Whitten Camera Project 2026 SOW DRAFT.pdf

PDF 1 MB Posted

Attached to
USDA WHITTEN CAMERA PROJECT
Solicitation number
FY26-015023
Issued by

About this file

This is a draft Statement of Work (SOW) for the Whitten Camera Project 2026, a video surveillance system upgrade at the USDA Whitten Building located at 1400 Independence Avenue SW, Washington, DC 20250.

The project requires installation of twelve new Avigilon cameras across three categories: three fixed interior cameras (two on 1st Floor Offices in Whitten Visitor Center 103A and one on 5th Floor Roof Access Door 507A), seven 4-way exterior cameras (two on Jefferson Lawns with 12' poles, one on Whitten Apron 2nd Floor as replacement, two on Whitten Apron with 18' poles as replacements, and two on Whitten Apron security gate boxes with 6' poles), and two pan-tilt-zoom (PTZ) cameras on Whitten Apron security gate boxes with 6' poles. The contractor must perform detailed site surveys, develop ground-trenching plans and cable-routing diagrams for USDA approval, procure all materials, install and configure cameras, provide 64GB SDXC Class 10 SD cards, integrate with existing Extron video wall systems, comply with NECA 1 and BICSI standards, and provide comprehensive documentation including as-built drawings in AutoCAD and PDF formats. The contractor must hold current Avigilon VAR certification with qualified IP security systems staff. The period of performance is 120 days from award, with deliverables due at 10 days (material procurement), every 10 days thereafter (progress reports), and 120 days (site commissioning with system testing and certifications). Evaluation criteria include technical acceptability, confidence rating (Substantial, Satisfactory, Limited, or No Confidence), and price reasonableness based on cost realism. The contractor shall submit invoices through www.ipp.gov and coordinate with Project Manager Mike O'Connor and Technical Point of Contact Dwain Countiss.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft

Whitten Camera Project

Task Objective

OSSP, under direction from the Office of the Secretary of Agriculture office, is seeking to strengthen Avigilon video surveillance coverage at the Whitten Buildings by installing (12) new cameras in locations identified as major security vulnerabilities which will resolve the immediate gaps in visibility coverage at the Whitten facility and strengthen the ability to detect, deter, and respond to security incidents with greater speed and accuracy. The Contractor shall perform a detailed site survey of each location and procure, install, and configure all required cameras. This includes furnishing all Avigilon Video Surveillance System (VSS) devices, equipment, mounting hardware, poles, and any additional materials necessary for both interior and exterior deployment. As part of the site survey, the Contractor shall determine all required cable routes and pathways. The Contractor shall develop and submit proposed ground-trenching plans, cable-routing diagrams, and pathway designs to USDA for review and approval. Upon approval, the Contractor is responsible for procuring all materials and completing all work associated with the approved pathways, routes, and ground trenching. All work must comply with USDA standards, applicable building requirements, and industry best practices. Contractor is also responsible for obtaining all required cameras licenses and permits, including but not limited to building, local, and state permits, necessary to complete the work. Due to the facility’s critical operational function and its historic design is very important, each installation location must adhere to established guidelines to ensure the work remains as aesthetically pleasing as possible and maintains the sites overall historical continuity.

• 3 Fixed Camera Locations o 1st Floor Offices – 2 Whitten Visitor Center 103A o 5th Floor Roof Access Door– 507A

• 7 4-Way Exterior Camera Locations o 1 Camera in the East Wing Jefferson Lawn on 12’ camera poles o 1 Camera in the West Wing Jefferson Lawn on 12’ camera poles o 1 Camera on the Whitten Apron 2nd Floor on extension mount off building replacing existing camera o 2 Cameras on the Whitten Apron on 18’ camera poles, replacing existing poles installed o 2 Cameras on the Whitten Apron security gate boxes on 6’ camera poles o

• 2 PTZ Camera Locations o 2 PTZ Cameras Whitten Apron security gate boxes on 6’ camera poles

Support Need Statement

1.1 Contractor will procure and install all wiring, fiber optic cable and electrical power necessary to provide control of both fixed and pan/tilt/zoom (PTZ) cameras, install all cabling necessary to connect cameras to switches and/or routers in the identified telecom closets. All cabling will be installed in accordance with the manufacturer’s installation instructions. Contractors shall coordinate with OSSP to determine the optimal field of view for each newly installed camera.

1.2 Contractor will purchase, install, and configure 64GB SDXC Class 10 SD cards for all newly deployed cameras. This effort will ensure continuous data retention during outages, communication failures, or other system disruptions.

1.3 Contractor will be responsible for supplying, installing, and programming all cameras, camera licenses, related devices, software, and head-end equipment required to deliver a fully functioning system. The Contractor shall also ensure that all additions or configuration changes made to the Video Surveillance System (VSS) are fully aligned with the existing Extron video wall system, maintaining seamless operation and synchronization between the two systems.

1.4 Contractor will provide point-to-point labeling for all associated devices and install all communication racks, frames, and enclosures used to house NVRs and network switches. All work must comply with NECA 1 standards, the BICSI Telecommunications Distribution Methods Manual (TDMM) for communications equipment space layout, and the BICSI Information Technology Systems Installation Methods Manual (ITSIMM) for installation practices within communications equipment spaces.

1.5 The contractor will coordinate with USDA/OCIO- CEC to identify the nearest telecommunications closets for integrating the new cameras into the existing network. The contractor will then configure all cameras into the existing Avigilon VSS platform currently operating on the USDA network infrastructure.

1.6 Contractor will provide all final system documentation, including as-built drawings in AutoCAD and PDF format, software licenses, system passwords, manufacturer installation and troubleshooting guides, reference books, and physical keys. In addition, the Contractor shall provide all applicable warranty documentation, including assurance plans and extended-warranty options.

1.7 The contractor must hold current Avigilon VAR certification and be authorized to provide sales, system design, installation, and ongoing support for Avigilon high-definition surveillance solutions. All assigned staff must be vetted and possess specialized knowledge in IP security systems, video analytics, Avigilon Control Center (ACC) and Unity software environments

1.8 Contractor will coordinate with OSSP/FPD to identify and approved evaluation criteria and complete performance and closeout testing of all devices.

Place of Performance Whitten Building, 1400 Independence Ave. SW. Washington, DC 20250

Period of Performance The Period of Performance will be 120 days from date of award.

Points of Contact (POC) Project Manager:

Mike O’Connor, (202) 997-3801, mike.oconnor@usda.gov 1400 Independence Ave, SW Room 1420, Washington, DC 20250

Technical Point of Contact (TPOC):

Dwain Countiss, (202) 690-0216, dwain.countiss@usda.gov 1400 Independence Ave, SW Room 1409, Washington, DC 20250

Deliverables The required deliverables associated with this work shall be provided in the below table, accompanied by a brief description and the deliverable due date:

Item No. Deliverable Objective Due

1 Material Procurement and Lead Time Order Materials 10 days after award

2 Reports Summarize installation progress, equipment ordered, meetings, and problems encountered.

and every 10 days thereafter until site commissioning

3 Site Commissioning/100%

Conduct system tests witnessed by PM/TPOCs, where appropriate;

provide certifications that the new system passed the test plan.

120 days after award mailto:mike.oconnor@usda.gov mailto:dwain.countiss@usda.gov

Security Requirement Unclassified.

Processing The work statement provided will be used to establish the Statement of Work (SOW) for vendor response, and to govern the overall support activity that vendors will be expected to deliver for the ordering activity.

The SOW will be submitted to vendors to solicit a response. Vendors may ask questions to clarify the support need. In some cases, the vendors may require a Site Visit to review the location where the work is to be performed, and to obtain a full understanding of the work that needs to be accomplished.

Evaluation The Government will award an agreement resulting from the solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government. The following factors shall be used to evaluate offers:

• Technical – An offer must be technically acceptable to be considered for award.

• Confidence Rating – An offer will be reviewed, and a confidence assessment score provided

• Price – the offer will be reviewed for price reasonableness The most advantageous response will be the response that offers the highest confidence rating and most reasonable price.

The specific evaluation processes are as follows:

Technical Evaluation Process The evaluation will utilize a review team of at least two assigned team members assigned this responsibility by the Contracting Officer. These team members will identify whether the response from the vendor is Acceptable or Unacceptable. An Acceptable determination will be provided if it responds affirmatively to all minimum requirements contained in the solicitation materials. Two of the three team members must rate the proposal as acceptable to permit an Acceptable rating. As a response deemed Acceptable by the technical evaluation team indicates a vendor that has demonstrated capability to accomplish the scope of work, it will be provided to the Contracting Officer for subsequent evaluation.

Any Unacceptable rating will be provided a full description of the following for the BPA Contracting Officer’s review:

• Weakness – a flaw in the proposal that increases the risk of unsuccessful contract performance, and the specific identification of the flaw

• Significant Weakness – a proposal flaw that appreciably increases the risk of unsuccessful contract performance, and the specific identification of the flaw

• Deficiency – a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level, and the specific identification of the material failure or combination of weaknesses in the proposal

An Unacceptable rating will be shared with the vendors as part of a Notice to Unsuccessful Offerors, accompanied with the evaluation team findings as described above.

Confidence Rating Process The Contracting Officer will review the response and will assess a confidence rating. The following adjectival rating guidelines will be used when subjectively assessing vendor responses:

Confidence Assessment Rating Description

SUBSTANTIAL

CONFIDENCE

Based on the offeror’s response, the government has a high expectation that the offeror will successfully perform the required effort.

SATISFACTORY

CONFIDENCE

Based on the offeror’s response, the government has an expectation that the offeror will successfully perform the required effort.

LIMITED

CONFIDENCE

Based on the offeror’s response, the government has a low expectation that the offeror will successfully perform the required effort.

NO

CONFIDENCE

Based on the offeror’s response, the government has no expectation that the offeror will be able to successfully perform the required effort.

Price Evaluation The Contracting Officer shall evaluate all offers price submissions to validate them as being fair and reasonable and representing cost realism. Offerors are direct to FAR 2.101(b) for a definition of “cost realism”, which states:

“Cost realism” means that the costs in an offeror’s proposal—

(1) Are realistic for the work to be performed.

(2) Reflect a clear understanding of the requirements; and

(3) Are consistent with the various elements of the offeror’s technical proposal

Vendor submissions that are either too low or too high will be deemed unreasonable or incorporating too much risk for the government to accept. Pricing is expected to align with the level of effort determinations provided by the ordering activity.

NOTE: Ordering activities that do not utilize a schedule of materials, and permit vendors to identify the materials needed, accept the expertise of these vendors to satisfy the support need or ordering requirements. In such cases, the price evaluation will not take into consideration the cost of materials in the determination of price reasonableness.

Task Award Once a vendor is selected for award by the Contracting Officer, the vendor shall be notified and will directly coordinate with the POCs to engage the work and/or support need

Physical Security The Contractor shall be responsible for safeguarding all Government property and data made available for Contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

Professional Conduct While on Government Facilities Contractor employees shall observe and maintain themselves in accordance with professional standards according to their location. Attire should be consistent with professional standards. They shall not engage in private activities for personal gain or any other unauthorized purpose while on Government-owned or leased property, nor may Government time or equipment be utilized for these purposes.

Inspection and Acceptance Work and work schedules will be cooperative efforts between the Technical Point of Contact (TPOC), the Program Manager (PM), and/ or the contractor.

The Government shall review deliverables for conformance with this statement of work and all referenced documents for completeness and accuracy. The Government will provide comments to the contractor within three working days after receipt of a draft deliverable. The contractor will provide corrections and deliver a revised deliverable within three working days of Government comments. For the purpose of this statement of work, workdays do not include weekends and federal holidays.

Contractor shall document any open issues, possible problems, or any other items that could hinder the performance of the project along with deliverables. Furthermore, resolutions to known problems or foreseen problems/issues shall be included in all deliverables submitted. Any open issues that need to be addressed shall be included and communicated to the Government once they are known for possible resolution.

Limitation of Authority The government assigned Project or Program Manager, Task POC, or COR are responsible for monitoring the Contractor’s performance. Any proposed modifications to the task order, such as changes to the scope of work, or to the terms and conditions of the task order must be authorized by the Contracting Officer.

Submission of Invoices The contractor shall submit to the Project Manager and/or COR an invoice with a description of the services/supplies provided in the previous period. The government shall review the invoice to ensure the services/supplies have been delivered and are acceptable, and that the invoice amount is correct. Before payment is made, the government must indicate validation. The Contractor shall submit all invoices through www.ipp.gov for the Contracting Officer approval and for payment.

http://www.ipp.gov/

Whitten Building VSS Camera Locations & Model Types:

• 3 Fixed Camera Locations o 1st Floor Offices – 2 Whitten Visitor Center 103A (Page 5) o 5th Floor Roof Access Door– 507A (Page 16)

• 7 4-Way Exterior Camera Locations o 1 Camera in the East Wing Jefferson Lawn (Page 4) o 1 Camera in the West Wing Jefferson Lawn (Page 6) o 5 Cameras on the Whitten Apron (Page 5)

• 2 PTZ Camera Locations o 2 PTZ Cameras in the Whitten entrance (Page 5)

H

WAITING AREA

OIG

148W

OIG

STORAGE

OIG

146W.1

OIG

COPY/PRINT

OCFO

141W

OCFO

TELECOM

BLDG CORE

140W.2

BLDG CORE

WOMEN'S RESTROOM

BLDG CORE

L1-WR-138W

BLDG CORE

JANITOR'S CLOSET

BLDG CORE

137W

BLDG CORE

MEN'S RESTROOM

BLDG CORE

L1-MR-121W

BLDG CORE

STORAGE

OBPA

135W.1

OBPA

STORAGE

OBPA

135W.2

OBPA

FILE ROOM

OIG

116-W.1*

OIG

COPY/PRINT

OIG

116W

OIG

CONFERENCE

OIG

113W

OIG

OFFICE

OIG

110W

OCCUPIED

OIG

CONFERENCE

OGC

105W

OGC

STORAGE

BLDG CORE

123W.1

BLDG CORE

STORAGE

OGC

101W.1

OGC

STORAGE

OSEC

100W

OSEC

OGC

107W

OGC

OBPA

126W

OBPA

OIG

117W

OIG

OCFO

143W

OCFO

L1-9 L1-8

L1-STR-2W L1-STR-1W

L1-7

OFFICE

OIG

151W

OCCUPIED

OIG

OFFICE

OIG

149W

PARADIS

OIG

OFFICE

OIG

147W

COFFEY

OIG

OFFICE

OIG

146W

MONACO

OIG

OFFICE

OCFO

145W

VACANT

OCFO

OFFICE

OCFO

140W

MOANEY

OCFO

OFFICE

OCFO

139W

OCCUPIED

OCFO

OFFICE

OIG

120W

BOYD

OIG

OFFICE

OIG

117-W.1*

FONG

OIG OFFICE

OIG

114W

OCCUPIED

OIG

OFFICE

OIG

111W

THOMPSON

OIG

OFFICE

OGC

123W

OCCUPIED

OGC

OFFICE

OBPA

124W

OCCUPIED

OBPA

OFFICE

OBPA

128W

OCCUPIED

OBPA

OFFICE

OBPA

129W

ZIEGLER

OBPA

OFFICE

OBPA

130W

YORK

OBPA

OFFICE

OBPA

131W

MURRY

OBPA

OFFICE

OBPA

132W

JOHNSON

OBPA

OFFICE

OBPA

133W

STAIERT

OBPA

OFFICE

OBPA

134W

KUSKE

OBPA

OFFICE

OBPA

135W

MAHAN

OBPA

OFFICE

OGC

108W

VADEN

OGC

OFFICE

OGC

103W

CARRINGTON

OGC

OFFICE

OGC

102W

CLARKSON

OGC

OFFICE

OGC

101W

BUMBARY-LANGSTON

OGC

143W-A

OCCUPIED

143W-B

COATES

117W-A

RUBITO

117W-B

ANGEL

126W-C

OCCUPIED

126W-B

OCCUPIED

126W-A

OCCUPIED

107W-A

SMITH

107W-B

STEPHENS

126W-D*

OCCUPIED

212019181716151413121110987654321

DD

EE

FF

GG

HH

II

JJ

KK

LL

MM

NN

A

B

C

D

E

F

G

H

I

J

K

C1-030

TY5.000

C5-031

TY5.000

C7-115

TY5.001

C1-029

TY5.000

C4-114

TY5.001

C12-113

TY5.001

C5-032

TY5.000

C1-028

TY5.000

C10-116

TY5.001

C10-117

TY5.001

KEY PLAN

A B

C

D

C

B

A

13 2456

D

C

B

A

13 2456

Printed on ___% Post-Consumer Recycled Content Paper

©2018 AECOM Corporation

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

CLIENT

CONSULTANT

PROJECT

LEVEL 01-AREA A

TY1.101.A

60634596

Washington, DC

USDA HQ VSS_UPGRADE

USDA OSSP

AECOM

4 N Park Drive Suite 300 Hunt Valley, MD 21030

W H

IT

T

E N

B U

IL

D

IN

G

Scale: 1/8" = 1'-0"

1 LEVEL 01-SECURITY AREA A

I/R DATE DESCRIPTION

06.26.2020 40% SUBMISSION

07.15.2020 80% SUBMISSION

07.30.2020 100% SUBMISSION

ML ML

STORAGE

OSEC

104A.1*

OSEC

BRIEFING ROOM

OSEC

104A

OSEC

INTERPRETER ROOM

OSEC

105A*

OSEC

TELECOM

BLDG CORE

106A.3*

BLDG CORE

STORAGE

BLDG CORE

105A.1*

BLDG CORE

ELECTRICAL

BLDG CORE

106A.1*

BLDG CORE

ELECTRICAL

BLDG CORE

106A

BLDG CORE

STORAGE

BLDG CORE

106A.2*

BLDG CORE

VISITOR CENTER

DA-OO

103A

DA-OO

PANTRY

OBPA

101A.2*

OBPA

ELECTRICAL

BLDG CORE

101A.3*

BLDG CORE

PATIO

BLDG CORE

100A*

BLDG CORE

STORAGE

BLDG CORE

128A-W*

BLDG CORE

WOMEN'S RESTROOM

BLDG CORE

L1-WR-124A

BLDG CORE

CONFERENCE

OCE

108A

OCE

ELECTRICAL

BLDG CORE

112A.7*

BLDG CORE

STORAGE

OCE

113A

OCE

PANTRY

OCE

112A.2*

OCE

MECHANICAL

BLDG CORE

112A.3*

BLDG CORE

STORAGE

OES

119A.2*

OES

A/V ROOM

OES

121A.1*

OES

CONFERENCE

OES

121A

OES

MEN'S RESTROOM

BLDG CORE

L1-MR-123A

BLDG CORE

JANITOR'S CLOSET

BLDG CORE

124A-W*

BLDG CORE

OPEN PLAN AREA

OBPA

101A

OBPA

OCE

112A

OCE

OPEN PLAN AREA

OES

119A

OES

WAITING AREA

OES

116A

OES

STORAGE

OES

119A.1*

OES

L1-5*

L1-6*

PRESS ROOM

OSEC

107A

OSEC

L1-STR-1A*

SHAFT

BLDG CORE

L1-S-1900

BLDG CORE

L1-4*

SHAFT

BLDG CORE

L1-S-1901

BLDG CORE

STORAGE

DA-OO

103-A.1*

DA-OO

ELECTRICAL

BLDG CORE

103-A.2*

BLDG CORE

OFFICE

OCE

110A

OCCUPIED

OCE

OFFICE

OCE

111A.2*

OCCUPIED

OCE

OFFICE

OCE

111A.3*

OCCUPIED

OCE

OFFICE

OCE

112A.4*

OCCUPIED

OCE

OFFICE

OCE

112A.5*

OCCUPIED

OCE

OFFICE

OCE

112A.6*

OCCUPIED

OCE

OFFICE

OES

119A.5*

OCCUPIED

OES

OFFICE

OES

119A.3*

LINDSEY

OES

OFFICE

OES

119A.4*

GIBSON

OES

OFFICE

OBPA

101A.1*

NAVARRO

OBPA

OFFICE

OBPA

REHREN

OBPA

OFFICE

DA-OO

115A

OCCUPIED

DA-OO

OFFICE

OCE

111A

OCCUPIED

OCE

OFFICE

DA-OO

102-A

OCCUPIED

DA-OO

OFFICE

OES

119A.6*

KOSS

OES

112A-A*

OCCUPIED

112A-B*

OCCUPIED

119A-E*

VILORAS

119A-F*

VACANT

119A-N*

ROSS

119A-K*

VACANT

119A-I*

OCCUPIED

119A-U*

CLEMONS

119A-Q*

OCCUPIED

119A-H*

SCAFF

119A-R*

TALERO

119A-T*

CARDENAS

101A-A*

NORMAN

101A-B*

OCCUPIED

119A-O*

OCCUPIED

119A-L*

OCCUPIED

119A-S*

VACANT

119A-P*

VACANT

119A-M*

KINGSBERRY

119A-J*

VACANT

119A-G*

GOGNIAT

119A-B*

OCCUPIED

119A-A*

GERALD

119A-C*

VACANT

119A-D*

SimpsonJr

3736353433323130292827262524

AA

BB

CC

DD

EE

FF

GG

HH

II

JJ

KK

LL

MM

NN

A

B

C

D

E

F

G

H

I

J

C5-036

TY5.000

C5-037

TY5.000

C5-039

TY5.000

C5-033

TY5.000

C5-034

TY5.000

C5-035

TY5.000

C11-118

TY5.001

C11-119

TY5.001

C11-121

TY5.001

C5-038

TY5.000

C11-120

TY5.001

C5-041

TY5.000

C5-040

TY5.000

C5-042

TY5.000

C5-044

TY5.000

C5-043

TY5.000

C10-125

TY5.001

C10-124

TY5.001

C12-122

TY5.001

C12-123

TY5.001

C5-045

TY5.000

C5-046

TY5.000

C5-048

TY5.000

C5-047

TY5.000

C5-049

TY5.000

VS-003

KEY PLAN

A B

C

SHEET KEYNOTES

D

C

B

A

13 2456

D

C

B

A

13 2456

Printed on ___% Post-Consumer Recycled Content Paper

©2018 AECOM Corporation

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

CLIENT

CONSULTANT

PROJECT

LEVEL 01-AREA B

TY1.101.B

60634596

Washington, DC

USDA HQ VSS_UPGRADE

USDA OSSP

AECOM

4 N Park Drive Suite 300 Hunt Valley, MD 21030

W H

IT

T

E N

B U

IL

D

IN

G

Scale: 1/8" = 1'-0"

1 LEVEL 01-SECURITY AREA B

I/R DATE DESCRIPTION

06.26.2020 40% SUBMISSION

07.15.2020 80% SUBMISSION

1 UTILIZE ALL EXISTING CONDUIT INFRASTRUCTURE WHEN APPLICABLE.

H

STORAGE

OBPA

101E.1

OBPA

STORAGE

OBPA

124E.1

OBPA

FILE ROOM

OBPA

125E

OBPA

STORAGE

OBPA

119E.1

OBPA

STORAGE

OBPA

135E.1

OBPA

STORAGE

OBPA

135E.2*

OBPA

MEN'S RESTROOM

BLDG CORE

L1-MR-121E

BLDG CORE

JANITOR'S CLOSET

BLDG CORE

137E

BLDG CORE

WOMEN'S RESTROOM

BLDG CORE

L1-WR-138E

BLDG CORECOPY/PRINT

OBPA

139E

OBPA

TELECOM

BLDG CORE

139E.1

BLDG CORE

STORAGE

OBPA

146E.1

OBPA

STORAGE

OBPA

140E.1

OBPA

STORAGE - COMPUTER

OBPA

145E

OBPA

OBPA

103E

OBPA

OBPA

124E

OBPA

L1-2 L1-1

L1-STR-1E

L1-3

HEALTH UNIT

DA-OO

100E

DA-OO

OBPA

148E

OBPA

L1-STR-2E

OFFICE

OBPA

101E

POLLARD

OBPA OFFICE

OBPA

104E

OCCUPIED

OBPA

OFFICE

OBPA

126E

VILLELA

OBPA

OFFICE

OBPA

127E

BECKWITH

OBPA

OFFICE

OBPA

128E

PREPETIT

OBPA

OFFICE

OBPA

129E

SFECLA

OBPA

OFFICE

OBPA

130E

PASTERNAK

OBPA

OFFICE

OBPA

131E

SMITH

OBPA

OFFICE

OBPA

113E

LYONS

OBPA

OFFICE

OBPA

114E

DAHL

OBPA

OFFICE

OBPA

116E

SMITH

OBPA

OFFICE

OBPA

132E

MAYNARD

OBPA

OFFICE

OBPA

133E

HOFFMAN

OBPA

OFFICE

OBPA

134E

ZITO

OBPA

OFFICE

OBPA

135E

DRUHAN

OBPA

OFFICE

OBPA

112E

BURNER

OBPA OFFICE

OBPA

115E

RUSSELL

OBPA

OFFICE

OBPA

111E

LUCERO

OBPA

OFFICE

OBPA

110E

SHEPPARD

OBPA

OFFICE

OBPA

109E

HELLER

OBPA

OFFICE

OBPA

108E

BARRIOS

OBPA

OFFICE

OBPA

107E

GREENLEE

OBPA

OFFICE

OBPA

106E

SEXTON

OBPA OFFICE

OBPA

117E

PATEL

OBPA

OFFICE

OBPA

120E

NELSON

OBPA

OFFICE

OBPA

118E

HERNANDEZ

OBPA

OFFICE

OBPA

119E

ERLEBACHER

OBPA

OFFICE

OBPA

146E

PERRY

OBPA

OFFICE

OBPA

147E

POPE-TRICE

OBPA

OFFICE

OBPA

142E

PAZ

OBPA

OFFICE

OBPA

143E

BARKDULL

OBPA

OFFICE

OBPA

144E

OCCUPIED

OBPA

OFFICE

OBPA

150E

JACOBS

OBPA

OFFICE

OBPA

151E

DOTSON

OBPA

OFFICE

OBPA

140E

POE

OBPA

OFFICE

OBPA

141E

HETRICK

OBPA

103E-A

JONES

103E-B

TUCKER

124E-A

VACANT

124E-B

VACANT 124E-C

VACANT

148E-B*

VACANT

148E-A*

OCCUPIED

149E-A*

OCCUPIED

605958575655545352515049484746454443424140

A

B

C

D

E

F

G

H

I

J

K

C5-053

TY5.000

C1-051

TY5.000

C1-052

TY5.000

C12-127

TY5.001

C1-050

TY5.000

C4-126

TY5.001

C12-128

TY5.001

C5-054

TY5.000

C10-129

TY5.001

C10-130

TY5.001

C10-131

TY5.001

C10-133

TY5.001

C12-132

TY5.001

KEY PLAN

A B

C

D

C

B

A

13 2456

D

C

B

A

13 2456

Printed on ___% Post-Consumer Recycled Content Paper

©2018 AECOM Corporation

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

CLIENT

CONSULTANT

PROJECT

LEVEL 01-AREA C

TY1.101.C

60634596

Washington, DC

USDA HQ VSS_UPGRADE

USDA OSSP

AECOM

4 N Park Drive Suite 300 Hunt Valley, MD 21030

W H

IT

T

E N

B U

IL

D

IN

G

Scale: 1/8" = 1'-0"

1 LEVEL 01-SECURITY AREA C

I/R DATE DESCRIPTION

06.26.2020 40% SUBMISSION

ML

ML

CONFERENCE

OASCR

509A.6

OASCR

OASCR

509A.1

OASCR

BUILDING CORE SPACE

BLDG CORE

510A.1*

BLDG CORE

WOMEN'S RESTROOM

BLDG CORE

L5-WR-512A

BLDG CORE

OASCR

511-A

OASCR

STORAGE

OSEC

560A

OSEC

STORAGE

OSEC

559A

OSEC

STORAGE - IT

OC

557A

OC

STORAGE - IT

OC

556A

OC

WORKROOM

OASCR

509A.3

OASCR

STORAGE

OASCR

505A

OASCR

BUILDING CORE SPACE

BLDG CORE

504A*

BLDG CORE

OPPE

506-A

OPPE

STORAGE

OTR

501A.1

OTR

STORAGE

OTR

501A.2

OTR

STORAGE

OASCR

509A.5

OASCR

CONFERENCE

OTR

500A

OTR

TELECOM

BLDG CORE

501A.7

BLDG CORE

BUILDING CORE SPACE

BLDG CORE

550A*

BLDG CORE

PANTRY

OC

548A

OC

MECHANICAL

BLDG CORE

548A.1

BLDG CORE

STORAGE - IT

OC

549A

OC

STORAGE - IT

OC

547A

OC

MEN'S RESTROOM

BLDG CORE

L5-MR-550A

BLDG CORE

BREAK ROOM

WHL

541A

WHL

CONFERENCE

WHL

534A

WHL

CONFERENCE

OPPE

528A

OPPE

BUILDING CORE SPACE

BLDG CORE

524A.3*

BLDG CORE

CONFERENCE

OPPE

523A

OPPE

OFFICE

RD

516A

OCCUPIED

RD

LACTATION ROOM

DA-OO

514A

DA-OO

OFFICE

WHL

536A.1*

OCCUPIED

WHL

OPEN PLAN AREA

OPPE

524A

OPPE

OPPE

520A

OPPE

RD

515A

RD

OPEN PLAN AREA

OASCR

507-A

OASCR

OGC-OE

502-A

OGC-OE

OPPE

501A.3

OPPE

OPEN PLAN AREA

OTR

501-A

OTR

L5-STR-5C

L5-6

L5-5

L5-STR-5B

515A-2*

OCCUPIED

L5-4

L5-STR-5A

OFFICE

OPPE

520A.2*

OCCUPIED

OPPE

OFFICE

OPPE

518A

BEATTY

OPPE RD

517A

RD

OFFICE

RD

513A

POWELL

RD

CONFERENCE

OSEC

510A

OSEC

OFFICE

OASCR

509A.2

OCCUPIED

OASCR

OFFICE

OTR

501A.6

OCCUPIED

OTR

OFFICE

WHL

542A

REID

WHL

OPEN PLAN AREA

WHL

540A

WHL

OFFICE

OPPE

535A

NICHOLAS

OPPE

OPEN PLAN AREA

WHL

536A

WHL

OFFICE

OPPE

532A

SHORTY

OPPE

OFFICE

OPPE

533A

VACANT

OPPE

OFFICE

OPPE

531A

HOLMES

OPPE

OFFICE

OPPE

529A

VACANT

OPPE

STORAGE

OPPE

501A.4

OPPE

OFFICE

OTR

501A.5

OCCUPIED

OTR

RD

545A

RD

OFFICE

WHL

543A

VACANT

WHL

OFFICE

OSEC

546A

OCCUPIED

OSEC

OFFICE

OSEC

544A

ASHTON

OSEC

OFFICE

OPPE

530A

PANIZO

OPPE

OFFICE

OASCR

509A.4

VACANT

OASCR

OFFICE

OPPE

506A-1

OCCUPIED

OPPE

OFFICE

OGC-OE

502A.1

OCCUPIED

OGC-OE

OFFICE

OASCR

562A

PICK

OASCR

OFFICE

OSEC

558A

OCCUPIED

OSEC

OFFICE

OSEC

561A

VELASQUEZ

OSEC

522A-1*

OCCUPIED

520A-1*

WELCH

507A-B

EDMONSON

507A-C

SANCHEZ

501A-E

OCCUPIED

501A-F

OCCUPIED

507A-A

VACANT

501A-A

CASTRO

501A-B

WUESTE

501A-H

VACANT

526A-8*

OCCUPIED

526A-7*

OCCUPIED

526A-6*

OCCUPIED

526A-3*

OCCUPIED

526A-2*

VACANT

526A-1*

VACANT

526A-4*

OCCUPIED

524A.-2*

OCCUPIED

524A-1*

VACANT

540A-A*

MANN

540A-B*

MILLER

501A-D

OCCUPIED

501A-G

OCCUPIED

501A-C

OCCUPIED

536A-A

OCCUPIED

515A-1*

OCCUPIED

502A-B

OCCUPIED502A-A

OCCUPIED

506-AA*

OCCUPIED

506-AB*

VACANT

501A-J*

VACANT

501A-K*

OCCUPIED

526A-5*

OCCUPIED

511-AB*

VACANT

511-AA*

KNISHKOWY

509A-1A*

OCCUPIED

545A-A

OCCUPIED

545A-B

OCCUPIED

517A-A*

OCCUPIED

517A-B*

OCCUPIED

WHITTEN _ LEVEL 5 - Occupancy

3736353433323130292827262524

AA

BB

CC

DD

EE

FF

GG

HH

II

JJ

KK

LL

MM

NN

C5-107

TY5.000

C5-112

TY5.000

C5-109

TY5.000

C1-108

TY5.000

C1-110

TY5.000

C1-111

TY5.000

C8-134

TY5.001

C8-135

TY5.001

KEY PLAN

A B

C

D

C

B

A

13 2456

D

C

B

A

13 2456

Printed on ___% Post-Consumer Recycled Content Paper

©2018 AECOM Corporation

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

CLIENT

CONSULTANT

PROJECT

LEVEL 05-AREA B

TY1.105.B

60634596

Washington, DC

USDA HQ VSS_UPGRADE

USDA OSSP

AECOM

4 N Park Drive Suite 300 Hunt Valley, MD 21030

W H

IT

T

E N

B U

IL

D

IN

G

Scale: 1/8" = 1'-0"

1 LEVEL 05-SECURITY AREA B

I/R DATE DESCRIPTION

06.26.2020 40% SUBMISSION

Sheets
TY001 - SECURITY LEGEND & GENERAL NOTES
TY1.1B1.A - BASEMENT-AREA A
TY1.1B1.B - BASEMENT-AREA B
TY1.1B1.C - BASEMENT-AREA C
TY1.101.A - LEVEL 01-AREA A
TY1.101.B - LEVEL 01-AREA B
TY1.101.C - LEVEL 01-AREA C
TY1.102.A - LEVEL 02-AREA A
TY1.102.B - LEVEL 02-AREA B
TY1.102.C - LEVEL 02-AREA C
TY1.103.A - LEVEL 03-AREA A
TY1.103.B - LEVEL 03-AREA B
TY1.103.C - LEVEL 03-AREA C
TY1.104.A - LEVEL 04-AREA A
TY1.104.B - LEVEL 04-AREA B
TY1.104.C - LEVEL 04-AREA C
TY1.105.B - LEVEL 05-AREA B
TY5.000 - SECURITY DETAILS
TY5.001 - SECURITY DETAILS
TY6.000 - SECURITY SCHEDULE
TY6.001 - SECURITY SCHEDULE
TY6.002 - SECURITY DIAGRAM
Whitten_Camera_Project_2026_SOW.pdf
Task Objective
Support Need Statement
Place of Performance
Period of Performance
Points of Contact (POC)
Deliverables
Security Requirement
Processing
Evaluation
Technical Evaluation Process
Confidence Rating Process
Price Evaluation
Task Award
Physical Security
Professional Conduct While on Government Facilities
Inspection and Acceptance
Limitation of Authority
Submission of Invoices
Whitten Building Apron & Floorplans with camera Locations_4_22_26.pdf
Sheets
TY001 - SECURITY LEGEND & GENERAL NOTES
TY1.1B1.A - BASEMENT-AREA A
TY1.1B1.B - BASEMENT-AREA B
TY1.1B1.C - BASEMENT-AREA C
TY1.101.A - LEVEL 01-AREA A
TY1.101.B - LEVEL 01-AREA B
TY1.101.C - LEVEL 01-AREA C
TY1.102.A - LEVEL 02-AREA A
TY1.102.B - LEVEL 02-AREA B
TY1.102.C - LEVEL 02-AREA C
TY1.103.A - LEVEL 03-AREA A
TY1.103.B - LEVEL 03-AREA B
TY1.103.C - LEVEL 03-AREA C
TY1.104.A - LEVEL 04-AREA A
TY1.104.B - LEVEL 04-AREA B
TY1.104.C - LEVEL 04-AREA C
TY1.105.B - LEVEL 05-AREA B
TY5.000 - SECURITY DETAILS
TY5.001 - SECURITY DETAILS
TY6.000 - SECURITY SCHEDULE
TY6.001 - SECURITY SCHEDULE
TY6.002 - SECURITY DIAGRAM
Whitten_Camera_Project_2026_SOW1.pdf
Task Objective
Support Need Statement
Place of Performance
Period of Performance
Points of Contact (POC)
Deliverables
Security Requirement
Processing
Evaluation
Technical Evaluation Process
Confidence Rating Process
Price Evaluation
Task Award
Physical Security
Professional Conduct While on Government Facilities
Inspection and Acceptance
Limitation of Authority
Submission of Invoices
Whitten_Camera_Project_2026_SOW1.pdf
Task Objective
Support Need Statement
Place of Performance
Period of Performance
Points of Contact (POC)
Deliverables
Security Requirement
Processing
Evaluation
Technical Evaluation Process
Confidence Rating Process
Price Evaluation
Task Award
Physical Security
Professional Conduct While on Government Facilities
Inspection and Acceptance
Limitation of Authority
Submission of Invoices

File details come from the government source that posted it. Updated .