WRRC_Mechanical_Drawings_Record_Set_07-10-2022_.pdf
PDF 13 MB Posted
- Attached to
- Rec Center Gym Lights
- Solicitation number
- 25-037
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This mechanical drawings record set pertains to the City of Wheat Ridge, Colorado's Recreation Center Gym Lights project (RFP 25-037), a comprehensive LED lighting replacement initiative for the Main Hall and Gymnasium areas. The project requires a turn-key solution encompassing lighting design, fixture installation, and implementation of new energy-efficient LED lighting systems with integrated controls. The mechanical drawings document equipment specifications and weight calculations, including multiple components ranging from 1,210 lbs to 20,900 lbs with associated load increments (+390 lbs to +6,575 lbs). A mandatory pre-proposal meeting is scheduled for October 13, 2025, at the Wheat Ridge Recreation Center, with proposals due by October 24, 2025, at 2:00 pm Mountain Time. Contractors must complete the installation within a seven-day period in 2025, working around the recreation center's operational schedule. The contract will be subject to annual renewal based on contractor performance and pricing, with the city maintaining flexibility in future procurement decisions.
The city will evaluate contractors using a best value procurement model, considering qualifications, price, product quality, service capabilities, and alignment with city policies and budget. Ideal contractors must be local to Colorado and capable of providing complete connection details, electrical drawings, material specifications, and documentation to ensure code and permit compliance. A performance bond will be required for the project. While specific budget details are not provided in the documentation, the project involves a sophisticated lighting infrastructure upgrade focusing on energy efficiency and modernization. The contract opportunity does not explicitly mention set-aside designations or restrictions for disadvantaged enterprises. The technical complexity of integrating new LED lighting systems with existing recreational center infrastructure requires contractors to demonstrate advanced proficiency in LED lighting design and installation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
dbeiers Text Box 15600 lbs ▲ +1600 lbs dbeiers Text Box 4100 lbs ▲ +645 lbs dbeiers Text Box 18000 lbs ▲ +5300 lbs dbeiers Text Box 20900 lbs ▲ +6575 lbs dbeiers Text Box 20900 lbs ▲ +6575 lbs dbeiers Text Box 1210 lbs ▲ +390 lbs
File details come from the government source that posted it. Updated .