This contract document package contains specifications and standard drawings for the construction of Zone 4 Curb Ramp Installation (CC No. 1879) issued by the City of Huntington Beach Department of Public Works in Huntington Beach, California. The project will provide construction of curb access ramps and truncated domes to existing ramps throughout the city at locations prioritized by Public Works staff based on requirements for the upcoming residential pavement management project and public requests. Bid items include mobilization, storm water pollution prevention plan preparation, construction best management practices installation and maintenance, construction of 15 curb access ramps per Caltrans Standard Plans A88A/A88B with appurtenances, installation of one 4-inch PVC sleeve for street assembly signage, removal and replacement of existing sidewalk (500 square feet), removal and replacement of existing curb and gutter (100 linear feet), and removal and installation of five truncated domes. Electronic bids are due by 10:00 AM on December 4, 2026, through the City's PlanetBids System Vendor Portal. The successful bidder must complete the work within 20 working days from the Notice to Proceed. Contract award will be made to the lowest responsive and responsible bidder as determined solely by the City, with the right to reject any or all bids and take bids under advisement for a maximum of 60 days.

Bidders must provide a proposal guarantee of not less than 10 percent of the total bid amount in the form of a certified check, cashier's check, or bid bond, submitted physically to the City Public Works Office by the bid opening date and time. The successful contractor must possess a valid State of California Class A contractor's license and obtain a business license from the City. Prevailing wage requirements apply pursuant to California Labor Code Section 1773 et seq., with rates determined by the Director of Industrial Relations available at www.dir.ca.gov/DLSR. The City will deduct five percent retention from all progress payments, though contractors may substitute an escrow holder surety of equal value. The contract is funded in part through a Community Development Block Grant (CDBG) from the Federal Department of Housing and Urban Development and is subject to federal equal employment opportunity, noncollusion, debarment and suspension, and lobbying restriction requirements. Contractors and subcontractors must register with the California Department of Industrial Relations (DIR) pursuant to SB 854. A Disadvantaged Business Enterprise (DBE) goal of zero percent has been established for this project. Liquidated damages will be assessed for delays beyond the completion timeline as calculated per the contract terms, with extensions granted for unforeseeable delays beyond the contractor's control.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O N T R A C T D O C U M E N T S

SPECIFICATIONS AND STANDARD DRAWINGS

for the construction of

Zone 4 Curb Ramp Installation

CC No. 1879 in the

C I T Y O F H U N T I N G T O N B E A C H

2000 MAIN STREET

HUNTINGTON BEACH, CALIFORNIA 92648

(714) 536-5431

BIDS ELECTRONICALLY DUE:

December, 4 at 10:00 AM

NO LATER THAN SPECIFIED TIME

CHAU L. VU, DIRECTOR

DEPARTMENT OF PUBLIC WORKS

iii

NOTE: If there are any questions relative to this project, please call Max Olin, at 714-536-5518 or max.olin@surfcity-hb.org:

CITY OF HUNTINGTON BEACH

DEPARTMENT OF PUBLIC WORKS

17371 GOTHARD STREET

HUNTINGTON BEACH, CALIFORNIA 92647

(714) 960-8861

TABLE OF CONTENTS

SECTION A

NOTICE INVITING ELECTRONIC BIDS .......................................................................... A-1

SECTION B

INSTRUCTIONS TO BIDDERS .............................................................................................B-1

1. Proposal Forms ............................................................................................................B-1

2. Proposal Guarantee ......................................................................................................B-1

3. Proposal Signature .......................................................................................................B-1

4. Delivery of Proposal ....................................................................................................B-2

5. Return of Proposal Guarantee ......................................................................................B-2

6.Taxes .............................................................................................................................B-2

7. Disqualification of Bidders ..........................................................................................B-2

8. Contractor's License Requirement ...............................................................................B-2

9. References ....................................................................................................................B-2

10. Listing of Subcontractors ...........................................................................................B-3

11. Discrepancies and Misunderstandings .......................................................................B-3

12. Equivalent Materials ..................................................................................................B-3

13. Legal Responsibilities ................................................................................................B-3

14. Award of Contract......................................................................................................B-3

15. Material Guarantee.....................................................................................................B-4

16. Execution of Contract ................................................................................................B-4

17. Submission of Bonds and Insurance ..........................................................................B-4

18. Addenda .....................................................................................................................B-5

19. Bid Protest ..................................................................................................................B-5

20. Questions to the Engineer ..........................................................................................B-5

SECTION C

PROPOSAL .............................................................................................................................C-1,2 iv

Project Bid Schedule .................................................................................................... C-2.1 - C-2.2

