2031ZA19R00002

Closed Special Notice Posted

Solicitation number
2031ZA19R00002
Agency
Bureau of Engraving and Printing Department of the Treasury
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333314 Optical Instrument and Lens Manufacturing
Place of performance
BEP Eastern Currency Facility 14th and C Streets Washington, District of Columbia 20228, United States

Notice details come from SAM.gov. Updated .

Notice text

Under the authority of FAR 6.302-1, the Bureau of Engraving and Printing intends to award, on a sole source basis, a contract to Spectra Systems Corporation.

The Bureau of Engraving and Printing (BEP) has a requirement for three (3) Offline Quality Control Units (OFQCU) required to replace aging quality control inspection equipment for increased efficiency and protection of the material supply chain for a critical security feature used in U.S. Currency. This requirement will include three OFQCU, installation of the equipment, and training.


The proposed Contractor is the manufacturer of the highly specialized equipment to be provided under this proposed contract action, and based on the proprietary nature of the equipment no other sources are available to satisfy this requirement. As the manufacturer of the equipment to be purchased, delivered and installed under this contract, Spectra Systems Corporation will reduce any potential unacceptable delays (FAR 6.302-1(a)(2)(ii)(B).


A determination by the Government not to compete this proposed contract requirement based upon responses to this notice is solely within the discretion of the Government. Interested parties who believe they possess the capability to satisfy this requirement should submit documentation that clearly demonstrates their capability.


Responses to this notice shall be received by 24 September 2018 at 12:00 P.M. EST. All responses must be in writing only via email to the point of contacts specified in this notice. Any cost associated with the preparation and submission of data or information or any other costs incurred in responding to this notice is the sole responsibility of the respondent and will not be reimbursed by the Government.

.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity