This is a Work Item Index Report for the USNS SACAGAWEA (T-AKE 2) corrective maintenance and voyage repair availability scheduled for August 1 through September 14, 2026, at Chinhae, South Korea. The report catalogs approximately 100 work items organized into eight major sections covering hull and structural repairs, propulsion machinery, electrical systems, communication and navigation equipment, auxiliary machinery, habitability and furnishings, HVAC systems, and underway replenishment equipment. Key structural work includes messenger reel replacement, handrail and topside preservation, cargo door repairs, ballast tank and food waste tank inspections, and flight deck preservation. Propulsion and auxiliary system items encompass lube oil pump overhaul, steering gear relief valve testing, sewage system piping cleaning, anchor windlass repairs, and emergency generator maintenance. Additional scope includes ECDIS and announcing system modifications, high voltage electrical safety upgrades, UPS battery replacements, SCBA compressor repairs, lagging and insulation work, tile deck renewals, air conditioning shaft seal replacement, and various winch and hauling equipment refurbishments for the ship's underway replenishment operations.

The associated competitive solicitation (N6264926RKTBD) is anticipated for release in late May or early June 2026 through System for Award Management (SAM) as a Firm-Fixed Price contract. The Naval Supply Systems Command, NAVSUP Fleet Logistics Center Yokosuka Site Chinhae, will conduct the competitive procurement with performance onboard the vessel at ROKPOG AMMO PIER in Chinhae, South Korea. All prospective contractors must be duly authorized to operate in South Korea and comply with DFARS 252.225-7042, with non-ROK incorporated entities required to meet USFK Invited Contractor and Technical Representative Program requirements. Interested parties should monitor SAM.gov for solicitation release and register as required for contract award eligibility.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Print Date:

04/09/2026

MSC Corrective Maintenance

Engineering Report

USNS SACAGAWEA

(TAKE 2)

XXXXX-XX-X-XXXX

2026-08-01 - VRA

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
GENERAL REQUIREMENTS AND DEFINITIONS
NSP
0002
UTILITIES AND GENERAL SERVICES FOR SHIP AND PORT
A
0004
TESTING AND QUALITY ASSURANCE
NSP
0005
HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE
NSP
SECTION 0100
HULL AND STRUCTURAL
0101
MESSENGER REELS (VR25-0088)
A
0102
HANDRAIL REPLACEMENT
A
0103
TOPSIDE PRESERVATION (VR26-0006)
A
0104
CLEANING LOCKER PRESERVATION (VR25-0089)
A
0105
PLENUM REPAIRS (VR25-0014)
A
0106
ROLLER CURTAIN CARGO DOOR REPAIRS (VR25-0063-0073)
A
0107
HVAC ROOM DECK PRESERVATION (VR25-0091)
A
0108
ABS MISCELLANEOUS HITS
A
0109
CARGO ELEVATOR DOORS (VR26-0008)
A
0110
TANK VENTS (VR25-0090)
A
0111
TAKE-CSI-BALLAST TANK ZINC INSPECTION (2.5 YR)
A
0112
TAKE-CSI-FOOD WASTE TANK INSPECTION (2.5 YR)
A
0113
CLIMBER SAFETY RAILS (VR25-0023)
A
0114
GANGWAY FALL ARREST ANCHOR POINTS (VR19-0024)
A
0152
T-AKE Ultrasonic Thickness Gauging (Ballast Piping)
A
0156
TAKE-CCSI-FLIGHT DECK PRESERVATION (3 YR)
A
0163
TAKE-CCSI-FLIGHT DECK SAFETY NET INSPECTION AND
A
0173A
TAKE-CCSI-POINT AND PRESERVE 2K SQFT TOPSIDE (1YR)
A
SECTION 0200
PROPULSION MACHINERY
0201
LUBE OIL PRIMING PUMP OVERHAUL (VR25-0092)
A
SECTION 0300
ELECTRICAL
0301
T-ALT 661 ECDIS MODIFICATION FOR PAPERLESS
A
Page 1 of
3
Print Date:
04/09/2026