List of Subcontractors ..................................................................................................................C-7

Noncollusion Affidavit ................................................................................................................C-8

Utility Agreement ........................................................................................................................C-9

Disqualification Questionnaire ..................................................................................................C-10

Compensation Insurance Certification .......................................................................................C-11

Bidder's Information ..................................................................................................................C-12

Notary Certificate.......................................................................................................................C-13

Bidder’s Project History ............................................................................................................C-14

Bidder's Critical Staff .................................................................................................................C-15

California Department of Industrial Relations (DIR) Certificate ..............................................C-16

Bidder's Certification……………………………… C-18

CDBG Exhibit A-DISADVANTAGED BUSINESS ENTERPRISE (DBE) C-19

CDBG Exhibit B-DBE INFORMATION — GOOD FAITH EFFORTS C-20

CDBG Exhibit C-LOCAL AGENCY BIDDER DBE COMMITMENT C-25

CDBG Exhibit D-EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION C-27

CDBG Exhibit E-NONCOLLUSION AFFIDAVIT C-24

CDBG Exhibit F-DEBARMENT AND SUSPENSION CERTIFICATION C-28

CDBG Exhibit G-NONLOBBYING CERT FOR FEDERAL-AID CONTRACTS C-29

CDBG Exhibit H-DISCLOSURE OF LOBBYING ACTIVITIES C-30

CDBG Exhibit 1-FEDERAL LOBBYING RESTRICTIONS C-34

SECTION D

SAMPLE CONTRACT ............................................................................................................ D-1

SECTION E

SPECIAL PROVISIONS ..................................................................................... E-1

PART 1 GENERAL PROVISIONS

SECTION 1 – GENERAL ....................................................................... E-2

1-2 TERMS AND DEFINITIONS

1-7 AWARD AND EXECUTION OF THE CONTRACT

SECTION 2 – SCOPE OF THE WORK ............................................................. E-3

2-2 PERMITS

2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES

SECTION 3 – CONTROL OF THE WORK ....................................................... E-4

3-4 AUTHORITY OF BOARD AND THE ENGINEER

3-7 CONTRACT DOCUMENTS

3-8 SUBMITTALS

v

3-10 SURVEYING

3-11 CONTRACT INFORMATIONAL SIGNS

3-12 WORK SITE MAINTENANCE

3-14 CLAIMS RESOLUTION

SECTION 4 - CONTROL OF MATERIALS ................................................... E-11

4-1 GENERAL

4-3 INSPECTION

4-4 TESTING

4-6 TRADE NAMES

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES ................. E-12

5-3 LABOR

5-4 INSURANCE

5-7 SAFETY

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK ............. E-15

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF

THE WORK

6-2 PROSECUTION OF THE WORK

6-3 TIME OF COMPLETION

6-9 LIQUIDATED DAMAGES

SECTION 7 – MEASUREMENT AND PAYMENT ....................................... E-18

7-3 PAYMENT

7-4 PAYMENT FOR EXTRA WORK

SECTION 8 - FACILITIES FOR AGENCY PERSONNEL ............................ E-21

8-1 GENERAL

PART 2 CONSTRUCTION MATERIALS

SECTION 200 - ROCK MATERIALS ............................................................. E-33

200-1 ROCK PRODUCTS

200-2 UNTREATED BASE MATERIALS

SECTION 201 - CONCRETE, MORTAR AND

RELATED MATERIALS ...................................................... E-33

201-1 PORTLAND CEMENT CONCRETE

SECTION 203 - BITUMINOUS MATERIALS ............................................... E-34 vi

203-6 ASPHALT CONCRETE

203-11 ASPHALT RUBBER HOT MIX (ARHM)

203-17 FIBER REINFORCEMENT FOR ASPHALT (ALL TYPES)

SECTION 213 - ENGINEERING GEOSYNTHETICS ................................... E-18

213-4 PAVING FABRIC

213-5 GEOTEXTILES AND GEOGRIDS

SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS,

AND PAVEMENT MARKERS ....................................................................... E-18

214-5 THERMOPLASTIC MATERIAL FOR TRAFFIC

STRIPING AND MARKINGS.

