WI 0101 SAFE FOR MAN CERTIFICATION OF TANKS FOR CLEANING.docx
DOCX document 38 KB Posted
- Attached to
- GUADALUPE MARINE CHEMIST GAS FREE
- Solicitation number
- N4044326Q0047
About this file
This is a Statement of Work for marine chemist services supporting the USNS GUADALUPE (T-AO 200) hull structure maintenance in September 2026. The contractor shall provide a certified Marine Chemist to gas free and certify twenty-two (22) cargo and ballast tanks located across multiple Tank Top Deck areas for safe entry and cleaning by Ship's Force. The work will be performed at Naval Air Station North Island in San Diego, California, from September 12-22, 2026. Services include initial "Safe for Man" certification testing for each tank and subsequent daily inspections and testing by a qualified competent person throughout the period of performance to maintain certified safe conditions. The Marine Chemist is expected to conduct approximately eight (8) visits averaging two hours each as tanks become available for testing, with the contractor eligible to credit back up to four (4) unused visits upon completion. Tanks requiring certification include ten Cargo Oil (DFM) tanks with capacities ranging from 178,147 to 892,439 gallons, and twelve Fuel Oil tanks with capacities ranging from 2,174 to 140,182 gallons. The contractor and all subcontractors must comply with applicable General Technical Requirements (GTR) and maintain coordination with the Government regarding Marine Chemist scheduling, preferably with prior-day notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS GUADALUPE
(T-AO 200)
100 – HULL STRUCTURE
| SEPT 2026 | ||
| ITEM NO. 101 | CATEGORY “A” | MSC MAINT HUB SAN DIEGO |
SAFE FOR MAN CERTIFICATION OF TANKS FOR CLEANING
1.0 ABSTRACT:
1.1 Provide the services of a Marine Chemist for “Safe for Man” certification of twenty-two (22) total tanks for safe entry and cleaning by Ship’s Force.
2.0 REFERENCES/ENCLOSURES:
2.1 List of Applicable Tanks, Voids and Cofferdams to be Opened
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1. Location: Multiple tank locations across mostly the Tank Top Deck
3.2 Item Description/Manufacturer's Data: None
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES/INFO: None
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors must comply with all applicable GTRs.
5.2 Location/POP: Naval Air Station North Island San Diego, CA
SEPTEMBER 12-22, 2026
5.3 Cleaning of cargo and ballast tanks will be accomplished by Ship’s Force (in San Diego).
6.0 QUALITY ASSURANCE REQUIREMENTS: Refer to Paragraph 7.0
7.0 STATEMENT OF WORK:
7.1 Contractor shall provide a certified Marine Chemist to gas free twenty-two (22) cargo and ballast tanks, throughout the period of performances for tank cleaning.
7.2 Once Marine Chemist certificates are issued for each tested Tank, Contractor to maintain “Safe for Man” conditions as specified by Chemist’s certificate for each Tank.
7.2.1. Contractor shall provide a qualified “competent person” through safety program to DAILY inspect and test conditions of each certified tank for remainder of Period of Performance.
7.3 Marine Chemist is expected to be available for multiple workdays as separate tanks become available for “Safe for Man” testing throughout Period of Performance.
7.3.1. Contractor to coordinate Marine Chemist visits preferably with a prior-day notice for testing of Tanks as newly available for testing and certification.
7.3.2. For bidding purposes, estimate a total of eight (8) Marine Chemist visits for approximately two hours per visit.
7.3.2.1. Contractor to CREDIT back up to four (4) unused Marine Chemist visits upon completion of Period of Performance.
Enclosure 2.2.1 - USNS GUADALUPE (T-AO 200) List of Applicable Tanks, Voids and Cofferdams to be Opened:
Cargo Oil (DFM) Tanks
| Description |
| Tank Location |
| 100% Capacity |
(gals) Area
(SF)
Arrival Condition (Ltons)
| No. 1 DFM Cargo Tank P/S |
| (5-22-2/1) |
| 2x(266,931) |
| No. 2 CTR. JP-5 Cargo Tank |
| (5-26-0) |
| 892,439 |
| No. 3 CTR DFM/JP-5 Cargo Tank |
| (5-31-0) |
| 333,206 |
| No. 3 DFM Cargo Tank P/S |
| (5-31-2/1) |
| 2x(274,750) |
| No. 5 DFM Cargo Tank P/S |
| (5-37-2/1) |
| 2x (178,147) |
| No. 7 CTR DFM/JP-5 Cargo Tank |
| (5-43-0) |
| 666,419 |
| No. 7 DFM Cargo Tank P/S |
| (5-43-2/1)) |
| 2x(377,010) |
| No. 8 DFM/JP-5 Cargo Tank |
| (5-47-0) |
| 666,419 |
| No. 9 CTR JP-5 Cargo tank |
| (5-51-0) |
| 666,419 |
| No.9 DFM Cargo Tank P/S |
| (5-51-2/1) |
| 2x(373,849) |
| No. 10 CTR JP-5 Cargo tank |
| (5-55-0) |
| 566,457 |
| No. 10 DFM Cargo Tank P/S |
| (5-55-2/1) |
| Port 380,460 |
Stbd 348,816
Fuel Oil Tanks
| Description |
| Tank Location |
| 100% Capacity |
(gals) Area
(SF)
Arrival Condition (Ltons)
| No. 2 F.O. Deep Tank P/S |
| (5-59-2/1) |
| 2x(70,803) |
| No. 3 F.O. Deep Tank P/S |
| (5-98-2/1) |
| 2x(140,182) |
| F.O. Service Tank |
| (3-60-2) |
| 24,203 |
| F.O. Settling Tank |
| (3-60-0) |
| 44,005 |
| AUX F.O. Storage Tank |
| (3-60-1) |
| 57,022 |
| AUX F.O. Service Tank FWD |
| (2-60-2) |
| 13,699 |
| AUX F.O. Service Tank AFT |
| (2-64-2) |
| 15,456 |
| AUX F.O. Settling Tank |
| (3-60-4) |
| 43,093 |
| Contaminated F.O. Tank |
| (5-60-0) |
| 19,702 |
| Aux Contaminated F.O TANK |
| (5-67-2) |
| 8,475 |
| F.O. Purifier Sludge Tank |
| (3-64-4) |
| 2,174 |