at jennifer.s.heath2.civ@army.mil and must clearly state if and how they meet the conditions under which they can receive the documents referenced above. In addition, companies requesting the above information must register for an account with an internet accessible portal known as the Corporate Management System Online (CMS II). Registrants will access the CMS II website (https://www.mycmsportal.com) and follow instructions to complete registration. Documents are currently available for viewing in the CMS II under the 3GEN FLIR folder so the registrants must specifically request access to only the 3GEN FLIR folder. Access to the 3GEN FLIR folder documents will only be granted upon verification that criteria dictated by Distribution D and export control restrictions are met by registered companies or organizations.
Foreign participation is excluded.
SECRET Clearance, at a minimum, is required. No classified information will be provided as part of this RFI, however, in the event of any subsequent Request for Proposal or Request for Quotation, classified information may become part of that solicitation and will be required as part of any resulting contract.
Sources will be required to complete an abbreviated design review prior to manufacturing to demonstrate the design meets stated performance requirements within cost, schedule, and risk.
Sources responding to this Request for Information (RFI) are requested to provide answers to the following questions with as much detailed information as possible:
1. Brief summary of the company
Company Information
Company Name:
Company CAGE Code:
Company DUNS Number. If your Company holds a GSA Schedule contract (541 or other), please provide the Schedule number
Company: Address
Company Phone #
Company email:
Company Representative and Business Title:
Company Socioeconomic Classification -- (Small Business (SB), (8)(a), Woman-Owned (WOSB), Economically-Disadvantaged Women-Owned (EDWOSB), Veteran-Owned and Operated(VOSB), Service-Disabled Veteran-Owned, (SDVOSB), or Historically Underutilized Small Business-Zone (HUBZone), Historically Black College and Universities/ Minority Institutions (HBCU/MI))
2. Describe how you achieved a Government qualified B-Kit and under what contract(s) the work was performed.
3. Describe how you achieved a Government qualified B-Kit and under what contract(s) the work was performed.
4. Describe capability to build and test a production representative B-Kit in accordance with the technical documents listed above.
5. Describe an execution plan for producing first articles, conduct a first article test, and enter production. At a minimum the plan should include:
- A detailed timeline from theoretical contract award to delivery. Within the timeline, please include major milestones of first articles, contractor qualification testing, and transition to production.
- Any major capital purchases, key tests, engineering, and documentation required to produce requested items.
- Any Government Furnished Equipment, Government assisted testing, or Government facilities required.
- A risk assessment for each item your company believes they can produce.
- Ramp rate and maximum monthly capacity your company believes they can produce.
- Estimated lead time for new orders after qualification.
- Rough order of Magnitude (ROM) costs for non-recurring tasks to set up and qualify first article. Please separate cost estimates by major milestones, key events, and key equipment purchases.
6. Identify sources of supply for any components or assemblies for which you are likely to subcontract production. Standard off the shelf components, such as catalog items, do not need to be addressed.
- What are the supplies being subcontracted?
- Will any SBs be the supplier and if so, what percentage will be supplied by SBs?
7. Will any of your manufacturing, assembly, or engineering be accomplished outside the USA? If so, please provide details on how you will keep this program International Trade in Arms Regulations compliant.
8. Describe your company’s approach to manage and mitigate obsolescence. At a minimum include the following:
- Obsolescence tracking and industry monitoring
- Assessment if the current design is producible without additional design work
- Potential issues ordering long lead or custom items
- Capability to redesign out obsolete components and produce and qualify a replacement item.
9. Provide a Rough Order of Magnitude (ROM) unit cost of each item which you wish to produce at the below quantity range bins. If separate Non-Recurring Engineering (NRE) costs are required, as per question 6 please provide an estimated cost for the NRE broken down into what your company believes are logical decision points from the execution plan. If NRE is to be amortized across a buy it may be included here with explanation.
- 10-25
- 26-50
- 51-100
- 101-200
- 200+
10. Is our company planning on business arrangements with other companies? If so, please advise of the process used in selecting members.
11. Please provide details regarding proposed joint ventures, teaming arrangements, strategic alliances, and/or other business arrangements to satisfy these requirements. Offerors are encouraged to identify teams, indicating each team member's size based upon the NAICS code of the work that the team member may be doing.
12. What are the core competencies of your employees that would support these requirements? Also, please provide the total number of individuals currently employed by your company that can support the requirements.
13. Does your company have a SECRET facility or access to one?
14. Do all the employees that would support this requirement have a security clearance? If not, what percentage of employees that will be involved in this effort, have a security clearance?
15. Please provide your current facility size to include storage capabilities.
16. Discuss existing production capacity. If you do not currently have a production line what quantities are required to start one and keep it running. Additionally, what minimum quantities per year are necessary to maintain the industrial base?
17. Does your firm possess an approved Defense Contract Audit Agency (DCAA) accounting system?
QUESTIONS 17 - 19 ONLY APPLY TO THE SMALL BUSINESS RESPONDENTS:
In addition to the above, small businesses responding should provide the following information:
18. If you identify your company as a Small Business or any of the Small Business subcategories above, then is your company interested in being a prime on this contract? If so, please inform how you will meet the limitations on subcontracting Clause 52.219-14.
19. Under the current SB size standard, do you anticipate your company remaining a small business for at least the next three years, under the stated NAICS code 334511? The Government will use this information to assist in determining if this effort is eligible as a small business set aside.
20. If you are a small business, can your company sustain if not paid for 90 calendar days?
21. The Government requests that interested parties with the capabilities to meet the above requirements should electronically submit White Papers of not more than twenty (20) pages, 8.5" x 11" paper, 12-point, Times New Roman font, with a minimum of one (1) inch margins all around. Responses to Small Business Questions 20 thru 24 are not counted in the above stated twenty (20) page limitation. Any information submitted by respondents to this source sought notice is totally voluntary and at no cost to the Government. This information will help the Government form its acquisition strategy. All information received in response to this source sought synopsis that is marked "Proprietary" will be handled accordingly. Responses will not be returned nor will receipt be confirmed. No solicitation exists; therefore, do not request a copy of a solicitation.
22. Please provide the following Point of Contact information on all responses:
Responses are due no later than 4:00 PM EST (local time at Fort Belvoir, VA) on 27 August 2025. Email responses should not exceed 5 Megabytes (MB). Responses received after this date and time may not be reviewed. Send responses electronically to:
Taylor Venanzi, Contract Specialist, email: taylor.l.venanzi.civ@army.mil
Alexis Williams, Contracting Officer, email: alexis.r.williams.civ@army.mil
Contracting Office Address:
Army Contracting Command, APG-Fort Belvoir
10205 Burbeck Road, Bldg 362
Fort Belvoir VA 22060-5811
Point of Contact (s):
Taylor Venanzi, Contract Specialist, email: taylor.l.venanzi.civ@army.mil
Alexis Williams, Contracting Officer, email: alexis.r.williams.civ@army.mil
Contracting Office Address:
ACC-APG-Belvoir, ATTN: CCAP-CCV-B2, 10205 Burbeck Road, Fort Belvoir, VA 22060-5863
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| 3GEN FLIR LRIP B-KIT Technical and Engineering Services - PoP extension and Ceiling increase | Special Notice | |
| 3GEN FLIR LRIP B-KIT Technical and Engineering Services - CPFF Ceiling Increase | Special Notice | |
| Sources Sought for Third Generation Forward Looking (3GEN FLIR) Infrared B-Kit | Pre-Solicitation | |
| 3GEN FLIR LRIP B-KIT Technical and Engineering Services | Award Notice | |
| Pre-Solicitation Notice Third Generation Forward Looking (3GEN FLIR) Infrared B-Kit | Pre-Solicitation | |
| Draft Performance Work Statement (PWS) Third Generation Forward Looking (3GEN FLIR) Infrared B-Kit | Special Notice | |
| Third Generation Forward Looking (3GEN FLIR) Infrared B-Kit | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Export Variant (XV) Second Generation Forward Looking Infrared (2GF) Thermal Receiver Units (TRUs) and Imager Assemblies Repair | ACC Aberdeen Proving Ground | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity