This is a draft Statement of Work (SOW) for the Whitten Camera Project 2026, a video surveillance system upgrade at the USDA Whitten Building located at 1400 Independence Avenue SW, Washington, DC 20250.
The project requires installation of twelve new Avigilon cameras across three categories: three fixed interior cameras (two on 1st Floor Offices in Whitten Visitor Center 103A and one on 5th Floor Roof Access Door 507A), seven 4-way exterior cameras (two on Jefferson Lawns with 12' poles, one on Whitten Apron 2nd Floor as replacement, two on Whitten Apron with 18' poles as replacements, and two on Whitten Apron security gate boxes with 6' poles), and two pan-tilt-zoom (PTZ) cameras on Whitten Apron security gate boxes with 6' poles. The contractor must perform detailed site surveys, develop ground-trenching plans and cable-routing diagrams for USDA approval, procure all materials, install and configure cameras, provide 64GB SDXC Class 10 SD cards, integrate with existing Extron video wall systems, comply with NECA 1 and BICSI standards, and provide comprehensive documentation including as-built drawings in AutoCAD and PDF formats. The contractor must hold current Avigilon VAR certification with qualified IP security systems staff. The period of performance is 120 days from award, with deliverables due at 10 days (material procurement), every 10 days thereafter (progress reports), and 120 days (site commissioning with system testing and certifications). Evaluation criteria include technical acceptability, confidence rating (Substantial, Satisfactory, Limited, or No Confidence), and price reasonableness based on cost realism. The contractor shall submit invoices through www.ipp.gov and coordinate with Project Manager Mike O'Connor and Technical Point of Contact Dwain Countiss.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft
Whitten Camera Project
Task Objective
OSSP, under direction from the Office of the Secretary of Agriculture office, is seeking to strengthen Avigilon video surveillance coverage at the Whitten Buildings by installing (12) new cameras in locations identified as major security vulnerabilities which will resolve the immediate gaps in visibility coverage at the Whitten facility and strengthen the ability to detect, deter, and respond to security incidents with greater speed and accuracy. The Contractor shall perform a detailed site survey of each location and procure, install, and configure all required cameras. This includes furnishing all Avigilon Video Surveillance System (VSS) devices, equipment, mounting hardware, poles, and any additional materials necessary for both interior and exterior deployment. As part of the site survey, the Contractor shall determine all required cable routes and pathways. The Contractor shall develop and submit proposed ground-trenching plans, cable-routing diagrams, and pathway designs to USDA for review and approval. Upon approval, the Contractor is responsible for procuring all materials and completing all work associated with the approved pathways, routes, and ground trenching. All work must comply with USDA standards, applicable building requirements, and industry best practices. Contractor is also responsible for obtaining all required cameras licenses and permits, including but not limited to building, local, and state permits, necessary to complete the work. Due to the facility’s critical operational function and its historic design is very important, each installation location must adhere to established guidelines to ensure the work remains as aesthetically pleasing as possible and maintains the sites overall historical continuity.
• 3 Fixed Camera Locations o 1st Floor Offices – 2 Whitten Visitor Center 103A o 5th Floor Roof Access Door– 507A
• 7 4-Way Exterior Camera Locations o 1 Camera in the East Wing Jefferson Lawn on 12’ camera poles o 1 Camera in the West Wing Jefferson Lawn on 12’ camera poles o 1 Camera on the Whitten Apron 2nd Floor on extension mount off building replacing existing camera o 2 Cameras on the Whitten Apron on 18’ camera poles, replacing existing poles installed o 2 Cameras on the Whitten Apron security gate boxes on 6’ camera poles o
• 2 PTZ Camera Locations o 2 PTZ Cameras Whitten Apron security gate boxes on 6’ camera poles
Support Need Statement
1.1 Contractor will procure and install all wiring, fiber optic cable and electrical power necessary to provide control of both fixed and pan/tilt/zoom (PTZ) cameras, install all cabling necessary to connect cameras to switches and/or routers in the identified telecom closets. All cabling will be installed in accordance with the manufacturer’s installation instructions. Contractors shall coordinate with OSSP to determine the optimal field of view for each newly installed camera.
1.2 Contractor will purchase, install, and configure 64GB SDXC Class 10 SD cards for all newly deployed cameras. This effort will ensure continuous data retention during outages, communication failures, or other system disruptions.
1.3 Contractor will be responsible for supplying, installing, and programming all cameras, camera licenses, related devices, software, and head-end equipment required to deliver a fully functioning system. The Contractor shall also ensure that all additions or configuration changes made to the Video Surveillance System (VSS) are fully aligned with the existing Extron video wall system, maintaining seamless operation and synchronization between the two systems.