PART 3 CONSTRUCTION METHODS

SECTION 300 - EARTHWORK ....................................................................... E-43

300-1 CLEARING AND GRUBBING

300-2 UNCLASSIFIED EXCAVATION

SECTION 301- SUBGRADE PREPARATION, TREATED MATERIALS, AND

PLACEMENT OF BASE MATERIALS .................................. E-44

301-1 SUBGRADE PREPARATION

SECTION 302 - ROADWAY SURFACING .................................................... E-44

302-5 ASPHALT CONCRETE PAVEMENT

302-9 ASPHALT RUBBER HOT MIX (ARHM)

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION ............. E-49

303-5 CONCRETE CURBS, WALKS GUTTERS, CROSS GUTTERS,

ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS

PART 4 EXISTING IMPROVEMENTS

SECTION 400 – PROTECTION AND RESTORATION OF EXISTING

IMPROVEMENTS ............................................................................................ E-54

400-1 GENERAL

SECTION 402 – UTILITIES ............................................................................. E-54 vii

402-1 LOCATION

402-2 PROTECTION

402-4 RELOCATION

402-5 DELAYS DUE TO UTILITY CONFLICTS

SECTION 403 – MANHOLE ADJUSTMENT AND RECONSTRUCTION .. E-55

403-3 MANHOLES IN ASPHALT CONCRETE PAVEMENT

403-5 PAYMENT

SECTION 404 – COLD MILLING ................................................................... E-56

404-1 GENERAL

404-2 MILLING MACHINE

404- PAYMENT

viii

APPENDICES

APPENDIX A DOWNLOAD PUBLIC WORKS STANDARDS, TRUCK ROUTE,

TRASH PICK UP, STREET SWEEPING SCHEDULE,

AND TEMPORARY WATER METER

APPENDIX B DOWNLOAD ADDITIONAL COPIES OF PROJECT PLANS AND

SPECIFICATIONS (ENSURE ONLY THE PLANET BIDS LINK IS

PROVIDED IN THIS APPENDIX IF BIDDING ELECTRONICALLY:

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340)

APPENDIX C DOWNLOAD REGIONAL WATER QUALITY CONTROL BOARD

PERMITS

APPENDIX D CONTRACTOR BUSINESS LICENSE APPLICATION

APPENDIX E INSURANCE AND INDEMNITY REQUIREMENTS

APPENDIX F BOND FORMS

APPENDIX G AGENCY EXTRA WORK FORMS

APPENDIX H LOCATION MAPS AND RAMP LISTS

APPENDIX I STANDARD PLANS AND DETAILS

APPENDIX J UNDERGROUND SERVICE ALERT IDENTIFICATION NUMBER

APPENDIX K CONTRACTORS GUIDE TO PREVAILING WAGE AND GENERAL

CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

APPENDIX L PREVAILING WAGE SCHEDULE

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340

A-1

S E C T I O N A

N O T I C E I N V I T I N G E L E C T R O N I C B I D S for the construction of

Zone 4 ADA Ramps

CC No. 1879 in the

CITY OF HUNTINGTON BEACH

PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as

AGENCY, invites electronic bids for the above stated project and will receive such bids prior to 10:00 AM on Friday, December, 4, 2026, on the City’s PlanetBids System Vendor Portal, at which time or thereafter bids will be opened and made available online. Bids received after this time will be considered non-responsive. Prospective bidders must first register as a vendor and then bid on this project via the City’s PlanetBids System Vendor Portal website at:

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340

Copies of the bid documents, including instructions to bidders, bidder proposal form, and specifications may be downloaded free at:

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340. Bidders must first register as a vendor on the City of Huntington Beach PlanetBids system to view and download the Contract

Documents, to be added to the prospective bidders list, and to receive addendum notifications when issued.

Any contract entered into pursuant to this notice will incorporate the provisions of the State

Labor Code. Pursuant to the provisions of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are available online at www.dir.ca.gov/DLSR and also on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648.

The AGENCY will deduct 5% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Contract Code, Section 10263. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon.

The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract.

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340 http://www.dir.ca.gov/DLSR

A-2

No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. For electronic submittal of bids, the bid security must be received at the City of Huntington Beach Public Works Office, 2000 Main Street, no later than the bid opening date and time. The bid security must be submitted in a sealed envelope bearing the name and address of the bidder, and the outside of the envelope must read as follows:

OFFICIAL BID SECURITY - DO NOT OPEN

Project Manager: Max Olin Project Name: Zone 4 ADA Ramps

CC #: 1879

Bid Opening Date: 10:00 AM on Friday, December, 4, 2026

The successful bidder shall be licensed in accordance with provisions of the Business and

Professions Code and shall possess a State Contractor's License Class A, at the time of the bid opening.

The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All extension of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern.

Project Description:

This project will provide the construction of curb access ramps and truncated domes to existing ramps throughout the city. These locations are prioritized from a list compiled by Public Works staff, based on requirements for the upcoming residential pavement management project and public requests. The proposed locations are listed in the Appendix along with Contractor guidelines and provisions to meet all Federal requirements.

All questions related to this bid solicitation must be submitted through the City’s PlanetBids

System Vendor Portal per the information provided in the Instructions to Bidders. Any other contact to City staff regarding this bid solicitation will be referred back to the PlanetBids system.

The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maximum period of 20 days.

B-1

S E C T I O N B

I N S T R U C T I O N S T O B I D D E R S

1. Proposal Forms

Contract documents may be downloaded, at no cost, from the City’s PlanetBids System Vendor

Portal website at: https://www.planetbids.com/portal/portal.cfm?CompanyID=15340. Bidders must first register as a vendor on the City of Huntington Beach PlanetBids system to view and download the Contract Documents, to be added to the prospective bidders list, and to receive addendum notifications when issued.

Bids will only be received electronically through the City’s PlanetBids System Vendor Portal website at: https://www.planetbids.com/portal/portal.cfm?CompanyID=15340. Bids will not be accepted after the specified Bid Opening date and time. The bidder shall have the sole exclusive responsibility for ensuring that the bid is received by the specified bid opening date and time. For technical support with the electronic bidding system, please click the Help Center icon from any

PlanetBids screen to be directed to the technical support help desk.

Electronic bids shall be submitted and uploaded on the Proposal forms provided by the AGENCY.

All information requested therein must be clearly and legibly set forth in the manner and form indicated. The AGENCY may reject any proposal not meeting these requirements. Unauthorized conditions, limitations, or provisions attached to a proposal will render it informal and may cause its rejection. The complete proposal forms shall be without interlineations, alterations or erasures.

Alternative proposals will not be considered unless requested. No oral, telegraphic, or telephonic proposals or modifications will be considered. Any bidder may personally withdraws his bid from the City’s PlanetBids system prior to the bid opening date and time stated in the Notice Inviting

Bids. Any request to withdraw a bid after bid opening shall meet all requirements of Public

Contract Code section 5100 et seq. and must be submitted in writing within five (5) working days, excluding Saturdays, Sundays and State holidays, specifying in detail the mistake.

2. Proposal Guarantee

Proposals must be accompanied by a proposal guarantee consisting of a certified or cashier's check or bid bond payable to the AGENCY in the amount not less than 10% of the total amount named in the proposal. Any proposal not accompanied by such a guarantee will not be considered. Said check or bond shall be made payable to the AGENCY, and shall be given as a guarantee that the bidder will enter into a contract within 10 working days after the bidder has been notified by the

AGENCY that the bidder will be awarded the work and the bidder will furnish the necessary bonds as hereinafter provided. In the case of refusal or failure to enter into said contract, the check or bond, as the case may be, shall be forfeited to the AGENCY.

For electronic submittal of proposals, the certified cashier’s check or bid bond (bid security), must be received at the City of Huntington Beach Public Works office, 2000 Main Street, Huntington

Beach, CA 92648 no later than the bid opening date and time. The bid security must be submitted in a sealed envelope bearing the name and address of the bidder, and the outside envelope must read as follows:

B-2

OFFICIAL BID SECURITY - DO NOT OPEN

Project Manager: Max Olin Project Name: Zone 4 ADA Ramps

CC #: 1879

Bid Opening Date: 10:00 AM on Friday, December, 4, 2026

3. Proposal Signature

If the proposal is made by an individual, it shall be signed and his full name with his address shall be given; if it is made by a firm, it shall be signed with the co partnership name by a member of the firm who shall sign his own name and the name and address of each member shall be given;

and if it is made by a corporation, the name of the corporation shall be signed by its duly authorized officer or officers attested by the corporate seal, and the names and titles of all officers of the corporation shall be given.

4. Delivery Of Proposal

Bids will only be received electronically through the City’s PlanetBids System Vendor Portal website at: https://www.planetbids.com/portal/portal.cfm?CompanyID=15340. Bids will not be accepted after the specified Bid Opening date and time. The bidder shall have the sole exclusive responsibility for ensuring that the bid is received by the specified bid opening date and time. For technical support with the electronic bidding system, please click the Help Center icon from any

PlanetBids screen to be directed to the technical support help desk.

Any bidder may personally withdraw their bid from the City’s PlanetBids system prior to the bid opening date and time stated in the Notice Inviting Bids. Any request to withdraw a bid after bid opening shall meet all requirements of Public Contract Code section 5100 et seq. and must be submitted in writing within five (5) working days, excluding Saturdays, Sundays and State holidays, specifying in detail the mistake.

5. Return Of Proposal Guarantees

The proposal guarantees of all the bidders will be held until the awarded bidder has properly executed all contract documents. The day after the award of contract, the remaining proposal guarantees accompanying all other proposals will become null and void and returned to the unsuccessful bidders.

6. Taxes

No mention shall be made in the proposal of Sales Tax, Use Tax or any other tax, as all amounts bid will be deemed and held to include any such taxes which may be applicable.

7. Disqualification Of Bidders

In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor.

8. Contractor's License Requirement

B-3

This project requires the Contractor to possess a valid State of California contractor's license of the proper classification in accordance with the provisions of Public Contract Code Section 10164.

9. References

All reference information called for in the bid proposal must be submitted with the bid proposal.

Failure to provide reference information of history of similar work and experience with the bid proposal at the time of bid opening may lead to rejection of such proposal as non-responsive.

10. Listing Of Subcontractors

Bidders shall list in the bid proposal the name and place of business of each subcontractor who will perform work or labor or render services for the Contractor in an amount in excess of one-half of one percent of the Contractor's total bid or $10,000, whichever is greater.

11. Discrepancies And Misunderstandings

Bidders must satisfy themselves by personal examination of the work site, plans, specifications and other contract documents, and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the Work must be performed.

No bidder shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Should a bidder find any errors, omissions, or discrepancies in the plans, specifications, and other contract documents or should he be in doubt as to their meaning, he shall notify the AGENCY. Such notification, if any, must be submitted before the Q&A deadline on PlanetBids for the project. Any inquiries received after this deadline will not be accepted. Questions must be submitted electronically through the City’s PlanetBids system. Emails, phone calls, and faxes will not be accepted. Questions submitted to City staff will not be addressed and bidder will be directed to the PlanetBids system.

If the City determines that the point in question is substantive and is not clearly and fully set forth in the Contract Documents, the City will issue a written addendum clarifying the matter which will be posted on the City’s PlanetBids System Vendor Portal website at:

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340. Any interpretation of the

Contract Documents will be made only by written addenda on the City’s PlanetBids system. City will not be responsible for any explanations or interpretations provided in any other manner. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any bidder, and no bidder should rely on any such oral interpretation. Any addenda issued during the bidding period shall form a part of the contract and shall be included with the proposal.

12. Equivalent Materials

Requests for the use of equivalents to those specified, must be submitted to the AGENCY 10 working days prior to the need of such materials unless otherwise specified in the Special

Provisions. Within that time, the AGENCY will issue a written response indicating approval or disapproval of such request. It is the sole responsibility of the successful bidder to prove to the

AGENCY that such a material is truly an equivalent.

13. Legal Responsibilities

B-4

All proposals must be submitted, filed, made and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same or expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions and requirements set forth, contemplated and referred to in the Plans, Specifications and other contract documents, and to full compliance therewith. Additionally, any bidder submitting a proposal shall, by such action thereby, agree to pay at least the minimum prevailing per diem wages as provided in Section 1773, et. seq. of the labor code for each craft, classification or type of workman required as set forth by the Director of Industrial Relations of the State of California.

14. Award Of Contract

The award of contract, if made, will be to the lowest responsive and responsible bidder as determined solely by the AGENCY. The AGENCY reserves the right to reject any or all proposals, to waive any irregularity, and to take the bids under advisement for a maximum period of 60 days.

In no event will an award be made until all necessary investigations are made to the responsibility and qualifications of the bidder to whom the award is contemplated.

15. Material Guarantee

The successful bidder may be required to furnish a written guarantee covering certain items of work for varying periods of time from the date of acceptance of the work by the AGENCY. The work to be guaranteed, the form, and the time limit of the guarantee will be specified in the special provisions. Said guarantee shall be signed and delivered to the AGENCY before acceptance of the contract by the AGENCY. Upon completion of the contract, the amounts of the two contract bonds required in Section 2-4, "CONTRACT BONDS," of the Standard Specifications for Public

Works Construction, may be reduced to conform to the total amount of the contract bid prices for the items of work to guaranteed, and this amount shall continue in full force and effect for the duration of the guarantee period. However, the Labor and Material Bond can not be reduced until the expiration of 35 days after the date of recordation of the Notice of Completion.

16. Execution Of Contract

The successful bidder shall execute a written contract with the AGENCY on the form of agreement provided prior to the scheduled date of the award of contract by AGENCY

Council and shall secure all insurance and bonds required by the Specifications within 10 working days from the date of the award. Failure to enter into a contract shall be just cause for the annulment of the award and the forfeiture of the proposal guarantee. If the successful bidder fails to execute the contract, the AGENCY may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder fails to execute the contract, the AGENCY may award the contract to the third lowest bidder. On the failure of such second or third lowest responsible bidder to execute the contract, such bidder's guarantees shall be likewise forfeited to the AGENCY. The work may then be re-advertised.

