WPA - RFP - Classroom Unit Ventilator & AC Repl(s) 2024 [FINAL DOC].pdf
PDF 3 MB Posted
- Solicitation number
- RFP-WPRA-250000000229-2
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This document is a Request for Proposal (RFP) issued by Weston Preparatory Academy, a charter school located in Detroit, Michigan, for the removal and replacement of eight classroom unit ventilators and air conditioning units. The RFP requires bidders to furnish and install new horizontal unit ventilators and outdoor-mounted air conditioning units, including all necessary components and connections. A voluntary walkthrough is scheduled for November 1, 2024, and proposals are due by November 8, 2024. The project is expected to be completed by March 31, 2025.
The RFP outlines specific technical requirements for the replacement units, including heating and cooling capacities, coil configurations, and control systems. Bidders must provide three references and comply with various forms and requirements, such as prevailing wage, familial disclosure, school safety, and Iran sanctions forms. The successful bidder will be required to provide a bid bond, performance and payment bond, and a 5-year workmanship warranty.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WPA - RFP - Classroom Unit Ventilator & AC Repl(s) 2024 11.04.24 [Addendum #1].pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
Weston Preparatory Academy
Classroom Unit Ventilator & AC Replacements 2024
Farrah Adams School Leader
REQUEST FOR PROPOSAL---THIS IS NOT AN ORDER OR OFFER
IF FOR ANY REASON YOU CANNOT RETURN THIS BID, PLEASE RETURN THIS FORM INDICATING
SO TO ENSURE THAT YOUR NAME MAY BE RETAINED ON OUR BIDDER LIST.
SCHEDULE:
RFP RELEASE: October 28, 2024
VOLUNTARY WALK-THRU: 3 PM, NOVEMBER 1, 2024
WALK-THROUGH LOCATION: WESTON PREPARATORY ACADEMY
22930 CHIPPEWA ST
DETROIT, MI 48219
PROPOSAL QUESTIONS DEADLINE: NOVEMBER 6, 2024
PROPOSAL SUBMITTAL DEADLINE: NOVEMBER 8, 2024
BOARD APPROVAL: JUNE 10, 2024*
* Board approved project with a not to exceed amount
SUBMIT PROPOSAL TO:
CS PARTNERS
869 S OLD US 23
BRIGHTON, MI 48114
MARK PROPOSAL:
WESTON PREPARATORY ACADEMY
“CLASSROOM UNIT VENTILATOR & AC REPLACEMENTS 2024”
22930 CHIPPEWA ST
DETROIT, MI 48219
ATTN: MS FARRAH ADAMS
The Academy is soliciting sealed proposals for the removal/disposal and installation of (8) new horizontal unit ventilators and (8) A/C units to include all components and connections including electrical and plumbing needed to complete the project.
WESTON PREPARATORY ACADEMY
CLASSROOM UNIT VENTILATOR & AC REPLACEMENTS 2024
SCOPE OF SERVICES (SOS)
GENERAL SPECIFICATIONS:
1. Remove and dispose of (8) existing unit ventilators in classrooms #3, #5, #6, #7, #14, #16, #17 & #18.
2. Furnish & install (8) new horizontal unit ventilators in classrooms above to include all components and connections including electrical and plumbing needed to complete the project.
3. See EXHIBIT “A” for the written specification requirements.
4. See EXHIBIT “B” for a floor plan layout of the work area.
REQUIREMENTS OF BIDDER:
1. A VOLUNTARY WALK THROUGH shall be provided to allow contractors to become familiar with the project as described in the schedule above.
2. The successful bidder shall complete and submit the Prevailing Wage, Familial Relationships, School Safety and the Iran Sanctions forms with the bid packet. Failure to execute and include these documents will result in bid rejection.
3. (3) References must be provided by ALL prospective Bidders.
4. Successful bidder shall commence construction no less than (7) days after issuance of a notice to proceed.
5. This project SHALL be completed no later than March 31st, 2025.
6. A Bid-bond will be required in the form of 5% of the project amount from each bidder.
7. A Performance and Payment bond on 100% of the bid will be required by the successful bidder.
8. All bids shall be good for thirty (30) days after the proposal submittal deadline.
9. Successful bidder will be required to field verify square footage and conditions.
10. Successful bidder will be required to secure a permit, if required. Permits and associated costs are the contractor’s responsibility.
11. All State of Michigan and local building codes shall be strictly followed.
12. All proposals to be backed by a 5-year workmanship warranty from the contractor.
13. Successful bidder shall fully restore any damage to grass or landscaping caused by materials being delivered to the constructions area(s).
CONTENTS OF PROPOSAL PACKET:
1. Proposal Cover & Schedule Document
2. Scope of Services Document
3. Pricing (ATTACHMENT A)
4. Specifications (EXHIBIT A)
5. Floor Plan of Work Limits (EXHIBIT B)
6. Various Documents (ATTACHMENT B)
GENERAL INFORMATION:
1. CHANGES TO RFP: All additions, corrections or changes to the solicitation documents will be made in the form of a written Change Form as issued by the Academy only. Bidders shall not rely upon interpretations, corrections, or changes made in any other manner, whether by telephone or in person. Additions, corrections, and changes shall not be binding unless made by such a written, signed Change Form. All written, signed Change Forms issued shall become part of the Agreement documents. Change Forms will be sent to all known potential bidders by e-mail.
2. CONTACT INFORMATION: To receive future communications related to this RFP, possible bidders are asked to immediately send contact information by email to David Blackmar, at dblackmar@charterschoolpartners.com failure to do so may limit your ability to submit a complete, competitive Proposal.
3. RIGHT TO WITHDRAW BIDS: By submitting a Proposal in response to this RFP, Bidder agrees to be bound by this
RFP’s terms and conditions. Proposals may be withdrawn by the Bidder without penalty at any time before notification that the Bidder’s Proposal has been selected. However, if the Bidder withdraws after selection of its Proposal but before executing the Contract for any reason (“Late Withdrawal”), Bidder shall pay liquidated damages to the Academy in an amount equal to five percent (5%) of the amount of the Proposal (“Liquidated
Damages”). The Academy and Bidder intend these Liquidated Damages to constitute compensation and not a penalty. Bidder’s payment of the Liquidated Damages shall be Bidder’s sole liability and entire obligation and the
Academy’s exclusive remedy for Late Withdrawal of Bidder’s Proposal.
4. RFP, PROPOSALS AND ACCEPTANCE DO NOT OBLIGATE: The parties agree that they will not consider either distribution of this RFP or receipt of Proposals by the Academy or even notification of Proposal acceptance by the Academy as an obligation or commitment by the Academy to either purchase equipment from the Bidder or to enter into a contractual agreement. Rather, the parties understand that the Academy will have no binding obligation until it signs the Contract approved by its legal counsel.
5. TAX-EXEMPT STATUS: The Academy is a tax-exempt entity. A tax-exempt form will be provided to the successful bidder.
6. FOIA: All bids are confidential until the listed bid opening time and date; however, as a public entity, the Academy is subject to the Michigan Freedom of Information Act (FOIA). Information contained in proposals may be subject to FOIA requests.
7. RESPONSIBILITY: Bidder is solely responsible for ensuring its bid is received by the Academy in accordance with the solicitation requirements, before the date and time specified in this Request, and at the place specified.
mailto:dblackmar@charterschoolpartners.com
8. INSURANCE: The Bidder shall purchase and maintain insurance sufficient to protect it from any and all claims which may arise out of or result from the Bidder’s services related to this RFP and any resultant contract, whether such service be by the Bidder individually or by anyone directly or indirectly employed by Bidder, or by anyone for whose acts Bidder may be liable, including independent contractors. Insurance policies purchased and maintained shall include, but are not limited to, the following:
a. Worker’s compensation insurance for claims under Michigan’s Workers’ Compensation Act or other similar employee benefit act of any other state applicable to an employee in the minimum amount as specified by statute;
b. Employer’s liability insurance, in conjunction with workers’ compensation insurance, for claims for damages because of bodily injury, occupational sickness or disease or death of an employee when workers’ compensation may not be an exclusive remedy, subject to a limit of liability of not less than
$100,000 each incident;
c. Motor vehicle liability insurance required by Michigan law including no-fault coverage for claims arising from ownership, maintenance or use of a motor vehicle with liability limits of not less than $1,000,000 per occurrence. Coverage shall include all owned vehicles, all non-owned vehicles, and all hired vehicles.
d. Commercial General Liability insurance for claims for damages because of bodily injury or death of any person, other than the Bidder’s employees, or damage to tangible property of others, including loss of use, which provides coverage for contractual liability, with a limit of not less than $1,000,000 each occurrence and a mandatory $2,000,000 annual aggregate.
Insurance required shall be in force until acceptance by the Academy of the entire completed work, and shall be written for not less than any limits of liability specified above. Certificates of insurance, acceptable to the
Academy, shall be provided to the Academy no less than ten (10) working days prior to the project start-up.
All Certificates of Insurance and duplicate policies shall contain the following clauses:
1. “It is understood and agreed that thirty (30) days advance written notice of cancellation, nonrenewal, reduction and/or material change in coverage will be mailed to the Academy; and
2. “It is understood and agreed that the following are listed as additional insureds: The Academy, including all elected and appointed officials, all employees and volunteers, all boards, commissions, departments and/or authorities and their board members, employees and volunteers and CS Partner, it’s management consultant firm.”
9. NON-DISCRIMINATION: In the performance of the proposal and resultant contract, bidder agrees not to discriminate against or grant preferential treatment to any individual or group on the basis of race, sex, color, ethnicity, or national origin in the operation of public employment, public education, or public contracting. Bidder shall not discriminate against any employee or applicant for employment to be employed in the submission of this Proposal or in performance of the duties necessitated by an award of the proposed contract with respect to his or her hire, tenure, terms, conditions or privileges of employment, or any matter directly or indirectly related to employment, because of his or her race, color, religion, national origin, ancestry, gender, height, weight, marital status, age, except where a requirement as to age is based on a bona fide occupational qualification, or disability that is unrelated to the individual's ability to perform the duties of a particular job or position. Any breach of this provision will be regarded as a material breach of the contract.
10. PROPOSAL DELIVERY: Proposals must be returned no later than 12:00 pm, November 8, 2024. (No Proposals will be accepted after this time) in a sealed envelope clearly marked:
Weston Preparatory Academy DELIVER TO:
“Classroom Unit Ventilator & AC Replacements 2024” CS Partners
22930 Chippewa St 869 S. Old US 23 (Suite 500)
Detroit, MI 48219 Brighton, MI 48114
Attn: Farrah Adams
Please provide one (1) original, three (3) printed copies and one (1) electronic copy (USB drive) of the submission delivered to the above stated location. The Academy will accept proposals sent by FAX or Email under extenuating circumstances as approved by the Academy only.
11. PROPOSAL OPENING: There will be a public proposal opening for this RFP at 12:00 pm, October 16th, 2023 and will take place at a designated location on the School campus. (NOT REQUIRED)
12. PROPOSAL REJECTION/ACCEPTANCE: The Academy reserves the right to accept or reject any or all proposals, to waive any irregularities and to make the final determination as to the best low qualified proposal.
The Academy is not required to accept the lowest cost proposal in all or in part. The proposal award will not be based solely upon cost, but will be evaluated based upon criteria formulated around the most important features of the services, of which qualifications, experience or capacity may be overriding factors.
The Academy reserves the right to waive any informalities or immaterial omissions or defects not involving prices, time or changes in the work and to reject any or all proposal, if to do so is deemed in the best interest of the Academy. In no event will an award be made until all necessary investigations are made as to the responsibility and qualification of the bidder to whom is it proposed to make such an award. Any contract awarded to a person or company who is discovered to have been in default or disqualified at the time of the awarding of the contract shall be voidable at the discretion of the Academy.
13. PROPOSAL AWARD: In the event the proposal is awarded by the Academy, a Notice of Intent to Award will be used to notify all bidders of her intent to award the proposal to the Bidder providing the best value to the
Academy.
14. CONTRACT: The Academy’s award of any proposal is subject to and conditioned upon execution of a formal agreement for products and services between the successful bidder and the Academy. In submitting a proposal, the bidder acknowledges that the contents of the RFP will become incorporated within any formal agreement.
This RFP does not include every term and provision which shall be included in the formal agreement. In the event that the bidder fails to execute the formal agreement within 14 days of its presentment by the Academy, the Academy may reject the selected bidder, and proceed to accept another qualified proposal, or reject all proposals.
A copy of a bidder’s suggested terms and conditions may be submitted with bidder’s proposal, however, neither the Academy’s acceptance of any proposal nor award of any contract pursuant to this RFP shall be construed as any definitive acceptance by the Academy of Bidder’s suggested terms and conditions. In the event of a conflict in terms, the order of precedence to resolve the conflict will be as follows: Michigan State law, the terms and conditions of the signed contract, the terms and conditions of the RFP, and last, the Bidder’s Proposal.
15. DISPUTES: In the event a bidder disagrees with the recommendation of the Academy concerning this award, the bidder is required to submit their concern(s) in writing to the Board Attorney within ten (10) business days from the date of the notice of intent to award.
16. QUESTIONS: All questions about this RFP must be received by 5:00 pm, November 6, 2024 in writing, via email, to:
David Blackmar
CS Partners dblackmar@charterschoolpartners.com
Correspondence or inquiries made directly to bidders regarding their proposals from all other persons are to be directed to the person(s) designated above for appropriate review and response. Contact with other Academy staff or School Board members could be reason for disqualification.
Any significant explanation desired by a proposer, regarding the meaning or interpretation of the Request for Proposals must be requested with sufficient time allowed for a reply to reach all prospective proposers to submit their proposals. Any information given to a prospective bidder concerning the Request for Proposal will be furnished to all prospective bidders as an amendment or addendum to the Request for Proposal, if such information would be of significance to uninformed bidders. The Academy shall make the sole determination as to the significance to uninformed bidders.
ADA ASSISTANCE:
The Academy will provide necessary and reasonable auxiliary aids and services, such as signers for the hearing impaired and audio tapes of printed materials being considered, to individuals with disabilities upon two days’ notice to the Academy. Individuals with disabilities requiring auxiliary aids or services should contact the
Academy by writing or calling.
mailto:dblackmar@charterschoolpartners.com
ATTACHMENT A
PROJECT PRICING
Proposal Sheet for: Weston Preparatory Academy
Contract Price for: “Classroom Unit Ventilator & AC Replacements 2024”
Proposal Deadline: 12:00 pm, November 8, 2024
ITEM DESCRIPTION ALT AMOUNT AMOUNT
1) Classroom Unit Ventilator & AC Replacements 2024 $
GRAND TOTAL $
VENDOR INFORMATION
Company Name: _____________________________________________________________________
Address/City/State/Zip: _______________________________________________________________
Email Address: _______________________________________________________________________
Company website: ____________________________________________________________________
Printed name and title of Authorized Company Representative:
Name
Title
Signature of Authorized Company Representative:
Date: _______________________
EXHIBIT A
{1 of 2}
1.0 CLASSROOM UNIT VENTILATOR REPLACEMENT SPECIFICATIONS:
1.1.0 GENERAL DESCRIPTION:
1.1.1 Remove and dispose of (8) existing unit ventilators and (8) air conditioners servicing classrooms #3, #5, #6, #7, #14, #16, #17 & #18.
1.1.2 Furnish & install (8) new horizontal unit ventilators and (8) outdoor mounted air conditioners to service classrooms above.
1.1.3 The units shall be installed to meet all applicable manufacturers specifications and guidelines, all applicable governmental guidelines, and all industry-approved standards.
2.0 REMOVALS:
2.1.0 MATERIALS REMOVAL:
2.1.1 The (8) existing units shall be completely removed and provided to the owner for any parts salvaging of their choice prior to disposal.
2.1.2 The flooring will be assessed for excessive deterioration prior to the installation of the new units.
2.1.3 The Academy will be notified if deficient areas are found.
2.2.0 MATERIALS DISPOSAL:
2.2.1 Proper off-site disposal shall be coordinated with the Academy as the project begins.
3.0 INSTALLATION:
3.1.0 HEATING UNITS:
3.1.1 Furnish and install (8) new Modine (or approved by owner) heating unit ventilators
(Model # VFV1000AA52D1CA4AB1BND).
3.1.2 The heating type shall be hot water/2-row coil/right hand S&R connections.
3.1.3 The heating capacity shall be 58,800 BTU/hr.
3.1.4 Shall include (2) solid end panels and (2) front access panels per unit.
3.1.5 Shall include a 2-inch sub-base with front return and rear OA opening.
3.1.6 Shall include a 3 speed ECM motor.
3.1.7 Shall include the carrier UV open controls/valve control.
3.1.8 Shall include a hot water coil, 2-way modulating control valve.
3.1.9 Shall include unions and supply and return pressure/temperature taps.
3.1.10 Shall include ball valves and circuit setter.
3.1.11 Shall include a cold weather damper assembly.
3.2.0 COOLING UNITS:
3.2.1 Furnish and install (8) new Carrier (or approved by owner) air-cooled air conditioner units (Model # 26SCA430N003)
3.2.2 The cooling type shall be R454ab coil/4-row coil/left hand connections.
3.2.3 The cooling capacity shall be 2.5 tons or 30,000 BTU/hr.
3.2.4 The air conditioner unit shall be outdoor-mounted and suitable for ground or rooftop installation.
3.2.5 The unit cabinet will be constructed of galvanized steel, and coated with a powder coat paint.
3.2.6 The condenser fan will be direct-drive propeller type, discharging air upward.
3.2.7 Compressor will be hermetically sealed and will be mounted on rubber vibration isolators.
3.2.8 Condenser coil will be air cooled and leak tested at 150 psig and pressure tested at 470 psig.
3.2.9 The refrigeration circuit components shall include liquid-line shutoff valve with sweat connections, vapor-line shutoff valve with sweat connections, system charge of Puron (R454ab) refrigerant, and compressor oil.
3.2.10 The unit shall be shipped with a filter drier for Puron (R454ab) refrigerant
EXHIBIT A
{2 of 2}
4.0 CONTROLS:
4.0.1 The unit ventilator shall be furnished with a unit mounted thermostat for accurate temperature control including the a/c unit.
4.0.2 The unit shall have factory installed DDC ready control to facilitate a system wide controller as needed in the future.
5.0 MODIFICATIONS:
5.0.1 Modify existing outside air opening as needed to accommodate new unit
5.0.2 Make all piping modifications as needed
5.0.3 Make modifications to existing electrical as needed
6.0 NOTES:
6.0.1 Contractor to provide site-specific safety plan prior to any work commencing. All applicable MIOSHA safety regulations to be strictly followed on this project. Any work outside of the screen-walls shall require tie-off.
6.0.2 Installations must comply with all current relevant standards, codes of practice, and the State building regulations.
6.0.3 Any and all state and local permits shall be obtained by the prospective contractor with pricing included in the proposal.
6.0.4 The furnished and installed units shall be to be backed by manufactures warranty from the manufacturer and a 1-year workmanship warranty from contractor.
6.0.5 The work site shall be properly cleaned after each work day and upon project completion to the owner’s satisfaction.
REPLACED
REPLACED
REPLACE REPLACE REPLACE REPLACE
REPLACE REPLACE REPLACE REPLACE
XXXXXXXXXXXXXXXXX 11
dblackmar Typewritten Text dblackmar dblackmar Typewritten Text dblackmar Typewritten Text dblackmar
EXHIBIT B
Prevailing Wage Compliance Certification
Under Michigan law, MCL 408.1101 et seq., Public Act 10 of 2023, contractors and subcontractors are required to pay prevailing wage and benefit rates to employees on state funded construction projects. These rates are set by the Michigan Department of Labor and Economic Opportunity. This requirement does not change compliance with the Davis-Bacon Act, 40 USC 3121 et seq., for prevailing wage rates applying to federally funded or assisted projects.
I, _____________________ (bidder), certify that _______________ (company name) will follow all the requirements under Michigan describe on form WHD 9918 DTMB form (attached).
https://www.michigan.gov/leo/-/media/Project/Websites/leo/Documents/WAGE-HOUR/WHD-99xx-Information-Sheets/WHD-9918-PW-REQUIREMENTS-INFO-SHEET/WHD-9918-DTMB-PW-rates-1-31-2022_ad-jf_.pdf?rev=d6d173da37ed451c9da6027ef1b0c54c&hash=89C157647352E20578EFB6C578C810A8
FAMILIAL DISCLOSURE STATEMENT
All bidders must complete the following familial disclosure form in compliance with MCL 380.1267 (Public Act 232 of 2004) and attach this information to the bid.
By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exists between the owner or any employee of the bidder and any member of the school or academy board, the superintendent, executive officer, school leader or principal of the school or academy, or employee of the educational service provider. The school or academy shall not accept a bid that does not include this sworn and notarized disclosure statement.
Disclose any familial relationship and complete the form below in its entirety:
The following are familial relationships as described above (provide employee name, family contact name, family contact position, and familial relationship or NONE.)
Signature(s) Title:
Name of Firm:
State of County of
On this day of , 20 , before me a Notary Public in and for said county, personally appeared , agent of the said firm and who acknowledge the same to be his free act and deed as such agent.
Notary Public Commission Expires
Affidavit of Bidder-Compliance with School Safety Initiative Legislation
The undersigned, the owner or authorized officer of _____________________________(the “Bidder”), certifies to the School or Academy, that any and all persons who will work directly or indirectly for the
Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL
380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”.1 The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within 3 business days to the School or Academy when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code2 or a substantially similar law, and to immediately report to the School or Academy if that person is subsequently convicted, plead guilty or plead no contest to that crime.
