XL6735.pdf
PDF 27 KB Posted
- Attached to
- SR 509, Clear Creek Stream Restoration Project
- Solicitation number
- XL6735
- Issued by
- Pierce County, Tacoma City, Washington
About this file
This is a bid opening notice from the Washington State Department of Transportation (WSDOT) for the SR 509, Clear Creek Stream Restoration Project located in Pierce County. The project encompasses removal of two dams and obstructions, restoration of a portion of Clear Creek, installation of a temporary stream diversion system, erosion control, clearing and grubbing, tree removal, channel excavation, stream grading, installation of large woody material, and planting work. The scope includes 111 line items with quantities such as 19,153 cubic yards of roadway excavation with haul, 15,322 cubic yards of embankment compaction, 9,300 cubic yards of channel excavation with haul, 10,838 tons of streambed sediment, 32,902 square yards of compost blanket, 1,631 square yards of type A topsoil, 7 acres of soil amendment, 4,213 linear feet of high visibility fence, and various other materials and installations. A mandatory pre-bid site visit is scheduled for September 10, 2026, at 10:00 a.m. at 4008 Pioneer Way East, Tacoma, Washington, with a 90-minute duration. Prospective bidders must provide notice of attendance via email to Andrey.Chepel@wsdot.wa.gov no later than two business days prior to the visit and must wear appropriate personal protective equipment including hard hat, reflective vest, safety glasses, gloves, and boots. The bid opening is scheduled for Wednesday, October 7, 2026, with a project duration of 300 working days.
The contract is estimated at $9,000,000 to $10,000,000 and includes a condition of award designation. Small business enterprise participation is set at 5%, with a 2% veteran-owned business requirement and a 15% apprentice utilization requirement. Lump sum bids are required for fish exclusion, temporary stream diversion, environmental compliance lead, hazard tree removal during construction, tree protection, type B progress schedule, roadway surveying, cleaning existing drainage structure, health and safety plan, bird protection and monitoring, and pollution prevention control plan. No addenda have been issued at the time of this document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID OPENING WEDNESDAY, OCTOBER 7, 2026 PRE-BID The site visit will take place on September 10, 2026, at 10:00 a.m., at 4008 Pioneer Way East, Tacoma WA. Proposal and Planholders shall give notice of their intent to attend the pre-Bid site visit by email to Andrey.Chepel@wsdot.wa.gov no later than two business days prior to the site visit. The meeting and site visit are expected to last a total of 90 minutes. Attendees must wear appropriate attire including a hard hat, reflective vest, safety glasses, gloves and boots.
Attendees will be required to sign a waiver prior to entering the project site. (PIERCE) SR
509, CLEAR CREEK STREAM RESTORATION PROJECT (CL 1, $9,000,000-$10,000,000)
CONTAINS CONDITION OF AWARD PUBLIC WORKS SMALL BUSINESS ENTERPRISE: 5%
VETERAN OWNED BUSINESS: 2%. A State project on SR 509. CONTAINS APPRENTICE UTILIZATION REQ: 15%. Requires: removal of two dams and other obstructions and restoration of a portion of Clear Creek, as well as a temporary stream diversion system, erosion control, clearing & grubbing, tree removal, channel excavation, stream grading, installation of large woody material, planting and other work. 300 working days. Involves 111 items: 19153 CY roadway excavation incl. haul, 15322 CY embankment compaction, 9300 CY channel excavation incl. haul, 10838 T streambed sediment, 32902 SY compost blanket, 1 EA tire wash, 1631 SY topsoil type A, 7 ACRE soil amendment, 4213 LF high visibility fence, 400 CY slash, 32 SF construction signs class A, 60 LF chain link fence type 3, 1 EA single wire gate 14 ft wide. Lump Sum Bids for: fish exclusion, temporary stream diversion, environmental compliance lead, hazard tree removal during construction, tree protection, type B progress schedule, roadway surveying, cleaning existing drainage structure, health and safety plan, bird protection and monitoring, SPCC plan.
(XL6735)(150907X)(25C504) (XE3766) no addenda