17. Submission Of Bonds And Insurance

The successful bidder will be required to furnish the necessary bonds and insurance to the

AGENCY within 10 working days from the award of contract. See Appendix F for the City approved Payment and Performance Bond Forms. The Contractor may use any standard form for the Bid Bond. The successful bidder shall provide a certificate stating that the bonding company

B-5 is admitted to do business in the State of California. This certification may be obtained from the

Executive Officer and Clerk of the Superior Court at the following address & phone:

Orange County Superior Court

Probate Court Operations

341 The City Drive

P.O. Box 14171

Orange, CA 92613-1571

(714) 935-6061, Contact Linda C. Wallace

Prior to the issuance of the Notice to Proceed, the AGENCY must be furnished with a Policy

Endorsement, from the successful bidder's insurance company, naming the AGENCY as an additional insured.

18. Addenda

Substantive City changes to the requirements contained herein will be made by written addendum to this Invitation for Bids. Any written addenda issued pertaining to this Invitation for Bids will be posted on the City’s PlanetBids System Vendor Portal website at:

https://www.planetbids.com/portal/portal.cfm?CompanyID=15340, and will be incorporated into the terms and conditions of any resulting Purchase Order and/or Contract as appropriate. The City shall not be bound to any modifications to or deviations from the requirements set forth in this

Instructions to Bidders as the result of oral instruction or communication.

The effect of all addenda to the contract documents shall be considered in the bid package and said addenda shall be made part of the contract documents and shall be returned with the bid package.

Failure to submit any such addenda with the bid package may render the bid irregular and may result in its rejection by the AGENCY.

19. Bid Protest

To be considered timely, a bid protest must be filed within the following time limits:

(a) Protests based upon alleged defects or improprieties in the bid documents shall be filed prior to the date of bid opening.

(b) All other protests must be filed within five calendar days after the protester knew or should have known the basis of the protest, but no later than five calendar days after the date of when the Bids were due to the AGENCY.

20. Questions to the Engineer

Questions regarding the bid documents (i.e. plans, specifications, contract documents, bid forms, etc.) will be received by the Engineer up to the Q&A deadline on PlanetBids for the project as specified in SECTION A. Questions asked of the Engineer after this time will not be addressed.

C-6

S E C T I O N C

P R O P O S A L for the construction of

Zone 4 ADA Ramps

CC No. 1879 in the

CITY OF HUNTINGTON BEACH

TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF

HUNTINGTON BEACH:

In compliance with the Notice Inviting ELECTRONIC Bids, the undersigned hereby proposes and agrees to perform all the work therein described, and to furnish all labor, material, equipment and incident insurance necessary therefor, in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the bid prices provided in the electronic bid form included in PlanetBids. The official bid schedule is provided electronically through the City’s

PlanetBids system. All bidders shall submit pricing exclusively using the PlanetBids Bid Form.

The PlanetBids bid form is hereby incorporated by reference into these bid documents and shall control for the purposes of bid evaluation and award. Failure to fully complete the PlanetBids Bid

Form shall render the bid non-responsive. The undersigned agrees to complete the work within 20 working days, starting from the date of the Notice to Proceed.

BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the PlanetBids Bid Form. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal.

BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the PlanetBids Bid Form are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE

CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded, the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.

C-7

If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of intent to award contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void.

Accompanying this proposal of bid, find in the amount of which said amount is not less than 10% of the aggregate of the total bid price, as required by the Notice

Inviting ELECTRONIC Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond for__% ", as the case may be) Any standard Surety Bid

Bond form is acceptable.

SECTION C

PROJECT BID

CURB RAMP PROJECT, CC 1879

C-2.1

BID ITEMS

SUB-TOTAL BID AMOUNT IN WORDS:

Note: All extensions of unit prices will be subject to verification by Owner. In case verification is required between the unit price and the extension, the unit price will govern. The Owner reserves the right to reject any or all proposals and bid items. In addition, the City reserves the right to include or remove Bid Schedule B in the award of the contract.

Item

No.

Description Quantity Unit Unit Cost Total Cost

(Extension)

1 Mobilization

1 LS $_______

2 Prepare Storm Water Pollution Prevention Plan (SWPPP)

1 LS $_______

3 Install & Maintain Construction BMPs

1 LS $_______

Construct Curb Access Ramp per Caltrans Std. Plan A88A/A88B as shown on Curb Ramp Detail 1 in Appendix H of Specifications (Item includes all appurtenances, curb & gutter, depressed curb, sawcut, sidewalk, domes, retaining curb, slot pave, repaint red curb, etc.)

EA $_______

Install 4" PVC Sleeve for Street Assembly Sign per City of HB Std. Plan 401 1 EA $_______

Remove and replace existing sidewalk per City of HB Std.

Plan 207 at locations adjacent to ramp. (Item includes all appurtenances, sawcut). This line item is for additional sidewalk beyond line items 4 and 5.

SF $_______

Remove and replaces existing 8”-12” Curb and Gutter per HB Std. Plan 205 (Item includes all appurtenances, sawcut, slot pave, etc.). This line item is for additional curb and gutter beyond line items 4 and 5. 100 LF $_______

Remove existing truncated dome and install new cast in place truncated dome. 5 EA $_______

C-8

LIST OF SUBCONTRACTORS

In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid or $10,000, whichever is greater, and the portion of the work to be done by such subcontractor.

Bid

Item(s)

Name and Address of

Subcontractor

State

License

Number

Class DIR PWC Registration #

Dollar

Amount

% of

Contract

By submission of this proposal, the Bidder certifies:

1. That he is able to and will perform the balance of all work which is not covered in the above subcontractors listing.

2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project.

C-9

NONCOLLUSION AFFIDAVIT

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ______ , at _________________, ___

Date City State

______________________________, being first duly sworn, deposes and says that he or she is

______________________________ of ____________________________ the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

Name of Bidder

Signature of Bidder

Address of Bidder

C-10

UTILITY AGREEMENT

HONORABLE MAYOR AND CITY COUNCIL

CITY OF HUNTINGTON BEACH, CALIFORNIA

Gentlemen:

The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the Zone 4 ADA Ramps, (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700, as follows:

"Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved."

The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal-OSHA requirements.

The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein.

Contractor

By

Title

Date: ___________________

C-11

DISQUALIFICATION QUESTIONNAIRE

In accordance with Government Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire.

QUESTIONNAIRE

Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation?

❑ Yes ❑ No

If the answer is yes, explain the circumstances in the space provided.

Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the

Proposal shall constitute signature of this questionnaire.

C-12

COMPENSATION INSURANCE CERTIFICATE

Pursuant to Section 1861 of the State Labor Code, each contractor to whom a public works contract has been awarded shall sign the following certificate.

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

Contractor

By

C-13

BIDDER'S INFORMATION

BIDDER certifies that the following information is true and correct:

Bidder Name

Business Address

City, State Zip

Telephone Number Email Address

State Contractor’s License No. and Class

Original Date Issued

Expiration Date

The work site was inspected by of our office on , 202 .

The following are persons, firms, and corporations having a principal interest in this proposal:

The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth.

Company Name

Printed or Typed Signature

C-14

NOTARY CERTIFICATE

Subscribed and sworn to before me this day of , 202 .

State of _____________________ )

County of ___________________ )

On ___________________________ before me, ______________________________________

Month, Day, and Year Insert Name and Title of Notary personally appeared _____________________________________________________________

Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature

Signature of Notary Public (PLACE NOTARY SEAL ABOVE)

C-15

Bidder’s Project History

For the purposes of this project, the bidder shall provide project history of similar work, specifically referencing the construction of {Describe specific work and experience necessary for project. For example, “Sanitary sewer line installation of at least of 1,000 of 8-inch and greater in public right-of-way. Sanitary sewer lift stations of similar size, project work within public streets, an area containing high ground water and pipeline construction in high ground water regions with trench depths of 8-feet to the invert.”}. Bidders are encouraged to submit supplemental relevant project history in addition to the projects listed herein.

Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past five years:

1.

Name and Address of Public Agency

Name and Telephone No. of Project Manager: ___________________________________

Contract Amount Type of Work Date Completed

Provide additional project description to show similar work:

2.

3.

C-16

Bidder’s Critical Staff

Listed below are the names of the bidders proposed Construction Project Manager, and

Superintendent. For each of these critical positions, please list at least three projects for which the critical staff has performed similar work within the last five years. These projects do not have to be under the employment of the bidder of this project. Bidders are encouraged submit supplemental relevant project history in addition to the projects listed herein.

1.

Name of proposed Project Manager

Telephone No. of proposed Project Manager: _____________________________________

Project Name & Contract Amount Type of Work Date Completed

2.

Name of proposed Superintendent

Telephone No. of proposed Superintendent: ______________________________________

C-17

CONTRACTOR REGISTRATION WITH CALIFORNIA DEPARTMENT

OF INDUSTRIAL RELATIONS (DIR) CERTIFICATE

Pursuant to SB 854 (citing Labor Code Section 1771.1(a)), passed by the California State Senate on June 20, 2014, established a new public works Contractor Registration Program, which requires all contractors and subcontractors bidding and performing work on Public Works Projects to register on an annual basis (each July 1 through June 30 state fiscal year) with the California

Department of Industrial Relations (DIR). Currently the annual non-refundable registration fee for

Contractors is $400. Each contractor to whom a public works contract has been awarded shall sign the following certificate.

DIR FACT SHEET on SB 854 https://www.dir.ca.gov/public-works/PublicWorksSB854.html

DIR’s Contractor Registration Link – Call (844) 522-6734 https://www.dir.ca.gov/public-works/contractor-registration.html

DIR’s Contractor Registration searchable database:

https://cadir.secure.force.com/ContractorSearch

I am aware and will comply with the provisions of Labor Code Section 1771.1(a) which states:

“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by

Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.”

I furthermore will comply by providing proof of registration with DIR as the primary contractor, as well as for ALL subcontractors at the time of submitting the bid.

Contractor

By

Email

PWC Registration #: __________________ https://www.dir.ca.gov/public-works/PublicWorksSB854.html https://www.dir.ca.gov/public-works/contractor-registration.html https://cadir.secure.force.com/ContractorSearch

C-18

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE

1. How many times in the last five years has your firm been assessed and paid liquidated damages after completion of a project under a construction contract with either a public or private owner?

0 1 2 3 4 5+

(Explain on a separate sheet. Identify all such projects by owner, owner’s address, date of completion of the project, amount of liquidated damages assessed and all other information necessary to fully explain the assessment of liquidated damages.)

2. How many times in the last five years has your firm made any claim against a project owner concerning work on a project or payment for a contract and filed that claim in court or arbitration?

0 1 2 3 4 5+

(Explain on a separate sheet. Identify the claim(s) by providing the project name, date of the claim, name of the entity (or entities) against whom the claim was filed, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim [e.g. "pending" or if resolved, a brief description of the resolution].)

3. How many times in the last five years has CalOSHA cited and assessed penalties against your firm for any “serious,” “willful” or

“repeat”

0 1

5+ violation(s) or the federal Occupational Safety and Health Administration cited and assessed penalties against your firm for violation(s) of safety or health regulations?

NOTE: If you have filed an appeal of a citation, and the Occupational Safety and

Health Appeals Board has not yet ruled on your appeal, you need not include information about it.

4. How many times during the last five years, has your firm been required to pay back wages and/or penalties related to state or federal prevailing wage laws for work performed by your firm?

0 1 2 3 4 5+

(Explain on a separate sheet. Identify the claim(s) by providing the project name, date of the claim, name of the claimant, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim [e.g.

"pending" or, if resolved, a brief description of the resolution].)

C-19

EXHIBIT A

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

This Project is subject to Part 200.321, Title 2, Code of Federal Regulations entitled "Contracting with Small and Minority Businesses, Women’s Business Enterprises, and Labor Surplus Area

Firms." The Regulations in their entirety are incorporated herein by this reference.

It is the policy of the City that disadvantaged business enterprises (DBEs), as defined in

Part 200.321, Title 2 CFR, shall be encouraged to participate in the performance of Contracts financed in whole or in part with federal funds. The Contractor should ensure that DBEs, as defined in Part 200.321, Title 2 CFR, have the opportunity to participate in the performance of this

Contract and shall take all necessary and reasonable steps, as set forth in Part 200.321, Title 2 CFR, for this assurance. The Contractor shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of subcontracts. Failure to carry out the requirements of this paragraph shall constitute a breach of Contract and may result in termination of this Contract or other remedy the City may deem appropriate.

Bidders shall be fully informed respecting the requirements of the Regulations and are urged to obtain DBE participation in this project, although there is no specific goal for DBE participation.

C-20

EXHIBIT B

DBE INFORMATION — GOOD FAITH EFFORTS

Federal-aid Project No. ______________________________ Bid Opening Date

The City of Huntington Beach established a Disadvantaged Business Enterprise (DBE) goal of 0% for this Project. The information provided herein shows that a good faith effort was made.

Lowest, second lowest and third lowest bidders shall submit the following information to document adequate good faith efforts. Bidders should submit the following information even if the “Local

Agency Bidder DBE Commitment” form indicates that the bidder has met the DBE goal. This will protect the bidder’s eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

Submittal of only the “Local Agency Bidder DBE Commitment” form may not provide sufficient documentation to demonstrate that adequate good faith efforts were made.

The following items are listed in the Section entitled “Submission of DBE Commitment” of the

Special Provisions:

A. The names and dates…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .