Work Item Index Report_USNS SACAGAWEA VRA KR.docx
DOCX document 140 KB Posted
- Solicitation number
- N6264926RKTBD
About this file
This is a Work Item Index Report for the USNS SACAGAWEA (T-AKE 2) corrective maintenance and voyage repair availability scheduled for August 1 through September 14, 2026, at Chinhae, South Korea. The report catalogs approximately 100 work items organized into eight major sections covering hull and structural repairs, propulsion machinery, electrical systems, communication and navigation equipment, auxiliary machinery, habitability and furnishings, HVAC systems, and underway replenishment equipment. Key structural work includes messenger reel replacement, handrail and topside preservation, cargo door repairs, ballast tank and food waste tank inspections, and flight deck preservation. Propulsion and auxiliary system items encompass lube oil pump overhaul, steering gear relief valve testing, sewage system piping cleaning, anchor windlass repairs, and emergency generator maintenance. Additional scope includes ECDIS and announcing system modifications, high voltage electrical safety upgrades, UPS battery replacements, SCBA compressor repairs, lagging and insulation work, tile deck renewals, air conditioning shaft seal replacement, and various winch and hauling equipment refurbishments for the ship's underway replenishment operations.
The associated competitive solicitation (N6264926RKTBD) is anticipated for release in late May or early June 2026 through System for Award Management (SAM) as a Firm-Fixed Price contract. The Naval Supply Systems Command, NAVSUP Fleet Logistics Center Yokosuka Site Chinhae, will conduct the competitive procurement with performance onboard the vessel at ROKPOG AMMO PIER in Chinhae, South Korea. All prospective contractors must be duly authorized to operate in South Korea and comply with DFARS 252.225-7042, with non-ROK incorporated entities required to meet USFK Invited Contractor and Technical Representative Program requirements. Interested parties should monitor SAM.gov for solicitation release and register as required for contract award eligibility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Print Date:
04/09/2026
MSC Corrective Maintenance
Engineering Report
USNS SACAGAWEA
(TAKE 2)
XXXXX-XX-X-XXXX
2026-08-01 - VRA
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| GENERAL REQUIREMENTS AND DEFINITIONS |
| NSP |
| 0002 |
| UTILITIES AND GENERAL SERVICES FOR SHIP AND PORT |
| A |
| 0004 |
| TESTING AND QUALITY ASSURANCE |
| NSP |
| 0005 |
| HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE |
| NSP |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| MESSENGER REELS (VR25-0088) |
| A |
| 0102 |
| HANDRAIL REPLACEMENT |
| A |
| 0103 |
| TOPSIDE PRESERVATION (VR26-0006) |
| A |
| 0104 |
| CLEANING LOCKER PRESERVATION (VR25-0089) |
| A |
| 0105 |
| PLENUM REPAIRS (VR25-0014) |
| A |
| 0106 |
| ROLLER CURTAIN CARGO DOOR REPAIRS (VR25-0063-0073) |
| A |
| 0107 |
| HVAC ROOM DECK PRESERVATION (VR25-0091) |
| A |
| 0108 |
| ABS MISCELLANEOUS HITS |
| A |
| 0109 |
| CARGO ELEVATOR DOORS (VR26-0008) |
| A |
| 0110 |
| TANK VENTS (VR25-0090) |
| A |
| 0111 |
| TAKE-CSI-BALLAST TANK ZINC INSPECTION (2.5 YR) |
| A |
| 0112 |
| TAKE-CSI-FOOD WASTE TANK INSPECTION (2.5 YR) |
| A |
| 0113 |
| CLIMBER SAFETY RAILS (VR25-0023) |
| A |
| 0114 |
| GANGWAY FALL ARREST ANCHOR POINTS (VR19-0024) |
| A |
| 0152 |
| T-AKE Ultrasonic Thickness Gauging (Ballast Piping) |
| A |
| 0156 |
| TAKE-CCSI-FLIGHT DECK PRESERVATION (3 YR) |
| A |
| 0163 |
| TAKE-CCSI-FLIGHT DECK SAFETY NET INSPECTION AND |
| A |
| 0173A |
| TAKE-CCSI-POINT AND PRESERVE 2K SQFT TOPSIDE (1YR) |
| A |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| LUBE OIL PRIMING PUMP OVERHAUL (VR25-0092) |
| A |
| SECTION 0300 |
| ELECTRICAL |
| 0301 |
| T-ALT 661 ECDIS MODIFICATION FOR PAPERLESS |
| A |
| Page 1 of |
| 3 |
| Print Date: |
| 04/09/2026 |
MSC Corrective Maintenance
Engineering Report
| 0302 |
| BILGE FLOODING ALARM (VR20-0068) |
| A |
| 0303 |
| TAKE-CSI-HIGH VOLTAGE SHIP SERVICE AND EMERGENCY |
| A |
| 0304 |
| TAKE-CSI-CLEANING MAIN GENERATORS AND |
| A |
| 0306 |
| TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND |
| A |
| 0310 |
| TAKE-CSI-REPLACE UPS BATTERIES (2.5 YR) |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0401 |
| EPIC ANNOUNCING SYSTEM (VR25-0097) |
| A |
| 0404 |
| TAKE-CSI-OE-570 WSC ANTENNA SYSTEM MAINTENANCE |
| A |
| 0407 |
| TAKE-CSI-CALIBRATE ELECTRONIC TEST EQUIPMENT |
| A |
| 0444 |
| T-ALT 649 SHIPS WHISTLE (VR25-0076) |
| A |
| 0459 |
| TAKE-CCSI-ECHO SOUNDER SERVICE (2.5 YR) |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| MDG VENT CONTAINMENT DRAIN PIPING AND VALVE |
| A |
| 0507 |
| TAKE-CSI-STEERING GEAR RELIEF VALVE TESTING (5 YR) |
| A |
| 0508 |
| FLIGHT DECK SPRINKLER PIPING (VR24-0057) |
| A |
| 0509 |
| INSPECTION OF SHIPS AIR RECEIVERS (VR25-0056) |
| A |
| 0510 |
| DRAIN PIPING REPAIRS |
| A |
| 0511 |
| M4 MOORING WINCH REPAIRS (VR25-0086) |
| A |
| 0512 |
| ANCHOR WINDLASS PLANETARY GEAR REPLACEMENT |
| A |
| 0513 |
| EDG TURBOCHARGER AND CYLINDER HEADS REUBILD |
| A |
| 0516 |
| TAKE-CSI-SEWAGE SYSTEM PIPING CLEANING (2.5 YR) |
| A |
| 0555 |
| INSPECT, TEST AND CERTIFY NON-CARGO LIFTING GEAR |
| A |
| 0564 |
| SCBA COMPRESSOR AND FILLING STATION REPAIRS |
| A |
| 0565D |
| TAKE-CCSI-FIXED GAS FIREFIGHTING SYSTEM |
| A |
| 0574 |
| LAGGING AND INSULATION REPAIRS |
| A |
| 0578 |
| TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER |
| A |
| 0579 |
| TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER |
| A |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0601 |
| TILE DECK RENEWALS (VR24-0018) |
| A |
| 0603 |
| LIFEBOAT DAVITS SHEAVE PINS (VR25-0087) |
| A |
| 0604 |
| LIGHT POSTS AND FIXTURES (VR25-0052) |
| A |
| 0605 |
| REPAIR AND REPLACE JOINER DOORS (VR26-0012) |
| A |
| 0606 |
| ENGINE ROOM LAGGING (VR26-0004) |
| A |
| 0610 |
| TAKE-CSI-GALLEY AND MSO EQUIPMENT CALIBRATION |
| A |
| 0668 |
| TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL |
| A |
| SECTION 0800 |
| HVAC |
| Page 2 of |
| 3 |
| Print Date: |
| 04/09/2026 |
MSC Corrective Maintenance
Engineering Report
| 0801 |
| T-ALT 657 MUSHROOM VENTILATOR W WATERTIGHT |
| A |
| 0802 |
| NO. 1 AIR CONDITIONING SHAFT SEAL (VR25-0096) |
| A |
| 0805 |
| AHU HEATERS REPLACEMENT (VR24-0119) |
| A |
| 0851 |
| TAKE-CCSI-GALLEY VENTILATION SYSTEM AND |
| A |
| 0852 |
| TAKE-CCSI-LAUNDRY VENT CLEANING (2.5 YR) |
| A |
| SECTION 1000 |
| UNDERWAY REPLENISHMENT EQUIPMENT |
| 1001 |
| HAULING WINCH DRUM CLUTCH ASSEMBLY |
| A |
| 1002 |
| SPANWIRE ELECTRIC MOTOR REPAIR (VR26-0007) |
| A |
| 1003 |
| REMOVE, REFURBISH AND REINSTALL RAM TENSIONER |
| A |
| 1006 |
| RAS STA 2, 6 & 8 CONTROLEX SOLO CABLES INSTALL |
| A |
| 1008 |
| FABRICATION OF HAULING WINCH LABYRINTH RINGS |
| A |
| 1061 |
| TAKE-CSI-HIGHLINE ASD REFURB AND FDN PRESERV(10 |
| A |
| 1062 |
| TAKE-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE |
| A |
| 1076 |
| TAKE-CSI-WINCH CONTROL BOOTH WINDOWS AND |
| A |