MSC Corrective Maintenance

Engineering Report

0302
BILGE FLOODING ALARM (VR20-0068)
A
0303
TAKE-CSI-HIGH VOLTAGE SHIP SERVICE AND EMERGENCY
A
0304
TAKE-CSI-CLEANING MAIN GENERATORS AND
A
0306
TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND
A
0310
TAKE-CSI-REPLACE UPS BATTERIES (2.5 YR)
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0401
EPIC ANNOUNCING SYSTEM (VR25-0097)
A
0404
TAKE-CSI-OE-570 WSC ANTENNA SYSTEM MAINTENANCE
A
0407
TAKE-CSI-CALIBRATE ELECTRONIC TEST EQUIPMENT
A
0444
T-ALT 649 SHIPS WHISTLE (VR25-0076)
A
0459
TAKE-CCSI-ECHO SOUNDER SERVICE (2.5 YR)
A
SECTION 0500
AUXILIARY MACHINERY
0501
MDG VENT CONTAINMENT DRAIN PIPING AND VALVE
A
0507
TAKE-CSI-STEERING GEAR RELIEF VALVE TESTING (5 YR)
A
0508
FLIGHT DECK SPRINKLER PIPING (VR24-0057)
A
0509
INSPECTION OF SHIPS AIR RECEIVERS (VR25-0056)
A
0510
DRAIN PIPING REPAIRS
A
0511
M4 MOORING WINCH REPAIRS (VR25-0086)
A
0512
ANCHOR WINDLASS PLANETARY GEAR REPLACEMENT
A
0513
EDG TURBOCHARGER AND CYLINDER HEADS REUBILD
A
0516
TAKE-CSI-SEWAGE SYSTEM PIPING CLEANING (2.5 YR)
A
0555
INSPECT, TEST AND CERTIFY NON-CARGO LIFTING GEAR
A
0564
SCBA COMPRESSOR AND FILLING STATION REPAIRS
A
0565D
TAKE-CCSI-FIXED GAS FIREFIGHTING SYSTEM
A
0574
LAGGING AND INSULATION REPAIRS
A
0578
TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER
A
0579
TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
TILE DECK RENEWALS (VR24-0018)
A
0603
LIFEBOAT DAVITS SHEAVE PINS (VR25-0087)
A
0604
LIGHT POSTS AND FIXTURES (VR25-0052)
A
0605
REPAIR AND REPLACE JOINER DOORS (VR26-0012)
A
0606
ENGINE ROOM LAGGING (VR26-0004)
A
0610
TAKE-CSI-GALLEY AND MSO EQUIPMENT CALIBRATION
A
0668
TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL
A
SECTION 0800
HVAC
Page 2 of
3
Print Date:
04/09/2026

MSC Corrective Maintenance

Engineering Report

0801
T-ALT 657 MUSHROOM VENTILATOR W WATERTIGHT
A
0802
NO. 1 AIR CONDITIONING SHAFT SEAL (VR25-0096)
A
0805
AHU HEATERS REPLACEMENT (VR24-0119)
A
0851
TAKE-CCSI-GALLEY VENTILATION SYSTEM AND
A
0852
TAKE-CCSI-LAUNDRY VENT CLEANING (2.5 YR)
A
SECTION 1000
UNDERWAY REPLENISHMENT EQUIPMENT
1001
HAULING WINCH DRUM CLUTCH ASSEMBLY
A
1002
SPANWIRE ELECTRIC MOTOR REPAIR (VR26-0007)
A
1003
REMOVE, REFURBISH AND REINSTALL RAM TENSIONER
A
1006
RAS STA 2, 6 & 8 CONTROLEX SOLO CABLES INSTALL
A
1008
FABRICATION OF HAULING WINCH LABYRINTH RINGS
A
1061
TAKE-CSI-HIGHLINE ASD REFURB AND FDN PRESERV(10
A
1062
TAKE-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE
A
1076
TAKE-CSI-WINCH CONTROL BOOTH WINDOWS AND
A