1.4 Contractor will provide point-to-point labeling for all associated devices and install all communication racks, frames, and enclosures used to house NVRs and network switches. All work must comply with NECA 1 standards, the BICSI Telecommunications Distribution Methods Manual (TDMM) for communications equipment space layout, and the BICSI Information Technology Systems Installation Methods Manual (ITSIMM) for installation practices within communications equipment spaces.
1.5 The contractor will coordinate with USDA/OCIO- CEC to identify the nearest telecommunications closets for integrating the new cameras into the existing network. The contractor will then configure all cameras into the existing Avigilon VSS platform currently operating on the USDA network infrastructure.
1.6 Contractor will provide all final system documentation, including as-built drawings in AutoCAD and PDF format, software licenses, system passwords, manufacturer installation and troubleshooting guides, reference books, and physical keys. In addition, the Contractor shall provide all applicable warranty documentation, including assurance plans and extended-warranty options.
1.7 The contractor must hold current Avigilon VAR certification and be authorized to provide sales, system design, installation, and ongoing support for Avigilon high-definition surveillance solutions. All assigned staff must be vetted and possess specialized knowledge in IP security systems, video analytics, Avigilon Control Center (ACC) and Unity software environments
1.8 Contractor will coordinate with OSSP/FPD to identify and approved evaluation criteria and complete performance and closeout testing of all devices.
Place of Performance Whitten Building, 1400 Independence Ave. SW. Washington, DC 20250
Period of Performance The Period of Performance will be 120 days from date of award.
Points of Contact (POC) Project Manager:
Mike O’Connor, (202) 997-3801, mike.oconnor@usda.gov 1400 Independence Ave, SW Room 1420, Washington, DC 20250
Technical Point of Contact (TPOC):
Dwain Countiss, (202) 690-0216, dwain.countiss@usda.gov 1400 Independence Ave, SW Room 1409, Washington, DC 20250
Deliverables The required deliverables associated with this work shall be provided in the below table, accompanied by a brief description and the deliverable due date:
Item No. Deliverable Objective Due
1 Material Procurement and Lead Time Order Materials 10 days after award
2 Reports Summarize installation progress, equipment ordered, meetings, and problems encountered.
and every 10 days thereafter until site commissioning
3 Site Commissioning/100%
Conduct system tests witnessed by PM/TPOCs, where appropriate;
provide certifications that the new system passed the test plan.
120 days after award mailto:mike.oconnor@usda.gov mailto:dwain.countiss@usda.gov
Security Requirement Unclassified.
Processing The work statement provided will be used to establish the Statement of Work (SOW) for vendor response, and to govern the overall support activity that vendors will be expected to deliver for the ordering activity.
The SOW will be submitted to vendors to solicit a response. Vendors may ask questions to clarify the support need. In some cases, the vendors may require a Site Visit to review the location where the work is to be performed, and to obtain a full understanding of the work that needs to be accomplished.
Evaluation The Government will award an agreement resulting from the solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government. The following factors shall be used to evaluate offers:
• Technical – An offer must be technically acceptable to be considered for award.
• Confidence Rating – An offer will be reviewed, and a confidence assessment score provided
• Price – the offer will be reviewed for price reasonableness The most advantageous response will be the response that offers the highest confidence rating and most reasonable price.
The specific evaluation processes are as follows:
Technical Evaluation Process The evaluation will utilize a review team of at least two assigned team members assigned this responsibility by the Contracting Officer. These team members will identify whether the response from the vendor is Acceptable or Unacceptable. An Acceptable determination will be provided if it responds affirmatively to all minimum requirements contained in the solicitation materials. Two of the three team members must rate the proposal as acceptable to permit an Acceptable rating. As a response deemed Acceptable by the technical evaluation team indicates a vendor that has demonstrated capability to accomplish the scope of work, it will be provided to the Contracting Officer for subsequent evaluation.
Any Unacceptable rating will be provided a full description of the following for the BPA Contracting Officer’s review:
• Weakness – a flaw in the proposal that increases the risk of unsuccessful contract performance, and the specific identification of the flaw
• Significant Weakness – a proposal flaw that appreciably increases the risk of unsuccessful contract performance, and the specific identification of the flaw
• Deficiency – a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level, and the specific identification of the material failure or combination of weaknesses in the proposal
An Unacceptable rating will be shared with the vendors as part of a Notice to Unsuccessful Offerors, accompanied with the evaluation team findings as described above.
Confidence Rating Process The Contracting Officer will review the response and will assess a confidence rating. The following adjectival rating guidelines will be used when subjectively assessing vendor responses:
Confidence Assessment Rating Description
SUBSTANTIAL
CONFIDENCE
Based on the offeror’s response, the government has a high expectation that the offeror will successfully perform the required effort.
SATISFACTORY
CONFIDENCE
Based on the offeror’s response, the government has an expectation that the offeror will successfully perform the required effort.
LIMITED
CONFIDENCE
Based on the offeror’s response, the government has a low expectation that the offeror will successfully perform the required effort.
NO
CONFIDENCE
Based on the offeror’s response, the government has no expectation that the offeror will be able to successfully perform the required effort.
Price Evaluation The Contracting Officer shall evaluate all offers price submissions to validate them as being fair and reasonable and representing cost realism. Offerors are direct to FAR 2.101(b) for a definition of “cost realism”, which states:
“Cost realism” means that the costs in an offeror’s proposal—
(1) Are realistic for the work to be performed.
(2) Reflect a clear understanding of the requirements; and
(3) Are consistent with the various elements of the offeror’s technical proposal
Vendor submissions that are either too low or too high will be deemed unreasonable or incorporating too much risk for the government to accept. Pricing is expected to align with the level of effort determinations provided by the ordering activity.
NOTE: Ordering activities that do not utilize a schedule of materials, and permit vendors to identify the materials needed, accept the expertise of these vendors to satisfy the support need or ordering requirements. In such cases, the price evaluation will not take into consideration the cost of materials in the determination of price reasonableness.
Task Award Once a vendor is selected for award by the Contracting Officer, the vendor shall be notified and will directly coordinate with the POCs to engage the work and/or support need
Physical Security The Contractor shall be responsible for safeguarding all Government property and data made available for Contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
Professional Conduct While on Government Facilities Contractor employees shall observe and maintain themselves in accordance with professional standards according to their location. Attire should be consistent with professional standards. They shall not engage in private activities for personal gain or any other unauthorized purpose while on Government-owned or leased property, nor may Government time or equipment be utilized for these purposes.
Inspection and Acceptance Work and work schedules will be cooperative efforts between the Technical Point of Contact (TPOC), the Program Manager (PM), and/ or the contractor.
The Government shall review deliverables for conformance with this statement of work and all referenced documents for completeness and accuracy. The Government will provide comments to the contractor within three working days after receipt of a draft deliverable. The contractor will provide corrections and deliver a revised deliverable within three working days of Government comments. For the purpose of this statement of work, workdays do not include weekends and federal holidays.
Contractor shall document any open issues, possible problems, or any other items that could hinder the performance of the project along with deliverables. Furthermore, resolutions to known problems or foreseen problems/issues shall be included in all deliverables submitted. Any open issues that need to be addressed shall be included and communicated to the Government once they are known for possible resolution.
Limitation of Authority The government assigned Project or Program Manager, Task POC, or COR are responsible for monitoring the Contractor’s performance. Any proposed modifications to the task order, such as changes to the scope of work, or to the terms and conditions of the task order must be authorized by the Contracting Officer.
Submission of Invoices The contractor shall submit to the Project Manager and/or COR an invoice with a description of the services/supplies provided in the previous period. The government shall review the invoice to ensure the services/supplies have been delivered and are acceptable, and that the invoice amount is correct. Before payment is made, the government must indicate validation. The Contractor shall submit all invoices through www.ipp.gov for the Contracting Officer approval and for payment.
http://www.ipp.gov/
Whitten Building VSS Camera Locations & Model Types:
• 3 Fixed Camera Locations o 1st Floor Offices – 2 Whitten Visitor Center 103A (Page 5) o 5th Floor Roof Access Door– 507A (Page 16)
• 7 4-Way Exterior Camera Locations o 1 Camera in the East Wing Jefferson Lawn (Page 4) o 1 Camera in the West Wing Jefferson Lawn (Page 6) o 5 Cameras on the Whitten Apron (Page 5)
• 2 PTZ Camera Locations o 2 PTZ Cameras in the Whitten entrance (Page 5)
H
WAITING AREA
OIG
148W
OIG
STORAGE
OIG
146W.1
OIG
COPY/PRINT
OCFO
141W
OCFO
TELECOM
BLDG CORE
140W.2
BLDG CORE
WOMEN'S RESTROOM
BLDG CORE
L1-WR-138W
BLDG CORE
JANITOR'S CLOSET
BLDG CORE
137W
BLDG CORE
MEN'S RESTROOM
BLDG CORE
L1-MR-121W
BLDG CORE
STORAGE
OBPA
135W.1
OBPA
STORAGE
OBPA
135W.2
OBPA
FILE ROOM
OIG
116-W.1*
OIG
COPY/PRINT
OIG
116W
OIG
CONFERENCE
OIG
113W
OIG
OFFICE
OIG
110W
OCCUPIED
OIG
CONFERENCE
OGC
105W
OGC
STORAGE
BLDG CORE
123W.1
BLDG CORE
STORAGE
OGC
101W.1
OGC
STORAGE
OSEC
100W
OSEC
OGC
107W
OGC
OBPA
126W
OBPA
OIG
117W
OIG
OCFO
143W
OCFO
L1-9 L1-8
L1-STR-2W L1-STR-1W
L1-7
OFFICE
OIG
151W
OCCUPIED
OIG
OFFICE
OIG
149W
PARADIS
OIG
OFFICE
OIG
147W
COFFEY
OIG
OFFICE
OIG
146W
MONACO
OIG
OFFICE
OCFO
145W
VACANT
OCFO
OFFICE
OCFO
140W
MOANEY
OCFO
OFFICE
OCFO
139W
OCCUPIED
OCFO
OFFICE
OIG
120W
BOYD
OIG
OFFICE
OIG
117-W.1*
FONG
OIG OFFICE
OIG
114W
OCCUPIED
OIG
OFFICE
OIG
111W
THOMPSON
OIG
OFFICE
OGC
123W
OCCUPIED
OGC
OFFICE
OBPA
124W
OCCUPIED
OBPA
OFFICE
OBPA
128W
OCCUPIED
OBPA
OFFICE
OBPA
129W
ZIEGLER
OBPA
OFFICE
OBPA
130W
YORK
OBPA
OFFICE
OBPA
131W
MURRY
OBPA
OFFICE
OBPA
132W
JOHNSON
OBPA
OFFICE
OBPA
133W
STAIERT
OBPA
OFFICE
OBPA
134W
KUSKE
OBPA
OFFICE
OBPA
135W
MAHAN
OBPA
OFFICE
OGC
108W
VADEN
OGC
OFFICE
OGC
103W
CARRINGTON
OGC
OFFICE
OGC
102W
CLARKSON
OGC
OFFICE
OGC
101W
BUMBARY-LANGSTON
OGC
143W-A
OCCUPIED
143W-B
COATES
117W-A
RUBITO
117W-B
ANGEL
126W-C
OCCUPIED
126W-B
OCCUPIED
126W-A
OCCUPIED
107W-A
SMITH
107W-B
STEPHENS
126W-D*
OCCUPIED
212019181716151413121110987654321
DD
EE
FF
GG
HH
II
JJ
KK
LL
MM
NN
A
B
C
D
E
F
G
H
I
J
K
C1-030
TY5.000
C5-031
TY5.000
C7-115
TY5.001
C1-029
TY5.000
C4-114
TY5.001
C12-113
TY5.001
C5-032
TY5.000
C1-028
TY5.000
C10-116
TY5.001
C10-117
TY5.001
KEY PLAN
A B
C
D
C
B
A
13 2456
D
C
B
A
13 2456
Printed on ___% Post-Consumer Recycled Content Paper
©2018 AECOM Corporation
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
CLIENT
CONSULTANT
PROJECT
LEVEL 01-AREA A
TY1.101.A
60634596
Washington, DC
USDA HQ VSS_UPGRADE
USDA OSSP
AECOM
4 N Park Drive Suite 300 Hunt Valley, MD 21030
W H
IT
T
E N
B U
IL
D
IN
G
Scale: 1/8" = 1'-0"
1 LEVEL 01-SECURITY AREA A
I/R DATE DESCRIPTION
06.26.2020 40% SUBMISSION
07.15.2020 80% SUBMISSION
07.30.2020 100% SUBMISSION
ML ML
STORAGE
OSEC
104A.1*
OSEC
BRIEFING ROOM
OSEC
104A
OSEC
INTERPRETER ROOM
OSEC
105A*
OSEC
TELECOM
BLDG CORE
106A.3*
BLDG CORE
STORAGE
BLDG CORE
105A.1*
BLDG CORE
ELECTRICAL
BLDG CORE
106A.1*
BLDG CORE
ELECTRICAL
BLDG CORE
106A
BLDG CORE
STORAGE
BLDG CORE
106A.2*
BLDG CORE
VISITOR CENTER
DA-OO
103A
DA-OO
PANTRY
OBPA
101A.2*
OBPA
ELECTRICAL
BLDG CORE
101A.3*
BLDG CORE
PATIO
BLDG CORE
100A*
BLDG CORE
STORAGE
BLDG CORE
128A-W*
BLDG CORE
WOMEN'S RESTROOM
BLDG CORE
L1-WR-124A
BLDG CORE
CONFERENCE
OCE
108A
OCE
ELECTRICAL
BLDG CORE
112A.7*
BLDG CORE
STORAGE
OCE
113A
OCE
PANTRY
OCE
112A.2*
OCE
MECHANICAL
BLDG CORE
112A.3*
BLDG CORE
STORAGE
OES
119A.2*
OES
A/V ROOM
OES
121A.1*
OES
CONFERENCE
OES
121A
OES
MEN'S RESTROOM
BLDG CORE
L1-MR-123A
BLDG CORE
JANITOR'S CLOSET
BLDG CORE
124A-W*
BLDG CORE
OPEN PLAN AREA
OBPA
101A
OBPA
OCE
112A
OCE
OPEN PLAN AREA
OES
119A
OES
WAITING AREA
OES
116A
OES
STORAGE
OES
119A.1*
OES
L1-5*
L1-6*
PRESS ROOM
OSEC
107A
OSEC
L1-STR-1A*
SHAFT
BLDG CORE
L1-S-1900
BLDG CORE
L1-4*
SHAFT
BLDG CORE
L1-S-1901
BLDG CORE
STORAGE
DA-OO
103-A.1*
DA-OO
ELECTRICAL
BLDG CORE
103-A.2*
BLDG CORE
OFFICE
OCE
110A
OCCUPIED
OCE
OFFICE
OCE
111A.2*
OCCUPIED
OCE
OFFICE
OCE
111A.3*
OCCUPIED
OCE
OFFICE
OCE
112A.4*
OCCUPIED
OCE
OFFICE
OCE
112A.5*
OCCUPIED
OCE
OFFICE
OCE
112A.6*
OCCUPIED
OCE
OFFICE
OES
119A.5*
OCCUPIED
OES
OFFICE
OES
119A.3*
LINDSEY
OES
OFFICE
OES
119A.4*
GIBSON
OES
OFFICE
OBPA
101A.1*
NAVARRO
OBPA
OFFICE
OBPA
REHREN
OBPA
OFFICE
DA-OO
115A
OCCUPIED
DA-OO
OFFICE
OCE
111A
OCCUPIED
OCE
OFFICE
DA-OO
102-A
OCCUPIED
DA-OO
OFFICE
OES
119A.6*
KOSS
OES
112A-A*
OCCUPIED
112A-B*
OCCUPIED
119A-E*
VILORAS
119A-F*
VACANT
119A-N*
ROSS
119A-K*
VACANT
119A-I*
OCCUPIED
119A-U*
CLEMONS
119A-Q*
OCCUPIED
119A-H*
SCAFF
119A-R*
TALERO
119A-T*
CARDENAS
101A-A*
NORMAN
101A-B*
OCCUPIED
119A-O*
OCCUPIED
119A-L*
OCCUPIED
119A-S*
VACANT
119A-P*
VACANT
119A-M*
KINGSBERRY
119A-J*
VACANT
119A-G*
GOGNIAT
119A-B*
OCCUPIED
119A-A*
GERALD
119A-C*
VACANT
119A-D*
SimpsonJr
3736353433323130292827262524
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
MM
NN
A
B
C
D
E
F
G
H
I
J
C5-036
TY5.000
C5-037
TY5.000
C5-039
TY5.000
C5-033
TY5.000
C5-034
TY5.000
C5-035
TY5.000
C11-118
TY5.001
C11-119
TY5.001
C11-121
TY5.001
C5-038
TY5.000
C11-120
TY5.001
C5-041
TY5.000
C5-040
TY5.000
C5-042
TY5.000
C5-044
TY5.000
C5-043
TY5.000
C10-125
TY5.001
C10-124
TY5.001
C12-122
TY5.001
C12-123
TY5.001
C5-045
TY5.000
C5-046
TY5.000
C5-048
TY5.000
C5-047
TY5.000
C5-049
TY5.000
VS-003
KEY PLAN
A B
C
SHEET KEYNOTES
D
C
B
A
13 2456
D
C
B
A
13 2456
Printed on ___% Post-Consumer Recycled Content Paper
©2018 AECOM Corporation
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
CLIENT
CONSULTANT
PROJECT
LEVEL 01-AREA B
TY1.101.B
60634596
Washington, DC
USDA HQ VSS_UPGRADE
USDA OSSP
AECOM
4 N Park Drive Suite 300 Hunt Valley, MD 21030
W H
IT
T
E N
B U
IL
D
IN
G
Scale: 1/8" = 1'-0"
1 LEVEL 01-SECURITY AREA B
I/R DATE DESCRIPTION
06.26.2020 40% SUBMISSION
07.15.2020 80% SUBMISSION
1 UTILIZE ALL EXISTING CONDUIT INFRASTRUCTURE WHEN APPLICABLE.
H
STORAGE
OBPA
101E.1
OBPA
STORAGE
OBPA
124E.1
OBPA
FILE ROOM
OBPA
125E
OBPA
STORAGE
OBPA
119E.1
OBPA
STORAGE
OBPA
135E.1
OBPA
STORAGE
OBPA
135E.2*
OBPA
MEN'S RESTROOM
BLDG CORE
L1-MR-121E
BLDG CORE
JANITOR'S CLOSET
BLDG CORE
137E
BLDG CORE
WOMEN'S RESTROOM
BLDG CORE
L1-WR-138E
BLDG CORECOPY/PRINT
OBPA
139E
OBPA
TELECOM
BLDG CORE
139E.1
BLDG CORE
STORAGE
OBPA
146E.1
OBPA
STORAGE
OBPA
140E.1
OBPA
STORAGE - COMPUTER
OBPA
145E
OBPA
OBPA
103E
OBPA
OBPA
124E
OBPA
L1-2 L1-1
L1-STR-1E
L1-3
HEALTH UNIT
DA-OO
100E
DA-OO
OBPA
148E
OBPA
L1-STR-2E
OFFICE
OBPA
101E
POLLARD
OBPA OFFICE
OBPA
104E
OCCUPIED
OBPA
OFFICE
OBPA
126E
VILLELA
OBPA
OFFICE
OBPA
127E
BECKWITH
OBPA
OFFICE
OBPA
128E
PREPETIT
OBPA
OFFICE
OBPA
129E
SFECLA
OBPA
OFFICE
OBPA
130E
PASTERNAK
OBPA
OFFICE
OBPA
131E
SMITH
OBPA
OFFICE
OBPA
113E
LYONS
OBPA
OFFICE
OBPA
114E
DAHL
OBPA
OFFICE
OBPA
116E
SMITH
OBPA
OFFICE
OBPA
132E
MAYNARD
OBPA
OFFICE
OBPA
133E
HOFFMAN
OBPA
OFFICE
OBPA
134E
ZITO
OBPA
OFFICE
OBPA
135E
DRUHAN
OBPA
OFFICE
OBPA
112E
BURNER
OBPA OFFICE
OBPA
115E
RUSSELL
OBPA
OFFICE
OBPA
111E
LUCERO
OBPA
OFFICE
OBPA
110E
SHEPPARD
OBPA
OFFICE
OBPA
109E
HELLER
OBPA
OFFICE
OBPA
108E
BARRIOS
OBPA
OFFICE
OBPA
107E
GREENLEE
OBPA
OFFICE
OBPA
106E
SEXTON
OBPA OFFICE
OBPA
117E
PATEL
OBPA
OFFICE
OBPA
120E
NELSON
OBPA
OFFICE
OBPA
118E
HERNANDEZ
OBPA
OFFICE
OBPA
119E
ERLEBACHER
OBPA
OFFICE
OBPA
146E
PERRY
OBPA
OFFICE
OBPA
147E
POPE-TRICE
OBPA
OFFICE
OBPA
142E
PAZ
OBPA
OFFICE
OBPA
143E
BARKDULL
OBPA
OFFICE
OBPA
144E
OCCUPIED
OBPA
OFFICE
OBPA
150E
JACOBS
OBPA
OFFICE
OBPA
151E
DOTSON
OBPA
OFFICE
OBPA
140E
POE
OBPA
OFFICE
OBPA
141E
HETRICK
OBPA
103E-A
JONES
103E-B
TUCKER
124E-A
VACANT
124E-B
VACANT 124E-C
VACANT
148E-B*
VACANT
148E-A*
OCCUPIED
149E-A*
OCCUPIED
605958575655545352515049484746454443424140
A
B
C
D
E
F
G
H
I
J
K
C5-053
TY5.000
C1-051
TY5.000
C1-052
TY5.000
C12-127
TY5.001
C1-050
TY5.000
C4-126
TY5.001
C12-128
TY5.001
C5-054
TY5.000
C10-129
TY5.001
C10-130
TY5.001
C10-131
TY5.001
C10-133
TY5.001
C12-132
TY5.001
KEY PLAN
A B
C
D
C
B
A
13 2456
D
C
B
A
13 2456
Printed on ___% Post-Consumer Recycled Content Paper
©2018 AECOM Corporation
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
CLIENT
CONSULTANT
PROJECT
LEVEL 01-AREA C
TY1.101.C
60634596
Washington, DC
USDA HQ VSS_UPGRADE
USDA OSSP
AECOM
4 N Park Drive Suite 300 Hunt Valley, MD 21030
W H
IT
T
E N
B U
IL
D
IN
G
Scale: 1/8" = 1'-0"
1 LEVEL 01-SECURITY AREA C
I/R DATE DESCRIPTION
06.26.2020 40% SUBMISSION
ML
ML
CONFERENCE
OASCR
509A.6
OASCR
OASCR
509A.1
OASCR
BUILDING CORE SPACE
BLDG CORE
510A.1*
BLDG CORE
WOMEN'S RESTROOM
BLDG CORE
L5-WR-512A
BLDG CORE
OASCR
511-A
OASCR
STORAGE
OSEC
560A
OSEC
STORAGE
OSEC
559A
OSEC
STORAGE - IT
OC
557A
OC
STORAGE - IT
OC
556A
OC
WORKROOM
OASCR
509A.3
OASCR
STORAGE
OASCR
505A
OASCR
BUILDING CORE SPACE
BLDG CORE
504A*
BLDG CORE
OPPE
506-A
OPPE
STORAGE
OTR
501A.1
OTR
STORAGE
OTR
501A.2
OTR
STORAGE
OASCR
509A.5
OASCR
CONFERENCE
OTR
500A
OTR
TELECOM
BLDG CORE
501A.7
BLDG CORE
BUILDING CORE SPACE
BLDG CORE
550A*
BLDG CORE
PANTRY
OC
548A
OC
MECHANICAL
BLDG CORE
548A.1
BLDG CORE
STORAGE - IT
OC
549A
OC
STORAGE - IT
OC
547A
OC
MEN'S RESTROOM
BLDG CORE
L5-MR-550A
BLDG CORE
BREAK ROOM
WHL
541A
WHL
CONFERENCE
WHL
534A
WHL
CONFERENCE
OPPE
528A
OPPE
BUILDING CORE SPACE
BLDG CORE
524A.3*
BLDG CORE
CONFERENCE
OPPE
523A
OPPE
OFFICE
RD
516A
OCCUPIED
RD
LACTATION ROOM
DA-OO
514A
DA-OO
OFFICE
WHL
536A.1*
OCCUPIED
WHL
OPEN PLAN AREA
OPPE
524A
OPPE
OPPE
520A
OPPE
RD
515A
RD
OPEN PLAN AREA
OASCR
507-A
OASCR
OGC-OE
502-A
OGC-OE
OPPE
501A.3
OPPE
OPEN PLAN AREA
OTR
501-A
OTR
L5-STR-5C
L5-6
L5-5
L5-STR-5B
515A-2*
OCCUPIED
L5-4
L5-STR-5A
OFFICE
OPPE
520A.2*
OCCUPIED
OPPE
OFFICE
OPPE
518A
BEATTY
OPPE RD
517A
RD
OFFICE
RD
513A
POWELL
RD
CONFERENCE
OSEC
510A
OSEC
OFFICE
OASCR
509A.2
OCCUPIED
OASCR
OFFICE
OTR
501A.6
OCCUPIED
OTR
OFFICE
WHL
542A
REID
WHL
OPEN PLAN AREA
WHL
540A
WHL
OFFICE
OPPE
535A
NICHOLAS
OPPE
OPEN PLAN AREA
WHL
536A
WHL
OFFICE
OPPE
532A
SHORTY
OPPE
OFFICE
OPPE
533A
VACANT
OPPE
OFFICE
OPPE
531A
HOLMES
OPPE
OFFICE
OPPE
529A
VACANT
OPPE
STORAGE
OPPE
501A.4
OPPE
OFFICE
OTR
501A.5
OCCUPIED
OTR
RD
545A
RD
OFFICE
WHL
543A
VACANT
WHL
OFFICE
OSEC
546A
OCCUPIED
OSEC
OFFICE
OSEC
544A
ASHTON
OSEC
OFFICE
OPPE
530A
PANIZO
OPPE
OFFICE
OASCR
509A.4
VACANT
OASCR
OFFICE
OPPE
506A-1
OCCUPIED
OPPE
OFFICE
OGC-OE
502A.1
OCCUPIED
OGC-OE
OFFICE
OASCR
562A
PICK
OASCR
OFFICE
OSEC
558A
OCCUPIED
OSEC
OFFICE
OSEC
561A
VELASQUEZ
OSEC
522A-1*
OCCUPIED
520A-1*
WELCH
507A-B
EDMONSON
507A-C
SANCHEZ
501A-E
OCCUPIED
501A-F
OCCUPIED
507A-A
VACANT
501A-A
CASTRO
501A-B
WUESTE
501A-H
VACANT
526A-8*
OCCUPIED
526A-7*
OCCUPIED
526A-6*
OCCUPIED
526A-3*
OCCUPIED
526A-2*
VACANT
526A-1*
VACANT
526A-4*
OCCUPIED
524A.-2*
OCCUPIED
524A-1*
VACANT
540A-A*
MANN
540A-B*
MILLER
501A-D
OCCUPIED
501A-G
OCCUPIED
501A-C
OCCUPIED
536A-A
OCCUPIED
515A-1*
OCCUPIED
502A-B
OCCUPIED502A-A
OCCUPIED
506-AA*
OCCUPIED
506-AB*
VACANT
501A-J*
VACANT
501A-K*
OCCUPIED
526A-5*
OCCUPIED
511-AB*
VACANT
511-AA*
KNISHKOWY
509A-1A*
OCCUPIED
545A-A
OCCUPIED
545A-B
OCCUPIED
517A-A*
OCCUPIED
517A-B*
OCCUPIED
WHITTEN _ LEVEL 5 - Occupancy
3736353433323130292827262524
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
MM
NN
C5-107
TY5.000
C5-112
TY5.000
C5-109
TY5.000
C1-108
TY5.000
C1-110
TY5.000
C1-111
TY5.000
C8-134
TY5.001
C8-135
TY5.001
KEY PLAN
A B
C
D
C
B
A
13 2456
D
C
B
A
13 2456
Printed on ___% Post-Consumer Recycled Content Paper
©2018 AECOM Corporation
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
CLIENT
CONSULTANT
PROJECT
LEVEL 05-AREA B
TY1.105.B
60634596
Washington, DC
USDA HQ VSS_UPGRADE
USDA OSSP
AECOM
4 N Park Drive Suite 300 Hunt Valley, MD 21030
W H
IT
T
E N
B U
IL
D
IN
G
Scale: 1/8" = 1'-0"
1 LEVEL 05-SECURITY AREA B
I/R DATE DESCRIPTION
06.26.2020 40% SUBMISSION
| Sheets |
| TY001 - SECURITY LEGEND & GENERAL NOTES |
| TY1.1B1.A - BASEMENT-AREA A |
| TY1.1B1.B - BASEMENT-AREA B |
| TY1.1B1.C - BASEMENT-AREA C |
| TY1.101.A - LEVEL 01-AREA A |
| TY1.101.B - LEVEL 01-AREA B |
| TY1.101.C - LEVEL 01-AREA C |
| TY1.102.A - LEVEL 02-AREA A |
| TY1.102.B - LEVEL 02-AREA B |
| TY1.102.C - LEVEL 02-AREA C |
| TY1.103.A - LEVEL 03-AREA A |
| TY1.103.B - LEVEL 03-AREA B |
| TY1.103.C - LEVEL 03-AREA C |
| TY1.104.A - LEVEL 04-AREA A |
| TY1.104.B - LEVEL 04-AREA B |
| TY1.104.C - LEVEL 04-AREA C |
| TY1.105.B - LEVEL 05-AREA B |
| TY5.000 - SECURITY DETAILS |
| TY5.001 - SECURITY DETAILS |
| TY6.000 - SECURITY SCHEDULE |
| TY6.001 - SECURITY SCHEDULE |
| TY6.002 - SECURITY DIAGRAM |
| Whitten_Camera_Project_2026_SOW.pdf |
| Task Objective |
| Support Need Statement |
| Place of Performance |
| Period of Performance |
| Points of Contact (POC) |
| Deliverables |
| Security Requirement |
| Processing |
| Evaluation |
| Technical Evaluation Process |
| Confidence Rating Process |
| Price Evaluation |
| Task Award |
| Physical Security |
| Professional Conduct While on Government Facilities |
| Inspection and Acceptance |
| Limitation of Authority |
| Submission of Invoices |
| Whitten Building Apron & Floorplans with camera Locations_4_22_26.pdf |
| Sheets |
| TY001 - SECURITY LEGEND & GENERAL NOTES |
| TY1.1B1.A - BASEMENT-AREA A |
| TY1.1B1.B - BASEMENT-AREA B |
| TY1.1B1.C - BASEMENT-AREA C |
| TY1.101.A - LEVEL 01-AREA A |
| TY1.101.B - LEVEL 01-AREA B |
| TY1.101.C - LEVEL 01-AREA C |
| TY1.102.A - LEVEL 02-AREA A |
| TY1.102.B - LEVEL 02-AREA B |
| TY1.102.C - LEVEL 02-AREA C |
| TY1.103.A - LEVEL 03-AREA A |
| TY1.103.B - LEVEL 03-AREA B |
| TY1.103.C - LEVEL 03-AREA C |
| TY1.104.A - LEVEL 04-AREA A |
| TY1.104.B - LEVEL 04-AREA B |
| TY1.104.C - LEVEL 04-AREA C |
| TY1.105.B - LEVEL 05-AREA B |
| TY5.000 - SECURITY DETAILS |
| TY5.001 - SECURITY DETAILS |
| TY6.000 - SECURITY SCHEDULE |
| TY6.001 - SECURITY SCHEDULE |
| TY6.002 - SECURITY DIAGRAM |
| Whitten_Camera_Project_2026_SOW1.pdf |
| Task Objective |
| Support Need Statement |
| Place of Performance |
| Period of Performance |
| Points of Contact (POC) |
| Deliverables |
| Security Requirement |
| Processing |
| Evaluation |
| Technical Evaluation Process |
| Confidence Rating Process |
| Price Evaluation |
| Task Award |
| Physical Security |
| Professional Conduct While on Government Facilities |
| Inspection and Acceptance |
| Limitation of Authority |
| Submission of Invoices |
| Whitten_Camera_Project_2026_SOW1.pdf |
| Task Objective |
| Support Need Statement |
| Place of Performance |
| Period of Performance |
| Points of Contact (POC) |
| Deliverables |
| Security Requirement |
| Processing |
| Evaluation |
| Technical Evaluation Process |
| Confidence Rating Process |
| Price Evaluation |
| Task Award |
| Physical Security |
| Professional Conduct While on Government Facilities |
| Inspection and Acceptance |
| Limitation of Authority |
| Submission of Invoices |
File details come from the government source that posted it. Updated .