This document includes a subcontracting plan submitted in response to solicitation number 693C7320R000004 for highway and/or bridge design and engineering services. WSP USA Inc. proposes goals to subcontract a minimum of 31% of work to small businesses, with 3% to veteran-owned small businesses, 3% to service-disabled veteran-owned small businesses, 3% to Historically Underutilized Business Zone small businesses, and 5% each to small disadvantaged businesses and women-owned small businesses. The plan administrator is identified as Laura Unger. The contract was awarded to WSP USA Inc. on April 12, 2021 for $80,000,000 to provide professional engineering and associated services to the Eastern Federal Lands Highway Division of the Department of Transportation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Highway and/or Bridge Design Engineering Services, EFLHD

SOLICITATION NUMBER: 693C7320R000004

CONTRACT NUMBER: 693C7321D000002

MAIN TABLE OF CONTENTS

CONTRACT BOOK

PART I-THE SCHEDULE

SECTION TITLE

A Solicitation/Contract Form (SF-252) B Supplies or Services and Prices/Costs C Description/Specifications/Statement of Work E Inspection and Acceptance F Deliveries and Performance G Contract Administration Data H Special Contract Requirements

PART II - CONTRACT CLAUSES

I Contract Clauses

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

J List of Attachments Corporate Certificate Subcontracting Plan

ARCHITECT-ENGINEER CONTRACT

1. CONTRACT NO.

693C7321D000002

2. EFFECTIVE DATE

3a. NAME OF ARCHITECT-ENGINEERING FIRM WSP USA Inc.

3b. TELEPHONE NO. (include Area Code) 703-742-5980

3c. ADDRESS OF ARCHITECT-ENGINEERING FIRM (include ZIP code) 13530 Dulles Technology Drive Suite 300 Herndon, VA 20171

CONTRACT ADMINISTRATOR NAME AND MAILING ADDRESS:

Robert A. Morris, PE, DBIA, ENV SP 13530 Dulles Technology Drive, Suite 300 Herndon, VA 20171

DUNS NO.: 08-919-2355

4. DEPARTMENT OR AGENCY AND ADDRESS (include ZIP code)

Federal Highway Administration Eastern Federal Lands Highway Division 22001 Loudoun County PKWY Ashburn, Virginia 20147

5. PROJECT TITLE AND LOCATION

The Federal Highway Administration (FHWA), Eastern Federal Lands Highway Division (EFLHD), anticipates awarding multiple award, Indefinite Delivery, Indefinite Quantity Contracts (IDIQCs) for Highway and/or Bridge Design And Engineering Services and for other Engineering, Planning, and Architectural Services for Construction projects predominantly associated with Federal Land Management agencies (National Park Service, U.S. Forest Service, Fish and Wildlife Service, etc.)

within the continental United States and its territories. The intent is for these contracts to be used by Eastern, Central, and Western Federal Lands Highway Division offices.

6. CONTRACT FOR (General description of service to be provided)

An Indefinite Delivery, Indefinite Quantity Contract to Provide Professional Engineers and Associated Occupational Specialties to Highway &/or Bridge Design & Engineering Services for the EFLHD.

NAISC CODE: 541330

7. CONTRACT AMOUNT (Express in words and 2figures)

The Contractor’s-Fixed Price Rates Are Contained in Section B. The minimum guaranteed contract amount is $100,000.00 over the life of the contract and the estimated total shared-contract amount is $80,000,000.

8. NEGOTIATION AUTHORITY

SF 252 is prescribed for use in awarding fixed-price contracts for architect-engineer services, as specified in 36.702(a). Pending issuance of a new edition of the form, Block 8, Negotiation Authority, is deleted.

9. ADMINISTRATIVE, APPROPRIATION, AND ACCOUNTING DATA:

SEE INDIVIDUAL TASK ORDERS

NSN: 7540-01-152-8072 252-102 STANDARD FORM 252 (REV. 10-83)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.236-2(a)

04/12/2021

10. The United States of America (called the Government) represented by the Contracting Officer Executing this contract, and the Architect Engineer agree to perform this contract in strict accordance with the clauses and the documents identified as follows, all or which are made a part of this contract:

Highway &/or Bridge Design & Engineering Services Indefinite Delivery/Indefinite Quantity Contracts (IDIQC)

PART I-THE SCHEDULE

SECTION A -Solicitation/Contract Form SECTION B -Supplies or Services and Prices/Costs SECTION C - Description/Specifications/Statement of Work SECTION E-Inspection and Acceptance SECTION F - Deliveries and Performance SECTION G -Contract Administration Data SECTION H - Special Contract Requirements

PART II - CONTRACT CLAUSES

SECTION I - Contract Clauses

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - Corporate Certificate and Subcontracting Plan

If the parties to this contract are comprised of more than one legal entity, each entity shall be jointly and severally liable under this contract. The parties hereto have executed this contract as of the date recorded in Item 2.

B

C

D

SIGNATURES NAMES AND TITLES (Typed)

11. ARCHITECT-ENGINEER OR ANOTHER PROFESSIONAL SERVICES CONTRACTOR

Robert A. Morris, PE, DBIA, ENVSP Vice President; Managing Director - Herndon Transportation Lead

12. THE UNITED STATES OF AMERICA

CONTRACTING OFFICER

STANDARD FORM 252 BACK (REV. 10-83)

3. Labor categories, hourly rates, and other direct costs:

CONTRACT LABOR RATES (PER HOUR)

Escalation fee not to exceed 4% per year Escalation Fee_ 3.5 %

Position Base Option Period 1

Option Period 2

Option Period 3

Option Period 4

6 Month Extension

Principal $104.58 $108.24 $112.03 $115.95 $120.01 $122.11

Project Manager $91.52 $94.72 $98.04 $101.47 $105.02 $106.86

Senior Engineer/ Planner/Designer $92.57 $95.80 $99.16 $102.63 $106.22 $108.08

Lead Engineer/ Planner/Designer $67.22 $69.57 $72.01 $74.53 $77.14 $78.49

Engineer/ Planner/Designer $39.06 $40.43 $41.84 $43.31 $44.82 $45.61

CADD/

Technical Support $34.00 $35.19 $36.42 $37.70 $39.02 $39.70

Registered Surveyor This position will be filled by a local subcontractor utilizing Attachment 1

– FHWA Subcontracting Plan for this Solicitation if possible

Three (3) Person Survey Party (Chief, 1-Instrument men, 1-Rodman;)

This position will be filled by a local subcontractor utilizing Attachment 1

– FHWA Subcontracting Plan for this Solicitation if possible

Clerical $35.97 $37.23 $38.53 $39.88 $41.27 $42.00

QA/QC Manager $80.86 $83.69 $86.62 $89.65 $92.79 $94.41

Contractors may add or modify positions as required.

Other Direct Costs Unit Cost

Calculated at Actual Cost

A combined Overhead/G&A: 137.73 %

Facilities Cost of Capital Rate: 0.54 %

Profit factor is to be negotiated per individual Task Order not to exceed 10% and is/will be based on level of effort.

Travel (mileage) and per diem costs shall conform to Government travel regulations.

End of Section B

ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN

SUBCONTRACTING PLAN for Solicitation No. 693C7320R000004

SUBCONTRACTING GOALS – BASE YEAR + All Option Years Total prime contract amount: $80,000,000 Total planned subcontracted amount: $8,000,000 Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.) $4,000,000 50%

Planned subcontracts to Small Business concerns (not elsewhere counted below): $2,480,000

31%

Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)1: $240,000 3%

Total planned subcontracts to Service Disabled Veteran Owned Small Business (SDVOSB) concerns: $240,000

3%

Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $240,000

3%

Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$400,000 5%

Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)2 concerns: $400,000 5%

SUBCONTRACTING GOALS – BASE YEAR

Total prime contract amount – Base Year: $16,000,000 Total planned subcontracted amount – Base Year: $1,600,000 Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.) $800,000 50%

Planned subcontracts to Small Business concerns (not elsewhere counted below): $496,000

31%

Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)3: $48,000 3%

Total planned subcontracts to Service Disabled Veteran Owned Small Business (SDVOSB) concerns: $48,000

3%

Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $48,000

3%

Each of the four (4) option years is estimated to allow for equal subcontracting opportunities. A separate table is not provided for each option year as all option years will have the same subcontracting goals.

1.1 Rationale if establishing a goal lower than 3% for VOSB:

1.2 Rationale if establishing a goal lower than 3% for SDVOSB:

1.3 Rationale if establishing a goal lower than 3% for HUBZone:

1.4 Rationale if establishing a goal lower than 5% for SDB:

Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$80,000 5%

Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)4 concerns: $80,000 5%

SUBCONTRACTING GOALS – Each Option Year Total prime contract amount – Option Year: $16,000,000 Total planned subcontracted amount – Option Year: $1,600,000 Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.) $800,000 50%

Planned subcontracts to Small Business concerns (not elsewhere counted below): $496,000

31%

Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)5: $48,000 3%

Total planned subcontracts to Service Disabled Veteran Owned Small Business (SDVOSB) concerns: $48,000

3%

Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $48,000

3%

Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$80,000 5%

Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)6 concerns: $80,000 5%

Not applicable

Not applicable

Not applicable

1.5 Rationale if establishing a goal lower than 5% for WOSB:

1.6 Rationale if establishing a goal lower than the subcontracting goal in FAR 19.702(a):

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract.

7 List all applicable size standards for each proposed subcontractor.

Type of Supply/Service to be Subcontracted

Company/Firm Name Subcontracted Amount

Subcontractor Size Standard7

Geotechnical, environmental, surveying, water resources, transportation and structural American Engineers Group, LLC TBD SB, SDB

Highway, bridge and retaining wall design;

hydrology and hydraulic, drainage, signing, right-of-way, and permitting

Barrett Hale & Alamo, LLC TBD SB, SDB

Environmental engineering and water resources

Caribe Environmental Services, Inc. TBD SB, SDB, VOSB

Cultural resource investigations (archaeology and architectural history), Section 106 documentation and coordination

Commonwealth Heritage Group, Inc. TBD SB

Geotechnical engineering, field investigations, drilling services Geo Cim, Inc. (PSC) TBD SB, SDB

Land surveying and mapping H & B Surveying and Mapping, LLC TBD SB, WOSB

Traffic and safety engineering; value engineering; civil and structural engineering

O&M Consulting, PSC TBD SB

Land surveying Pedro J. Davila Colon, Professional Land Surveyors, CSP TBD SB

Geotechnical and geostructural engineering and engineering geology services

Schnabel Engineering, LLC TBD Other than SB

Drainage design, civil infrastructure design support, bridge design support, GIS

Singhofen & Associates, Inc. TBD SB, HUBZone

Geotechnical engineering, field investigations, drilling services

Suelos PSC TBD SB, SDB

Traffic engineering design and analysis T3 Design Corporation TBD SB, SDB, WOSB

Trail and on-road bike facility design and landscape architecture Toole Design Group, LLC TBD Other than SB

Value Engineering Value Based Design, LLC TBD SB, SDB

Surveying Westin & Sampson Engineers, Inc. TBD Other than SB

ODCs like reproduction courier, and travel Various TBD Other than SB

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)

5. Indirect costs were not included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name: Laura Unger Title: Small Business Liaison Officer Address: 999 Third Ave., 32nd Fl., Seattle, WA 98104 Telephone: 206-382-5282 E-mail: Laura.Unger@wsp.com

WSP has strong experience in providing Bridge and/or Highway Design services to EFLHD. We used our familiarity from prior tasks to build our robust team of subcontractors offering the services anticipated to be needed on upcoming tasks. The overwhelming majority of our subconsultants are SBs, with many also certified as SDB and/or WOSB. For this contract, we recognized the need to improve HUBZone and VOSB utilization and have added new teaming partners with these certifications. We analyzed our past performance on similar contracts to develop challenging, yet realistic subcontracting goals in this plan and also coordinated with EFL on their expectations.

Through utilization of subcontractors identified above and performance of additional good faith efforts as described in this plan, WSP will work to meet these subcontracting percentage goals.

WSP used the full ceiling value under this program to draft its subcontracting plan. As this is a multiple-award IDIQ, our overall contract value is unknown, but is anticipated to be significantly lower than $80,000,000. The actual dollar amounts to be subcontracted will be proportionate to the work awarded to WSP. While we are unlikely to achieve the dollar value goals listed in this plan, we will strive to meet the subcontracting percentage goals.

WSP USA uses its Supplier Registration Database and SBA’s Dynamic Small Business Search as the primary sources to identify potential subcontractors. Other sources that may be used include PTAC and state certification databases to search for subcontractors local to a project site.

Not Applicable

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

a. Developing and maintaining bidders lists of SB, SDB, WOSB, HUBZone SB, VOSB, SDVOSB concerns, ANCs, and Indian Tribes (hereafter referred to as the small business community) from all possible sources.

b. Ensuring that procurement packages are structured to permit the small business community to participate to the maximum extent possible.

c. Assuring inclusion of the small business community in all solicitations for products or services, which they are capable of providing.

d. Reviewing solicitations and contracting documents to remove statements, clauses, etc., which may tend to restrict or prohibit the small business community participation.

e. Ensuring that the bid proposal review board documents its reasons for not selecting low bids submitted by the small business community.

f. Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.

g. Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.

h. Monitoring attainment of proposed goals.

i. Preparing and submitting required periodic subcontracting reports.

j. Coordinating contractor's activities during the conducting of compliance reviews by Federal agencies.

k. Coordinating the conduct of contractor's activities involving its small business subcontracting program.

Outreach efforts will be made by identifying:

· Contacts with minority and small business trade associations.

· Contacts with business development organizations.

· Attendance at small and minority business procurement conference and trade fairs.

The following internal efforts will be made to guide and encourage buyers:

· Workshops, seminars and training programs will be conducted.

· Activities will be monitored to evaluate compliance with this subcontracting plan.

· Arrange interviews with the small business community.

WSP USA maintains a small business program, including a database of subcontractors. Additionally, WSP USA has a Supplier Registration page available at: http://plus.wsp-pb.com/supplier_registration/. This page is meant to attract additional small business concerns to register in our system. We solicit information regarding the subcontractor’s socioeconomic status during the registration process. Our project teams are able to search the database of registered subcontractors by socio-economic category, discipline, and firm location. In addition to our prequalification system, our Small Business Liaison Officer (“SBLO”) engages in efforts (such as SBA Dynamic Small Business Searches and attendance at outreach events) to identify additional small business concerns. Our SBLO also periodically circulates emails, notifying WSP USA employees who routinely work on federal projects of potential small business concerns to consider for future subcontracting opportunities.

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $750,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);

Ensure that other than small business subcontractors with subcontracting plans

RAM

a. Source lists, guides, and other data identifying concerns in the small business community.

b. Organizations contacted to locate firms in the small business community.

c. On a contract-by-contract basis, records on all subcontract solicitations over $250,000 and indicating for each solicitation;

(i) whether concerns in the small business community were solicited, and if not, why not; and

(ii) reasons for the failure of the solicited concerns in the small business community to receive the subcontract award.

(iii) written designations from ANCs or Indian Tribes, in accordance with FAR 19.703, if applicable.

d. Records to support other outreach efforts, e.g., contacts with small business trade associations, business development organizations, and attendance at small business procurement conferences and trade fairs, and frequency of accessing SAM.

RAM

RAM

RAM

RAM

agree to submit eSRS documents online as required;

Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).

Submitted by:

POC Name: Robert A. Morris, PE, DBIA, ENV SP Title: Vice President; Managing Director – Herndon Transportation Lead Email Address: Robert.Morris@wsp.com Company Name: WSP USA Inc.

DUNS/CAGE: 089192355 / 1PN33

Mailing Address:

13530 Dulles Technology Drive, Ste. 300, Herndon, VA 20171

__________________________________________March 18, 2021; revised April 2, 2021 Signature

RAM

RAM

RAM

RAM

2019-122b_subk.pdf
Subcontracting Plan
1 Policy Statement
2 Type of Plan
3 Goals
4 Types of Supplies and Services to be Subcontracted
5 Method Used to Develop the Subcontracting Goals
6 Potential Sources for Solicitation Purposes
7 Indirect Costs
8 Plan Administrator
9 Equitable Opportunity/Efforts to Broaden SB and SDB Active Vendor Base
10 Flow-Down Clause
11 Timely Payments to Subcontractors
12 Reporting and Cooperation
13 Records
14 Additional Assurances
Appendix A: Subcontractors
Appendix B
2021-04-12T12:28:44-0400
MELVIN ORLANDO SLOAN

File details come from the government source that posted it. Updated .