WTP Gen and WWTF Gen and MCC Portfolio.pdf
PDF 38 MB Posted
- Solicitation number
- 250506-1
- Issued by
- Otero County, Colorado
About this file
The document is a comprehensive bid set for the City of Craig, Colorado, involving the WWTF Generator Addition and WTP Generator Addition & MCC Replacement project. The City will receive sealed bids until 10:00 a.m. on Tuesday, May 6, 2025, at the City Clerk's office. The project involves installing emergency generators and automatic transfer switches at the City's Wastewater Treatment Facility (WWTF) and Water Treatment Plant (WTP), including concrete pads, conduit trenching, masonry repairs, painting, and associated electrical work. A mandatory pre-bid meeting is scheduled for 1:00 p.m. on Tuesday, April 22, 2025, at City Hall, with questions accepted until the end of the day on Tuesday, April 29, 2025.
The project is funded through EPA Community Project Funding and is subject to specific requirements including the Davis-Bacon Act, Disadvantaged Business Enterprise (DBE) provisions, Build America, Buy America (BABA), and American Iron and Steel (AIS) requirements. Contractors will be required to compete six good faith efforts for subcontractor procurement. The prevailing wages are based on Heavy Construction in Moffat County, with wage determinations provided in the project documents. The City will provide pre-purchased equipment for the project, including generator sets, main distribution switchboards, main control centers, and automatic transfer switches, with the contractor responsible for installation, tracking shipments, and storage. The project has specific seasonal restrictions and outage limitations, with water treatment plant outages prohibited during the high water use season (March through August) and limited to three days in duration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
R ev is io n
Dwg No.
Job No.
Drawn by:
Date:
File:
PE:QC:
D at e By
Pr oj ec t M ile st on e:
2013-520.036
KNL
4/7/2025
CAP
GenSitePlan-WWTPAdmin
EMC
G001
Scope of Work Installation of new emergency diesel generators at Wastewater Treatment Plant and Water Treatment Plant. Work includes:
- Generator and Associated Electrical Equipment Installation
- Site Preparation and Restoration
- Ductbank Installation
- Associated Electrical Work
G001 - COVER
G002 - LEGENDS & ABBREVIATIONS
G003 - GENERAL NOTES
C101 - WWTP EXISTING CONDITIONS
C102 - WWTP SITE PLAN
C501 - WWTP CIVIL DETAILS
E001 - ELECTRICSL LEGEND AND GENERAL NOTES
E101 - ELECTRICAL SITE PLAN
E401 - ENLARGED ELECTRICAL PLANS
E601 - ELECTRICAL SCHEDULES AND DIAGRAMS
Sheet Index
Vicinity Map
Project Engineer
Chad Paulson, P.E. 33326
BI
S
ET
WWTP GENERATOR ADDITION
CITY OF CRAIG
118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com
Carl Ray, Water & Wastewater Director 300 W 4th St.
Craig, CO, 81625
Bid Set April 2025
Title:
W
TP
G
EN
ER
AT
O
AD
IT
IO
N
COVER
C
Y
F
AI
es t S ixt h
St re et , S ui te le nw oo d Sp rin gs
, C
0.
5.
w
.s gm -in c.
co m
WWTF Project Site
Electrical Engineer
Amber Haymes, P.E. 51258
AutoCAD SHX Text
I:\2013\2013-520_CityOfCraig\030-WTPMCCReplacement\H-Dwgs\Civil\PS-SheetSet\GenSitePlan-WWTPAdmin.dwg Plotted: 4/7/2025 4:50 PM By: Elle Coe Plotted: 4/7/2025 4:50 PM By: Elle Coe4/7/2025 4:50 PM By: Elle Coe By: Elle CoeElle Coe
UNCC 1-800-922-1987
T
C FO
TR U
E
U WT
E FO IR
C WE FO G S T U
EC FO
TRT U
GV
ICV
SV
GV
OSW
ET ET
M
GM EM WM
G W S
GM EM WM
C FO
TR U
EC FO
TRT U
G W S
SV
ICV
OSW
H
Y D
ICB
CO
SPR
ICB
SPR
CO
Y D
G002
LEGENDS &
ABBREVIATIONS
@ AT AT °DEGREE DIAMETER # NUMBER NUMBER AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS ABC AGGREGATE BASE COURSE AGGREGATE BASE COURSE ABUT ABUTMENT ABUTMENT ALT ALTERNATE ALTERNATE AP ANGLE POINT ANGLE POINT APWA AMERICAN PUBLIC WORKS ASSOCIATION AMERICAN PUBLIC WORKS ASSOCIATION AS ASPHALT ASPHALT ASD ALLOWABLE STRESS DESIGN ALLOWABLE STRESS DESIGN ASPH ASPHALT ASPHALT ATB ASPHALT TREATED BASE ASPHALT TREATED BASE BM BENCHMARK BENCHMARK BMP BEST MANAGEMENT PRACTICES BEST MANAGEMENT PRACTICES BP BEGIN PROJECT, BEGINNING POINT BEGIN PROJECT, BEGINNING POINT BT BEGIN TRANSITION BEGIN TRANSITION BVCE BEGINNING VERTICAL CURVE BEGINNING VERTICAL CURVE ELEVATION BVCS BEGINNING VERTICAL CURVE STATION BEGINNING VERTICAL CURVE STATION BW BOTTOM OF WALL BOTTOM OF WALL C CURB CURB CC CURB CUT CURB CUT CDOT COLORADO DEPARTMENT OF COLORADO DEPARTMENT OF TRANSPORTATION CDPHE COLORADO DEPARTMENT OF PUBLIC COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT CF CUBIC FEET CUBIC FEET CG CURB AND GUTTER CURB AND GUTTER CIP CAST IN PLACE CAST IN PLACE CL CENTERLINE CENTERLINE CMP CORRUGATED METAL PIPE CORRUGATED METAL PIPE CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CO CONCRETE CONCRETE COM COMMUNICATIONS COMMUNICATIONS CONC CONCRETE CONCRETE CONST CONSTRUCTION CONSTRUCTION CONT CONTINUOUS CONTINUOUS COR CORNER CORNER CPE CORRUGATED POLYETHYLENE PIPE CORRUGATED POLYETHYLENE PIPE CSP CORRUGATED STEEL PIPE CORRUGATED STEEL PIPE CTB CEMENT TREATED BASE CEMENT TREATED BASE CU CUBIC CUBIC CY CUBIC YARD CUBIC YARD D DEEP DEEP DEG DEGREES DEGREES DIA DIAMETER DIAMETER DIP DUCTILE IRON PIPE DUCTILE IRON PIPE DR DRAIN DRAIN DTM DIGITAL TERRAIN MODEL DIGITAL TERRAIN MODEL DW DRIVEWAY DRIVEWAY DWG DRAWING DRAWING E EASTING EASTING EA EACH EACH EB EAST BOUND EAST BOUND EG EXISTING GRADE EXISTING GRADE EL ELEVATION ELEVATION ELEV ELEVATION ELEVATION EOA EDGE OF ASPHALT EDGE OF ASPHALT EOD EDGE OF DRIVEWAY EDGE OF DRIVEWAY EOC EDGE OF CONCRETE EDGE OF CONCRETE EOG EDGE OF GRAVEL EDGE OF GRAVEL EOM EDGE OF MILLNGS EDGE OF MILLNGS EOP EDGE OF PAVEMENT EDGE OF PAVEMENT EP END PROJECT, END POINT END PROJECT, END POINT ES ELECTRIC SERVICE ELECTRIC SERVICE ESMT EASEMENT EASEMENT EST ESTIMATE ESTIMATE EVCE END VERTICAL CURVE ELEVATION END VERTICAL CURVE ELEVATION EVCS END VERTICAL CURVE STATION END VERTICAL CURVE STATION EX EXISTING EXISTING EXIST EXISTING EXISTING EXT EXTERIOR EXTERIOR FEMA FEDERAL EMERGENCY MANAGEMENT FEDERAL EMERGENCY MANAGEMENT AGENCY FES FLARED END SECTION FLARED END SECTION FF FINISHED FLOOR FINISHED FLOOR FG FINISHED GRADE FINISHED GRADE FH FIRE HYDRANT FIRE HYDRANT FHWA FEDERAL HIGHWAY ADMINISTRATION FEDERAL HIGHWAY ADMINISTRATION FL FLOWLINE FLOWLINE FOW FACE OF WALL FACE OF WALL FRTF FRONT FACE FRONT FACE FT FEET FEET G GAS GAS GAL GALLONS GALLONS GALV GALVANIZED GALVANIZED GB GRADE BREAK GRADE BREAK GIS GEOGRAPHICAL INFORMATION SYSTEM GEOGRAPHICAL INFORMATION SYSTEM GPS GLOBAL POSITIONING SYSTEM GLOBAL POSITIONING SYSTEM GR GRAVEL GRAVEL GRAV GRAVEL GRAVEL GS GAS SERVICE GAS SERVICE GSP GALVANIZED STEEL PIPE GALVANIZED STEEL PIPE GV GATE VALVE GATE VALVE HAZMAT HAZARDOUS MATERIALS HAZARDOUS MATERIALS HC HANDICAP RAMP HANDICAP RAMP HDPE HIGH DENSITY POLYETHYLENE HIGH DENSITY POLYETHYLENE HMA HOT MIXED ASPHALT HOT MIXED ASPHALT HORIZ HORIZONTAL HORIZONTAL HWY HIGHWAY HIGHWAY HYD HYDRANT HYDRANT ID INSIDE DIAMETER INSIDE DIAMETER INT INTERSECTION INTERSECTION INV INVERT INVERT IP INLET PROTECTION INLET PROTECTION JB JUNCTION BOX JUNCTION BOX L LEFT LEFT LGTH LENGTH LENGTH LB POUNDS POUNDS LB/FT POUNDS PER FOOT POUNDS PER FOOT LF LINEAR FOOT LINEAR FOOT LPFM LOW PRESSURE FORCE MAIN LOW PRESSURE FORCE MAIN LP LOW POINT LOW POINT LS LUMP SUM LUMP SUM LSA LANDSCAPED AREA LANDSCAPED AREA LT LIGHT POLE LIGHT POLE LTB LIME TREATED BASE LIME TREATED BASE M METERS METERS MAT'L MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MH MANHOLE MANHOLE MIN MINIMUM MINIMUM MISC MISCELLANEOUS MISCELLANEOUS MP MILE POST MILE POST MSE MECHANICALLY STABILIZE EARTH MECHANICALLY STABILIZE EARTH MW MONITORING WELL MONITORING WELL N NORTHING NORTHING N/A NOT APPLICABLE NOT APPLICABLE NAT NATIVE GRASS AREA NATIVE GRASS AREA NB NORTH BOUND NORTH BOUND NE NORTHEAST NORTHEAST NEPA NATIONAL ENVIRONMENTAL POLICY ACT NATIONAL ENVIRONMENTAL POLICY ACT NFPA NATIONAL FIRE PROTECTION ASSOCIATION NATIONAL FIRE PROTECTION ASSOCIATION NIP NAIL IN PLACE NAIL IN PLACE NO NUMBER NUMBER NPDES NATIONAL POLLUTANT DISCHARGE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NTP NOTICE TO PROCEED NOTICE TO PROCEED NTS NOT TO SCALE NOT TO SCALE NW NORTHWEST NORTHWEST O/S OFFSET OFFSET OC ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER OH OVERHEAD OVERHEAD OP OUTLET PROTECTION OUTLET PROTECTION OT OVERHEAD TELEPHONE OVERHEAD TELEPHONE PC POINT OF CURVATURE POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE POINT OF COMPOUND CURVATURE PERM PERMANENT PERMANENT PG PAGE PAGE PGL PROFILE GRADE LINE PROFILE GRADE LINE PI POINT OF INTERSECTION POINT OF INTERSECTION PL PROPERTY LINE PROPERTY LINE PM PROJECT MANAGER PROJECT MANAGER PNT POINT POINT POC POINT ON CURVE POINT ON CURVE POT POINT ON TANGENT POINT ON TANGENT PRC POINT OF REVERSE CURVE POINT OF REVERSE CURVE PROP PROPOSED PROPOSED PSF POUNDS PER SQUARE FEET POUNDS PER SQUARE FEET PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PT POINT OF TANGENCY POINT OF TANGENCY PUD PLANNED UNIT DEVELOPMENT PLANNED UNIT DEVELOPMENT PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION POINT OF VERTICAL INTERSECTION PVMT PAVEMENT PAVEMENT PVT POINT OF VERTICAL TANGENCY POINT OF VERTICAL TANGENCY Q PEAK DISCHARGE PEAK DISCHARGE QA/QC QUALITY ASSURANCE/QUALITY CONTROL QUALITY ASSURANCE/QUALITY CONTROL QTY QUANTITY QUANTITY R RIGHT RIGHT R-R REMOVE AND REPLACE REMOVE AND REPLACE RAD RADIUS RADIUS RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE REF REFERENCE REFERENCE REQ REQUIRED REQUIRED REVEG REVEGETATE REVEGETATE ROW RIGHT OF WAY RIGHT OF WAY RP RADIUS POINT RADIUS POINT RSS REINFORCED SOIL SLOPE REINFORCED SOIL SLOPE RW RETAINING WALL RETAINING WALL SAN SANITARY SANITARY SB SOUTH BOUND SOUTH BOUND SCF SEDIMENT CONTROL FENCE SEDIMENT CONTROL FENCE SD STORM DRAIN STORM DRAIN SDR STANDARD DIMENSION RATIO STANDARD DIMENSION RATIO SE SOUTHEAST SOUTHEAST SECT SECTION SECTION SF SQUARE FEET SQUARE FEET SHLDR SHOULDER SHOULDER SL SANITARY SEWER LINE SANITARY SEWER LINE SMH SANITARY SEWER MANHOLE SANITARY SEWER MANHOLE SOD GRASS AREA GRASS AREA SS SANITARY SEWER SERVICE SANITARY SEWER SERVICE SSD STOPPING SIGHT DISTANCE STOPPING SIGHT DISTANCE STA STATION STATION STBK SETBACK SETBACK SW SIDEWALK SIDEWALK SY SQUARE YARDS SQUARE YARDS SYM SYMMETRICAL SYMMETRICAL T TREAD STAIRS TREAD STAIRS TAN TANGENT TANGENT TBC TOP BACK OF CURB TOP BACK OF CURB TBLK THRUST BLOCK THRUST BLOCK TC TOP OF CURB TOP OF CURB TCE TEMPORARY CONSTRUCTION EASEMENT TEMPORARY CONSTRUCTION EASEMENT TELE TELEPHONE TELEPHONE TEMP TEMPORARY TEMPORARY TP TOP OF PIPE TOP OF PIPE TRANS TRANSITION TRANSITION TW TOP OF WALL TOP OF WALL TYP TYPICAL TYPICAL UCTV UNDERGROUND CABLE TELEVISION LINE UNDERGROUND CABLE TELEVISION LINE UE UNDERGROUND ELECTRIC LINE UNDERGROUND ELECTRIC LINE UG UNDERGROUND GAS LINE UNDERGROUND GAS LINE UT UNDERGROUND TELEPHONE LINE UNDERGROUND TELEPHONE LINE VC VERTICAL CURVE VERTICAL CURVE VCP VITRIFIED CLAY PIPE VITRIFIED CLAY PIPE W WIDE WIDE W/ WITH WITH WB WEST BOUND WEST BOUND WL WATER LINE WATER LINE WS WATER SERVICE WATER SERVICE WQCD WATER QUALITY CONTROL DIVISION WATER QUALITY CONTROL DIVISION WS WATER SERVICE WATER SERVICE X-S CROSS SLOPE CROSS SLOPE YD YARDYARD
OVERHEAD TELEPHONE LINE UNDERGROUND TELEPHONE LINE LOW PRESSURE GAS LINE HIGH PRESSURE GAS LINE UNDERGROUND CABLE TELEVISION LINE OVERHEAD CABLE TELEVISION LINE UNDERGROUND ELECTRICAL LINE OVERHEAD ELECTRICAL LINE WATER LINE WATER SERVICE LINE SANITARY SEWER LINE SANITARY SEWER SERVICE LINE FIBER OPTIC LINE IRRIGATION LINE BARBED-WIRE FENCE LINE CHAIN LINK FENCE EDGE OF ASPHALT EDGE OF CONCRETE CENTERLINE CONTOURS RIGHT-OF-WAY TOP OF CUT TOP OF FILL EASEMENT
EXISTING PROPOSED DESCRIPTIONPROPOSED DESCRIPTIONDESCRIPTION
ASPHALT MILLING ASPHALT CONCRETE SURFACING (PLAN VIEW) GRAVEL SURFACING UNDISTURBED SOIL RECOMPACTED SOIL
EXISTING PROPOSED DESCRIPTIONPROPOSED DESCRIPTION DESCRIPTIONDESCRIPTION
%%UHATCHING
MONUMENT MARKER CONTROL POINT MARKERS (CATV, ELEC, FIBER) (TELE, TRAFFIC, UNKNOWN) PEDESTALS (CATV, ELEC, FIBER) (TELE, TRAFFIC, UNKNOWN) MANHOLES (DRAINAGE, ELEC, FIBER, IRRIGATION, SANITARY, TELEPHONE, UNKNOWN, WATER) VAULTS/HANDHOLES (CATV, ELEC, FIBER, TELE, TRAFFIC, UNKNOWN) ELECTRIC TRANSFORMER GAS VALVE SANITARY VALVE IRRIGATION CONTROL VALVE WATER VALVE WATER SHUTOFF VALVE FIRE HYDRANT VENTS(GAS,WATER,SEWER,MISC.) METERS (GAS, ELECTRIC, WATER) GAS WELL MONITORING WELL WATER WELL CLEAN-OUT WATER SPIGOT IRRIGATION CONTROL BOX IRRIGATION HEADGATE IRRIGATION SPRINKLER HEAD PVC PIPE UTILITY POLE GUY WIRE BOLLARD "T" POST TRANSITION FROM SPILL TO CATCH GUTTER MINIMUM 4" TOP SOIL OR SPECIFIED ALTERNATIVE
EXISTING PROPOSED DESCRIPTION PROPOSED DESCRIPTIONPROPOSED DESCRIPTION DESCRIPTIONDESCRIPTION
LINETYPES
SYMBOLS
LEGEND
I:\2013\2013-520_CityOfCraig\030-WTPMCCReplacement\H-Dwgs\Civil\PS-SheetSet\GenSitePlan-WWTPAdmin.dwg Plotted: 4/7/2025 4:50 PM By: Elle Coe Plotted: 4/7/2025 4:50 PM By: Elle Coe4/7/2025 4:50 PM By: Elle Coe By: Elle CoeElle Coe
G003
GENERAL NOTES
EARTHWORK 1. TOPSOIL IS TO BE STRIPPED PRIOR TO COMMENCING ROUGH GRADING. STRIPPED TOPSOIL GENERATED TOPSOIL IS TO BE STRIPPED PRIOR TO COMMENCING ROUGH GRADING. STRIPPED TOPSOIL GENERATED ONSITE IS TO BE STOCKPILED AND USED FOR RE-VEGETATION. 2. ANY OPEN EXCAVATION LEFT UNATTENDED SHALL BE BARRICADED OR FENCED OFF BY THE CONTRACTOR. ANY OPEN EXCAVATION LEFT UNATTENDED SHALL BE BARRICADED OR FENCED OFF BY THE CONTRACTOR. 3. IF BEDROCK IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF BEDROCK. IF BEDROCK IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF BEDROCK. 4. IF GROUNDWATER IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF IF GROUNDWATER IS ENCOUNTERED CONTACT ENGINEER BEFORE PROCEEDING WITH WORK IN AREA OF GROUNDWATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY GROUNDWATER ENCOUNTERED DURING THE CONSTRUCTION OF ANY PORTION OF THIS PROJECT. GROUNDWATER SHALL BE PUMPED, PIPED, REMOVED AND DISPOSED OF IN A MANNER WHICH DOES NOT CAUSE FLOODING OF EXISTING STREETS OR EROSION ON ABUTTING PROPERTIES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND MEETING REQUIREMENTS OF CDPHE WATER QUALITY CONTROL DIVISION DEWATERING PERMIT FOR ANY DEWATERING DISCHARGES. 5. THE CONTRACTOR SHALL CERTIFY THAT ALL AGGREGATES USED ON THIS PROJECT ARE FREE FROM THE CONTRACTOR SHALL CERTIFY THAT ALL AGGREGATES USED ON THIS PROJECT ARE FREE FROM HAZARDOUS COMPONENTS IN EXCESS OF THE THRESHOLD CONCENTRATIONS ESTABLISHED BY THE E.P.A. 6. PLACEMENT OF AGGREGATE BASE COURSE OR PAVING SHALL NOT BEGIN UNTIL THE ENGINEER HAS PLACEMENT OF AGGREGATE BASE COURSE OR PAVING SHALL NOT BEGIN UNTIL THE ENGINEER HAS APPROVED THE SUBGRADE. EXISTING SUBGRADE MATERIAL SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES, MOISTURE CONDITIONED AND RECOMPACTED. THE SUBGRADE SHALL BE PROOF ROLLED AND APPROVED BY THE ENGINEER PRIOR TO THE PLACEMENT OF ANY SUBSEQUENT STRUCTURAL LAYERS. AREAS THAT DEFORM UNDER HEAVY WHEEL LOADS AS DETERMINED BY THE ENGINEER ARE NOT STABLE AND SHALL BE REMOVED AND REPLACED TO ACHIEVE A STABLE SUBGRADE. THE ENGINEER SHALL APPROVE THE TYPE AND WEIGHT OF THE VEHICLE TO BE USED FOR THE PROOF ROLL. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND LABOR NECESSARY FOR THE PROOF ROLL. PROOF ROLLING WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE WORK. 7. MOISTURE DENSITY CONTROL WILL BE REQUIRED FOR FULL DEPTH OF EMBANKMENTS AND AGGREGATE BASE MOISTURE DENSITY CONTROL WILL BE REQUIRED FOR FULL DEPTH OF EMBANKMENTS AND AGGREGATE BASE COURSE IN PAVED AREAS. DEMOLITION AND REMOVALS 1. SAWCUT ALL ASPHALT AND CONCRETE PAVEMENT TO BE REMOVED. FINAL LIMITS OF REQUIRED SAWCUTTING SAWCUT ALL ASPHALT AND CONCRETE PAVEMENT TO BE REMOVED. FINAL LIMITS OF REQUIRED SAWCUTTING AND PATCHING MAY VARY FROM LIMITS SHOWN ON PLANS. CONTRACTOR TO PROVIDE SAWCUT AND PATCH WORK TO ACHIEVE POSITIVE DRAINAGE AND A SMOOTH TRANSITION TO EXISTING ASPHALT WITHIN SLOPES ACCEPTABLE TO THE ENGINEER AND WITHIN MUNICIPAL STANDARDS. CONTRACTOR SHALL PROVIDE ADDITIONAL SAWCUTTING AND PATCHING AT UTILITY WORK, CONNECTION POINTS TO EXISTING PAVEMENT AND FEATURES, ETC. THAT MAY NOT BE DELINEATED ON PLANS. 2. ALL EXCESS MATERIALS GENERATED FROM THE SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ALL EXCESS MATERIALS GENERATED FROM THE SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DISPOSED OF PROPERLY.
GENERAL REQUIREMENTS: 1. WORK TO INCLUDE: WORK TO INCLUDE: 2. WORK SHALL MEET STANDARDS SET BY THE PROJECT'S JURISDICTIONS OF AUTHORITY. THIS INCLUDES BUT IS WORK SHALL MEET STANDARDS SET BY THE PROJECT'S JURISDICTIONS OF AUTHORITY. THIS INCLUDES BUT IS NOT LIMITED TO HOA STANDARDS, SPECIAL DISTRICT STANDARDS, CITY/TOWN STANDARDS, COUNTY STANDARDS, AND STATE STANDARDS. 3. ALL WORK SHALL BE DONE TO THE HORIZONTAL AND VERTICAL INFORMATION SHOWN ON THE PLANS. NO ALL WORK SHALL BE DONE TO THE HORIZONTAL AND VERTICAL INFORMATION SHOWN ON THE PLANS. NO FIELD CHANGES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER. 4. THE DESIGN IS BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN. THIS INCLUDES BUT THE DESIGN IS BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN. THIS INCLUDES BUT IS NOT LIMITED TO SITE CONDITIONS, FEATURES AND STRUCTURES, AND TOPOGRAPHICAL INFORMATION. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THE FEATURES SHOWN. THE CONTRACTOR SHALL REVIEW AND VERIFY EXISTING PHYSICAL FEATURES AND ELEVATIONS OF THE CONDITIONS TO BE ENCOUNTERED DURING CONSTRUCTION. 5. ANY DISCREPANCY WITHIN THESE PLANS SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ANY DISCREPANCY WITHIN THESE PLANS SHOULD BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER. 6. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. ANY DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. CONSTRUCTION ACTIVITIES INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF LITTER, AND ANY OTHER ACTION WHICH WOULD ALTER EXISTING CONDITIONS. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR SAFELY PERFORMING ALL WORK IN ACCORDANCE WITH APPLICABLE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFELY PERFORMING ALL WORK IN ACCORDANCE WITH APPLICABLE OSHA STANDARDS AND REGULATIONS. 8. THE ENGINEER AND OWNER SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY THE ENGINEER AND OWNER SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION. 9. COORDINATE ALL FACILITY OUTAGES AT LEAST TWO WEEKS IN ADVANCE, AND OBTAIN WRITTEN APPROVAL FROM COORDINATE ALL FACILITY OUTAGES AT LEAST TWO WEEKS IN ADVANCE, AND OBTAIN WRITTEN APPROVAL FROM THE CITY WATER AND WASTEWATER DIRECTOR. ALLOWABLE DURATION OF OUTAGES VARIES SEASONALLY, REFER TO PROJECT MANUAL APPENDIX B FOR DETAILS. 10. ALL PUBLIC AND PRIVATE UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS (OR AS REQUIRED BY ALL PUBLIC AND PRIVATE UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS (OR AS REQUIRED BY UTILITY COMPANIES) PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY. 11. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE OWNER AND THEIR ASSIGNED ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE OWNER AND THEIR ASSIGNED REPRESENTATIVE. THE OWNER AND THEIR ASSIGNED REPRESENTATIVE RESERVE THE RIGHT TO ACCEPT OR REJECT ANY MATERIALS AND WORKMANSHIP THAT DO NOT CONFORM TO THE PLANS OR SPECIFICATIONS. 12. PROJECT ACCEPTANCE TESTING WILL BE PERFORMED BY THE OWNER. CONTRACTOR SHALL PROVIDE 48 HOUR PROJECT ACCEPTANCE TESTING WILL BE PERFORMED BY THE OWNER. CONTRACTOR SHALL PROVIDE 48 HOUR MINIMUM NOTICE FOR REQUIRED TESTS. 13. PROGRESS AND RECORD PHOTOGRAPHS/VIDEOS SHALL BE PROVIDED BY THE CONTRACTOR TO RESOLVE PROGRESS AND RECORD PHOTOGRAPHS/VIDEOS SHALL BE PROVIDED BY THE CONTRACTOR TO RESOLVE DISPUTES AND TO DOCUMENT THE WORK PERFORMED AS A SUPPLEMENT TO THE RECORD DRAWINGS. IN GENERAL, ANY PHOTOGRAPHS/VIDEOS SHOULD BE SUFFICIENT TO SHOW THAT ALL WORK WAS PROPERLY COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. 14. SUBMITTALS SHALL BE PROVIDED FOR ALL MATERIALS TO BE INCORPORATED INTO THE PROJECT. SHOP SUBMITTALS SHALL BE PROVIDED FOR ALL MATERIALS TO BE INCORPORATED INTO THE PROJECT. SHOP DRAWINGS SHALL BE PROVIDED FOR ALL ITEMS HAVING DIMENSIONAL REQUIREMENTS. MATERIALS SUBMITTALS AND SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. THE ENGINEER'S REVIEW SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR ACCURACY, PROPER FIT OR PROPER FUNCTIONING AND PERFORMANCE OF THE WORK. 15. THE CONTRACTOR WILL BE RESPONSIBLE FOR DAILY CLEANING OF THE JOB SITE DURING AND AFTER THE CONTRACTOR WILL BE RESPONSIBLE FOR DAILY CLEANING OF THE JOB SITE DURING AND AFTER CONSTRUCTION. A CONTINUING EFFORT SHALL BE MADE THROUGH THE DURATION OF THE CONTRACT TO KEEP ALL AREAS CLEAN AND FREE OF ALL RUBBISH, REMOVED VEGETATION, CONSTRUCTION WASTE, EMPLOYEE WASTE, AND OTHER OBJECTIONABLE MATERIALS GENERATED FROM THE PROJECT. WEEDS SHALL BE REMOVED IN DISTURBED AREAS PRIOR TO THEIR PRODUCING SEED AND PRIOR TO FINISHED GRADING AND LANDSCAPING INSTALLATION. 16. FINAL CLEAN-UP MUST BE APPROVED AND ACCEPTED BY THE OWNER BEFORE THE CONTRACT MAY BE FINAL CLEAN-UP MUST BE APPROVED AND ACCEPTED BY THE OWNER BEFORE THE CONTRACT MAY BE CONSIDERED COMPLETE. 17. THE CONTRACTOR SHALL MAINTAIN TWO FULL SETS OF CONTRACT DRAWINGS MARKED UP TO INDICATE THE THE CONTRACTOR SHALL MAINTAIN TWO FULL SETS OF CONTRACT DRAWINGS MARKED UP TO INDICATE THE AS-BUILT CONDITIONS. THE DRAWINGS SHALL BE PROVIDED TO THE OWNER AND THE ENGINEER UPON COMPLETION OF THE WORK. WHERE PRACTICAL, THE CONTRACTOR IS TO PROVIDE AT LEAST TWO TIES FROM PHYSICAL MONUMENTS TO ALL FITTINGS, VALVES, MANHOLES, AND THE END OF ALL SERVICE LINES. SURVEY NOTES: 1. SOURCE OF MAPPING: EXISTING FIELD CONDITIONS WERE GENERATED BY A SURVEY PERFORMED BY SGM, SOURCE OF MAPPING: EXISTING FIELD CONDITIONS WERE GENERATED BY A SURVEY PERFORMED BY SGM, GLENWOOD SPRINGS, CO. 2. PROPERTY LINES, MONUMENTS, BENCHMARKS, SURVEY CONTROL, AND ADDITIONAL HISTORIC SURVEY PROPERTY LINES, MONUMENTS, BENCHMARKS, SURVEY CONTROL, AND ADDITIONAL HISTORIC SURVEY INFORMATION CANNOT BE REMOVED FOR CONSTRUCTION. DISTURBED SURVEY ITEMS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE RESTORED BY A STATE OF COLORADO LICENSED LAND SURVEYOR. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION STAKING OF BOTH HORIZONTAL AND VERTICAL THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION STAKING OF BOTH HORIZONTAL AND VERTICAL LAYOUT ON THIS PROJECT. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER FOR INTERPRETATION AND INFORMATION IN STAKING OF THE PROJECT FOR CONSTRUCTION. PERMITS 1. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE WORK AND SHALL COMPLY WITH THE THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE WORK AND SHALL COMPLY WITH THE PERMIT CONDITIONS. ACCESS AND PROTECTION REQUIREMENTS 1. PROPERTY OWNER ACCESS SHALL BE MAINTAINED AT ALL TIMES BY THE CONTRACTOR. PROPERTY OWNER ACCESS SHALL BE MAINTAINED AT ALL TIMES BY THE CONTRACTOR. 2. ALL EXISTING UTILITIES, EITHER UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE ALL EXISTING UTILITIES, EITHER UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGE TO, OR INTERRUPTION OF SERVICES CAUSED BY THE CONSTRUCTION. TEMPORARY EROSION CONTROLS MEASURES 1. THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL MEASURES (A.K.A. BEST MANAGEMENT PRACTICES OR THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL MEASURES (A.K.A. BEST MANAGEMENT PRACTICES OR BMPs), TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL TEMPORARY EROSION CONTROL MEASURES. 2. ERODIBLE STOCKPILES (INCLUDING TOPSOIL) SHALL BE CONTAINED WITH ACCEPTABLE CONTROL MEASURES AT ERODIBLE STOCKPILES (INCLUDING TOPSOIL) SHALL BE CONTAINED WITH ACCEPTABLE CONTROL MEASURES AT THE TOE OF THE STOCKPILE THROUGHOUT CONSTRUCTION. STOCKPILES THAT ARE INACTIVE FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH HAY OR STRAW MULCH WITH TACKIFIER, BONDED FIBER MATRIX, HYDRAULIC MULCH WITH TACKIFIER OR SPRAY-ON MULCH BLANKET. 3. DUST MITIGATION SHALL BE PROVIDED BY THE CONTRACTOR AS NECESSARY. WATER SHALL BE USED AS A DUST MITIGATION SHALL BE PROVIDED BY THE CONTRACTOR AS NECESSARY. WATER SHALL BE USED AS A DUST PALLIATIVE WHERE AND WHEN REQUIRED. SWEEPING AND CLEANING STREETS AND SIDEWALKS DURING THE CONSTRUCTION WILL BE DIRECTED BY THE AFFECTED JURISDICTIONS AND PERFORMED AS NECESSARY BY THE CONTRACTOR. CONCRETE CONSTRUCTION 1. CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO PLACEMENT OF FLATWORK OF SITE CONDITIONS OR CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO PLACEMENT OF FLATWORK OF SITE CONDITIONS OR DISCREPANCIES WHICH PREVENT REQUIRED GRADES FROM BEING ACHIEVED. 1. THE EXISTING AND PROPOSED ELEVATIONS OF FLATWORK, SIDEWALKS, CURBS, THRESHOLDS, PAVING, ETC. AS THE EXISTING AND PROPOSED ELEVATIONS OF FLATWORK, SIDEWALKS, CURBS, THRESHOLDS, PAVING, ETC. AS SHOWN IN THE PLANS MAY BE BASED ON EXTRAPOLATION OF FIELD SURVEY DATA, EXISTING CONDITIONS, AND DATA PROVIDED BY OTHERS. AT CRITICAL AREAS AND SITE FEATURES, CONTRACTOR SHALL HAVE FORMWORK INSPECTED AND APPROVED BY OWNER, OWNER'S REPRESENTATIVE, OR ENGINEER PRIOR TO PLACING CONCRETE. MINOR ADJUSTMENTS, AS APPROVED, TO PROPOSED GRADES, INVERTS, ETC. MAY BE REQUIRED TO PREVENT PONDING OR SLOPES NOT IN CONFORMANCE WITH THE JURISDICTIONAL STANDARDS. ALL FLATWORK MUST PREVENT PONDING AND PROVIDE POSITIVE DRAINAGE AWAY FROM EXISTING AND PROPOSED BUILDINGS, WALLS, ROOF DRAIN OUTFALLS, ACROSS DRIVES AND WALKS TOWARDS THE PROPOSED INTENDED DRAINAGE FEATURES AND CONVEYANCES.
I:\2013\2013-520_CityOfCraig\030-WTPMCCReplacement\H-Dwgs\Civil\PS-SheetSet\GenSitePlan-WWTPAdmin.dwg Plotted: 4/7/2025 4:51 PM By: Elle Coe Plotted: 4/7/2025 4:51 PM By: Elle Coe4/7/2025 4:51 PM By: Elle Coe By: Elle CoeElle Coe
Graphic Scale
In Feet: 1" = 5'
3 5 10
GenSitePlanWWTP-ExCon
C101
WWTP EXISTING
CONDITIONS
EP
EP
EXISTING TRANSFORMER
EXISTING ELECTRICAL PANEL
I:\2013\2013-520_CityOfCraig\030-WTPMCCReplacement\H-Dwgs\Civil\PS-SheetSet\GenSitePlanWWTP-ExCon.dwg Plotted: 4/7/2025 4:51 PM By: Elle Coe Plotted: 4/7/2025 4:51 PM By: Elle Coe4/7/2025 4:51 PM By: Elle Coe By: Elle CoeElle Coe
Graphic Scale
In Feet: 1" = 10'
5 10 20
GenSitePlanWWTP-SitePlan-KNL
C102
WWTP SITE PLAN
SURROUNDING 4' ACCESS AREA. GRADE AWAY AT 4% FOR DRAINAGE.
GENERATOR FUEL CONNECTION TO BE ROADSIDE.
NOTES: 1. ALL CONDUIT RUNS MAY NOT BE SHOWN ON PLAN VIEWS, SEE ELECTRICAL ALL CONDUIT RUNS MAY NOT BE SHOWN ON PLAN VIEWS, SEE ELECTRICAL PLANS FOR REQUIREMENTS. SINGLE LINES MAY REPRESENT MULTIPLE CONDUITS.
CONCRETE PAD GRADING BASED ON 3:1 FILL REQUIREMENTS. PREP SUBGRADE PER DETAIL ON SHEET C501.
EXISTING OXIDATION DITCH
EXISTING AERATION BUILDING
REPAIR SIDEWALK TO MATCH EXISTING.
CONTRACTOR TO POTHOLE ALL SEWER CROSSINGS PRIOR TO DUCT BANK INSTALLATION. DUCT BANK TO BE BURIED PER DETAIL ON SHEET C501. CONTRACTOR TO NOTIFY ENGINEERS OF ANY CONFLICTS PRIOR TO CONTINUING WORK.
EXISTING SERVICE TRANSFORMER
EXISTING METERING CABINET
NEW DIRECT BURIED DUCT BANK, SEE SHEET E101 FOR CONFIGURATION DETAIL
NEW CONCRETE ENCASED DUCT BANK, SEE SHEET E101 FOR CONFIGURATION DETAIL.
ROUTE UNDER EXISTING ELECTRICAL.
CONCRETE PAD FOR GENERATOR AND ATS T.O.P. = 6177.55 B.O.P. = 6176.55
4.0'
CONTRACTOR TO DAYLIGHT CONDUITS AND RUN VERTICALLY UP THE EXTERIOR WALL OF THE EXISTING AERATION BUILDING UNTIL CORE. CONDUIT CORE TO BE A MINIMUM OF 24" ABOVE CONCRETE FOUNDATION WALL.
6176.41'
CONTRACTOR TO CLEAR COMBUSTIBLE MATERIALS UP TO 5FT AWAY FROM THE GENERATOR ON ALL SIDES
I:\2013\2013-520_CityOfCraig\022-GeneratorUpgrades\H-Dwgs\Civil\PS-SheetSet\GenSitePlanWWTP-SitePlan-KNL.dwg Plotted: 4/7/2025 4:51 PM By: Elle Coe Plotted: 4/7/2025 4:51 PM By: Elle Coe4/7/2025 4:51 PM By: Elle Coe By: Elle CoeElle Coe
CX2
N.T.S.
EXTERIOR CONCRETE GENERATOR PAD DETAIL
CX2
TRENCHING DETAIL
WWTF CONCRETE LAYOUT
FRONT PAD PROFILE SIDE PAD PROFILE
KL
CP
GenSitePlan-Det
EC
C501
WWTP Civil Details
12"
3" EEXT
1 " EEXT12" EEXT
#5 @ 12" O.C. W/ STD 90° OR 180° HOOK @EACH END, EACH WAY, TOP
34" CHAMFER EXPOSED EDGES
#5 @ 12" O.C. EACH WAY, BOTTOM
6" CLASS 6 AGGREGATE BASE COURSE COMPACTED TO MINIMUM 95% PROCTOR. SUBGRADE TO MEET CITY STANDARDS.
NOTES: 1. ANCHOR GENERATOR PER MANUFACTURER SPECIFICATION.ANCHOR GENERATOR PER MANUFACTURER SPECIFICATION.
REFER TO SPECIFICATION SECTION 26 05 43 FOR DUCTBANK REQUIREMENTS.
GRADE
PATCH ASPHALT WHERE REQUIRED
COMPACTED CLEAN BACKFILL PER CITY STANDARDS. COMPACTED TO MINIMUM 95% PRCOTOR
CONDUIT DUCT BANK. ASSUME CONCRETE DIRECT BURY UNLESS OTHERWISE NOTED.
SEE CIVIL PLAN FOR EXTENT OF ASPHALT CUTS AND SPEC FOR REPLACEMENT.
COMPACTED CLASS 6 AGGREAGATE BASE COURSE TO EXTEND 6" BEYOND PAD BOTTOM EDGE AND DOWNWARD AT 1:1 GRADE TO 6" DEPTH.
10'-0"
2'-0"
1'-0"
1'-0"
3'-2 1/2"
16'-7"
34'-0"
3'-5"
1'-6"
2'-8 1/2"
ATS TOP AND BOTTOM CONDUIT AREA 10"X32"
TOP OF PAD ELEV.: 6177.55' BOTTOM OF PAD ELEV.: 6176.55'
ELECTRICAL STUB UP AREA
12"X12" DSC-1
1'-5.75"X2' T-1
6"
CONCRETE PAD
E.G.
1:1 GRADE
3:1 GRADE
CONCRETE PAD
E.G.
1:1 GRADE
3:1 GRADE
6" CLASS 6 AGGREGATE BASE COURSE
6" CLASS 6 AGGREGATE BASE COURSE
24"
4'-6"
I:\2013\2013-520_CityOfCraig\030-WTPMCCReplacement\H-Dwgs\Civil\PS-SheetSet\GenSitePlan-Det.dwg Plotted: 4/7/2025 4:51 PM By: Elle Coe Plotted: 4/7/2025 4:51 PM By: Elle Coe4/7/2025 4:51 PM By: Elle Coe By: Elle CoeElle Coe
## KVA
DEFINITIONS:
1. CONTRACTOR: THE ENTITY BINDED BY THE PRIME AGREEMENT WITH
THE CLIENT TO PERFORM THE TASKS INDICATED IN THE CONTRACT
DOCUMENTS. THE TERM CONTRACTOR INCLUDES AND IMPLIES ANY
RELEVANT SUB-CONTRACTOR THAT MAY BE PERFORMING THE
ACTUAL TASK UNDER THE CONTRACTOR’S DIRECTION.
2. CONTRACT DOCUMENTS: THE COMPLIMENTARY COLLECTION OF
DRAWINGS, SPECIFICATIONS, AND PROJECT MANUAL, WHICH ARE
DIRECTED TO THE CONTRACTOR, UNDER THE PRIME AGREEMENT.
3. FURNISH: TO SUPPLY, DELIVER, UNLOAD, AND INSPECT FOR DAMAGE.
4. INSTALL: TO UNPACK, ASSEMBLE, ERECT, APPLY, PLACE, FINISH,
CURE, PROTECT, CLEAN, START UP, AND MAKE READY FOR USE.
5. PROVIDE: TO FURNISH AND INSTALL.
6. SUPPLY: SAME AS FURNISH.
7. PRODUCT: MATERIAL, MACHINERY, COMPONENTS, EQUIPMENT,
FIXTURES, AND SYSTEMS FORMING THE WORK RESULT. NOT
MATERIALS OR EQUIPMENT USED FOR PREPARATION, FABRICATION,
CONVEYING, OR ERECTION AND NOT INCORPORATED INTO THE WORK
RESULT. PRODUCTS MAY BE NEW, NEVER BEFORE USED, OR RE-USED
MATERIALS OR EQUIPMENT.
8. PROJECT MANUAL: THE BOOK-SIZED VOLUME THAT INCLUDES THE
PROCUREMENT REQUIREMENTS (IF ANY), THE CONTRACTING
REQUIREMENTS, AND THE SPECIFICATIONS.
NATURE AND USE OF CONTRACT DOCUMENTS:
1. IF ANY DISCREPANCY IS FOUND WITHIN THE CONTRACT DOCUMENTS
DURING CONSTRUCTION, SUBMIT AN RFI TO THE ENGINEER FOR
DIRECTION BEFORE PROCEEDING. IF A DISCREPANCY IS FOUND
DURING BIDDING, AND THE DESIGN TEAM DOES NOT PROVIDE A
RESOLUTION BY THE FINAL ADDENDUM, BASE THE BID ON THE MORE
COSTLY INTERPRETATION. FAILING TO DO SO WILL NOT BE
CONSIDERED A VALID BASIS FOR CHANGE ORDERS DURING
CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETE
CONTRACT DOCUMENTS TO ALL TRADES, AND FOR COORDINATING
BETWEEN ALL TRADES TO ENSURE PROPER INSTALLATION OF
COMPLETE AND FUNCTIONAL SYSTEMS AS SHOWN ON THE CONTRACT
DOCUMENTS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ALL SCOPES OF WORK,
COMPLETENESS OF BIDS, AND PRICING EXERCISES. FURTHER,
COORDINATION AND DIVISION OF SCOPE AMONGST SUB-
CONTRACTORS IS THE RESPONSIBILITY OF THE CONTRACTOR.
4. DO NOT SCALE DRAWINGS FOR ROUGH-IN MEASUREMENTS OR USE
AS SHOP DRAWINGS. WHERE DRAWINGS ARE REQUIRED FOR THESE
PURPOSES OR HAVE TO BE MADE FROM FIELD MEASUREMENTS, TAKE
THE NECESSARY MEASUREMENTS AND PREPARE THE DRAWINGS.
5. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT SHOW
EVERY SYSTEM OFFSET REQUIRED. COORDINATE WITH THE EXISTING
AND NEW STRUCTURE, ELECTRICAL, PLUMBING, FIRE PROTECTION
AND CEILING TO PROVIDE OFFSETS AS REQUIRED AND APPROPRIATE.
CODES, INSPECTIONS, AND PERMITS:
1. PERFORM ALL WORK IN ACCORDANCE WITH THE CODES,
REGULATIONS, AND LOCAL AMENDMENTS, AS CURRENTLY ADOPTED
BY THE AUTHORITY HAVING JURISDICTION (AHJ).
2. IF ANY DISCREPANCIES ARE FOUND BETWEEN CONTRACT
DOCUMENTS AND ANY APPLICABLE CODE OR LEGAL REQUIREMENT,
SUBMIT AN RFI TO ENGINEER FOR DIRECTION BEFORE PROCEEDING.
3. OBTAIN ALL PERMITS AND INSPECTIONS, AND PAY FOR ALL UTILITY
METERS AND UTILITY CONNECTIONS, REQUIRED BY THE AHJ FOR
PROJECT COMPLETION.
WARRANTY:
1. UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIAL ON ALL
WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A
PERIOD OF ONE YEAR, FOLLOWING FINAL ACCEPTANCE, EXCEPT AS
EXTENDED BY STANDARD MANUFACTURER WARRANTY AND/OR BY
REQUIRED EXTENSION STATED IN THE CONTRACT DOCUMENTS.
SUBMITTALS AND SUBSTITUTIONS:
1. MEET THE CRITERIA DESCRIBED HEREIN, PRIOR TO ENGINEER'S
REVIEW OF THE SUBMITTAL.
2. REFERENCE EQUIPMENT TAGS PROVIDED IN THE CONTRACT
DOCUMENTS.
3. CLEARLY INDICATE THE INTENDED PRODUCT TYPE, MODE, OPTIONS,
ACCESSORIES (FACTORY AND FIELD INSTALLED), AND ANY OTHER
OPTIONS OF ANY KIND.
4. INDICATE THE PLAN ISSUANCE AND DATE ON WHICH SUBMITTAL IS
BASED.
5. IF PROPOSING A SUBSTITUTION IN PLACE OF THE BASIS OF DESIGN
EQUIPMENT, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SPATIAL REQUIREMENTS, ACOUSTICAL, THERMAL, PHOTOMETRIC, AND
ELECTRICAL PERFORMANCE CHARACTERISTICS, AND COORDINATION
OF ALL INSTALLATION REQUIREMENTS. REVIEW AND APPROVAL BY
THE DESIGN TEAM DOES NOT ALTER OR MITIGATE THIS
RESPONSIBILITY. CLEARLY MARK SUBSTITUTIONS AS SUCH.
6. DESCRIBE ANY IMPACT TO OTHER DIVISIONS CREATED BY A
PRODUCT SUBSTITUTION ON THE SUBSTITUTION REQUEST FOR
CONSIDERATION BY THE DESIGN TEAM. PROVIDE AN ESTIMATE OF
ASSOCIATED COST IMPACT TO OTHER DIVISIONS WHERE APPLICABLE.
7. INDICATE WHERE PRODUCTS REQUIRE A PERFORMANCE DE-RATE
DUE TO ALTITUDE EFFECTS.
8. RE-SUBMITTALS MUST CONTAIN MARKUPS THAT CLEARLY DELINEATE
THE CHANGED ITEMS. ENGINEER WILL NOT RE-REVIEW THE ENTIRE
SUBMITTAL PACKAGE IN ORDER TO FIND THE CHANGES.
9. ALL DATA REQUIRED FOR REVIEW MUST BE CONTAINED IN THE FILES
PROVIDED TO THE ENGINEER. LINKS TO MANUFACTURER’S WEBSITES
WILL NOT BE ACCEPTED.
10. ROOM SCHEDULES ARE ACCEPTABLE TO INDICATE QUANTITIES.
PROJECT CLOSEOUT REQUIREMENTS:
1. COMPLETE ALL REQUIRED AHJ INSPECTIONS. MAKE COPIES OF
PERMITS AND INSPECTION REPORTS AVAILABLE.
2. PROVIDE A COMPLETE SET OF AS-BUILT PLANS AT THE COMPLETION
OF THE PROJECT WITH ALL CHANGES NOTED.
3. CONDUCT A TRAINING SESSION FOR OWNER’S DESIGNATED STAFF
FOR ALL CONTROLS SYSTEMS AND MAJOR EQUIPMENT. PRODUCE A
SIGN IN SHEET FOR THIS SESSION SHOWING ATTENDEES, DATE, LIST
OF EQUIPMENT AND SYSTEMS COVERED.
4. CLEAN JOB SITE OF ALL CONSTRUCTION DEBRIS, REPAIR ALL
DAMAGED FINISHES. REMOVE ALL EXISTING EQUIPMENT LABELS THAT
ARE NO LONGER ACCURATE, AND INSTALL NEW LABELING FOR NEW
EQUIPMENT AND SYSTEMS.
5. DELIVER EQUIPMENT MANUALS AND ANY REQUIRED SPARE PARTS TO
OWNER.
ACCESS AND CLEARANCES:
1. MAINTAIN ALL SERVICE AND ACCESS CLEARANCES REQUIRED BY
CODE OR MANUFACTURER FOR ALL EQUIPMENT.
2. PROVIDE ACCESS FOR ALL EQUIPMENT, ETC. LOCATED ABOVE NON-
ACCESSIBLE CEILINGS OR IN CONCEALED AREAS. PROVIDE
SUFFICIENT ACCESS FOR SERVICING AND MAINTENANCE.
3. UTILIZE APPROPRIATELY RATED ACCESS PANELS WHEN
PENETRATING A RATED ASSEMBLY.
PENETRATIONS AND RATED ASSEMBLIES:
1. THE ARCHITECTURAL PLANS SERVE AS THE REFERENCE FOR
LOCATIONS OF RATED WALLS, PARTITIONS, AND ASSEMBLIES.
COORDINATE ALL PENETRATIONS PRIOR TO ROUGH IN. FOR ALL
PENETRATIONS OF FIRE RATED ASSEMBLIES, UTILIZE AN ASSEMBLY UL
LISTED TO MAINTAIN THE RATING AND APPROVED BY ALL APPLICABLE
CODES.
STRUCTURAL MODIFICATIONS:
1. DO NOT DRILL, NOTCH, CUT, OR ALTER STRUCTURAL MEMBERS IN
ANY MANNER EXCEPT AS PERMITTED BY THE MATERIAL SPECIFIC
SECTIONS OF THE BUILDING CODE, MANUFACTURER’S GUIDELINES
FOR ENGINEERED PRODUCTS, OR THE RECOMMENDATION OF THE
STRUCTURAL ENGINEER OF RECORD.
EXISTING CONDITIONS AND DEMOLITION:
1. VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS
TO THE EXTENT POSSIBLE BEFORE BEGINNING WORK. IF
DISCREPANCIES ARE FOUND BETWEEN THE CONTRACT DOCUMENTS
AND ACTUAL SITE CONDITIONS, SUBMIT AN RFI TO THE ARCHITECT OR
ENGINEER FOR DIRECTION BEFORE PROCEEDING.
2. COORDINATE IN ADVANCE ALL WORK THAT AFFECTS EXISTING
SYSTEMS OR OPERATIONS (SUCH AS SHUT DOWNS, TIE-INS, OR
DEMOLITION), WITH THE BUILDING OWNER IN ADVANCE.
3. RETURN EXISTING EQUIPMENT NOTED AS TO BE REMOVED TO
OWNER IN THE SAME CONDITION AS FOUND (EXCEPT WHERE
CONTRACT DOCUMENTS CALL FOR DISPOSAL BY CONTRACTOR).
COORDINATE DELIVERY AND STORAGE LOCATION WITH CONTRACTOR.
4. COORDINATE REPAIR OF ADJACENT CONSTRUCTION AND FINISHES
DAMAGED OR EXPOSED DURING DEMOLITION WORK. MATCH EXISTING
FINISHES, AND INCLUDE PAINT ON ENTIRE WALL OR ROOM IF
REQUIRED TO MATCH COLOR.
5. X-RAY ANY SLAB PENETRATIONS PRIOR TO CORE DRILLING.
6. PRIOR TO TRENCHING OR EXCAVATION, CONTACT UTILITY
COMPANIES TO IDENTIFY UNDERGROUND UTILITIES AND LOCATE
SECONDARY SERVICE FEEDERS, UNDERGROUND BRANCH CIRCUITS,
GAS LINES, SPRINKLER LINES, ETC. ANY CUT OR DAMAGED
UNDERGROUND SYSTEMS TO BE REPAIRED OR REPLACED AT
CONTRACTOR'S EXPENSE.
7. PROVIDE MEANS OF TRACING TO ALL UNDGROUND UTILITIES OUTSIDE
THE BUILDING PERIMETER, IN COMPLIANCE WITH SUBSURFACE UTILITY
ENGINEERING REGULATIONS.
SINGLE LINE DIAGRAM SYMBOLS
CIRCUIT BREAKER
FUSE
SWITCH
NEUTRAL BUS
GROUND BUS
BOND
GROUNDING ELECTRODE
TRANSFORMER
UTILITY METER
POWER METER
GROUND FAULT CIRCUIT INTERRUPTOR
ARC ENERGY REDUCTION
MAINTENANCE SWITCH
SURGE SUPRESSOR
VARIABLE FREQUENCY DRIVE
RECEPTACLES
STANDARD WALL MOUNTED
DUPLEX RECEPTACLE
CROSS LINES INDICATE
QUADRUPLEX
SINGLE LINE
INDICATES SIMPLEX
TRIANGLE INDICATES SPECIAL
NEMA TYPE (SEE KEYNOTES)
CENTER FILL INDICATES ABOVE
COUNTER (6" TO BOTTOM)
OUTER CIRCLE INDICATES
CEILING MOUNT (FLUSH)
OUTER SQUARE INDICATES
FLOOR MOUNT
"G" INDICATES PROVIDE GFCI
PROTECTION AT DEVICE OR BREAKER
"W" INDICATES WEATHERPROOF
IN-USE COVER AND GFCI PROTECTION
NT
GR
SPD
GFI
RECEPTACLE SYMBOL MODIFIERS:
ANNOTATION SYMBOLS
KEYNOTE TAG
REVISION TAG
ELECTRICAL EQUIPMENT TAG
REFER TO EQUIPMENT SCHEDULE
ELECTRICAL CONNECTION TAG
(EQUIPMENT SPECIFIED BY OTHERS)
REFER TO CONNECTION SCHEDULE
FEEDER TAG
REFER TO FEEDER SCHEDULE
CIRCUIT TAG
REFER TO PANEL SCHEDULE
AA-#-###
LINETYPES / PHASING
SOLID DARK LINES INDICATE
NEW OR MODIFIED ITEMS
DASHED DARK LINES INDICATE
ITEMS TO BE DEMOLISHED
SOLID LIGHT LINES INDICATE
EXISTING ITEMS TO REMAIN
reference info
A###
AA - #,#,#
AA-#-###
ARS
MET
VFD
SYMBOL LEGEND
# NUMBER
Φ PHASE
A AMPERES
AC ALTERNATING CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BLDG BUILDING
CND CONDUIT
CATV CATEGROY 5 CABLE
CB CIRCUIT BREAKER
CCT CORRELATED COLOR TEMPERATURE
CCTV CLOSED CIRCUIT TELEVISION
CD CANDELA
CKT CIRCUIT
CLF CURRENT LIMITING FUSE
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL
DC DIRECT CURRENT
DIA DIAMETER
EC ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
ELEV ELEVATOR
EPO EMERGENCY POWER OFF
FACP FIRE ALARM CONTROL PANEL
FAA FIRE ALARM ANNUNCIATOR
FLAFULL LOAD AMPERES
G GROUND
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
HOA HAND-OFF-AUTOMATIC SWITCH
HVAC HEATING, VENTILATION, AIR CONDITIONING
HZ HERTZ
IG ISOLATED GROUND
KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT-AMPERES
KVAR KILOVOLT-AMPERES REACTIVE
LTG LIGHTING
LRA LOCKED ROTOR AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MI MINERAL INSULATED
MLO MAIN LUGS ONLY
MWMEGAWATT
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELEC. MANUFACTURERS ASSOC.
