ZLA - Flooring Replacement Drawings.pdf

PDF 488 KB Posted

Attached to
REPLACE VINYL FLOORING IN CHILD CARE CENTER, PALMDALE, ARTCC
Solicitation number
6920
Issued by

View the file

Other files

File Type Posted
customer satisfaction survey .docx DOCX document
Sol_697DCK-20-R-00174.pdf PDF
wage rates.pdf PDF
SF1442.pdf PDF
ZLA Childcare Flooring Project - Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARTCC

CHILDCARE CENTER FLOORING REPLACEMENT

ARTHUR POP MIKE MISHREKI

ENGINEERING

SERVICES

ENROUTE/FSS

PROJECT ENGINEER MGR: ENGINEERING - LA

1705197

ZLA - 1705197 - G001

Replace Flooring at Child Care Center "Just Plane Kids" 2555 E Avenue P Palmdale, CA 93550 Los Angeles Air Route Traffic Control Center (ZLA)

SHEET INDEX

SHEET SHEET

TITLE DESCRIPTION

G001 TITLE SHEET

A001 CONSTRUCTION PLAN

A002 PHASING PLAN

ARTHUR POP MIKE MISHREKI

PROJECT ENGINEER MGR: ENGINEERING - LA

1705197

ZLA - 1705197 - A002

N.T.S.

80' 0"

' 4

RE-ISSUE

N/AN

LEGEND:

EXISTING CARPET FLOORING

EXISTING LINOLEUM FLOORING

NOT PART OF SCOPE

CONSTRUCTION NOTES:

REPLACE EXISTING CARPET FLOORING. MATCH EXISTING COLOR AND

DESIGN.

REPLACE EXISTING LINOLEUM FLOORING. MATCH EXISTING COLOR AND

DESIGN

REPLACE EXISTING RESILIANT FLOOR BASE. MATCH EXISTING COLOR

AND DESIGN.

NOTE TO CONTRACTOR:

1. ALL WORK TO BE PERFORMED IN SHIFTS NOT TO EXCEED 8 HOURS PER

DAY, BETWEEN THE HOURS: 6:00PM - 5:00 AM, MONDAY THROUGH FRIDAY.

ANY OTHER SCHEDULE WOULD HAVE TO BE REQUESTED IN WRITING AND

APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE ASSIGNED

TO THE PROJECT.

2. ALL ODORS SHALL BE VENTILATED OUT PRIOR TO CLOSE OF EACH

NIGHT WORK SHIFT. THERE SHALL BE NO EXPOSED ADHESIVE, AND

AREAS SHALL BE CLEAN, WITH NO TRIP HAZARDS BEFORE BEING

REOCCUPIED.

3. CONTACTOR SHALL SUBMIT A STAGING PLAN, AND OBTAIN APPROVAL

PRIOR TO COMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. IF A

STAGING AREA IS USED FOR STORING TOOLS AND/OR MATERIALS, AN

ENCLOSED POD SHALL BE USED, AND OCCUPY A PARKING STALL. THIS

SHALL BE SHOWN ON THE STAGING PLAN.

4. NO ADHESIVES SHALL BE USED UNTIL AFTER MIDNIGHT.

5. ACTUAL DIMENSIONS TO BE FIELD VERIFIED.

TYP.

2 3

GIRLS LAUNDRY

AGE 6-12

BOYS

STOR.

AGE 6-12

AGE 6-12

DINING / ART

KITCHEN

COTS

GIRLS

ST

O

R

BOYSWOMENSMENS

RECEPTION

ISOLATION

STAFF/CONF.

DIRECTOR

OFFICE

VE

ST

IB

U

LE

MECH / ELEC

INFANT

PRESCHOOL 2

PRESCHOOL 1

ARTHUR POP MIKE MISHREKI

PROJECT ENGINEER MGR: ENGINEERING - LA

1705197

ZLA - 1705197 - A003

N.T.S.

RE-ISSUE

N/A

N

ISOLATION

DIRECTOR

OFFICE STAFF/CONF.

VE

ST

IB

U

LE

PRESCHOOL 1

DINING / ART

PRESCHOOL 2

AGE 6-12

AGE 6-12

AGE 6-12

GIRLS

BOYS

STOR.

LAUNDRY

RECEPTION

KITCHEN

COTS

GIRLS

BOYSWOMENSMENS

MECH / ELEC

ST

O

R

INFANT

PHASE IV

PHASE III

PHASE II

PHASE I

LEGEND:

PHASING WORK AREA DELIMITATION

NOT PART OF SCOPE

NOTE TO CONTRACTOR:

1. PROJECT IS TO BE COMPLETED IN PHASES AS SHOWN. IF A CHANCE TO

THE PHASE SEQUENCE OR NUMBER OF PHASES OR AREA INCORPORATED IN

EACH PHASE IS NEEDED, SUCH CHANGE MUST BE REQUESTED IN WRITING

AND MUST BE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ADVANCE.

2. ALL WORK TO BE PERFORMED IN SHIFTS NOT TO EXCEED 8 HOURS PER

DAY, BETWEEN THE HOURS: 6:00PM - 5:00 AM, MONDAY THROUGH FRIDAY.

ANY OTHER SCHEDULE WOULD HAVE TO BE REQUESTED IN WRITING AND

APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE ASSIGNED TO

THE PROJECT.

3. CONTACTOR SHALL SUBMIT A STAGING PLAN, AND OBTAIN APPROVAL

PRIOR TO COMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.

4. NO ADHESIVES SHALL BE USED UNTIL AFTER MIDNIGHT.

5. ACTUAL DIMENSIONS TO BE FIELD VERIFIED.

6. CONTRACTOR SHALL MOVE EXISTING FURNITURE WITHIN THE PHASING

AREA IN WHICH WORK IS BEING PEFORMED.

File details come from the government source that posted it. Updated .