WWTP Expansion to 0.9 MGD - Summary

This is a Project Description document for a wastewater treatment plant (WWTP) expansion project in Texas. The project encompasses significant upgrades and additions to existing treatment infrastructure, including construction of a new submersible lift station, installation of a new 40-foot diameter clarifier, construction of a new aeration basin, and establishment of a sludge transfer station. The scope further requires expansion of the existing chlorine contact basin, installation of new elevated concrete platforms, and implementation of new disinfection and dechlorination systems. A critical operational improvement involves replacement of the current coarse bubble aeration system with a fine bubble aeration system, complete with all associated electrical controls, conduit, wiring, and programming. Site work components include grading, drainage modifications, and detention area construction to support the expanded facility. The project is designed to expand treatment capacity to 0.9 million gallons per day (MGD).

The document does not specify pricing terms, contract duration, response deadlines, bid due dates, site visit schedules, pre-bid meeting information, or award timelines within the available content. No information regarding set-asides, incumbent contractors, funding sources, or budget allocations is detailed in the provided materials. Potential bidders should seek clarification on project timeline, budget parameters, and specific bidding procedures through official project documentation or contact with the issuing Texas jurisdiction.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .