WRRC_Electrical_Drawings_Record_Set_07-10-2022_.pdf

PDF 12 MB Posted

Attached to
Rec Center Gym Lights
Solicitation number
25-037
Issued by
Jefferson County, Weston CDP, Colorado

About this file

This is an electrical drawings record set for the City of Wheat Ridge, Colorado's Recreation Center gym lights LED lighting replacement project (RFP 25-037). The project scope encompasses a comprehensive LED lighting system replacement for the Main Hall and Gymnasium areas of the Recreation Center, requiring turn-key solutions that include lighting design, fixture installation, energy-efficient LED lighting systems with integrated controls, complete connection details, electrical drawings, material specifications, and documentation to ensure code and permit compliance. A mandatory pre-proposal meeting is scheduled for October 13, 2025, at the Wheat Ridge Recreation Center, with proposals due by October 24, 2025, at 2:00 pm Mountain Time. The contract requires contractors to complete the installation within a seven-day period in 2025 while accommodating the recreation center's operational schedule. The city will evaluate proposals using a best value procurement model, assessing qualifications, price, product quality, service capabilities, and alignment with city policies and budget.

Ideal contractors must be local to Colorado and demonstrate advanced technical expertise in LED lighting design and installation. A performance bond will be required for the project. The contract is subject to annual renewal based on the contractor's performance and pricing, with the city reserving the right to rebid or terminate the agreement and maintaining flexibility for potential multi-year engagement. The documentation does not explicitly identify specific budget amounts, set-aside designations for disadvantaged enterprises, or current incumbents. The project involves a sophisticated infrastructure upgrade focused on energy efficiency, longevity, serviceability, and safety improvements to the facility's lighting systems, with contractors expected to integrate new lighting systems seamlessly with existing recreational center infrastructure.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .