This document is a Work Item Index Report for the deactivation of the USNS MILLINOCKET (EPF 3). The report provides a detailed list of work items required to deactivate the vessel, including services and requirements for the hull and structure, propulsion machinery, electrical systems, communication and navigation equipment, auxiliary machinery, HVAC, and drydocking. The key work items include laying up main engines and reduction gears, removing sea valves and cooling systems, deactivating auxiliary systems like the AFFF and HEF systems, and renewing various anodes.

The related federal contract opportunity is a sources sought notice for the USNS Millinocket Deactivation, which will be solicited under NAICS code 336611 for shipbuilding and repair with a size standard of 1,300 employees. The contractor will be required to tow the vessel from Everett, Washington to their facility on the West Coast and then to a MARAD designated location. Interested firms are requested to provide a response demonstrating their experience in performing similar work by 10:00 a.m. on November 20, 2025. This sources sought notice is for information gathering purposes only and does not constitute a solicitation or request for quotes.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Print Date:

11/08/2024

MSC Corrective Maintenance

Engineering Report

USNS MILLINOCKET

(EPF 3)

DEACT MNT TBD

2025-05-02 - DEACT

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
INTENT SCOPE GENERAL AND DEFINITIONS
NSP
0002
TECHNICAL REPRESENTATIVES
NSP
0003
APPROACH BERTH AND MOORING
NSP
0004
TESTING AND QUALITY ASSURANCE
NSP
0005
ELECTRICAL SAFETY
NSP
0006
HEAVY WEATER PLAN
NSP
0007
COLD WEATHER PLAN
NSP
0010
FURNISH OFFICE
A
0011
GENERAL SERVICES
A
0013
PROJECT PLANNING AND MONITORING
A
0014
WEIGHT MOMENT REPORT
A
0015
ILS GFM
A
0016
FIRE PROTECTION AND SHIPS SAFETY PROGRAM
A
0017
HANDLING SHIPS STORES
A
0018
DELIVERY AND REDELIVERY
A
0019
ACCESS AND SECURITY
A
0020
GAS FREE CERTIFICATES
A
0021
CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS
A
0023
HAZARDOUS WASTE DISPOSAL
A
0026
CONDUCT ASBESTOS AIR SAMPLING
A
SECTION 0100
HULL AND STRUCTURAL
0104
DEHUMIDIFICATION SYSTEM
A
0105
SEA VALVE Blanking-Schest Removal-Cofferdam
A
0107
TOWING_PREPARATIONS
A
0110
UNDERWATER HULL INSPECTION AND CLEANING
A
0111
SWFM COOLING FLUSH
A
0122
Vessel Towing Deep Sea x 2
A
0123
Portable Fire Extinguisher Disposal
A
0124
Rescue Boat Lay-up
A
0126
ANCHOR AND CHAIN REMOVAL
A
Page 1 of
3
Print Date:
11/08/2024

MSC Corrective Maintenance

Engineering Report

0132
WATERLINE FLOODING MARKINGS
A
0133
RODENT AND INSECT EXTERMINATION REPORT
A
0151
MES and Life raft Removal and Crating
A
SECTION 0200
PROPULSION MACHINERY
0201
Main Engine - Lay-up
A
0202
Reduction Gears Lay-up
A
0203
Waterjet Steering and Reversing CYL REMOVALS AND
A
0204
Install Propulsion Shaft locking devices
A
0205
Waterjet Hoses and Manifold removal
A
SECTION 0300
ELECTRICAL
0301
UPS battery removal and disposal
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0401
Antenna Removal
A
0402
Communication Equipment Removal
A
0403
Bridge Navigation Equipment Removal
A
0404
Computers and Peripherals Removal
A
0405
NGW and Ancillary equipment
A
SECTION 0500
AUXILIARY MACHINERY
0501
SSDG Lay-up
A
0502
HYDRAULIC SMARTPACS LAYUP
A
0503
WEATHER DECK DRAIN BLANKING
A
0504
DAVIT LAY-UP
A
0505
AFFF SYSTEM DEACTIVATION
A
0506
HEF SYSTEM DEACTIVATION
A
0507
COMPRESSED GAS CYLINDER REMOVAL & DISPOSAL
A
0508
CARGO CRANE DECOMISSIONING AND OIL REMOVAL
A
0509
STERN RAMP DECOMISSIONING AND OIL REMOVAL
A
0510
REFRIGERANT REMOVAL AND COMPRESSOR LAYUP
A
0511
VACUUM SEWAGE SYSTEM PIPING FLUSHING
A
0512
DEACTIVATE THE SINGLE CANTILEVER FOILS
A
SECTION 0800
HVAC
0801
HVAC SYSTEM LAYUP
A
SECTION 0900
DRYDOCKING
0902
STERN TUBE PACKING INSTALL EPF DEACT
A
Page 2 of
3
Print Date:
11/08/2024

MSC Corrective Maintenance

Engineering Report

0910
RENEW VARIOUS ANODES
A
Page 3 of
3

image1.jpeg

File details come from the government source that posted it. Updated .