ZLA - Flooring Replacement Drawings.pdf
PDF 488 KB Posted
- Solicitation number
- 6920
View the file
Other files
| File | Type | Posted |
|---|---|---|
| customer satisfaction survey .docx | DOCX document | |
| Sol_697DCK-20-R-00174.pdf | ||
| wage rates.pdf | ||
| SF1442.pdf | ||
| ZLA Childcare Flooring Project - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARTCC
CHILDCARE CENTER FLOORING REPLACEMENT
ARTHUR POP MIKE MISHREKI
ENGINEERING
SERVICES
ENROUTE/FSS
PROJECT ENGINEER MGR: ENGINEERING - LA
1705197
ZLA - 1705197 - G001
Replace Flooring at Child Care Center "Just Plane Kids" 2555 E Avenue P Palmdale, CA 93550 Los Angeles Air Route Traffic Control Center (ZLA)
SHEET INDEX
SHEET SHEET
TITLE DESCRIPTION
G001 TITLE SHEET
A001 CONSTRUCTION PLAN
A002 PHASING PLAN
ARTHUR POP MIKE MISHREKI
PROJECT ENGINEER MGR: ENGINEERING - LA
1705197
ZLA - 1705197 - A002
N.T.S.
80' 0"
' 4
RE-ISSUE
N/AN
LEGEND:
EXISTING CARPET FLOORING
EXISTING LINOLEUM FLOORING
NOT PART OF SCOPE
CONSTRUCTION NOTES:
REPLACE EXISTING CARPET FLOORING. MATCH EXISTING COLOR AND
DESIGN.
REPLACE EXISTING LINOLEUM FLOORING. MATCH EXISTING COLOR AND
DESIGN
REPLACE EXISTING RESILIANT FLOOR BASE. MATCH EXISTING COLOR
AND DESIGN.
NOTE TO CONTRACTOR:
1. ALL WORK TO BE PERFORMED IN SHIFTS NOT TO EXCEED 8 HOURS PER
DAY, BETWEEN THE HOURS: 6:00PM - 5:00 AM, MONDAY THROUGH FRIDAY.
ANY OTHER SCHEDULE WOULD HAVE TO BE REQUESTED IN WRITING AND
APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE ASSIGNED
TO THE PROJECT.
2. ALL ODORS SHALL BE VENTILATED OUT PRIOR TO CLOSE OF EACH
NIGHT WORK SHIFT. THERE SHALL BE NO EXPOSED ADHESIVE, AND
AREAS SHALL BE CLEAN, WITH NO TRIP HAZARDS BEFORE BEING
REOCCUPIED.
3. CONTACTOR SHALL SUBMIT A STAGING PLAN, AND OBTAIN APPROVAL
PRIOR TO COMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. IF A
STAGING AREA IS USED FOR STORING TOOLS AND/OR MATERIALS, AN
ENCLOSED POD SHALL BE USED, AND OCCUPY A PARKING STALL. THIS
SHALL BE SHOWN ON THE STAGING PLAN.
4. NO ADHESIVES SHALL BE USED UNTIL AFTER MIDNIGHT.
5. ACTUAL DIMENSIONS TO BE FIELD VERIFIED.
TYP.
2 3
GIRLS LAUNDRY
AGE 6-12
BOYS
STOR.
AGE 6-12
AGE 6-12
DINING / ART
KITCHEN
COTS
GIRLS
ST
O
R
BOYSWOMENSMENS
RECEPTION
ISOLATION
STAFF/CONF.
DIRECTOR
OFFICE
VE
ST
IB
U
LE
MECH / ELEC
INFANT
PRESCHOOL 2
PRESCHOOL 1
ARTHUR POP MIKE MISHREKI
PROJECT ENGINEER MGR: ENGINEERING - LA
1705197
ZLA - 1705197 - A003
N.T.S.
RE-ISSUE
N/A
N
ISOLATION
DIRECTOR
OFFICE STAFF/CONF.
VE
ST
IB
U
LE
PRESCHOOL 1
DINING / ART
PRESCHOOL 2
AGE 6-12
AGE 6-12
AGE 6-12
GIRLS
BOYS
STOR.
LAUNDRY
RECEPTION
KITCHEN
COTS
GIRLS
BOYSWOMENSMENS
MECH / ELEC
ST
O
R
INFANT
PHASE IV
PHASE III
PHASE II
PHASE I
LEGEND:
PHASING WORK AREA DELIMITATION
NOT PART OF SCOPE
NOTE TO CONTRACTOR:
1. PROJECT IS TO BE COMPLETED IN PHASES AS SHOWN. IF A CHANCE TO
THE PHASE SEQUENCE OR NUMBER OF PHASES OR AREA INCORPORATED IN
EACH PHASE IS NEEDED, SUCH CHANGE MUST BE REQUESTED IN WRITING
AND MUST BE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ADVANCE.
2. ALL WORK TO BE PERFORMED IN SHIFTS NOT TO EXCEED 8 HOURS PER
DAY, BETWEEN THE HOURS: 6:00PM - 5:00 AM, MONDAY THROUGH FRIDAY.
ANY OTHER SCHEDULE WOULD HAVE TO BE REQUESTED IN WRITING AND
APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE ASSIGNED TO
THE PROJECT.
3. CONTACTOR SHALL SUBMIT A STAGING PLAN, AND OBTAIN APPROVAL
PRIOR TO COMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.
4. NO ADHESIVES SHALL BE USED UNTIL AFTER MIDNIGHT.
5. ACTUAL DIMENSIONS TO BE FIELD VERIFIED.
6. CONTRACTOR SHALL MOVE EXISTING FURNITURE WITHIN THE PHASING
AREA IN WHICH WORK IS BEING PEFORMED.