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NO NORMALLY OPEN
P POLE
PNL PANEL
PT POTENTIAL TRANSFORMER
QTY QUANTITY
REC RECEPTACLE
RMS ROOT MEAN SQUARE
RVSS REDUCED VOLTAGE SOFT STARTER
SE SERVICE ENTRANCE
SP SPARE
ST SHUNT TRIP
SYM SYMMETRICAL
TELE TELECOMMUNICATIONS
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
UG UNDER GROUND
UL UNDERWRITERS LABORATORY
UTIL SERVING UTILITY
V VOLT
VA VOLT-AMPERE
VFD VARIABLE FREQUENCY DRIVE
VT VOLTAGE TRANSFORMER
W WATT OR WIRE
WP WEATHERPROOF OR WATERPROOF
XFMR TRANSFORMER
ix th tr t, u ite o p ri g s, .9
.1
-i
Print Date:
P ro je c t s to a l l:
U rs
\a y
\D ts
\C ra ig
.r v
/7
/2
:2
:3
A
IG
NOT FOR
CONSTRUCTION
AH
2025-04-07
AHKG
ELECTRICAL
LEGEND AND
E001
B id
CraigWWTPGen_MEP_R24.rvt
.l l\ fi
\P
\2
-5 it fC
\0
-W r\
-D
\M
\R c ri p ti o
ELECTRICAL SHEET LIST
Sheet
Number Sheet Name
E001 ELECTRICAL LEGEND AND GENERAL NOTES
E101 ELECTRICAL SITE PLAN
E401 ENLARGED ELECTRICAL PLANS
E601 ELECTRICAL SCHEDULES AND DIAGRAMS
ADOPTED CODES
LOCAL AMENDMENTS CURRENT
AHJ CITY OF CRAIG
NEC 2023
IECC 2018
IBC 2018
IMC 2018
IFGC 2018
IPC 2018
SERVICE
TRANSFORMER
METERING
CABINET
PV SYSTEM
DISCONNECT
NET METER
ATS-2
E401
GEN-2 1
MCC-2 MDS MCC-1
EXISTING OXIDATION DITCH
EXISTING AERATION
EQUIPMENT BUILDING
ELECTRICAL ROOM
LOADING DOCK
EXISTING UNDERGROUND
SEWER OR WATER, TYPICAL
EXISTING UNDERGROUND
ELECTRICAL, TYPICAL
EXISTING 208V TRANSFORMER
AND PANEL TO REMAIN
E101
ATS OUTPUT POWER TO MDS
(3) 4" SCHED 40 PVC
NORMAL POWER FROM
UTILITY TO ATS
TYP.
3"
CONTROLS TO MCC-2
(1) 1" SCHED 40 PVC
SPARE
ATS OUTPUT POWER TO MDS
CONTROLS TO MCC-2
SPARE
(1) 1" SCHED 40 PVC T
NORMAL POWER FROM
UTILITY TO ATS
REFER TO SPECIFICATION
SECTION 26 05 43 FOR
GENERAL DUCT BANK
REQUIREMENTS.
ELECTRICAL SITE
PLAN
c ri p ti o
NORTH
SCALE: 3/16" = 1'-0"
ELECTRICAL SITE PLAN
GENERAL PLAN NOTES
FOR FACILITY OUTAGES, OBTAIN WRITTEN APPROVAL FROM THE CITY WATER AND
WASTEWATER DIRECTOR AT LEAST TWO WEEKS IN ADVANCE. OUTAGES CAN NOT EXCEED 4
HOURS IN DURATION.
TO MITIGATE LEAD TIME IMPACTS, LARGE EQUIPMENT REQUIRED FOR THIS PROJECT HAS BEEN
PRE-PURCHASED DIRECTLY BY THE CITY. REFER TO EQUIPMENT SCHEDULE FOR DETAILS.
EQUIPMENT SUBMITTALS FOR PRE-PURCHASED EQUIPMENT ARE PROVIDED IN PROJECT
MANUAL APPENDIX A. EXPECTED SHIP DATES AND STORAGE LOCATIONS ARE PROVIDED IN
APPENDIX B.
ALL CONDUIT ROUTING SHOWN ON THESE DRAWINGS IS SCHEMATIC IN NATURE. FIELD
COORDINATE EXACT ROUTING WITH CITY PRIOR TO TRENCHING OR ROUGH IN. INTERIOR
CONDUIT MAY BE EXPOSED, RUN PARALLEL WITH BUILDING LINES.
SCALE: 1" = 1'-0"
DUCT BANK A
DUCT BANK B
DUCT BANK C
KEYNOTES
1 RECEIVE AND INSTALL NEW GENERATOR, WHICH HAS BEEN PRE-PURCHASED BY THE CITY.
LAYOUT DEPICTED HERE ILLUSTRATES ORIENTATION INTENT, CONTRACTOR IS RESPONSIBLE
FOR REVIEWING EQUIPMENT SUBMITTALS IN DETAIL AND ENSURING ALL MANUFACTURER
REQUIREMENTS ARE MET.
2 RECEIVE AND INSTALL NEW SERVICE ENTRANCE AUTOMATIC TRANSFER SWITCH, WHICH HAS
BEEN PRE-PURCHASED BY THE CITY. LAYOUT DEPICTED HERE ILLUSTRATES ORIENTATION
INTENT, CONTRACTOR IS RESPONSIBLE FOR REVIEWING EQUIPMENT SUBMITTALS IN DETAIL
AND ENSURING ALL MANUFACTURER REQUIREMENTS ARE MET.
3 EXISTING MDS IN CONTROL ROOM IS CURRENTLY THE SERVICE ENTRANCE, BUT NEW ATS WILL
BECOME THE SERVICE ENTRANCE AS PART OF THIS PROJECT. ISOLATE NEUTRAL AND GROUND
INSIDE MDS, MCC-1 AND MCC-2. VERIFY GROUNDING ELECTRODE CONNECTION IS TO GROUND
BUS RATHER THAN NEUTRAL. REMOVE ALL “SERVICE DISCONNECT” LABELS AND PROVIDE
“BUILDING DISCONNECT” LABELS.
4 INTERCEPT EXISTING SERVICE LATERAL NEAR WHERE IT ENTERS THE BUILDING BEHIND THE
MDS. PROVIDE A SPLICE VAULT WITH TOP FLUSH WITH GRADE, AND SPLICE NEW LOAD SIDE
FEEDER FROM ATS TO EXISTING CONDUCTORS SUPPLYING MDS. PULLING NEW CONDUCTORS
FROM ATS TO MDS IS ALSO ACCEPTABLE, IF IT CAN BE DONE WITHIN THE ALLOWABLE FACILITY
OUTAGE DURATION. REFER TO GENERAL PLAN NOTES.
5 DISCONNECT AND ABANDON EXISTING SERVICE CONDUCTORS FROM METERING CABINET TO
SPLICE LOCATION.
6 REFER TO CIVIL DRAWINGS FOR DUCT BANK AND PIPE CROSSING DETAILS.
7 COORDINATE WITH YAMPA VALLY ELECTRIC FOR REPLACEMENT OF EXISTING SERVICE
CONDUCTORS. SCHEDULE ALL YVEA WORK IN ADVANCE TO MINIMIZE FACILITY OUTAGE
DURATION.
8 PROVIDE PERMANENT WEATHERPROOF PLACARD AT ATS SHOWING LOCATIONS OF PV
DISCONNECT, SERVICE DISCONNECT (ATS) AND BUILDING DISCONNECT (MDS). UPDATE
PLACARD ON EXISTING PV DISCONNECT TO REFLECT THE NEW CONFIGURATION.
9 COORDINATE WITH SMITH POWER PRODUCTS TO SCHEDULE DELIVERY OF PRE-PURCHASED
GENERATOR AND ATS FROM STORAGE LOCATION IN FREDERICK, CO. DELIVERY TO SITE HAS
BEEN PAID FOR BY THE CITY, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING, OFFLOADING,
FUEL FILL, AND TESTING. REFER TO SPECIFICATIONS FOR FULL DETAILS.
EXH
AU
ST
AIR
IN
TAKE
FUEL FILL
BOX
STUB UP AREA
T-1
SHARED CONCRETE PAD
(REFER TO CIVIL)
GENERATOR ENCLOSURE
REQUIRED CLEAR SPACE
(TYPICAL)
42"
42"
DSC-1
ACCESS DOOR SWING
(TYPICAL)
GEN-2
1 2
3 4
ENLARGED
ELECTRICAL PLANS
E401 c ri p ti o
NORTH
SCALE: 3/8" = 1'-0"
ENLARGED GENERATOR PAD PLAN
GENERAL PLAN NOTES
FOR FACILITY OUTAGES, OBTAIN WRITTEN APPROVAL FROM THE CITY WATER AND
WASTEWATER DIRECTOR AT LEAST TWO WEEKS IN ADVANCE. OUTAGES CAN NOT EXCEED 4
HOURS IN DURATION.
TO MITIGATE LEAD TIME IMPACTS, LARGE EQUIPMENT REQUIRED FOR THIS PROJECT HAS BEEN
PRE-PURCHASED DIRECTLY BY THE CITY. REFER TO EQUIPMENT SCHEDULE FOR DETAILS.
EQUIPMENT SUBMITTALS FOR PRE-PURCHASED EQUIPMENT ARE PROVIDED IN PROJECT
MANUAL APPENDIX A. EXPECTED SHIP DATES AND STORAGE LOCATIONS ARE PROVIDED IN
APPENDIX B.
ALL CONDUIT ROUTING SHOWN ON THESE DRAWINGS IS SCHEMATIC IN NATURE. FIELD
COORDINATE EXACT ROUTING WITH CITY PRIOR TO TRENCHING OR ROUGH IN. INTERIOR
CONDUIT MAY BE EXPOSED, RUN PARALLEL WITH BUILDING LINES.
1 RECEIVE AND INSTALL NEW SERVICE ENTRANCE AUTOMATIC TRANSFER SWITCH, WHICH HAS
BEEN PRE-PURCHASED BY THE CITY. LAYOUT DEPICTED HERE ILLUSTRATES ORIENTATION
INTENT, CONTRACTOR IS RESPONSIBLE FOR REVIEWING EQUIPMENT SUBMITTALS IN DETAIL
AND ENSURING ALL MANUFACTURER REQUIREMENTS ARE MET.
2 PROVIDE PERMANENT WEATHERPROOF PLACARD AT ATS SHOWING LOCATIONS OF PV
DISCONNECT, SERVICE DISCONNECT (ATS) AND BUILDING DISCONNECT (MDS). UPDATE
PLACARD ON EXISTING PV DISCONNECT TO REFLECT THE NEW CONFIGURATION.
3 RECEIVE AND INSTALL NEW GENERATOR, WHICH HAS BEEN PRE-PURCHASED BY THE CITY.
LAYOUT DEPICTED HERE ILLUSTRATES ORIENTATION INTENT, CONTRACTOR IS RESPONSIBLE
FOR REVIEWING EQUIPMENT SUBMITTALS IN DETAIL AND ENSURING ALL MANUFACTURER
REQUIREMENTS ARE MET.
4 COORDINATE WITH SMITH POWER PRODUCTS TO SCHEDULE DELIVERY OF PRE-PURCHASED
GENERATOR AND ATS FROM STORAGE LOCATION IN FREDERICK, CO. DELIVERY TO SITE HAS
BEEN PAID FOR BY THE CITY, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING, OFFLOADING,
FUEL FILL, AND TESTING. REFER TO SPECIFICATIONS FOR FULL DETAILS.
5 DIRECT BURY CONDUITS IN SHARED TRENCH: GENERATOR OUTPUT POWER TO ATS,
CONTROLS TO ATS, AND INPUT POWER TO LOAD CENTER FROM T-1.
4 POLE ATS
800A LSI
PANEL
120/208
3 PHASE
15 KVA
STANDBY
GENERATOR
GR NT
LOAD
CENTER
800A LSI
60A/2P
16'-0" 240V/1Φ
GLC
T1
T1
GEN
SERV MCC
GEC
MCC-1
METER CABINET
L
1100A
MCC-2
X /3
600A
MSB
1600A
CONTROLS
SPD MET
GEN-2 ATS-2
DSC-1
T-1
NEW EQUIPMENT PAD
EXISTING LATERAL
TO BE PARTIALLY REMOVED
FAULT AND VOLTAGE DROP CALCULATIONS
IP
I
IR
IZ
IA
-L
V
IV
IL
1 SERVICE
At the secondary of the utility transformer.
(Assumes infinite bus with existing 750 kVA transformer) 17300
2 ATS 1 17300 3 3 400 AL 480 75 0.5% 0.5% 19154
3 MDS 2 19154 3 2 500 CU 480 75 0.5% 0.9% 17460
4 DSC-1 2 19154 1 1 10 CU 480 3 0.0% 0.5% 15397
5 T-1 PRI 4 15397 1 1 10 CU 480 3 0.0% 0.5% 12871
6 T-1 SEC 5 12871 1 0 0 0 480 0 0.0% 0.5% 1170
7 GEN PANEL 6 1170 1 1 6 AL 240 20 0.5% 1.0% 1034
* Length shown is an estimate for calculation purposes. Do not use this length for bidding. If field conditions require feeder to be more than 20% different from this length, notify engineer for direction before proceeding.
SERVICE LOAD SUMMARY
FULL LOAD AMPS DEMAND FACTOR DEMAND AMPS
BLOWER #1 (200 HP*) 231 125% 289
BLOWER #2 (200 HP) 231 100% 231
PUMP #1 (75 HP) 101 100% 101
PUMP #2 (75 HP) 101 100% 101
PUMP #3 (STANDBY ONLY) 101 0% 0
EXISTING BRANCH PANEL 18 100% 18
ADDED GENSET ACCESSORIES 25 100% 25
NEW TOTAL DEMAND: 765 AMPS
@ 480V, 3 PH
SERVICE CAPACITY: 800 AMPS
* Existing motor is 125HP, calculation anticipates a future upgrade to 200HP. 1
SCHEDULES AND
DIAGRAMS
E601 c ri p ti o
REMARKS:
1. Refer to specifications for full product submittals.
ELECTRICAL EQUIPMENT SCHEDULE
TYPE DESCRIPTION FURNISHED BY INSTALLED BY VOLTS PHASE ENCLOSURE MOUNTING MANUFACT. REMARKS
T-1 STEP DOWN TRANSFORMER, 120/240, 15 KVA CONTRACTOR CONTRACTOR 480 V 1 NEMA 3R PAD
CONTRACTOR'S
OPTION
DSC-1 PRIMARY DISCONNECT FOR T-1, FUSED AT 30 AMPS CONTRACTOR CONTRACTOR 480 V 1 NEMA 3R RACK
CONTRACTOR'S
OPTION
AUTOMATIC TRANSFER SWITCH, SERVICE
ENTRANCE RATED, 800 AMP, 85KAIC
CITY OF CRAIG CONTRACTOR 480 V 3 NEMA 3R PAD ASCO 1
GEN-2 DIESEL GENERATOR, 550 KW CITY OF CRAIG CONTRACTOR 480 V 3 NEMA 3R PAD MTU 1
NO SCALE
SINGLE LINE DIAGRAM
1 INSTALL NEW LEGALLY REQUIRED STANDBY GENERATOR PER NEC ARTICLE 701. CONFIGURE AS A
SEPARATELY DERIVED SYSTEM, WITH GROUND AND NEUTRAL BONDED AT GENERATOR.
2 GENERATOR INCLUDES AN INTEGRAL LOAD CENTER (240V SINGLE PHASE MLO) PREWIRED TO
ACCESSORIES SUCH AS HEATERS AND BATTERY CHARGER. PROVIDE BACKFEED BREAKER AND SUPPLY
THE LOAD CENTER FROM NEW STEP DOWN TRANSFORMER.
3 REMOVE EXISTING GROUND NEUTRAL BONDING AT EXISTING MDS, WHICH WILL NO LONGER BE THE
SERVICE ENTRANCE.
4 PROVIDE NEW SERVICE GROUNDING ELECTRODE SYSTEM CONSISTING OF TWO 3/4” BY 8’ CU CLAD
STEEL GROUND RODS, DRIVEN WITH TOPS AT 30” BELOW GRADE, AT LEAST 16’ APART.
FEEDER SCHEDULE
TAG AMPACITY FEEDER
GEC N/A # 2/0 CU (IN SCHED 80 PVC WHERE EXPOSED)
GEN 800 3 Sets of: [ (4) 400 MCM AL + # 4/0 AL SSBJ IN 4" PVC ]
MCC 800
2 Sets of: [ (4) 500 MCM CU + # 1/0 CU EGC IN 4" PVC ] PLUS ONE SPARE 4" PVC
OR
3 Sets of: [ (4) 400 MCM AL + # 3/0 AL EGC IN 4" PVC ]
SERV 800 3 Sets of: [ (4) 400 MCM AL IN 3.5" PVC ]
GLC 60 1 Sets of: [ (3) # 4 AL + # 8 AL EGC IN 1.5" PVC ]
T1 30 1 Sets of: [ (2) # 10 CU + #10 CU EGC IN 0.5" PVC ]
TAG
Sheets and Views
G001 COVER
G002 LEGENDS & ABBREVIATIONS
G003 GENERAL NOTES
C101 WWTP EXISTING CONDITIONS
C102 WWTP SITE PLAN
C501 WWTP Civil Details
PROJECT MANUAL
WWTF GENERATOR ADDITION AND WTP GENERATOR
ADDITION & MCC REPLACEMENT
APRIL 2025
PREPARED BY:
SGM
118 W. 6TH STREET, SUITE 200
GLENWOOD SPRINGS, CO 81601
[This page was left blank intentionally.]
City of Craig WWTF Generator Addition and WTP Generator - MCC Replacement
TABLE OF CONTENTS 04-01-2025
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 AD FOR BID
00 21 13 INSTRUCTIONS TO BIDDERS
00 41 00 BID FORM
00 43 00 BID BOND
00 45 10 CONTRACTOR QUALIFICATION STATEMENT
00 51 00 NOTICE OF AWARD
00 52 00 STANDARD AGREEMENT
00 55 00 NOTICE TO PROCEED
00 61 00 PERFORMANCE BOND
00 61 50 PAYMENT BOND
00 62 00 APPLICATION FOR PAYMENT
00 62 50 CERTIFICATE OF SUBSTANTIAL COMPLETION
00 62 60 NOTICE OF ACCEPTABILITY OF WORK
00 70 00 STANDARD GENERAL CONDITIONS
00 80 00 SUPPLEMENTARY CONDITIONS OF THE CONSTRUCTION
CONTRACT
00 94 00 WORK CHANGE DIRECTIVES
00 94 10 CHANGE ORDERS
00 94 20 FIELD ORDERS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 31 19 PROJECT MEETINGS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 74 16 SITE MAINTENANCE
01 77 00 CLOSEOUT PROCEDURES
DIVISION 26 - ELECTRICAL
26 01 26 TESTING OF ELECTRICAL SYSTEMS
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND
CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33.13 CONDUIT FOR ELECTRICAL SYSTEMS
26 05 43 UNDERGROUND RACEWAYS FOR ELECTRICAL SYSTEMS
City of Craig WWTF Generator Addition and WTP Generator - MCC Replacement
TABLE OF CONTENTS 04-01-2025
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73 POWER SYSTEM STUDIES
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 24 19 MOTOR-CONTROL CENTERS
26 32 13 ENGINE GENERATORS
26 36 00 TRANSFER SWITCHES
BID AND AGREEMENT DOCUMENTS
00100 Ad for Bid - WTP Gen and WWTF Gen & MCC 00 10 00-1
SECTION 00 10 00
ADVERTISEMENT FOR BID
The City of Craig will receive sealed bids for the WWTF Generator Addition and WTP Generator Addition & MCC Replacement until 10:00am, Tuesday, May 6, 2025, at the office of the City Clerk, 300 West 4th Street, Craig, Colorado 81625, at which time they will be publicly opened and read aloud. Electronic submissions will also be accepted at kcarmody@ci.craig.co.us. Bids received after this time will not be accepted and will be returned unopened.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .