Wing and Base Assembly SOW TY20_MK1.docx

DOCX document 166 KB Posted

Attached to
Wing and Base Assembly Federal contract opportunity
Solicitation number
N6893625Q0005
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document is a Statement of Work (SOW) for the Wing and Base Heat Pipe Assembly for the Type 20 PATRIOT radar system and the MK1 radar system. The SOW outlines the technical requirements for the fabrication, testing, documentation, and delivery of these proprietary heat dissipating assemblies. It identifies the applicable government drawings, requirements for specification changes, mercury exclusion, and testing. The SOW includes a milestone schedule and list of deliverables.

The related federal contract opportunity is a pre-solicitation notice for the procurement of seven Type 20 and four MK1 Table, Wing and Base Heat Pipe Assemblies on a sole-source basis from Advanced Cooling Technologies. The government is seeking capability statements from interested firms that can fulfill the technical requirements within the required timeframe without compromising quality, accuracy, reliability, or schedule. Responses are due by 11 November 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Wing and Base Assembly, newest first.
File Type Posted
Type 20 W and B Drawings.zip ZIP file
MK 1 W and B Drawings.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PATRIOT Type 20 and MK 1 Radar Wing and Base Heat Pipe Assembly Statement of Work (SOW)

Prepared by Naval Air Warfare Center Weapons Division (NAWCWD) Weapons Control and Integration Branch, Code D55J300 Bldg. 01043, Cobra St., Mail Stop 6633 China Lake, CA 93555

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Critical Technology; 20221107. Other requests shall be referred to Program Executive Office, Undersea Warfare Systems (PEO UWS), Submarine Electromagnetic Systems Program Office (PMS435).

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (TITLE 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE - For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

1.0 Background

The Wing and Base Heat Pipe Assembly for the Type 20 PATRIOT radar system is a proprietary technology developed to NAWCWD specification to effectively dissipate heat produced by the radar system. This product is a unique assembly of intricate parts that meet the required form, fit and function of the radar and the submarine mast that it is housed in. The Wing and Base Heat Pipe Assembly required will maintain the required form and fit and will maintain the functional capability of heat removal from critical components. The components that make up this product are complex and require the proprietary technical and manufacturing expertise from an experienced manufacturer without need for additional research, experimentation or evaluation that other manufacturers do not possess and such development would come at the cost to the Government. This non-recurring engineering that other manufacturers would need to perform would drastically reduce the speed-to-the-fleet of the system, delaying the deployment of an important safety critical system and delaying submarine delivery to the fleet.

2.0 Scope

The contractor shall be required to fabricate, test, document and deliver Wing and Base Heat Pipe assemblies utilizing proprietary heat dissipating technology. The design and fabrication of the assembly is based on current documented drawings listed within this document.

2.1Applicable Documents
2.1.1Government Documents Type 20 Radar

The following NAWCWD drawings describes the Type 20 Wing and Base Heat Pipe assemblies:

80151036Center Shaft Base Assembly Rev A
80151037Static Base Rev D
80151038Center Shaft Rev A
80151039Heat Pipe Cylinder Rev A
80151040Oval Heat Pipe Tube Rev A
80151041Heat Pipe Condenser Saddle Rev -
80151044End Cap Rev B
80151045Motor Hold Down Tab Rev A
80151051Wing Rev C

2.1.2 Government Documents MK1 Radar

The following NAWCWD drawings describes the MK1 Wing and Base Heat Pipe assemblies:

80080407Static Base Assembly Rev L
80080408Static Base Rev W
80080410Table Base Rev D
80080411Table Wing Rev L
80080417Center Shaft End Top Piece Rev D
80080418Center Shaft Base Assembly Rev D
80080425Motor Hold Down Tab Rev -
80080427Center Shaft No Coating Rev B
80080462Heat Pipe Cylinder-Oval Rev B
80080463Oval Heat Pipe Tube Rev -
80080464Condenser Saddle Rev –

3.0 Detailed Requirements

3.1 Wing and Base Heat Pipe Subsystem Specification Changes

All proposed changes or waiver requests to the Wing and Base Heat Pipe subsystem specifications must be submitted to the Government for review and approval prior to delivery of any unit. The Contractor must submit a RFV via DD Form 1694.

3.2 Mercury Exclusion

The supplies furnished under this contract shall not contain functional mercury. Functional mercury is that mercury or mercury compound required for proper operation of the supplies or without the presence of which the supplies would fail to function properly. External contamination by metallic mercury or mercury compounds shall be cause for rejection of the supplies. The mercury vapor concentration in trapped air within any tested item(s) shall not exceed 0.01 mg. per cubic meter.

3.3 Wing and Base Heat Pipe Subsystem Testing

Testing shall include full dimensional inspection of all units.

4.0 Schedule and Deliverables

4.1 Milestone Schedule

Contract MilestoneWeeks after Contract Award
or Completion Date

Wing and Base Heat Pipe Subassemblies 24 weeks ARO

4.2 Deliverables

Deliverables include Wing and Base Heat Pipe assemblies manufactured per drawings listed under 2.1 Government Documents.