This Statement of Work (SOW) details the replacement of the Upper Playground Structure at the U.S. Coast Guard Rio Bayamon Housing in Bayamon, Puerto Rico. The project requires a licensed contractor to remove the existing playground structure and install a new playground designed for children ages 5-12, utilizing the existing 40 ft x 40 ft concrete playground area. The contractor must provide three configuration/layout options with color choices, submit equipment details for approval, and ensure installation complies with Consumer Product Safety Commission, ASTM, and ADA guidelines.

Key project specifications include completing all work within 90 calendar days during normal working hours (0600-1700), with potential after-hours work subject to Contracting Officer approval. The contractor must submit a roster of personnel, project schedule, safety plan, product data, and operation and maintenance manuals. The project will be coordinated through LCDR William Birch or Mr. Oswald Mora, with a warranty period of one year or the manufacturer's standard warranty, whichever is longer. The project number is 30318963, and the work location is 500 Carr 177, Bayamon, PR 00959.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GUARD BASE SAN JUAN

SAN JUAN, PUERTO RICO 00901

STATEMENT OF WORK FOR

REPLACE RBH UPPER PLAYGROUND STRUCTURE

AT

UNITED STATES COAST GUARD

RIO BAYAMON HOUSING

500 CARR 177

BAYAMON, PR 00959

WORK ORDER NUMBER: 30318963

APRIL 2025

Reviewer Signature Date Facilities Manager

O. Mora, PE

Facilities Engineer

LCDR W. Birch

BASE San Juan PN: 30318963 Replace RBH Upper Playground Structure

1. General

1.1. General Work Requirements

The work includes furnishing all labor, tools, equipment, materials, supervision, and incidentals for work at the U.S. Coast Guard Rio Bayamon Housing Complex. Work generally includes, but is not limited to, the following:

Replace existing playground structure at the RBH Upper Playground Structure with a new playground structure intended for ages 5-12 years.

1.2. Qualifications and Performance Requirements

1.2.1. Qualifications

A. All work shall be performed by licensed contractors with license in respective trade.

1.2.2. Performance Requirements

A. Provide three configuration/layout options of playground structure with a variety of design features similar to existing structure. Provide color options for selection. Provide equipment submittals for USCG contracting officer’s representative approval prior to purchase.

B. Installation of all new equipment shall be in strict accordance with equipment manufacturer’s installation recommendations.

1.3. Specific Work Requirements

1.3.1. Remove and dispose of existing structure.

1.3.2. Furnish and install new playground structure designed for ages 5-12 years old.

1.3.3. New structure shall utilize existing 40 ft x 40 ft square concrete playground.

Adhere to all safety buffers and distances required.

1.3.4. Field verify all dimensions.

1.3.5. Coordinate all staging and laydown areas with the Coast Guard prior to work starting.

1.4. Period of Performance

1.4.1. All work shall be completed within 90 calendar days from award date.

1.4.2. Complete during normal working hours (M-F 0600-1700). After-hours work may be completed upon approval from Contracting Officer.

1.5. Project Location

U.S. Coast Guard Rio Bayamon Housing 500 Carr 177 Bayamon, PR 00959

2. Applicable Documents and Code Compliance

2.1. Playgrounds shall meet guidelines contained in the Consumer Products Safety

Commission (CPSC) Handbook for Public Playground Safety, the American Society for Testing Materials (ASTM) F-1487-93, and ADA guidelines for playgrounds.

2.2. The contractor shall assume full responsibility to ensure work is in compliance with all applicable ICC, Coast Guard Regulations, and local regulations, unless otherwise specified.

3. Submittals

3.1. Within 10 days after award the contractor shall hold a kick-off meeting for all interested parties to go over expectations, requirements, and proposed plan of execution.

3.2. Submittal List

A. Roster Of Personnel

B. Project Schedule

(1) Prepare a Construction Progress Schedule. It shall include all major milestones and events for the entire duration of the construction contract.

C. Safety Plan

(1) At a minimum, describe the general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, or similar conditions of the work.

D. Product Data

(1) Submit the product data sheet for each manufactured item. It shall include the manufacturer's descriptive literature of cataloged products, equipment drawings, diagrams, performance and characteristic curves and catalog cuts. Submit complete descriptive data for each type of material. Clearly mark data to indicate the type of material to be provided.

3.3. Operation And Maintenance Manuals

3.3.1. Submit electronically and provide a minimum of two paper copies to the unit. At a minimum, the manual shall contain the following:

(1) Contact information for the prime contractor, subcontractor, and major equipment vendor/supplier;

(2) Warranty information;

(3) Test procedures;

(4) Results of all testing and commissioning procedures;

(5) Performance data;

(6) A control sequence describing start-up, operation and shutdown instructions;

(7) Installation instructions;

(8) Maintenance instructions;

(9) Operating instructions;

(10) Parts list.

4. Warranty

The Contractor shall warrant that all goods supplied, systems, equipment, designs, and work covered by this Scope of Work and subsequent contract shall be satisfactory for its intended purpose, shall conform to and perform as called for in the Contract requirements specifications and shall be free from all defects and faulty materials and workmanship. Any goods supplied, systems, equipment, designs, or work found to be defective within the time specified below shall be repaired, remedied, or replaced, hereinafter called “corrective work”, by the Contractor, free of all charges including transportation. The duration is to be one year or the manufacturer’s standard warranty period, whichever is longer.

5. Coordination

Contact LCDR William Birch (787-360-1101), or Mr. Oswald Mora (939-202-0587) regarding all questions pertaining to the project.

6. Existing Condition & Reference Pictures:

Playground Structure View 1

Structure View View 2