YTPM 21-3001 Bid Schedule Blank.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Maintain Pavement Markings
- Solicitation number
- F5N3FQ1075AW01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offerc OF 1419 Pg TOTALS PAGE.pdf | ||
| YTPM 21-3001 Pav Mkings SOW - 5 April 2021.doc | DOC document | |
| Solicitation - FA660621B0002 - Issued.pdf | ||
| 2021 Airfield Marking Overall Plan.pdf | ||
| GROUNDING POINT MARKINGS UFC 3-575-01.docx | DOCX document | |
| Engineering Appendix A Airfield Runway Friction Testing.docx | DOCX document | |
| 32 17 23 01 Airfield Pavements and Roadways Marking.docx | DOCX document | |
| Wage Determinations 1.1.2021.pdf | ||
| 32 01 11 52 Airfield Pavements Rubber and Paint Removal.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Items 2
| BID SCHEDULE | |||||
| PROJECT YTPM 21-3001 | |||||
| MAINTAIN PAVEMENT MARKINGS | |||||
| LINE | ITEM (1) | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| Paint Airfield pavement markings (runways, taxiways, aprons, ramps, pads). Provide reflective glass beads. | ||||
| 001 | Paint, White, Reflective | 961.00 | HSF | $ - 0 |
| 002 | Paint, Yellow, Reflective | 1,040.00 | HSF | $ - 0 |
| 003 | Black, Line edging and blackout | 1,211.00 | HSF | $ - 0 |
| 004 | Paint, Yellow, Non-Reflective | 120.00 | HSF | $ - 0 |
| 005 | Paint, Red, Non-Reflective | 77.00 | HSF | $ - 0 |
| 006 | Glass Beads, Type I, RI=1.5 | 12,000.00 | LBS | $ - 0 |
| 007 | 85% Removal pavement markings on concrete pavement.IAW ETL 97-17 | 1,314.00 | HSF | $ - 0 |
| 008 | Repaint area warning signs on pavement along red line | 135.00 | EA | $ - 0 |
| 009 | Paint Stop Bar/Flight Line Road | 7,284.00 | SF | $ - 0 |
| 010 | Paint Closed Pavement Markings | 300.00 | SF | $ - 0 |
| 011 | Paint Static Ground Points | 100.00 | EA | $ - 0 |
| 012 | Parking Spot # | 30.00 | EA | $ - 0 |
| 013 | Runway Friction Testing | 2.00 | EA | $ - 0 |
| 014 | Paint Entry Control | 14.00 | EA | $ - 0 |
| 015 | Fuel Pits | 14.00 | EA | $ - 0 |
| 016 | Nose Gear/Ext Box | 15.00 | HSF | $ - 0 |
| 017 | AGE Markings | 31.00 | EA | $ - 0 |
| 018 | Equipment Staging Blocks | 27.00 | HSF | $ - 0 |
| 019 | Rubber Removal IAW ETL 97-17 | 6,000.00 | HSF | $ - 0 |
| $ - 0 | ||||
| Paint base pavement markings (roads and parking lots). Provide reflective glass beads. |
| 020 | Paint, White, 6" Reflective | 119,100.00 | SF | $ - 0 |
| 021 | Paint, Yellow, 6" Reflective | 100,200.00 | SF | $ - 0 |
| 022 | Black, 6" Line edging and blackout | 63,300.00 | SF | $ - 0 |
| 023 | Stop & Crossing lines | 2,500.00 | SF | $ - 0 |
| 024 | Crosswalks | 6,200.00 | SF | $ - 0 |
| 025 | Glass Beads, Type I, RI=1.5 | 2,500.00 | LBS | $ - 0 |
| 026 | Traffic Arrows | 54.00 | EA | $ - 0 |
| 027 | Paint, Parking Stalls, White | 3,725.00 | EA | $ - 0 |
| 028 | Paint, Parking Stall Ends | 14,700.00 | SF | $ - 0 |
| 029 | Handicap Parking Symbols | 65.00 | EA | $ - 0 |
| $ - 0 |
PROJECT TOTAL $ - 0