BIDDER: __________________________________
By: _______________________________________
Its: _______________________________________
Iran Economic Sanctions Act Certification
I am the __________________(insert title) of _________________________ (insert bidder company name), or I am bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the provision of contracted services to the School. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the School will rely on my representations in evaluating bids.
I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.
Signature ____________________________________
REFERENCES
1. Customer Name: Contact: Title:
Project: Phone Number:
Address:
Project Date:
2. Customer Name: Contact: Title:
Project: Phone Number:
Address:
Project Date:
3. Customer Name: Contact: Title:
Project: Phone Number:
Address:
Project Date:
STATE OF MICHIGAN
Wage and Hour Division
PO Box 30476 Lansing, MI 48909
517-284-7800 Informational Sheet: Prevailing Wages on State Funded Projects
WHD 9918 (2/24)
REQUIREMENTS
Effective February 13, 2024
The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects that are financed or financially supported by the state Prevailing rates compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. While the prevailing wage rates are compiled through surveys of collectively bargained agreements, a collective bargaining agreement is not required for contractors to be on or be awarded state projects. The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate.
State of Michigan responsibilities:
• The department establishes the prevailing rate for each classification of construction mechanic requested by the contracting agents prior to contracts being let out for bid on a state project.
DTMB responsibilities
• If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re- determination of rates must be requested by the contracting agents.
• Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.
Contractor responsibilities:
• Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing rates prescribed in a contract.
• Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic. This record shall be available for reasonable inspection by DTMB or the department.
• Each contractor or subcontractor is liable for the payment of the prevailing rate to its employees.
• The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.
• A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.
Enforcement:
A person who has information of an alleged prevailing wage violation on a prevailing wage project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with contractual requirements, the Contracting Agent may consider the Contractor to be in material breach of the contract and may terminate the contract for cause at the sole discretion. There are also civil penalties for failure to be in compliance with Act 10. View the entire text of Act 10 of 2023 at michigan.gov/wagehour.
Informational Sheet: Prevailing Wages on State Projects
P a g e | 1 of 10
WHD-9917 2/24
General Information Regarding Fringe Benefits
Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate:
o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract or policy o If a fringe benefit is paid into a fund, for a construction mechanic
When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week).
The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:
Vacation 40 hours X $14.00 per hour = $560/2080 = $.27 Dental insurance $31.07 monthly premium X 12 mos. = $372.84 /2080 = $.18 Vision insurance $5.38 monthly premium X 12 mos. = $64.56/2080 = $.03 Health insurance $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $1.33 Life insurance $27.04 monthly premium X 12 mos. = $324.48/2080 = $.16 Tuition $500.00 annual cost/2080 = $.24 Bonus 4 quarterly bonus/year x $250 = $1000.00/2080 = $.48 401k Employer Contribution $2000.00 total annual contribution/2080 = $.96
Total Hourly Credit $3.65
Other examples of the types of fringe benefits allowed:
Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums
The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate o Legally required payments, such as:
Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions) o Reimbursable expenses, such as:
Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:
Industry advancement funds Financial or material loans
SUSAN CORBIN
DIRECTOR
DEPARTMENT OF LABOR AND ECONOMIC OPPORTUNITY
WAGE AND HOUR DIVISION
Prevailing Wage Rates for State Funded Projects Official Rate Schedule
GRETCHEN WHITMER
GOVERNOR
ORS#: ORS-001157
Date Issued: 10/24/2024 Contract Award By Date: 01/22/2025 Contracting Agency: Weston Preparatory Academy (Detroit) (CA-0136) Contracting Agency Representative: David Blackmar (dblackmar@charterschoolpartners.com) Project Number: WPARFP2402 Project Name: Classroom Unit Ventilators & AC Replacements 2024 Project Description: The removal/disposal and installation of (8) new horizontal unit ventilators and (8) A/C units to include all components and connections including electrical and plumbing needed to complete the project.
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 1 of 191
FOR ALL AWARDED CONTRACTS ONLY
• Every Contractor and Subcontractors shall keep Posted on the Construction Site, in a conspicuous place, a copy of all applicable prevailing wage rate schedules contained in a contract.
• The Prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated classifications.
• Please refer to WHD-9917 & WHD 9918 for any additional information.
Official Rate Schedule
Wayne
Classification Name Category Last Updated
Boilermaker Boilermaker 05/10/2024 Classification Description: Boilermaker
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $72.47 $107.55 $142.63 Apprentice: 1st Period $53.53 $79.15 $104.75 Apprentice: 2nd Period $55.14 $81.56 $107.97 Apprentice: 3rd Period $56.73 $83.94 $111.15 Apprentice: 4th Period $58.31 $86.31 $114.31 Apprentice: 5th Period $59.85 $88.62 $117.39 Apprentice: 6th Period $63.03 $93.39 $123.75 Apprentice: 7th Period $66.17 $98.10 $130.03 Apprentice: 8th Period $69.32 $102.83 $136.33
Overtime Provisions Over 8-hour day/40-hour week
9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82
Saturday First 8 hours $90.82 9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82
Sunday/Holiday $109.17
Four 10-hour days allowed? - Yes Make Up Day Allowed? - No
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 2 of 19120
Wayne
Classification Name Category Last Updated
Bricklayers, Stone Mason, Pointer, Cleaner & Caulker - BAC 2 - Metro Detroit
Bricklayer 09/24/2024
Classification Description: Bricklayers, Stone Mason, Pointer, Cleaner & Caulker
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $65.01 $97.53 $130.02 Apprentice: Bricklayer Apprentice Level 5 $52.46 $78.71 $104.92
Apprentice: Bricklayer Apprentice Level 6 $54.31 $81.48 $108.62
Apprentice: Bricklayers Apprentice 2nd Level $46.91 $70.38 $93.82
Apprentice: Bricklayers Apprentice 4th Level $50.61 $75.93 $101.22
Apprentice: Bricklayers Apprentice Level 1 $45.06 $67.61 $90.12
Apprentice: Bricklayers Apprentice Level 3 $48.76 $73.16 $97.52
Apprentice: Bricklayers Apprentice Level 7&8 $56.16 $84.26 $112.32
Overtime Provisions Over 8-hour day/40-hour week
9th hour $65.01 10th hour $65.01 Beyond 10 hours $65.01
Saturday First 8 hours $65.01 9th hour $65.01 10th hour $65.01 Beyond 10 hours $65.01
Sunday/Holiday $130.02
Four 10-hour days allowed? - Yes
Between Nov. 1 and Apr 30, if inclement weather, or other conditions beyond the Employer’s control, Saturdays may be worked as make-up days. Make-up time shall be paid at the straight time rate until forty hrs are worked unless the standard workweek included a holiday, then 32 hrs straight time
Make Up Day Allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 3 of 19121
Wayne
Classification Name Category Last Updated
Carpenter/Piledriver-687-Z1 Carpenter 09/16/2024 Classification Description: Carpenter/Piledriver
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $72.05 $92.86 $113.66 Apprentice: 1st year $47.22 $59.81 $72.39 Apprentice: 2nd year $53.43 $68.07 $82.71 Apprentice: 3rd year $59.64 $76.34 $93.03 Apprentice: 4th year $65.85 $84.60 $103.35
Overtime Provisions Over 8-hour day/40-hour week
9th hour $92.86 10th hour $92.86 Beyond 10 hours $92.86
Saturday First 8 hours $92.86 9th hour $92.86 10th hour $92.86 Beyond 10 hours $92.86
Sunday/Holiday $113.66
Four 10-hour days allowed? - Yes
Base Rate Comment: 4-10s allowed Mon-Sat
Yes, but Saturdays may not be used as a make-up day. One and a half (1 ½) the straight time rate applies to all Saturday hours, and those over 40 hours per week.
Double time applies on all Sundays, Holidays, and all time over 12 hours per day.
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 4 of 19122
Wayne
Classification Name Category Last Updated
Carpet & Resilient Floor Layer Carpenter 05/10/2024 Classification Description: Carpet and Resilient Floor Layer, (does not include installation of prefabricated formica & parquet flooring which is to be paid carpenter rate)
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $60.80 $79.22 $97.63 Apprentice: Apprentice 1st Year $42.73 $53.88 $65.03 Apprentice: Apprentice 2nd Year $48.17 $61.14 $74.10 Apprentice: Apprentice 3rd Year $53.61 $68.39 $83.17 Apprentice: Apprentice 4th Year $59.07 $75.67 $92.27
Overtime Provisions Over 8-hour day/40-hour week
9th hour $79.22 10th hour $79.22 Beyond 10 hours $79.22
Saturday First 8 hours $79.22 9th hour $79.22 10th hour $79.22 Beyond 10 hours $79.22
Sunday/Holiday $97.63
Four 10-hour days allowed? - No
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 5 of 19123
Wayne
Classification Name Category Last Updated
Diver Tender-687-Z1 Carpenter 09/16/2024 Classification Description: Journeyman-Diver Tender
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $71.16 $91.97 $112.77
Overtime Provisions Over 8-hour day/40-hour week
9th hour $91.97 10th hour $91.97 Beyond 10 hours $91.97
Saturday First 8 hours $91.97 9th hour $91.97 10th hour $91.97 Beyond 10 hours $91.97
Sunday/Holiday $112.77
Four 10-hour days allowed? - Yes
Overtime Rate Comment: Double time over 12 hours/day.
Yes, but Saturdays may not be used as a make-up day. One and a half (1 ½) the straight time rate applies to all Saturday hours, and those over 40 hours per week.
Double time applies on all Sundays, Holidays, and all time over 12 hours per day.
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 6 of 19124
Wayne
Classification Name Category Last Updated
Cement Mason Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $50.76 $72.40 $94.04 Apprentice: 1st Year $39.26 $55.15 $71.04 Apprentice: 2nd year $42.54 $60.07 $77.60 Apprentice: 3rd year $45.83 $65.01 $84.18
Overtime Provisions Over 8-hour day/40-hour week
9th hour $67.19 10th hour $67.19 Beyond 10 hours $83.62
Saturday First 8 hours $67.19 9th hour $67.19 10th hour $67.19 Beyond 10 hours $67.19
Sunday/Holiday $83.62
Four 10-hour days allowed? - No
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 7 of 19125
Wayne
Classification Name Category Last Updated
Cement Mason - B Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $47.49 $62.61 $77.73 Apprentice: 1st Year $36.91 $46.74 $56.57 Apprentice: 2nd Year $39.93 $51.27 $62.61 Apprentice: 3rd Year $42.95 $55.80 $68.65
Overtime Provisions Over 8-hour day/40-hour week
9th hour $62.61 10th hour $62.61 Beyond 10 hours $62.61
Saturday First 8 hours $62.61 9th hour $62.61 10th hour $62.61 Beyond 10 hours $62.61
Sunday/Holiday $77.73
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 8 of 19126
Wayne
Classification Name Category Last Updated
Cement Mason - BR Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $43.45 $56.64 $69.82 Apprentice: 1st Year $34.22 $42.79 $51.36 Apprentice: 2nd Year $36.86 $46.75 $56.64 Apprentice: 3rd Year $39.49 $50.70 $61.90
Overtime Provisions Over 8-hour day/40-hour week
9th hour $56.64 10th hour $56.64 Beyond 10 hours $56.64
Saturday First 8 hours $56.64 9th hour $56.64 10th hour $56.64 Beyond 10 hours $56.64
Sunday/Holiday $69.82
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 9 of 19127
Wayne
Classification Name Category Last Updated
Cement Mason - G Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $48.21 $63.42 $78.63 Apprentice: 1st year $37.56 $47.45 $57.33 Apprentice: 2nd Year $40.61 $52.02 $63.43 Apprentice: 3rd Year $43.65 $56.58 $69.51
Overtime Provisions Over 8-hour day/40-hour week
9th hour $63.42 10th hour $63.42 Beyond 10 hours $63.42
Saturday First 8 hours $63.42 9th hour $63.42 10th hour $63.42 Beyond 10 hours $63.42
Sunday/Holiday $78.63
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 10 of 19128
Wayne
Classification Name Category Last Updated
Cement Mason - K Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $44.49 $57.87 $71.25 Apprentice: 1st Year $34.95 $43.64 $52.34 Apprentice: 2nd Year $37.63 $47.66 $57.70 Apprentice: 3rd Year $40.31 $51.68 $63.06
Overtime Provisions Over 8-hour day/40-hour week
9th hour $57.87 10th hour $57.87 Beyond 10 hours $57.87
Saturday First 8 hours $57.87 9th hour $57.87 10th hour $57.87 Beyond 10 hours $57.87
Sunday/Holiday $71.25
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 11 of 19129
Wayne
Classification Name Category Last Updated
Cement Mason - L Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $47.09 $61.77 $76.45 Apprentice: 1st Year $36.81 $46.35 $55.89 Apprentice: 2nd Year $39.75 $50.76 $61.77 Apprentice: 3rd Year $42.69 $55.17 $67.65
Overtime Provisions Over 8-hour day/40-hour week
9th hour $61.77 10th hour $61.77 Beyond 10 hours $61.77
Saturday First 8 hours $61.77 9th hour $61.77 10th hour $61.77 Beyond 10 hours $61.77
Sunday/Holiday $76.45
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 12 of 19130
Wayne
Classification Name Category Last Updated
Cement Mason - M Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $42.88 $55.60 $68.32 Apprentice: 1st Year $33.98 $42.25 $50.52 Apprentice: 2nd Year $36.52 $46.06 $55.60 Apprentice: 3rd Year $39.06 $49.87 $60.68
Overtime Provisions Over 8-hour day/40-hour week
9th hour $55.60 10th hour $55.60 Beyond 10 hours $55.60
Saturday First 8 hours $55.60 9th hour $55.60 10th hour $55.60 Beyond 10 hours $55.60
Sunday/Holiday $68.32
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 13 of 19131
Wayne
Classification Name Category Last Updated
Cement Mason - s Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $48.12 $67.83 $87.53 Apprentice: 1st 6 months $31.72 $43.23 $54.73 Apprentice: 2nd 6 months $33.60 $46.05 $58.49 Apprentice: 3rd 6 months $35.49 $48.88 $62.27 Apprentice: 4th 6 months $37.37 $51.70 $66.03 Apprentice: 5th 6 months $39.25 $54.52 $69.79 Apprentice: 6th 6 months $41.14 $57.36 $73.57
Overtime Provisions Over 8-hour day/40-hour week
9th hour $63.24 10th hour $63.24 Beyond 10 hours $78.35
Saturday First 8 hours $63.24 9th hour $63.24 10th hour $63.24 Beyond 10 hours $63.24
Sunday/Holiday $78.35
Four 10-hour days allowed? - No
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 14 of 19132
Wayne
Classification Name Category Last Updated
Cement Mason - SJ Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $47.08 $61.76 $76.43 Apprentice: 1st Year $36.81 $46.35 $55.89 Apprentice: 2nd Year $39.74 $50.75 $61.75 Apprentice: 3rd Year $42.68 $55.15 $67.63
Overtime Provisions Over 8-hour day/40-hour week
9th hour $61.76 10th hour $61.76 Beyond 10 hours $61.76
Saturday First 8 hours $61.76 9th hour $61.76 10th hour $61.76 Beyond 10 hours $61.76
Sunday/Holiday $76.43
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 15 of 19133
Wayne
Classification Name Category Last Updated
Cement Mason - TC Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $44.72 $58.51 $72.30 Apprentice: 1st Year $35.07 $44.04 $53.00 Apprentice: 2nd Year $37.82 $48.16 $58.50 Apprentice: 2rd Year $40.58 $52.30 $64.02
Overtime Provisions Over 8-hour day/40-hour week
9th hour $58.51 10th hour $58.51 Beyond 10 hours $58.51
Saturday First 8 hours $58.51 9th hour $58.51 10th hour $58.51 Beyond 10 hours $58.51
Sunday/Holiday $72.30
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 16 of 19134
Wayne
Classification Name Category Last Updated
Cement Mason - UP Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $38.67 $50.71 $62.74 Apprentice: 1st Year $30.25 $38.08 $45.90 Apprentice: 2nd Year $32.65 $41.68 $50.70 Apprentice: 3rd Year $35.06 $45.29 $55.52
Overtime Provisions Over 8-hour day/40-hour week
9th hour $50.71 10th hour $50.71 Beyond 10 hours $50.71
Saturday First 8 hours $50.71 9th hour $50.71 10th hour $50.71 Beyond 10 hours $50.71
Sunday/Holiday $62.74
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 17 of 19135
Wayne
Classification Name Category Last Updated
Cement Mason - W Cement Mason 05/10/2024 Classification Description: Cement Mason
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $52.82 $74.60 $96.37 Apprentice: 1st 6 Months $34.23 $46.71 $59.19 Apprentice: 2nd 6 Months $36.30 $49.82 $63.33 Apprentice: 3rd 6 Months $38.39 $52.95 $67.51 Apprentice: 4th 6 Months $40.47 $56.07 $71.67 Apprentice: 5th 6 Months $42.54 $59.18 $75.81 Apprentice: 6th 6 Months $44.63 $62.31 $79.99
Overtime Provisions Over 8-hour day/40-hour week
9th hour $67.94 10th hour $67.94 Beyond 10 hours $83.05
Saturday First 8 hours $67.94 9th hour $67.94 10th hour $67.94 Beyond 10 hours $67.94
Sunday/Holiday $83.05
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 18 of 19136
Wayne
Classification Name Category Last Updated
Class A Laborer - Zone A Class A Laborer 05/10/2024 Classification Description: Construction Laborer, Demolition Laborer, Mason Tender, Carpenter Tender, Drywall Handler, Concrete Laborer, Cement Finisher tender, concrete chute and concrete Bucket Handler, Concrete Laborer, Cement Finisher Tender
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $50.10 $64.48 $78.85 Apprentice: 0-1,000 Hours $42.91 $53.69 $64.47 Apprentice: 1,001-2,000 Hours $44.35 $55.85 $67.35 Apprentice: 2,001-3,000 Hours $45.79 $58.01 $70.23 Apprentice: 3,001-4,000 Hours $48.66 $62.31 $75.97
Overtime Provisions Over 8-hour day/40-hour week
9th hour $64.48 10th hour $64.48 Beyond 10 hours $64.48
Saturday First 8 hours $64.48 9th hour $64.48 10th hour $64.48 Beyond 10 hours $64.48
Sunday/Holiday $78.85
Four 10-hour days allowed? - Yes
Saturday
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 19 of 19137
Wayne
Classification Name Category Last Updated
Communication Technician Communication Technician 05/13/2024 Classification Description:
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $67.89 $98.24 $128.58
Overtime Provisions Over 8-hour day/40-hour week
9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24
Saturday First 8 hours $98.24 9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24
Sunday/Holiday $128.58
Four 10-hour days allowed? - Yes
ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 20 of 19138
Wayne
Classification Name Category Last Updated
Diver-687-Z1 Diver 10/01/2024 Classification Description: Diver
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $82.48 $107.41 $132.34
Overtime Provisions Over 8-hour day/40-hour week
9th hour $107.41 10th hour $107.41 Beyond 10 hours $107.41
Saturday First 8 hours $107.41 9th hour $107.41 10th hour $107.41 Beyond 10 hours $107.41
Sunday/Holiday $132.34
Four 10-hour days allowed? - Yes
Overtime Rate Comment: Double time due when over 12 hours worked per day
Yes, but Saturdays may not be used as a make-up day. One and a half (1 ½) the straight time rate applies to all Saturday hours, and those over 40 hours per week.
Double time applies on all Sundays, Holidays, and all time over 12 hours per day.
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 21 of 19139
Wayne
Classification Name Category Last Updated
Drywall - DF Drywall 05/10/2024 Classification Description: Drywall Finishers
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $51.86 $67.66 $83.46 Apprentice: 1st period $39.22 $48.70 $58.18 Apprentice: 2nd period $40.80 $51.07 $61.34 Apprentice: 3rd period $43.96 $55.81 $67.66 Apprentice: 4th period $48.70 $62.92 $77.14
Overtime Provisions Over 8-hour day/40-hour week
9th hour $67.66 10th hour $67.66 Beyond 10 hours $67.66
Saturday First 8 hours $67.66 9th hour $67.66 10th hour $67.66 Beyond 10 hours $67.66
Sunday/Holiday $83.46
Four 10-hour days allowed? - Yes
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 22 of 19140
Wayne
Classification Name Category Last Updated
Drywall Taper Drywall 05/10/2024 Classification Description: Drywall Taper Four 10s allowed Monday-Thursday
Wage Rates Straight Time
Time and a Half
Double Time
Total Hourly Wage $45.91 $59.74 $73.56 Apprentice: 4th 6 months $41.76 $53.51 $65.26 Apprentice: First 3 months $32.08 $38.99 $45.90 Apprentice: Second 3 months $34.85 $43.14 $51.44 Apprentice: Second 6 months $37.62 $47.30 $56.98 Apprentice: Third 6 months $40.38 $51.44 $62.50
Overtime Provisions Over 8-hour day/40-hour week
9th hour $59.74 10th hour $59.74 Beyond 10 hours $73.56
Saturday First 8 hours $59.74 9th hour $73.56 10th hour $73.56 Beyond 10 hours $73.56
Sunday/Holiday $73.56
Four 10-hour days allowed? - Yes
Friday make-up day for bad weather or holidays
ORS#: ORS-001157 | CA#: CA-0136 | Date Issued: 10/24/2024 | Contract Award By Date: 01/22/2025 Page 23 of 19141
Wayne
Classification Name Category Last Updated
Electrician - IW Electrician 05/10/2024 Classification Description: Inside Wireman
Wage Rates Straight Time
Time and a Half
Double Time
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .