This is Addendum No. 1 issued by Rochester Community Schools for the Brookland Elementary School project in Rochester Hills, Michigan (Project No. 2015-059), with Frank Rewold and Son serving as Construction Manager. The addendum, issued January 12, 2018, provides numerous architectural, mechanical, and electrical modifications to the original bid documents. Key changes include moisture remediation requirements for carpet and LVT flooring, modifications to various specification sections including penetration firestopping, painting, operable partitions, and food service equipment, and extensive site work modifications including demolition, grading, paving, and utility plans.
The addendum details significant changes to multiple drawing sheets, including modifications to storm drainage systems, ADA parking stalls, sidewalk and curb work under Alternate CC-01, and various interior modifications such as ceiling types, lighting fixtures, and mechanical systems. Notable additions include a new cooler/freezer and storage racks in Dry Storage Room D274, revisions to room finish schedules, and updates to electrical and mechanical systems to accommodate the new food service equipment. The document provides technical specifications and drawing modifications but does not include pricing information or contract terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Memo 1 (1-15-18).pdf | ||
| RCS Brooklands Advertisement To Bid | — | |
| 10221 RCS Brooklands Bid Form | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM Page 1
2015-059 180104 addendum 1 write up
ADDENDUM NO.: 001
PROJECT: ROCHESTER COMMUNITY SCHOOLS
BROOKLAND ELEMENTARY
Rochester Hills, Michigan
PROJECT NO: 2015-059
CM: Frank Rewold and Son
DOCUMENTS ISSUED: January 04, 2018
ADDENDUM ISSUED: January 12, 2018
This Addendum is issued before the receiving of bids to clarify or to include certain revisions to the plans or specifications. All work required by this Addendum shall be in accordance with the original plans and apply to this project.
It is requested to include the work hereinafter described, in the proposal by the contractor for the complete work.
ARCHITECTURAL
General Notes:
1. Moisture remediation to be provided if required for carpet and lvt flooring
A. Carpet – SprayLock 65000 B. LVT – Koestar Vap 1 2000
Specifications:
1. Refer to Section 01 2300 - Section Name: Alternates (issued)
A. Added alternate CC-01.
1. Refer to Section 07 8413 - Section Name: Penetration Firestopping (issued)
B. New specification section.
2. Refer to Section 09 9100 – Painting (not issued)
A. Removed painting of metal lockers in Summary Section 1.2.
B. Removed painting of metal lockers from Interior Paint Schedule 2.6
3. Refer to Section 10 2226 – Operable Partitions (issued)
A. Added Pocket Doors Section 2.7
4. Refer to Section 11 4011 – Food Service Equipment (issued)
A. New specification section.
ADDENDUM NO. 1
Rochester School District Project No: 2015-059 Brooklands Elementary School January 12, 2018 Page 2
4. Refer to Section 23 0933 – Temperature Controls (issued)
A. Revise sub-section 1.4 as shown in bold text.
B. Revise sub-section 2.1 & 2.2 as shown in bold text
Drawing Changes:
1. Refer to Sheet C1.0 – Overall Site Plan (issued):
A. Included for reference of new locations of proposed work.
2. Refer to Sheet C1.2 – Demolition Plan Area “A” (issued):
A. Added demolition notes 2A and 3A with hatches for location of numerous sidewalk and curb and gutter removals. All removals are labeled either as a 2A or 3A callout noted as “(ALT. CC-01)” with the defined hatch per their demolition note.
B. Added two locations of concrete sidewalk removal for installation process of underdrain.
3. Refer to Sheet C1.3 – Demolition Plan Area “B” (issued):
A. Added “Alternate CC-01” note indicating demolition work that is included in Alternate CC-01. Numerous locations of sidewalk and curb and gutter removals.
4. Refer to Sheet C1.4 – Grading and Utility Plan Area “A” (issued):
A. Updated storm system just north of the school to the west. Rerouted underdrain to a new storm structure.
Includes callout out for cleaning out an existing storm structure furthest west in front of the school.
B. Updated storm system just north of the school to the east. Rerouted underdrain to a new storm structure.
Includes callout out for cleaning out an existing storm structure furthest east in front of the school.
C. Updated note referring to this sheet (C1.4) for added grade work and cross section for storm system just north of the school in the middle.
D. Added grading for walk and at proposed door detail.
E. Added grading note for ADA parking stalls within the parking lot just northwest of the school.
5. Refer to Sheet C1.6 – Paving and Layout Plan “A” (issued):
A. Added “Alternate CC-01” note indicating paving work that is included in Alternate CC-01. Numerous locations of proposed sidewalk and curb and gutter work.
B. Added two locations of concrete sidewalk proposed work for installation process of underdrain.
C. Moved furthest two barrier free stalls and associated detail callouts across the drive lane to the east within the eastern most parking lot.
D. Re-named detail “A-A” in detail callout for stair cross-section and handrail location to “SH”. Associated detail reference to sheet C1.8.
E. Added areas of crack seal (detail AP-CS) within the service drive on the east side of the school.
F. Added numerous paving layout dimensions for reference.
6. Refer to Sheet C1.7 – Paving and Layout Plan “B” (issued):
A. Added “Alternate CC-01” note indicating paving work that is included in Alternate CC-01. Numerous locations of proposed sidewalk and curb and gutter work.
B. Added areas of crack seal (detail AP-CS) within the service drive on the east and south side of the school.
C. Added note to match existing asphalt playground striping after pavement operations are complete.
Brooklands Elementary School January 12, 2018 Page 3
7. Refer to Sheet C1.8 – Paving Details and Notes (issued):
A. Added details and notes for Alternate CC-01 work, including ramp, pathway, walk, and curb and gutter details.
B. Re-named detail “A-A” for stair cross-section and handrail location to “SH”. Updated detail as well to include location of handrails.
8. Refer to Sheet A0.02 – Code Plans (issued):
A. Added Level of Alteration A and B B. Revised Level of Alteration Square Footage in Code Plan Information.
9. Refer to Sheet AD2.10B – Unit B First Floor Demolition Plan (issued)
A. Removed existing television in Principals office B166.
10. Refer to Sheet AD2.10D – Unit D First Floor Demolition Plan (issued)
B. Added demolition note 3A to Dry Storage Room D257.
11. Refer to Sheet A2.10D – Unit D First Floor Plan (issued)
A. Added Cooler/Freezer and storage racks to Dry Storage Room D274.
12. Refer to Sheet A3.02A – Room Finish Schedules (not issued)
A. Added note to Room Finish Schedule General Notes F. Existing glazed CMU wall base in corridors not be painted.
13. Refer to Sheet A3.02B – Room Finish Schedules (issued)
A. Added Acoustical Ceiling tile to room D274 Dry Storage.
14. Refer to Sheet A3.03 – Material and Color Schedule (issued)
A. Added ceiling type AT4 to Material and Color Schedule.
B. Removed epoxy paint type from paint type P4.
C. Removed Classroom from paint type P3 in notes.
D. Removed color of paint P3. Color to be determined.
E. Added color to carpets C-8 thru C-13.
15. Refer to Sheet A4.01 – Exterior Elevations (not issued)
A. Revised note for mechanical louver to match existing color in Elevation B.
16. Refer to Sheet A6.02 – Interior Elevations (issued)
A. Revised notes for gypsum board wall and soffit to be pre-finished gypsum board for Elevations M and P.
17. Refer to Sheet A7.10B – Unit B Reflected Ceiling Plan (issued)
A. Revised Key note from 1 to 2 in Media Center B177.
18. Refer to Sheet A7.10D – Unit D Reflected Ceiling Plan (issued)
A. Revised ceiling in Dry Storage Room D274.
19. Refer to Sheet A8.10D – Unit D Floor Patter and Equipment Plan (issued)
Brooklands Elementary School January 12, 2018 Page 4
A. Added Cooler/Freezer and storage racks to Dry Storage Room D274.
B. Added typical elevation tags to toilet rooms D252 and D255.
C. Added note for returning tile wall on plan in toilet rooms D252 and D255.
20. Refer to Sheet FS-1 – Food Service Equipment Plan, Schedule, Utilities, Special Conditions (issued)
A. New drawing.
21. Refer to Sheet MD4.10D – Unit D Mechanical Demolition Plan (issued)
A. Added Demolition Note D in Dry Storage D274 to read: “Remove existing diffuser in order to relocate.
22. Refer to Sheet M4.10D – Unit D Mechanical Plan (issued)
A. Relocated existing diffuser as indicated.
B. Added Construction Note 3 in Dry Storage D274 to read: “Relocate existing diffuser as indicated and balance to existing airflow”.
23. Refer to Sheet E0.02 – Electrical Standards Schedule (issued)
A. Revised light fixture types SL1 and SL2 to 12,000 lumens.
B. Added light fixture type L4.
24. Refer to Sheet ED1.10D – Unit D Power Plan (issued)
A. Added note as indicated.
B. Removed light fixtures as indicated.
25. Refer to Sheet E2.10B – Unit B Power Plan (issued)
A. Added light fixture type L4 as indicated
26. Refer to Sheet E3.10D – Unit D Power Plan (issued)
A. Provided power to freezer as indicated.
File details come from the government source that posted it. Updated .