About this file

This is a Project Manual and Bid Set document prepared by WW Associates for the Town of Orange, Virginia, involving professional engineering services for water treatment plant chemical feed improvements. The project encompasses the furnishing and installation of polyaluminum chloride bulk storage tanks and feed systems, caustic soda bulk storage tanks and feed systems, hydrofluorosilicic acid feed systems, corrosion inhibitor feed systems, gas chlorination feed systems, algaecide feed systems, a 1,760-square-foot chemical feed and storage building addition, and associated site and electrical system improvements. Bids were to be received by 2:00 PM local time on Tuesday, December 12, 2023, at the Town of Orange Public Works Department, with public opening following submission. A non-mandatory pre-bid conference was scheduled for 10:00 AM on Friday, November 17, 2023, at the Public Works Department Community Room. The contract will be awarded on a unit price basis to the lowest responsible bidder. The project manual specifies a construction period of 360 calendar days for substantial completion and 390 calendar days for complete project closeout, with liquidated damages of $1,000 per day for delays beyond the substantial completion date.

Bid security in the amount of 5 percent of the base bid, either as a certified check or acceptable bid bond, is required at time of submission. Performance and Labor and Material Payment Bonds in the amount of 100 percent of the bid are required upon contract award. The contract includes eight base bid items covering mobilization (maximum 5 percent of total base bid), site demolition and site work, site piping, asphalt pavement, building addition, process equipment purchase, work inside the building addition and existing building, and gas chlorination system work. Prime contractors must demonstrate at least five years of experience working in at least five municipal water treatment plants of similar design and must submit a list of similar installations with references. Contractors must be licensed in the Commonwealth of Virginia and are responsible for obtaining all required permits, including Orange County Building and Land Disturbance Permits, at their own expense. Insurance requirements include workers compensation (statutory), general liability ($1,000,000 per occurrence), excess or umbrella liability ($10,000,000 per occurrence), and automotive liability ($1,000,000 combined single limit), with the Town of Orange and WW Associates, Inc. listed as additional insureds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPRROOFFEESSSSIIOONNAALL EENNGGIINNEEEERRIINNGG SSEERRVVIICCEESS

WWA PROJECT NO. 221009.01

PPRROOJJEECCTT MMAANNUUAALL

WWAATTEERR TTRREEAATTMMEENNTT PPLLAANNTT

CCHHEEMMIICCAALL FFEEEEDD IIMMPPRROOVVEEMMEENNTTSS –– RREEBBIIDD

TTOOWWNN OOFF OORRAANNGGEE,, VVIIRRGGIINNIIAA

PO Box 4119 Lynchburg, VA 24502 Phone: 434-316-6080

968 Olympia Drive, Suite 1 Charlottesville, VA 22911 Phone: 434-984-2700 www.wwassociates.net

BID SET

April 29, 2022

Prepared by:

WW Associates Project No. 221009.01 01000/1

Section 01000 Table of Contents

SECTION

Division 1 – General Requirements Advertisement for Bids Instructions to Bidders Bid Form Measurement and Payment General Requirements Supplementary Conditions

Standard Contract Forms

Division 2 – Site Work Demolition Earthwork Paving and Surfacing Water Distribution System Storm Sewer Systems Pipe Supports and Anchors Seeding

Division 3 – Concrete Concrete Reinforcing Cast-in-Place Concrete

Division 4 – Masonry Unit Masonry

Division 5 – Metals (Not Used)

Division 6 – Wood and Plastics Rough Carpentry Sheathing Shop Fabricated Wood Trusses

Division 7 – Thermal and Moisture Protection (Not Used)

Division 8 – Doors and Windows Commercial Hollow Metal Doors and Frames

WW Associates Project No. 221009.01 01000/2

Overhead Coiling Doors Finish Hardware

Division 9 – Finishes

High Performance Coatings

Division 10 – Specialties Signage Fire Extinguishers

Division 11 – Equipment Chlorination Equipment High-Density Crosslinked Polyethylene (HDPE) Chemical Tanks Chemical Piping and Appurtenances Chemical Feed Pumps (Peristaltic) Pipe Supports and Anchors for Chemical Piping

Division 12 – Furnishings (Not Used)

Division 13 – Special Construction Building Systems Basic Instrumentation Data Submittals Installation Drawings Installation and Startup Training Maintenance Sequence of Operation

Division 14 – Conveying Systems (Not Used)

Division 15 – Mechanical Plumbing System

Division 16 – 25 (Not Used) Division 26 – Electrical Common Work Results for Electrical Grounding and Bonding for Electrical Systems Hangers and Supports for Electrical Systems

WW Associates Project No. 221009.01 01000/3

Raceways and Boxes for Electrical Systems Lighting Control Devices Low-Voltage Transformers Panelboards Wiring Devices Enclosed Switches and Circuit Breakers Lighting

End of Table of Contents

WW Associates Project No. 221009.01 01100/1

Section 01100 Advertisement for Bids

Re: Water Treatment Plant

Chemical Feed Improvements – REBID Town of Orange, Virginia

Bids on the referenced project will be received by the Deputy Town Clerk at the Town of Orange Public Works Department, 235 Warren Street, Orange, VA 22960, until 2:00 PM local prevailing time on Tuesday, December 12, 2023, and then publicly opened.

Bids may be withdrawn using the procedure set forth in Virginia Code § 2.2-4330B.2.

The project will consist of the following work:

▪ Polyaluminum chloride bulk storage tanks and feed system

▪ Caustic soda bulk storage tank and feed system

▪ Hydrofluorosilic acid feed system

▪ Corrosion inhibitor feed system

▪ Gas chlorination feed system

▪ Algaecide feed system

▪ 1,760 square foot chemical feed / storage building addition

▪ Associated site and electrical system improvements

The Town will award the contract on a unit price basis.

Bid documents consisting of project manual and drawings are open to the public for inspection at the following locations:

▪ Town of Orange, VA website, http://www.townoforangeva.org

▪ eVA – Virginia’s eProcurement Marketplace, https://eva.virginia.gov

A non-mandatory pre-bid conference will be held at 10:00 AM, local prevailing time, Friday, November 17, 2023 at the Public Works Department Community Room, 235 Warren Street, Orange, VA 22960.

Bid documents in Adobe Acrobat (PDF) format may be obtained from WW Associates, Inc. at no charge. Contact WW Associates, Inc. at (434) 316-6080. Bidder must include contact person and e-mail address, business address, and telephone number to receive bid documents.

Bid Security: Bids shall be accompanied by a certified check or an acceptable bid bond in the amount of 5 percent of the base bid.

Bidders must be licensed as Contractors in the Commonwealth of Virginia in accordance with Title 54.1, Chapter 11 of the Code of Virginia (1950) as amended.

Town of Orange, Virginia Gregory S. Woods, Town Manager

End of Advertisement for Bids http://www.townoforangeva.org/ https://eva.virginia.gov/

WW Associates Project No. 221009.01 01200/1

Section 01200 Instructions to Bidders

1 General: To be valid for consideration, bids must be completed and submitted in accordance with these instructions to bidders.

1.1 The Contractor is advised to refer to Section 01600 – Standard Contract Forms for contract documents required for this project.

1.2 A pre-bid conference will be held as specified in Section 01100 – Advertisement for Bids and any subsequent addendums to bidding documents.

1.3 Bid submission must be received by the date and time specified in Section 01100 –

Advertisement for Bids and any subsequent addendums to bidding documents.

1.4 It is the Contractor’s responsibility to ensure they have obtained all issued bid documents, including, but not limited to, addendums, prior to bidding this project.

2 Qualification of Bidders

2.1 The prime Contractor for this project shall represent at least five (5) years of experience working in at least five (5) municipal water treatment plants of similar design to the satisfaction of the Engineer to be considered qualified to construct this project. The Contractor shall submit, with the bid, a list of similar installations with references, to be considered a qualified bidder.

2.2 Each bidder must be prepared to submit within 5 calendar days of the Owner’s request written evidence of his qualifications for the project, including financial data, previous experience, and evidence of authority to conduct business in the jurisdiction where the project is located.

3 Examination of Bid Documents and Site

3.1 Before submitting bids, each bidder must examine bid documents thoroughly;

familiarize himself with federal, state, and local laws, ordinances, rules, and regulations affecting the work; and correlate his observations with the requirements of the bid documents.

3.2 Bidders are requested and expected to visit the site of the project to alert themselves to local and special conditions, which may be encountered during construction of the project. Failure to make such investigations shall not relieve the successful bidder from performing and completing the work in accordance with the contract documents.

4 Interpretations

WW Associates Project No. 221009.01 01200/2

4.1 All questions concerning this project shall be directed to WW Associates, Inc., E-Mail: jclark@wwassociates.net. Jason A. Clark, P.E. is the point of contact.

No oral interpretations of the bid documents will be made to any bidder. To be given consideration, requests for interpretations must be received in time to allow preparation of written response at least 5 days prior to receipt of bids.

Interpretations will be written in the form of written addenda to the bid documents and mailed to all parties recorded by WW Associates, Inc. as having received bid documents, prior to scheduled receipt of bids. Only interpretations by formal written addenda will be binding.

5 Bid Submission

5.1 Submit one copy of the bid using forms furnished by WW Associates, Inc. and fill in all blank spaces on the form. Repeat notation “Contractor’s Current Virginia License No. ____________” on outside of inner envelope containing bid and bid security, and place this envelope within another envelope addressed to:

5.1.1 Kim Strawser, CZA, CMC

Deputy Town Clerk Town of Orange Public Works Department 235 Warren Street Orange, VA 22960

5.2 The inner envelope shall have noted thereon:

5.2.1 “Bid for Construction of Water Treatment Plant – Chemical Feed Improvements – REBID, Town of Orange, Virginia.”

5.3 Bid security and bidding documents, and receipt deadline for bids shall be as specified herein.

5.3.1 No bidder shall withdraw, modify, or cancel any part of his bid for 90 days following bid opening.

5.4 Modifications and withdrawal of bids: Bids may be modified or withdrawn by appropriate document duly executed (in the manner that a bid must be executed) and delivered to the place where the bids are to be submitted at any time prior to the receipt of bids.

5.5 Withdrawal of bids after date for submission: In accordance with the procedures set forth in Virginia Code § 2.2-4330 B.2, the bidder will have 2 business days after the opening of bids within which to claim in writing any mistake as defined in said section and withdraw his bid, provided such mistake can be proved from the Contractor’s work papers. Failure to submit Contractor’s work papers will be considered as a waiver of any right of withdrawal of bids after the date for submission.

mailto:jclark@wwassociates.net

WW Associates Project No. 221009.01 01200/3

5.6 Bid documents in Adobe Acrobat (PDF) format may be obtained from WW

Associates, Inc., P.O. Box 4119, Lynchburg, VA 24502 at no charge. Bidder must provide name of contact person, complete business address, telephone number with area code, and e-mail address to avoid delay in receiving transmittals.

5.7 Bid Security: Bids shall be accompanied by a certified check or an acceptable bid bond in the amount of 5 percent of the base bid.

5.8 All Bid Items must be completed in their entirety; failure by the Contractor to fully complete the bid form will be considered a non-responsive bid.

5.9 The Contractor is advised to refer to the Permits paragraph in Section 01500 – Supplementary Conditions for bidding instructions on permit-related fees.

6 Agreement, insurance certificate, and bonds shall be drawn on forms identical to those bound within this project manual.

6.1 Bonds shall be with a surety company acceptable to the Owner.

6.2 A Performance Bond and a Labor and Material Payment Bond will be required in the amount of 100 percent of the bid.

7 Award of Contract

7.1 The award of the contract will be as specified in Section 01300 – Bid Form.

7.2 Should the responsive bid from the lowest responsible bidder exceed available funds, the Owner may negotiate with the lowest responsible bidder in accordance with Section 2.2-4318 of the Virginia Public Procurement Act to obtain a contract price within available funds.

7.3 The Owner reserves the right to reject any and all bids and waive any and all informalities and the right to disregard all nonconforming or conditional bids or counterproposals.

7.4 Submission of post-bid information shall be in accordance with the contract documents.

End of Section

Contractor ________________________________________ Date ______________ VA License No. _________________________

WW Associates Project No. 221009.01 01300/1

Section 01300 Bid Form

Gentlemen:

The undersigned, having visited and examined the site and having carefully studied the drawings and project manual for the Water Treatment Plant Chemical Feed Improvements – REBID, Town of Orange, Virginia, hereby proposes to furnish all plant, labor, equipment, materials, and services and to perform all operations necessary to execute and complete the work required for the project, in strict accordance with the drawings and technical specifications prepared by WW Associates, Inc., Engineers • Surveyors • Planners, dated April 29, 2022 together with addenda numbered ____, issued during bidding period and hereby acknowledged, subject to the terms and conditions of the agreement as follows:

The base bid is founded upon furnished equipment and materials of specified manufacturers for the unit prices shown on Section 01310 – Bid Schedule. The sum of all the individual bid items shown in Section 01310 – Bid Schedule shall be referred to hereinafter as the base bid. If a discrepancy occurs between the unit price and the extension thereof, the unit price shall prevail.

Base Bid Item No. 1 is defined as all work associated with project mobilization for the sum of ____________________________________________________________ dollars

Base Bid Item No. 2 is defined as all work associated with site demolition and site work for the sum of ______________________________________________________ dollars

Base Bid Item No. 3 is defined as all work associated with site piping for the sum of __________________________________________________________________ dollars

Base Bid Item No. 4 is defined as all work associated with asphalt pavement for the sum of _______________________________________________________________ dollars

Base Bid Item No. 5 is defined as all work associated with the building addition for the sum of ____________________________________________________________ dollars

Base Bid Item No. 6 is defined as all work associated with the purchase of process equipment for the sum of _____________________________________________ dollars

Base Bid Item No. 7 is defined as all work inside the building addition and the existing building for the sum of _______________________________________________ dollars

WW Associates Project No. 221009.01 01300/2

Base Bid Item No. 8 is defined as all work associated with the gas chlorination system for the sum of _________________________________________________________ dollars

Total Base Bid (Item Nos. 1-8) for the sum of: ________________________________ _______________________________________________ dollars ($______________).

Notes:

a) The basis of award for determining the low bidder is the Total Base Bid, Base Bid

Item Nos. 1 through 8.

b) The Total Base Bid is founded upon furnishing equipment and materials of specified manufacturers or approved equals.

c) The Contractor shall include all project mobilization costs in Base Bid Item No. 1.

It is understood and agreed that the Owner, in protecting his best interest, reserves the right to:

a) Reject any or all bids.

b) Accept any bid item at the base bid price, or any combination of the base bid items.

The base bid shall include the quantities on Section 01310 – Bid Schedule. The bidder declares that he understands that the quantities shown in the bid schedule are approximate only; and are subject to either increase of decrease based on the work shown on the drawings and for changes in the work as directed by the Owner and that should the quantities of any of the items of work be increased, the undersigned proposes to do the additional work at the unit price set out herein, and should the quantities be decreased, he also understands that payment will be made on the actual quantities installed at the unit prices, and will make no claim for the anticipated profits for any decrease in the quantities. Actual quantities will be determined upon completion of the work. Lump sum bid items will not be adjusted.

We are properly equipped to execute work as defined in the contract documents and so covered by this bid and will enter into agreement for the execution and completion of the work in accordance with the drawings, project manual, and this bid. We further agree that if awarded the contract, we will commence the work on the date stated in the “Notice to Contractor to Proceed,” and will prosecute the work and shall be substantially complete as defined in the general conditions within 360 calendar days and complete all obligations within 390 calendar days.

The Owner and Contractor recognize that time is of the essence with this agreement and that the Owner will suffer financial loss if the work is not completed within 390 calendar days for all work associated with this project. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, the Owner and Contractor therefore agree that, as liquidated damages for delay (but not as a penalty), the

WW Associates Project No. 221009.01 01300/3

Contractor shall pay the Owner one thousand dollars ($1,000.00) for each day that expires after the time specified for substantial completion of this project.

Enclosed herewith is the following security, offered as evidence that the undersigned will enter into agreement for the execution and completion of the work in accordance with the drawings and project manual:

Certified check for the sum of_________________________________________

Name of bank______________________________________________________

Bidder’s bond in amount of___________________________________________

Bond issued by_____________________________________________________

The undersigned further agrees that in case of failure on his part to execute the said agreement within 10 consecutive calendar days after written notice being given on the award of the contract, the monies payable by the securities accompanying this bid shall be paid to the Town of Orange as liquidated damages for such failure; otherwise, the securities accompanying this bid shall be returned to the undersigned.

The Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, coercive practices or otherwise taken any action in the restraint of free and competitive bidding.

This bid is subject to acceptance within a period of 90 days from bid submission date.

Respectfully Submitted, Contractor

By __________________________

Address

Telephone Date_______________________

Contractor’s Current Virginia License Number _____________Code _______

Item No.

Description Unit Quantity Unit Price Total

1 Mobilization (Maximum 5%) LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 1 - Mobilization

Total - Base Bid Item No. 1:

WW Associates Project No. 221009.01 01310/1

Description Unit Quantity Unit Price Total

1 Site Clearing and Grading LS 1

Saw Cut and Demolish Asphalt Pavement

LS 1

Demolish Gravel Access Road to Reservoir

LS 1

Remove and Reinstall Existing 2-inch Water Line

LS 1

Remove and Reinstall Existing Algaecide Line

LS 1

Remove and Reinstall Existing Power and Communication Lines

LS 1

Remove and Reinstall Existing Chain Link Fence

LS 1

Remove Existing Exterior Wall Pack Light

LS 1

Remove Existing Concrete Curb at Parking Area

LS 1

10 Remove Existing Exterior Hose Bibb LS 1

11 Erosion and Sediment Control LS 1

All Additional Items Required to Complete Base Bid Item No. 2

LS 1

Total - Base Bid Item No. 2:

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 2 - Site Demolition/Site Work

Provide Description of Work Covered Under Item No. 12:

WW Associates Project No. 221009.01 01310/2

Description Unit Quantity Unit Price Total

1 15-inch Storm Sewer LF

2 Drop Inlet DI-1 VLF 3.5

3 4-inch Building Drain LF

4 4-foot Diameter Containment Manhole LS 1

All Additional Items Required to Complete Base Bid Item No. 3

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 3 - Site Piping

Total - Base Bid Item No. 3:

Provide Description of Work Covered Under Item No. 5:

WW Associates Project No. 221009.01 01310/3

Description Unit Quantity Unit Price Total

Asphalt Pavement Repair - Parking Area

LS 1

Asphalt Pavement Repair - Access Road to Reservoir

LS 1

All Additional Items Required to Complete Base Bid Item No. 4

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 4 - Asphalt Pavement

Total - Base Bid Item No. 4:

Provide Description of Work Covered Under Item No. 3:

WW Associates Project No. 221009.01 01310/4

Description Unit Quantity Unit Price Total

1 Building Foundation LS 1

Demolition - Existing Windows and Frames

LS 1

3 New Door to Building Addition LS 1

Chemical Feed/Storage Building Addition

SF 1,760

All Additional Items Required to Complete Base Bid Item No. 5

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 5 - Building Addition

Total - Base Bid Item No. 5:

Provide Description of Work Covered Under Item No. 5:

WW Associates Project No. 221009.01 01310/5

Description Unit Quantity Unit Price Total

Polyaluminum Chloride (PAC) Storage Tanks

EA 2

2 Caustic Soda (CS) Storage Tank EA 1

Polyaluminum Chloride (PAC) Feed Pumps

LS 1

4 Caustic Soda (CS) Feed Pumps LS 1

Hydrofluorosilicic (HF) Acid Feed Pumps

LS 1

6 Corrosion Inhibitor (CI) Feed Pumps LS 1

7 Algaecide Feed Pumps LS 1

8 Gas Chlorination Equipment LS 1

All Additional Items Required to Complete Base Bid Item No. 6

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 6 - Purchase of Process Equipment

Total - Base Bid Item No. 6:

Provide Description of Work Covered Under Item No. 9:

WW Associates Project No. 221009.01 01310/6

Description Unit Quantity Unit Price Total

Demolition - Lime Volumetric Feeder - Second Floor

LS 1

Demolition - Lime Volumetric Feeder - Third Floor

LS 1

Demolition - Soda Ash Volumetric Feeder - Second Floor

LS 1

Demolition - Soda Ash Volumetric Feeder - Third Floor

LS 1

Demolition - Alum Volumetric Feeder - Second Floor

LS 1

Demolition - Alum Volumetric Feeder - Third Floor

LS 1

Demolition - Spare Volumetric Feeder - Second Floor

LS 1

Demolition - Spare Volumetric Feeder - Third Floor

LS 1

Demolition - Raw Water Header - First Floor

LS 1

10 HVAC - Building Addition LS 1

11 Demolition - Electrical LS 1

12 New Work - Electrical LS 1

13 SCADA Work (by Dorsett) LS 1

14 SCADA Wiring/Conduit LS 1

15 Interior Finished Water Line Piping LS 1

16 Interior Raw Water Line Piping LS 1

Polyaluminum Chloride (PAC) Feed System Installation/Startup

LS 1

Caustic Soda (CS) Feed System Installation/Startup

LS 1

Hydrofluorosilicic (HF) Acid Feed System Installation/Startup

LS 1

Corrosion Inhibitor (CI) Feed System Installation/Startup

LS 1

Algaecide Feed System Installation/Startup

LS 1

22 Chlorine Solution Piping/Conduit LS 1

23 New Chemicals for Startup LS 1

All Additional Items Required to Complete Base Bid Item No. 7

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 7 - Work Inside Building Addition and Existing Building

Total - Base Bid Item No. 7:

Provide Description of Work Covered Under Item No. 24:

WW Associates Project No. 221009.01 01310/7

Description Unit Quantity Unit Price Total

Gas Chlorination Feed System Installation/Startup

LS 1

Demolition - Post Chlorination Line - First Floor

LS 1

All Additional Items Required to Complete Base Bid Item No. 8

LS 1

Section 01310 - Bid Schedule Town of Orange WTP - Chemical Feed Improvements - REBID

Base Bid Item No. 8 - Gas Chlorination System

Total - Base Bid Item No. 8:

Provide Description of Work Covered Under Item No. 3:

WW Associates Project No. 221009.01 01310/8

WW Associates Project No. 221009.01 01320/1

Section 01320 Measurement and Payment

1 Measurement and Payment Definitions

1.1 Mobilization: Mobilization shall include all activities necessary to mobilize in order to carry out construction activities and demobilize to remove all material and equipment not incorporated into the project. No more than 50 percent of the mobilization cost will be paid in the first pay request by the Contractor under this item. Any additional monies will be distributed equally over the remaining pay periods. Mobilization shall be a maximum of 5% of the Total Base Bid.

1.2 Site Clearing and Grading: Clearing and grading of the project site shall be measured as a lump sum payment. This price shall be full compensation for clearing, grubbing, excavation, material removal and disposal, fine grading, and tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.3 Saw Cut and Demolish Asphalt: Saw cutting and demolition of existing asphalt pavement shall be measured as a lump sum payment. This price shall be full compensation for excavation, material removal and disposal, and tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.4 Demolish Gravel Access Road to Reservoir: Demolition of the existing gravel access road to the reservoir shall be measured as a lump sum payment. This price shall be full compensation for excavation, material removal and disposal, and tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.5 Remove and Reinstall Existing Water Line: Removal and replacement of existing water line shall be measured as a lump sum payment. Price shall include all materials, equipment, and labor to excavate, disconnect, plug, remove and dispose of existing water line. Price shall include new water line, complete in place with a minimum cover of 3.5 feet as shown on the contract drawings, and shall include all pipe, fittings, corporation stops, service saddles, all types of joint restraints, and all materials, equipment, and labor to excavate, provide bedding, install pipe, required compaction tests, backfill the water line, pressure tests, flushing, disinfecting, and restoring disturbed area to original or better conditions.

1.6 Remove and Reinstall Existing Algaecide Line: Removal and replacement of existing algaecide line shall be measured as a lump sum payment. Price shall include all materials, equipment, and labor to excavate, disconnect, plug, remove and dispose of existing algaecide line. Price shall include new algaecide line, complete in place with a minimum cover of 3.5 feet as shown on the contract drawings, and shall include all conduit, tubing, penetrations and connections at the existing underground vault, corporation stops, and all materials, equipment, and labor to excavate, provide bedding, install conduit and tubing, required compaction

WW Associates Project No. 221009.01 01320/2 tests, backfill the algaecide line, and restoring disturbed area to original or better conditions.

1.7 Remove and Reinstall Existing Power and Communication Lines: Removal and replacement of existing power and communication lines shall be measured as a lump sum payment. Price shall include all materials, equipment, and labor to excavate, disconnect, remove, and dispose of existing lines. Price shall include new power and communication lines, complete in place with a minimum cover of 3.5 feet as shown on the contract drawings, and shall include all conduit, wiring, handholes, boxes, concrete, and all materials, equipment, and labor to excavate, provide bedding, install conduit and wiring, required compaction tests, backfill the power and communication lines, and restoring disturbed area to original or better conditions.

1.8 Remove and Replace Chain Link Fence: Removal and replacement of existing chain link fence shall be measured as a lump sum payment. Price shall include all clearing and grubbing, excavation, concrete, fence fabric, gates, posts, barbed wire, fence appurtenances, disposal of excess or unsuitable material, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.9 Remove Existing Exterior Wall Pack Light: Removal of the existing exterior wall pack light shall be measured as a lump sum payment. Price shall include removal and disposal of the light fixture, disconnecting the electrical circuit back to the electrical panel, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.10 Remove Existing Concrete Curb at Parking Area: Removal of the existing concrete curb at the parking area shall be measured as a lump sum payment. Price shall include saw cutting, excavation, and removal and disposal of existing concrete curb, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.11 Remove Existing Exterior Hose Bibb: Removal of the existing exterior hose bibb shall be measured as a lump sum payment. Price shall include removal and disposal of the hose bibb, disconnect, remove, plug, and dispose of the existing water service line back to its main, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.12 Erosion and Sediment Control: Erosion and sediment control shall be measured as a lump sum payment. This item shall include all erosion and sediment control measures and devices, including, but not limited to, temporary construction entrance, silt fence, storm drain inlet protection, diversion dikes, riprap, outlet protection, rock check dams, topsoil storage areas, permanent and temporary seeding with mulching, soil stabilization blankets and matting, stormwater conveyance channels, and miscellaneous stone, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

WW Associates Project No. 221009.01 01320/3

1.13 Storm Sewer: Price per linear foot for each size and type gravity storm sewer, complete in place, with a minimum cover of 3.5 feet as shown on the contract drawings, and shall include furnishing all material, equipment, and labor to excavate, provide bedding, install the pipe, backfill to subgrade if under paved area or backfill to grade if not under paved area, and test the sewer line. Price includes tracer wire. Price includes relocation, repair, and/or replacement of all above ground obstructions along the sewer alignment, including, but not limited to, fence, landscaping, curbs, asphalt pavement, and/or structures and miscellaneous items.

Price includes relocation, repair, and/or replacement of all below ground improvements along the sewer alignment including, but not limited to, all underground utilities, vaults, and miscellaneous items.

1.14 Building Drain: Price per linear foot for each size and type gravity building drain, complete in place, with a minimum cover of 3.5 feet as shown on the contract drawings, and shall include furnishing all material, equipment, and labor to excavate, provide bedding, install the pipe, fittings, and cleanouts, backfill to subgrade if under paved area or backfill to grade if not under paved area, and test the sewer line. Price includes tracer wire. Price includes relocation, repair, and/or replacement of all above ground obstructions along the drain alignment, including, but not limited to, fence, landscaping, curbs, asphalt pavement, and/or structures and miscellaneous items. Price includes relocation, repair, and/or replacement of all below ground improvements along the sewer alignment including, but not limited to, all underground utilities, vaults, and miscellaneous items. This pay item covers drain piping located 5 feet outside of the building.

1.15 Drop Inlet DI-1: Price per vertical foot for each size drop inlet structure, measured from invert to bottom of casting, shall include furnishing all material, equipment, and labor to excavate, dewater, provide excavation support, bedding, and inlet casting, install the new drop inlet and casting, and backfill and compact to subgrade if in paved area, or backfill and compact to grade if not in paved area.

1.16 Containment Manhole: The containment manhole shall be measured as a lump sum payment item. This price shall be full compensation for construction, excavation, excavation support, dewatering, stone, compaction, connections, disposal of materials, tools, labor, equipment, and materials, to complete the work as shown on the drawings and in accordance these specifications.

1.17 Asphalt Pavement Repair: Asphalt pavement repair shall be measured as a lump sum payment item. This price shall include furnishing all materials, equipment and labor to install aggregate base material, liquid asphalt, and asphalt material and compact new aggregate base and asphalt material as shown on the drawings and in accordance with these specifications.

1.18 Building Foundation: The building foundation shall be measured as a lump sum payment item. This price shall include excavation, subgrade validation, aggregate fill material, backfill and compaction, cast-in place concrete slab and footings, trench drains and grating, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these

WW Associates Project No. 221009.01 01320/4 specifications. This pay item includes drain piping located within 5 feet and inside of the building.

1.19 Demolition – Existing Windows and Frames: Demolition of existing windows and frames in the existing treatment building shall be measured as a lump sum payment item. Price shall include removal and disposal of the existing windows and frames, and for all tools, labor, equipment, and materials to complete the work as shown on the drawings and in accordance with these specifications.

1.20 New Door to Building Addition: The new door to the building addition shall be measured as a lump sum payment item. This price shall include furnishing all materials, equipment, and labor to install the door, door frame, hardware, and miscellaneous accessories as shown on the drawings and in accordance with these specifications.

1.21 Chemical Feed/Storage Building: Price per square foot for the chemical feed/storage building, complete in place, and shall include furnishing all material, equipment, and labor to install concrete unit masonry, steel reinforcement, control joints, mortar, grout, anchors, ties, masonry cleaning, masonry coatings, interior gypsum board, wood roof trusses, roof shingles, doors and frames, door hardware, coiling roll-up door, windows and frames, trim, gutters and downspouts, wall and attic insulation, and miscellaneous accessories as shown on the drawings and in accordance with these specifications.

1.22 Chemical Storage Tank: Price to furnish each size high density crosslinked polyethylene (HDPE) storage tank for each chemical service indicated and as shown on the drawings and in accordance with these specifications. The price shall include furnishing inlet and outlet fittings, manways, flexible connections, tank overflows, vents, seismic restraint systems, ladders and safety cages, ultrasonic level instruments, gaskets, bolts, and miscellaneous tank accessories.

1.23 Chemical Feed Pump: The feed pumps for each chemical service shall be measured as a lump sum payment item. The price shall include furnishing each peristaltic feed pump as shown on the drawings and in accordance with these specifications.

The price shall include furnishing calibration columns, chemical feed pump shelves, pressure relief valves, spill containment work stations, and miscellaneous pump accessories.

1.24 Gas Chlorination Equipment: The gas chlorination equipment shall be measured as a lump sum payment item. The price shall include furnishing cylinder mounted chlorinators, rotameters, ejectors, gas chlorine cylinder scales, chlorine gas leak detector, and miscellaneous accessories as shown on the drawings and in accordance with these specifications.

1.25 Demolition – Volumetric Feeder: Demolition of the volumetric feeder equipment for each chemical service shall be measured as a lump sum payment. This price shall be full compensation for equipment/material removal and disposal, and tools, WW Associates Project No. 221009.01 01320/5 labor, equipment, and materials to complete the work as shown on the drawings and in these specifications.

1.26 Demolition – Raw Water Header – First Floor: Removal of the existing raw water header shall be measured as a lump sum payment. Price shall include all materials, equipment, and labor to excavate, disconnect, plug, remove and dispose of existing water line as shown on the drawings and in these specifications.

1.27 HVAC – Building Addition: HVAC improvements for the project shall be measured as a lump sum payment item. This price shall include all new HVAC work for the new building addition and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

1.28 Demolition – Electrical: Electrical demolition for the project shall be measured as a lump sum payment item. This price shall include all new electrical work and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

1.29 New Work – Electrical: Electrical improvements for the project shall be measured as a lump sum payment item. This price shall include all new electrical work and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

1.30 SCADA Work: SCADA improvements for the project shall be measured as a lump sum payment indicated in the Bid Form. This price shall include all SCADA work indicated in the proposal presented in Appendix A, SCADA equipment startup/testing, and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

This work shall be performed by Dorsett Controls, the Town’s Instrumentation and Controls (IC) Contractor.

1.31 SCADA Wiring/Conduit: SCADA wiring shall be measured as a lump sum payment. This price shall include the conduit, control conductors, wiring, electrical appurtenances, SCADA work not indicated in the proposal presented in Appendix A, and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

1.32 Interior Finished Water Line Piping: New finished water line shall be measured as a lump sum payment. Price shall include new water line, complete in place as shown on the contract drawings, and shall include all pipe, fittings, valves, corporation stops, service saddles, all types of joint restraints and pipe supports, and all materials, equipment, and labor to install pipe, perform pressure tests, flushing, and disinfecting.

1.33 Interior Raw Water Line Piping: New raw water line shall be measured as a lump sum payment. Price shall include new water line, complete in place as shown on the contract drawings, and shall include all pipe, fittings, valves, corporation stops, service saddles, all types of joint restraints and pipe supports, inline static mixers, WW Associates Project No. 221009.01 01320/6 and all materials, equipment, and labor to install pipe, perform pressure tests, flushing, and disinfecting.

1.34 Chemical Feed System Installation/Startup: Installation and startup of each chemical feed system shall be measured as a lump sum payment item. This price shall include all work to install and startup each chemical storage tank, chemical feed pumps, miscellaneous equipment items and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications. Price shall include new chemical feed conduit, tubing, fittings, valves, corporation stops, service saddles, all types of pipe supports, and all materials, equipment, and labor to install conduit, tubing, and perform pressure tests and flushing.

1.35 Chlorine Solution Piping/Conduit: New chlorine solution conduit and tubing shall be measured as a lump sum payment. Price shall include new chemical feed conduit, tubing, fittings, valves, corporation stops, service saddles, all types of pipe supports, and all materials, equipment, and labor to install conduit, tubing, and perform pressure tests and flushing to complete the work according to the drawings and these specifications.

1.36 New Chemicals for Startup: Furnishing bulk chemicals for chemical feed system startup shall be measured as a lump sum payment item. This price shall include all necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and in accordance with these specifications.

1.37 Gas Chlorination Feed System Installation/Startup: Installation and startup of the gas chlorination feed system shall be measured as a lump sum payment item. This price shall include all work to install and startup the gas chlorination equipment, miscellaneous equipment items and necessary tools, equipment, labor, materials, and incidentals necessary to complete the work according to the drawings and these specifications.

1.38 Demolition – Post-Chlorination Line – First Floor: Removal and replacement of existing post-chlorination line shall be measured as a lump sum payment. Price shall include all materials, equipment, and labor to disconnect, plug, remove and dispose of existing line.

1.39 Additional Items: Additional items shall be measured as a lump sum payment. This price shall be full compensation for all labor, equipment, and materials required to complete the work as shown on the drawings and in these specifications that are not addressed by the other Measurement and Payment Definitions Items specified herein. Additional items shall be identified by the Contractor on the Bid Schedule for each Base Bid Item.

WW Associates Project No. 221009.01 01400/1

Section 01400 General Requirements

1 GENERAL

1.1 Summary of Work

1.1.1 The work covered under this contract comprises the furnishing of all labor, materials, equipment, tools and services and the installation and construction of all items, and the performance of all work necessary to complete the work shown or called for on the drawings and/or this project manual.

1.1.2 All units under this Contract shall be operable, shall be installed as designed, and shall conform to the manufacturer’s specifications for the particular application.

1.2 Contractor Use of Premises

1.2.1 The Contractor shall assume full responsibility for protection and safekeeping of products stored on or off premises.

1.2.2 The Contractor shall coordinate use of premises with the Owner and Engineer, and remove stored products that interfere with the operations of the Owner or other contractors.

1.3 Construction and Scheduling Sequence

1.3.1 Construction of the project will require taking portions of the plant off-line at certain times.

1.3.1.1 Relocate utilities in the footprint of the new building prior to other construction.

1.3.1.2 Construct the new chemical feed / storage building addition prior to any chemical system work. Once the building addition is complete, complete chemical feed/storage improvements.

1.3.1.3 The Contractor shall not start disassembly/demolition of any chemical feed system until the new chemical feed/storage system is online and fully functional. The Contractor shall perform a 5 (consecutive) day on-line performance test to demonstrate the new chemical feed/storage system is in proper working order. The Contractor shall maintain the existing gas chlorination system in operation until the new gas chlorination system has been constructed and is fully functional.

1.3.1.4 The Contractor shall perform switchovers from the existing chemical feed to the new chemical feed/storage systems during discrete nighttime outages. No more than one chemical system

WW Associates Project No. 221009.01 01400/2 shall be switched over during a given outage. Each nighttime outage will not exceed eight hours. This outage may occur from 8:00 P.M. to 4:00 A.M. Provide all equipment and personnel required to facilitate the work during each outage.

1.3.2 The water treatment plant shall remain in full operation during the construction period. Phases of the construction which involve the temporary interruption of essential services and demolition of existing items shall be scheduled in consultation with the Owner or his representative, shall not be of longer duration than essential to accomplish the purpose for such interruptions, and shall be coordinated to give the Owner the ability to maintain water service. Requests for interruptions and outages must be submitted in writing to the Owner a minimum of 2 weeks in advance of the interruption or outage for review and approval. Written permission granted by the Owner’s representatives (i.e., the Water Plant Manager and the Director of Community Development) as part of the approval process.

Liaison with the Owner in these matters is a salient feature of this contract.

1.3.3 Provide a written construction schedule and plan which describes in detail each major task and operation which will interfere with any existing system, equipment, or operation. The plan shall describe the sequence and proposed method of accomplishing each task and the proposed schedule for interruptions.

1.3.4 All construction activities shall be performed within the property boundaries and inside acquired easements and right of ways designated for this project.

Laydown areas for this project shall be the Contractor’s responsibility.

1.3.5 The Contractor shall maintain access for chemical truck deliveries to the plant.

1.3.6 The Owner and its operators shall have full access to equipment and structures under construction at all times to allow them to maintain operation of the water treatment plant.

1.3.7 The Contractor shall make provisions for protecting all asphalt and concrete surfaces. Rubber tired vehicles will be required. Any damage to asphalt or concrete surfaces shall repaired/replaced in kind by the Contractor.

1.3.8 The Contractor shall create a pre-construction video of the entire project area to demonstrate pre-construction conditions. The Contractor shall provide the Owner with a DVD of the pre-construction video as a submittal.

1.4 Work Restrictions

1.4.1 Occupancy: If the Owner elects to operate any of the project improvements under partial utilization, prior to the project’s final acceptance, neither WW Associates, Inc. nor the Contractor shall be held responsible for the safety or

WW Associates Project No. 221009.01 01400/3 well being of those occupants beyond the normal care and practice of the construction industry.

1.4.2 Normal working hours for the Contractor shall be 7:00 A.M. to 3:00 P.M., Monday through Friday, excluding state and federal holidays, unless otherwise approved by the Owner and WW Associates, Inc.

1.5 Procurement

1.5.1 All procurement activities involving the expenditure of Federal funds must be conducted in compliance with the Procurement Standards codified in 2 C.F.R. § 200.317 through § 200-326 unless otherwise directed in writing by the Federal agency or state pass-through agency that awarded the funds. The Town of Orange will follow all applicable local, state, and Federal procurement requirements when expending Federal funds. Should the Town of Orange have more stringent requirements, the most restrictive requirements shall apply so long as it is consistent with state and Federal law.

1.5.2 The Davis Bacon Act and CFR 35.10030, American Iron and Steel does not apply.

1.6 Contract Modification Procedures

1.6.1 Change Orders: No amount, in part or in whole, of a change order shall be included in a requisition for payment by the Contractor until the change order has been executed and copies of the change order have been distributed to the Owner and Contractor.

1.6.2 Work Orders: A work order is a device which enables the Owner to promptly order changes in the work which may involve changes in cost or contract time, or both pending preparation and execution of a formal change order.

1.6.3 Request for Change Order Proposal: The Owner may request the Contractor to submit a change order proposal for changes in contract work. The Contractor shall submit the proposal in accordance with contract requirements within 3 days of a request by the Engineer or Owner. The Owner may issue to the Contractor a work order authorizing the required changes for an additional amount not to exceed, or a deduction of not less than the amount shown in the work order. If the Contractor is not in agreement with the amount stipulated in the work order, he shall, within a reasonable time after the issue date of the order, submit to WW Associates, Inc. an equitable proposal and develop with the Owner a mutually acceptable price for the required change in work.

1.6.4 The Contractor may initiate changes by submitting a written notice to the Engineer containing:

WW Associates Project No. 221009.01 01400/4

1.6.4.1 Description of the proposed changes.

1.6.4.2 Statement of the reason for making the changes.

1.6.4.3 Statement of the effect on the Contract Sum and the Contract Time.

1.6.4.4 Statement of the effect on the Work of separate Contractors.

1.6.4.5 Documentation supporting any change in Contract Sum or Contract Time, as appropriate.

1.7 Payment Procedures

1.7.1 Applications and Certificates for Payment: The form of each application for payment shall be EJCDC Document C-620 entitled, “Application and Certificate for Payment” accompanied by “Continuation Sheet,” and “Stored Material Summary.” Each application for payment by the Contractor, excluding the first, shall be accompanied by a “Contractor’s Affidavit of Payment of Debts and Claims,” AIA Document G706, and “Contractor’s Affidavit of Release of Liens,” AIA Document G706A. Each application shall be submitted on forms. Payment for stored material delivered but not incorporated in the work will be the invoiced amount only. Submit invoices with application for payment.

1.7.2 Upon recommendation by WW Associates, Inc. of the Contractor’s request for partial payment, the Owner shall pay to the Contractor 95 percent of the total amount due and the Owner shall retain 5 percent of the amount due until final completion and acceptance of all work covered by the contract.

1.7.3 Schedule of Values: Submit complete schedule of values at least 10 days prior to first application for payment.

1.8 Project Meetings

1.8.1 Preconstruction conferences with the Contractor will be held after the effective date of the agreement.

1.8.2 Progress Meetings: Each month, the Contractor, Engineer, and the Owner shall hold a progress meeting to review progress to date and to resolve all questions for the upcoming month.

1.9 Progress Schedules: Submit a detailed construction schedule prior to the preconstruction conference.