YELLOWFIN SOW.docx
DOCX document 19 KB Posted
- Attached to
- 52000PR240002751 CGC YELLOWFIN PROP REPAIR
- Solicitation number
- 52000QR240002751
About this file
This federal solicitation requests proposals for propeller repair services for the USCGC Yellowfin. Contractors must remove fairing plates and tighten prop nuts on both propeller shafts of the vessel. One fairing plate must be cut off while another just needs to be unbolted. Pictures must be provided and all necessary equipment, tools, and a safety diver included. Proposals are due by February 8, 2024 with work to be completed by February 13, 2024 onboard the vessel at its home port in Key West, Florida. Award will be a firm-fixed price contract to the responsible bidder providing the best overall value based on specification conformity, price, and past performance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Divers to remove Fairing plates from both shafts and tighten both prop nuts CGC YELLOWFIN
1. SCOPE
The contractor shall remove fairing plates on both shafts and tighten both prop nuts. The port shaft fairing plate must be cut off the shaft. The prop nuts must be tightened to remove the cotter pin, then replace with new cotter pin. The starboard shaft just needs the fairing plate unbolted and removed, then the prop nuts tightened.
2. REFERENCE
3. REQUIREMENTS
The vendor shall provide support for the items detailed below;
3.1.1 Ensure Equipment is properly tagged out by ships force personnel.
3.1.2 All the tools and equipment to complete the job.
3.1.3 The safety diver.
3.1.4 Provide pictures of props and all associated parts being worked on.
4.0 ADMINISTRATION.
4.1 CONTRACTOR PERSONNEL
4.1.1 Qualified Personnel.
The Contractor shall provide qualified personnel and subject matter experts to perform all required tasks specified in this SOW.
4.1.2 Employee Conduct.
Contractor employees shall present a professional appearance and their conduct shall not reflect discredit upon the U.S. Government, and any involved Departments or Agencies. Contractor employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of military uniforms, and possession of weapons) when visiting or working at Government facilities.
4.1.3 Conflict of Interest.
The Contractor shall not employ any person who is an employee of the U.S. Government if that employment would, or would appear to cause, a conflict of interest. The Contractor shall take appropriate precautions as delineated in the Federal Acquisition Regulation (FAR) to preclude actual or apparent conflicts of interest.
4.2 PERIOD OF PERFORMANCE.
The contractor shall provide this assessment within the dates of 13 FEB 2024. The work is to be completed no later than 13 FEB 2024. (The government estimates this requirement can be completed in one days).
Time: 0800-TBD (12hr work days are acceptable).
4.3 PLACE OF PERFORMANCE.
The primary place of performance shall be onboard USCGC YELLOWFIN located at below address.
USCGC YELLOWFIN (WPB-87319)
100 TRUMBO RD
Key West, FL 33040 Contracting Officer Technical Representative (COR):
MKC Lance Seavey, 361-772-1616
File details come from the government source that posted it. Updated .