Woodland High HVAC CM_R RFP10_2025_002.pdf
PDF 194 KB Posted
- Solicitation number
- PE-55391-NONST-2025-000000010
- Issued by
- Barrow County, Georgia
About this file
This document is a Request for Proposal (RFP) issued by the Bartow County School System (BCSS) for Construction Manager at Risk services for the HVAC Replacement project at Woodland High School in Cartersville, Georgia. The project has an estimated budget of $7.5 million and will involve replacing HVAC units, controls, and any required building systems. The RFP requires a mandatory pre-bid conference on November 20, 2024, and proposals are due on December 12, 2024, at 2:00 PM. The selected Construction Manager/Contractor at Risk (CM/C) firm will be responsible for project planning, cost management, scheduling, and quality assurance throughout the pre-construction and construction phases. The CM/C will provide a Guaranteed Maximum Price (GMP) for the construction and a Guaranteed Delivery Date (GDD).
The RFP specifies that the CM/C will be "at risk" for completing the project within the GMP, and any savings under the GMP will belong to BCSS. The CM/C will be required to provide performance, material, and labor payment bonds equal to 100% of the GMP, and individual trade contracts will be between the CM/C and the trade contractors, subject to BCSS approval. The BCSS also reserves the right to suspend or terminate the project at any time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10_2025_002 Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (“RFP”)
Notice of Construction Manager at Risk services for Woodland High School
HVAC replacement
ISSUE DATE: November 11, 2024
REQUEST FOR PROPOSAL: Woodland High School HVAC Replacement
SERVICE TO BE PROVIDED: Construction Manager at Risk
DUE DATE: December 12, 2024 @ 2;00 P.M.
MANDATORY PRE-BID CONFERENCE: Conducted no later than November 20, 2024
MANDATORY PRE-BID CONFERENCE LOCATION:
Central Office 65 Gilreath Road NW. Cartersville, Georgia 30121
RECEIPT & OPENING LOCATION:
Central Office 65 Gilreath Road NW. Cartersville, Georgia 30121
Link to copy of RFP 10-2025-002: Purchasing | Bartow County School System
SPECIAL NOTE TO PROPOSERS
Be sure your name, address, telephone number, email address and fax number has been recorded with the School System so you will receive copies of any amendments or additions to these Proposal Specifications.
In addition, all requests for additional information must be made in writing and emailed to David Van Hook at david.vanhook@bartow.k12.ga.us. In order to allow all vendors to use the same information, requests for information will not be honored after November 19, 2024, by 3:00 p.m.
https://www.bartow.k12.ga.us/page/purchasing
INTRODUCTION
The Bartow County School System (BCSS) desires to retain the services of a professional Construction Manager/Contractor at Risk (CM/C) firm for the management, under a construction management/contractor at risk format, for the HVAC Replacement project at Woodland High School at 800 Old Alabama Road Cartersville, GA 30120.
To qualify for consideration, a firm must be prepared to provide the expertise, resources, and personnel experience in project planning, cost management, project control, pre-construction and construction techniques, value-engineering analysis, scheduling, and quality assurance throughout the planning and construction phases of the project.
The services to be performed by the CM/C will be the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations and within established best-practices quality requirements of the construction industry. These services will be performed during the pre-construction phase and construction phase, and will include working with owner in project planning, arrangement of bid packages, bidding and award of the trade contracts, and management of construction until the Bartow County School System’s final occupancy of the Facility is achieved.
A MANDATORY PRE-PROPOSAL MEETING WILL BE HELD AT: 11:00 AM on November 20, 2024, AT THE BARTOW COUNTY SCHOOL SYSTEM CENTRAL
OFFICE, 65 GILREATH ROAD NW CARTERSVILLE, GA 30121.
PROJECT INFORMATION
● The project will be designed by CDH Partners, Atlanta GA with an estimated budget of
$7,500,000.00. The Preliminary scope of the project shall include:
o Replace HVAC units o Replace HVAC Controls o Remove and Replace any building systems required to perform the above work
● Renovation work is anticipated to start May 2025 and finish July, 2025.
● During the pre-construction phase, CM/C will assist the Bartow County School
System in establishing the exact scope of work, based on the established budget for this portion of the work.
● Questions about the anticipated scope of work and schedule should be directed to David Van Hook at david.vanhook@bartow.k12.ga.us
● Site visits to examine existing conditions are encouraged. Contact David Van Hook at david.vanhook@bartow.k12.ga.us to schedule. Proposers visiting BCSS properties are required to sign in at the main office of the school.
mailto:david.vanhook@bartow.k12.ga.us mailto:david.vanhook@bartow.k12.ga.us
MINIMUM QUALIFICATIONS TO BID
● Each bidder should provide evidence of a current, valid Georgia Business License with each bid submittal. A photocopy of your business license shall be acceptable.
● Bidders shall also submit the completed “Georgia Security and Immigration
Compliance Act OCGA 13-10-90” document upon award.
● Each bidder shall provide evidence of a current liability policy, with sufficient coverage terms, as further specified herein.
● Each bidder shall provide evidence of a current Georgia State Contractor’s License.
SCOPE AND STYLE OF SERVICES TO BE PERFORMED
In issuing the Request for Proposal, it is the intent of the BCSS that the successful CM/C will provide the required services for a fixed fee. It is further the intent of the BCSS that the successful CM/C will provide a Guaranteed Maximum Price (GMP) for the cost of the construction of the project to include a Guaranteed Delivery Date (GDD). BCSS also intends that the successful CM/C accept the following stipulations:
1. Provide Performance, Material, and Labor Payment Bonds in the amount of
100% of the GMP.
2. Individual Trade Contracts will be between the CM/C and the Trade
Contractors, subject to BCSS approval.
3. The CM/C will not perform any portion of the project with its own forces except as may be mutually agreed to by BCSS and the CM/C.
4. The CM/C will be "at risk” in the proposed undertaking and will be responsible for completing the project within the GMP.
5. Should the final cost of the project be less than the GMP, all savings shall belong to
BCSS.
6. Pay applications shall be held in retention through such time that construction is complete, and BCSS has taken delivery of the facility.
7. The BCSS shall have the authority to suspend or terminate performance of the project at any time.
The CM/C will share with the BCSS in writing, calculations, and assumptions on which the CM/C's proposed GMP is based and shall provide to BCSS any information requested by BCSS in a timely manner or according to a schedule set forth by BCSS.
| INTRODUCTION |
| PROJECT INFORMATION |
| MINIMUM QUALIFICATIONS TO BID |
| SCOPE AND STYLE OF SERVICES TO BE PERFORMED |
File details come from the government source that posted it. Updated .