WNYPC - Boiler #C203227 - Bid Quote Sheet.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
IFB 26-092 - WNYCP - Boiler
Solicitation number
2140769
Issued by
Erie County, New York

About this file

This is a bid quote sheet for preventive maintenance services for boiler systems at the Western New York Children's Psychiatric Center, issued by the New York State Office of Mental Health (OMH) under contract number OMH01-C203227-3650656. The contract requires bidders to provide preventive maintenance service for gas-fired condensing boilers (Lochinvar) and ancillary equipment located in Building 80, including semi-annual preventive maintenance, semi-annual tune-up service, and annual inspection and cleaning. The facility reserves the right to alter service scheduling as needed. The contract is anticipated to have a three-year term until new boilers are installed, commissioned, and accepted by the facility and OMH. Bidders must complete unit cost pricing for each preventive maintenance task, and failure to follow the bid sheet directions exactly may result in disqualification. No reimbursement is provided for travel time, travel expenses, mileage, or fuel costs.

The bid quote sheet includes two sections: preventive maintenance tasks with a subtotal of $0.00 and time and material rates for repairs not covered under routine maintenance. The time and material section provides a fixed material allowance of $5,000 per year (totaling $15,000 for three years) with a fixed 10% material markup on actual repairs, and requires bidders to quote hourly labor rates for straight time (80 estimated hours per year), overtime (16 estimated hours per year), and training (8 estimated hours per year). The total bid amount is estimated at $15,000, though actual payment will only be made for services performed and materials used. Bidders must attest to prevailing wage compliance, receipt of questions and answers, electronic payment system participation or commitment to apply within 10 days of contract selection, and disclosure of any New York State payroll employees hired within the past two years. The bid quote sheet must be signed and dated by an authorized representative to be valid for submission.

View the file

Other files

File Type Posted
C203227 - WNYPC - Boiler - IFB.pdf PDF
C203227 - WNYPC - Boiler - BP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WNY CPC Boiler #C203XXX

ATTACHMENT D - BID QUOTE SHEET: WESTERN NEW YORK CHILDREN'S PSYCHIATRIC CENTER - #OMH01-C203227-3650656
Provide Preventive Maintenance Service for the Boiler Systems and Ancillary Equipment per Appendix D of the Contract. The FACILITY reserves the right to alter the scheduling of the services as necessary. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs.

Subcontractors Costing: The prices/rates quoted include all direct and indirect costs of any subcontractors, including those used to meet any stated M/WBE/SDVOB participation goals.

CONTRACT NOTE: The Facility has a construction project that will renovate the building and replace the temporary boilers covered under the terms of this contract in Appendix D, Exhibit B – Equipment List. This contract is anticipated to be a three-year (3) term until the new boilers are installed, commissioned, and accepted by the Facility and OMH.
Directions: 1) Insert the Unit Cost in the Unit Cost ($) column for each preventive maintenance service task listed (unless blocked); 2) The Annual Cost for each Contract Year, which is equal to the Bid Unit x Service Frequency per Year x Unit Cost will be calculated automatically; 3) The Total Amount (Years 1 – 3) for each preventive maintenance service task listed, which is equal to the total sum of the Annual Costs for each Contract Year (1 through 3) will be calculated automatically; 4) The Subtotal Bid for Preventive Maintenance Tasks, which is equal to the sum of the Total Amount (Years 1 – 3) column will be calculated automatically.
Failure to follow these directions exactly may result in your bid being disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening.
Page 1: Preventive Maintenance Services for the Boiler Systems and Ancillary Equipment
Item / Bldg.Maintenance TaskBid UnitService Freq. per YearYear 1
Unit Cost ($)Year 1
Annual Cost ($)Year 2
Unit Cost ($)Year 2
Annual Cost ($)Year 3
Unit Cost ($)Year 3
Annual Cost ($)Total Amount

(Years 1-3)

Boilers, Condensing – Gas-Fired (Lochinvar) / Bldg. 80Semi-Annual PM32$0.00$0.00$0.00$0.00
Semi-Annual Tune-up Service32$0.00$0.00$0.00$0.00
Boiler Annual Inspection & Cleaning Service31$0.00$0.00$0.00$0.00
Page 1: Subtotal Bid for Preventive Maintenance Tasks ($)$0.00
Page 2: Time and Material Rates
With respect to labor and material for repairs not covered under the routine maintenance (including emergency service), provide labor rate quote. If on-site emergency service is requested by the FACILITY, a CONTRACTOR Service Technician shall arrive on-site within two (2) hours of the FACILITY's request for an on-site CONTRACTOR Technician. Prior FACILITY approval is required for all repairs. Material markup will be fixed at 10%. Shipping costs are not to be included in the material markup. There is no reimbursement for travel time and/or travel expenses including mileage and fuel costs.
Straight Time is defined as an eight (8) hour day Monday thru Friday. Overtime includes all other times except hours/days indicated as Straight Time, i.e.: NY State Holidays, weekends, etc.
Directions: 1) Insert the Hourly Labor Rate in the Unit Cost ($) column for Straight Time, Overtime, and Training. Do not enter any pricing for the Material Allowance; 2) The Annual Cost for the Contract Year, which is equal to the Estimated Service Frequency per Year x Unit Cost is calculated automatically; 3) The Total Amount (Years 1 – 3) for Straight Time, Overtime, and Training for each Contract Year (1 through 3) is calculated automatically; 4) The Time & Material Allowance Subtotal which is equal to the sum of the Total Amount (Years 1 – 3) column (Total Material Allowance + Total Straight Time + Total Overtime + Total Training) is calculated automatically.
The Unit Cost for each item must be completed for each item listed (unless blocked). Do not leave any areas blank or the bid may be disqualified. Please be advised that only actual services performed may be invoiced at the Unit Costs quoted as per Appendix C of the contract. Bidders are bound by the Unit Costs provided and cannot be changed after the Bid Opening.
ItemBid UnitEst. Service Freq. per YearYear 1
Unit Cost ($)Year 1 Annual Cost ($)Year 2
Unit Cost ($)Year 2 Annual Cost ($)Year 3
Unit Cost ($)Year 3 Annual Cost ($)Total Amount

(Years 1-3)

Material AllowanceLOT1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$15,000.00
Technician Straight TimeHRS80$0.00$0.00$0.00$0.00
Technician OvertimeHRS16$0.00$0.00$0.00$0.00
Training RateHRS8$0.00$0.00$0.00$0.00
Page 2: Time and Material Allowance Subtotal ($)$15,000.00
Note: The material allowance and the number of straight time, overtime and training hours are estimated and are only used for purposes of determining the lowest responsible bidder and an estimated contract total cost. Payment will only be made on the actual number of hours for repairs and the cost of materials used.
Page 3: Bid Totals
Directions: When finished, be sure to sign and date the bottom of the Bid Totals sheet. Only the signed original Bid Quote Sheet can be submitted with the proposal.
Preventive Maintenance Task Subtotal (Page 1)$0.00
Time and Material Allowance Subtotal (Page 2)$15,000.00
TOTAL BID$15,000.00
When applicable,
-The bidder’s signature below attests that they have reviewed the prevailing wage rates that apply to this solicitation.
-The bidder’s signature below attests to the receipt and understanding of the questions & answers associated with this solicitation.
-The bidder’s signature below attests that they will inform the OMH in writing of the name(s) of any individual(s) who will provide any service under the resulting contract who has not been off the New York State payroll for at a minimum of two years from the start date of the resulting contract. The bidder must notify the OMH of such individual(s) prior to the start of the contract or prior to that individual(s) providing any service in accordance with resulting contract.
-The bidder’s signature below attests they have reviewed and understand the requirements stated in the IFB (section 17) and the OMH contract boilerplate (Appendix C) regarding the necessity to accept Electronic Payments for all invoices if awarded this contract, and certifies that it has already applied to participate in the State Comptroller’s Electronic Payment system, or will do so within 10 days of receiving notification of contract selection.
-If award is to an individual:
□The signature below attests that I have not been on the New York State payroll during the last two years.
OR
□The signature below attests that I have been on the New York State payroll during the last two years and the N.Y. State Ethics Commission Approval Letter is attached.

Name of Firm_______________________________________________________ Date _________________________

Authorized Representative (Print):__________________________________________ Authorized Signature__________________________________________________________________

&"Arial,Regular"ATTACHMENT D - BID QUOTE SHEET

FACILITY NAME PSYCHIATRIC CENTER #OMH01-C201XXX-3650XXX

File details come from the government source that posted it. Updated .