Written Inquiries and Answers.pdf

PDF 85 KB Posted

Attached to
Concrete Replacement - Pueblo Complex
Solicitation number
DQ1 CAAA 2026000217 5
Issued by
Garfield County, Colorado

About this file

This document is a Written Inquiries and Answers record for the Concrete Replacement - Pueblo Complex project in Colorado (GovTribe ID: DQ 2026000217). The file addresses nine clarification questions submitted by bidders regarding the scope of work for concrete replacement at the Pueblo Complex facility. Key project requirements include removal and replacement of a minimum of six inches of subgrade concrete across all areas, with basketball hoops to be poured separately rather than monolithic with the main slab to maintain proper height and levelness. The contractor will be responsible for providing private utility locates on-site. Existing wooded steps, metal handrails, and HVAC units will be removed by the government team to allow concrete pouring in those areas. Concrete work will extend to metal skirting on existing sidewalks adjacent to trailer pods, and surveying will be permitted for the ADA ramp area between trailer pods one and two to ensure proper drainage and ADA compliance, provided surveyors pass background checks.

Additional administrative clarifications were provided regarding site operations and labor standards. The government will permit the main site supervisor to carry a cellular phone per Warden approval, though general cell phone use remains restricted otherwise. Metal forming stakes are acceptable and do not require numbering; however, they will be accounted for at the beginning and end of each work shift. The project is not utilizing Federal funds and therefore does not require Davis Bacon wage compliance. No information regarding pricing, contract duration, or award timeline is included in this inquiries and answers document.

View the file

Other files

File Type Posted
image0 (3).jpeg JPEG file
5.6 Exhibit F - PO Terms and Conditions eff0825.pdf PDF
1. Exhibit A - Offerer DQ Checklist.pdf PDF
image0 (7).jpeg JPEG file
image0 (1).jpeg JPEG file
4. Exhibit D - Price Proposal.xlsx XLSX spreadsheet
2. Exhibit B - Required Vendor Information - Services.pdf PDF
image0 (2).jpeg JPEG file
9. Attachment B - Consent to Search form.pdf PDF
3. Exhibit C - W-9 Request for Taxpayer ID Number.pdf PDF
8. Attachment A - Insurance Information.pdf PDF
5. Exhibit E - Vendor Disclosure Stmt.pdf PDF
image0 (4).jpeg JPEG file
7. Exhibit H - Non-conflict of Interest - Respondent.pdf PDF
image0 (9).jpeg JPEG file
6a. Exhibit G - General Information 032725.pdf PDF
image0 (8).jpeg JPEG file
image0 (6).jpeg JPEG file
image0 (5).jpeg JPEG file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DQ 2026000217 Concrete Replacement – Pueblo Complex

Written Inquiries and Answers

1. Do you have a specific depth you would like us to remove and replace for the subgrade under all concrete. 6", 12"?

Answer: Remove Min of six inches.

2. You will be providing the basketball hoops, and we were told to pour them monolithic with the rest of the slab, but this will make it very difficult to make sure to keep the proper height and levelness of the hoop can they be poured separately.

Answer: Yes

3. Mike stated that you will be doing the private locations. Will this be done at both locations?

Answer: Contractor will provide locates.

4. The rules state no cell phone for anyone but can we get approval for the main supervisor on site to have his.

Answer: We will allow the supervisor to have a cell phone. PER the Warden approval

5. YOS On the 2nd trailer/office pod the existing sidewalk is poured up to the metal skirt are we doing the same with the new concrete?

Answer: Yes concrete back to the metal skirting.

6. Verifying that Mike and crew will be removing all wooded steps, metal handrailing and

HVAC units for the concrete to be poured in these areas?

Answer: That is correct, my team will move the steps and handrails.

7. The area between trailer pod 1 and 2 that has the huge wood ADA ramp can we get approval beforehand to have surveying done on this to make sure; we can get proper drainage and ADA specifications?

Answer: Yes as long as they can pass a background check.

8. We use metal stakes for the forming and have a question about numbering these stakes and painting them. Paint not a problem numbering could be as they are long and thin. Do they have to be numbered?

Answer: Metal stakes are fine. We will account for them at the beginning and end of each work shift. They do not have to be numbered.

9. Is this project using Federal funds that we need to use Davis Bacon Wages?

Answer: No Davis Bacon wages