WNDI-2026-T1A- RFI T-1A GBTS Site Survey_Nov 2026.pdf
PDF 134 KB Posted
- Solicitation number
- WNDI-2026-T1A
About this file
This is a Sources Sought notice for market research purposes issued by the Department of the Air Force, Air Force Life Cycle Management Center (AFLCMC/WNDI) at Hill Air Force Base, Utah. The Government seeks potential sources capable of conducting a site survey at Sfax Air Base, Tunisia and performing an in-process construction assessment of an existing flight simulator facility being modified to accommodate the T-1A Ground Based Training System (GBTS). The facility will house two Operational Flight Trainers (OFTs)—non-motion, full-scale training devices with wraparound visual display systems and representative aircraft flight decks—and one Part Task Trainer (PTT), a desktop-based training device. Respondents must assess the facility's ability to safely move, store, manipulate, assemble, and test these devices; interface them with facility interconnects including air flow, electrical power, grounding, plumbing, and mounting surfaces; operate and maintain them within specified environmental parameters; withstand extreme local weather; and demonstrate structural soundness. The period of performance is estimated at less than six months, with no Government-furnished technical data provided.
Responses must include company information (CAGE Code, UEI Number, domestic ownership verification, NAICS Code 333310 small business qualification status), detailed approaches for performing the site survey and verifying facility requirements while identifying deficiencies and modifications, cost estimates for all efforts, company overview including organizational structure and core capabilities, and identification of customary commercial practices or industry factors affecting cost, schedule, or performance. Responses should be unclassified, with proprietary information clearly marked, submitted via email to David Michalsky (Contracting Point of Contact) or Matthew Brown (Technical Point of Contact), limited to approximately 5MB per email with multi-email submissions divided if exceeding 10MB. This notice does not constitute a solicitation, commitment to issue an RFP, or obligation to reimburse respondent costs, and responding is not required to participate in any future solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title: T-1A Ground Based Training System (GBTS) Site Survey and Simulator Facility Assessment
Announcement Type: Sources Sought
Notice ID: WNDI-2026-T1A
Disclaimer: This Sources Sought notice is issued solely for market research and planning purposes. It is not a solicitation, request for proposal (RFP), request for quotation (RFQ), invitation for bid (IFB), or commitment by the Government to issue a solicitation or make an award. The Government will not reimburse respondents for costs associated with preparation or submission of responses. Responses to this notice will not be considered offers and cannot form a binding contract.
Introduction: The Department of the Air Force, Air Force Life Cycle Management Center, Training Aircraft Directorate, Legacy Training Aircraft Division, Training International Branch (AFLCMC/WNDI), Hill Air Force Base, Utah, is conducting market research to identify potential sources with the capabilities, relevant experience, and resources necessary to perform the requirements described in this notice.
A response to this notice is not required to participate in any future solicitation, should one be issued. Small businesses are encouraged to respond to assist AFLCMC/WNDI in assessing market capability, the availability of competition, and potential small-business participation.
Interested parties are responsible for monitoring SAM.gov for updates to this notice.
Overview: This notice is issued solely for market research purposes to identify potential sources and obtain rough-order-of-magnitude (ROM) cost information in support of the T-1A GBTS.
The Government is seeking potential sources capable of conducting a site survey at Sfax Air Base, Tunisia, and performing an in-process construction assessment of an existing flight simulator facility being modified to accommodate the T-1A GBTS. The GBTS includes multiple T-1A training devices, specifically the Operational Flight Trainer (OFT) and Part Task Trainer (PTT). This market research is intended to identify potential sources capable of assessing the facility’s suitability to accommodate the installation, integration, operation, and sustainment of these training devices.
Background: The Tunisian Air Force is acquiring two (2) Operational Flight Trainers (OFTs) and one (1) Part Task Trainer (PTT) for installation, integration, and operation within a modified simulator facility at Sfax Air Base, Tunisia.
The T-1A OFT is a non-motion, full-scale training device that includes a wraparound visual display system, a representative aircraft flight deck, an instructor operator station, and associated peripheral electronics and cabling.
The T-1A PTT is a desktop-based, small-scale training device consisting of a pilot-only instrument panel, center console, and computer control system.
The existing simulator facility supports various ground-based flight-training devices and is currently being modified to accommodate the newly acquired T-1A training devices.
Response Instructions: AFLCMC/WNDI invites industry to submit unclassified written responses to this RFI in accordance with the submission guidance provided below.
Responses should include sufficient detail, supporting documentation, and recent relevant experience to demonstrate the respondent’s capability to provide site survey support for the T-1A GBTS. Responses should also include an associated ROM price estimate. Marketing material is considered an insufficient response to this RFI.
Respondents are responsible for ensuring compliance with all applicable security procedures and policies when preparing and submitting responses. Respondents should identify and clearly mark all proprietary information. Do not include classified information in response to this RFI.
Email submissions exceeding 10MB must be divided into multiple emails. Respondents are encouraged to limit each email submission to approximately 5MB.
Submit questions and responses to the following:
Contracting Point of Contact: David Michalsky; david.michalsky.1@us.af.mil Technical Point of Contact: Matthew Brown; matthew.brown.62@us.af.mil
Responses should include the following information:
Section I
1. Company Name
2. Address
3. CAGE Code
4. Unique Entity Identifier (UEI) Number
5. Point of Contact
6. Phone Number
7. E-mail Address
8. Web Page URL
9. Under NAICS Code 333310, with a small business size standard of 1,000 employees, identify whether your company qualifies as a small business and indicate all applicable socioeconomic business designations.
10. Would you recommend any other NAICS Code(s) and why? Any recommended alternative NAICS code should include a brief rationale based on the principal purpose of the anticipated requirement.
11. A statement verifying that your company is domestically owned.
Section II
Respondents should describe their approach for assessing and evaluating each of the following:
1. Describe your approach to perform a site survey of the existing/modified simulator facility at Sfax Air Base, Tunisia and address each aspect listed below associated with establishing a fully functional and operational facility for the T-1A GBTS. No technical data will be provided for this task. The period of performance is estimated to be less than 6 months. The respondent is not expected to perform the following tasks; only to ensure the facility will allow for these tasks to be accomplished and/or the facility is acceptable for each aspect.
1.1 Ability to safely move T-1A devices into and out of the facility with devices either in packaging or partially disassembled.
1.2 Ability to securely store packaged/crated devices in the facility under acceptable environmental conditions.
1.3 Ability to manipulate and maneuver the devices within the facility, including but not limited to uncrating, crating, moving, transferring, rearranging, assembling and disassembling.
1.4 Ability for personnel to assemble, set-up and test devices, and their associated peripherals, in appropriate operating envelopes.
mailto:david.michalsky.1@us.af.mil mailto:matthew.brown.62@us.af.mil
1.5 Ability to interface devices, and their associated peripherals, with applicable facility interconnects including but not limited to air flow, electrical power, grounding, plumbing, and mounting surfaces.
1.6 Ability to operate, maintain and sustain devices, and their associated peripherals, within operating limits including but not limited to temperature, lighting, acoustic, vibration, power stability, and humidity.
1.7 Existence of, or ability to include facility safeguards associated with operations including power shutoff, fire suppression, emergency shutdown, personnel safety, electric shock and surge protection, and hazard reduction.
1.8 Ability of the modified facility to withstand common extreme local weather occurrences including but not limited to high wind, rain, hot temperatures, salt spray and lightning.
1.9 Assessment of the structural soundness and anticipated longevity/lifecycle of the modified facility.
2. Describe your approach for verifying facility requirements, identifying deficiencies and discrepancies, and developing recommended facility modifications in the absence of Government-furnished technical data.
Explain how you will document and communicate your findings and recommendations.
3. Provide cost estimates for each effort identified in paragraphs 1 and 2.
4. Provide a brief overview of your company, including its organizational structure, core capabilities, and the goods and/or services it provides. Include a summary of workforce composition and management structure.
5. Identify any customary commercial practices, contract terms, insurance requirements, international travel considerations, site-access requirements, or other industry practices that could materially affect cost, schedule, performance, or competition for this requirement.
File details come from the government source that posted it. Updated .