YTPM 20-0002 CRACK SEALING SOW.docx
DOCX document 1 MB Posted
- Attached to
- Repair Crack Sealing
- Solicitation number
- F5N3FQ1075AW02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1 Before Award Section B Price Schedule.pdf | ||
| Solicitation - FA660621B0001.pdf | ||
| Wage Determinations 1.1.2021.pdf | ||
| YTPM 20-0002 General Conditions.docx | DOCX document | |
| YTPM 20-0002 Crack Sealing Site Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
PROJECT YTPM 20-0002
REPAIR BASE PAVEMENTS, CRACK SEALING
AIR FORCE RESERVE
439 CIVIL ENGINEERING
WESTOVER AIR RESERVE BASE
CHICOPEE, MASSACHUSETTS 01022
8 FEB 2021
STATEMENT OF WORK
YTPM 20-0002
Repair Base Pavements, Crack Sealing 8 Feb 2021
1. GENERAL _______________________________
A. This project consists of, but is not limited to the furnishing of all plant, labor, equipment, devices, tools, materials, transportation, supervision, and all miscellaneous requirements necessary to accomplish the work of sealing cracks in asphalt surfaces. All work shall be completed in conformance with applicable drawings and attached supplemental specifications.
B. The contractor shall apply joint sealant material to identified cracks on the asphalt surface of identified roads and parking lots until not to exceed quantities are expended.
C. See attached General Requirements for all Westover ARB specific requirements, rules and regulations.
2. SCOPE OF WORK ______________________________
A. The identified cracks must be cleared of all debris, grass, dirt, and failed joint sealant.
B. The contractor will ensure joint surfaces are cleaned and prepared in accordance with UFC 3-270-01 and UFC 3-250-08FA.
C. New joint sealant shall be applied according UFC 3-270-01. Crack sealant material will conform to Fed. Spec. SS-S-1401C, ASTM D6690.
D. Cracks shall not be overfilled but shall be in compliance with UFC 3-270-01 application procedures. Any sealant overfill shall be removed at time of application.
E. Extent of repairs shall be based on a “not to exceed” joint sealant quantity (Gallons based on negotiated contract cost, Approx. 1818 gallons at 77 LF per gallon).
F. The contractor shall repaint all disturbed surfaces impacted by crack sealing operations.
3. PHASES OF WORK ______________________________
A. This project will not be phased. The contractor will comply with all applicable standards and regulations for working on an active airfield.
4. TECHNICAL SUBMITTALS _________________ TYPE
A. Joint Sealant Manufactures Data B. Asphalt Equipment Specifications/Listing C. Paint Manufacturers Data
5. ATTACHMENTS ___________________________ PAGES
A. General Conditions 01 -- 11 B. Project Drawings 01 – 01 image1.jpeg
File details come from the government source that posted it. Updated .