2 Ton Underhung Crane
Awarded Award Notice Posted
- Solicitation number
- FA8126-15-Q-0006
- Agency
- AFLCMC Tinker AFB Lifecycle Management Center, Department of Defense
- Awarded
- to Southeast Material Handling Systems, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA8126-15-M-0046 Federal contract award
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- PSC
- Not on record
- Place of performance
- Tinker AFB Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Dec 23, 2014 4:01 pm
AS OF 23 DECEMBER 2014 Amendment 0003
Question 1:
Can you please clarify this? I have looked at all the
specs and drawings and it doesn't say anything about the collectors?
Answer 1:
Here's the part numbers for the conductor bar and collectors. Attachement provided
Question 2
:Also do you want an independent pushbutton for the crane (on its own Ctrack)
or do you want it off one of the hoists? It shows a pushbutton but does not
give us this information.
Answer 2 :
I am not familiar with the term Ctrack, but there should only be one pendant
controller that controls the bridge, trolley, and hoists
STIONS AND ASNWERS
Update #4 ·
Added: Dec 19, 2014 10:36 am
AS OF DECEMBER 19, 2014 QUESTIONS AND ANSWERS POSTING
QUESTION 1:
Are we just building these cranes and shipping them or do we have to install them? Also do all 9 need to be delivered at the same time or can they come in multiple shipments
ANSWER 1: The cranes will be shipped to Tinker AFB they will be installed and 125% load tested by Tinker personnel.
We will need all 9 cranes by March 31 2015 but we can allow a 14 day variance, a partial shipment will be fine if shipped per crane assembly consisting of 1 bridge and 2 each hoist.
QUESTION 2:
A) I just wanted to clarify that this solicitation is for the supply and delivery only of cranes and hoists. I saw in your response to a question that was posed that you are requesting delivery only no installation. Installation will be by others.
B) Another point I wanted to make sure of is, on the drawings in the notes it references about load testing after installation. We are not responsible for load testing either correct?
C)Lastly on the drawings in the notes it states vendor to provide interconnect schematics, please elaborate.
1) Yes, installation is done by others.
2) Correct, we will also do the load testing. The 125% load test comment was provided so that the vendor knows we expect it to pass a 125% load test.
3) The interconnect schematics refer to the wiring diagram of how the bridge, trolley, hoist, and controls are all connected.
Update #3 ·
Added: Dec 03, 2014 12:01 pm
AS OF DECEMBER 03, 2014
QUESTIONS AND ANSWERS
The drawings you sent are excellent, the only issue is they reference other drawings that apparently contain additional information?
The drawing itself is "sheet M3 of 5".
In the notes it also says to see M2 for elevation and other runway details?
Yes, there are other prints with this project. We have added an item description with the package that gives the lift length for the hoist, the overall height from the floor to the bottom of the W12 x 58 beams that the Loudan Rail part number 605.1850 will attach is 22 feet 3 inches please see drawing.
Can you please check and see if there are in fact other drawings available to be included?
The drawing M3 of 5 is the only drawing pertaining to the crane we are requesting.
Is someone else supplying and installing the runway and electrification for these cranes? There is a reference to drawing M2 for runways which is not included in the package.
We already have the Loudan rail, and duct-o-bar. We are requesting only the cranes and delivery to us not insulation. The runways are referenced on drawing M3 of 5 and are on the item description Loudan Rail part number 605.1850.
Update #2 ·
Added: Nov 26, 2014 10:59 am
AMENDMENT 0002
UPDATED DRAWINGS ATTACHED AS OF 26 NOVEMBER 2014
Update #1 ·
Added: Nov 25, 2014 11:51 am
This requiremetn is for a 2 Ton Underhung Crane
Offeror must submit drawings with adeuate information and specifications with their proposal in order for the technical evaluator to determine the proposed equipment meets the specifications listed in the attached item description document.
Attachments
| File | Type | Posted |
|---|---|---|
| Conductor_Bar_and_Collector_info.pdf | ||
| 14E038_B3001_M1-5_F119_Expansion_(Howsmon)_(Official)_M3--CRANE HOIST_DET_(1).pdf | ||
| 14E038_M1-5_F119_Expansion_M3_Crane Hoist_Det.dwf | DWF file | |
| Drawings.pdf | ||
| FA8126-15-Q-0006.pdf |