Wheel and Tire Shop LED Installation SOW.docx

DOCX document 26 KB Posted

Attached to
Wheel and Tire Shop LED Installation
Solicitation number
FA286020R0035
Issued by

View the file

Other files

File Type Posted
Office 6.jpg JPG image
Insp Storage 5.jpg JPG image
Assembly 5.jpg JPG image
Insp Storage 2.jpg JPG image
Office 8.jpg JPG image
Insp Storage 9.jpg JPG image
Office 3.jpg JPG image
Assembly 1.jpg JPG image
Insp Storage 7.jpg JPG image
Office 5.jpg JPG image
Insp Storage 6.jpg JPG image
Office 9.jpg JPG image
Office 2.jpg JPG image
Insp Storage 4.jpg JPG image
Office 4.jpg JPG image
Office 7.jpg JPG image
Insp Storage 1.jpg JPG image
Assembly 2.jpg JPG image
Assembly 3.jpg JPG image
Office 11.jpg JPG image
Insp Storage 8.jpg JPG image
Office 1.jpg JPG image
Insp Storage 10.jpg JPG image
Assembly 4.jpg JPG image
Office 12.jpg JPG image
Insp Storage 3.jpg JPG image
Office 10.jpg JPG image
RFI Answers (Wheels and Tire Shop LED).docx DOCX document
Solicitation - FA286020R0035.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

WHEEL AND TIRE PROJECT

CP#

LED LIGHT UPGRADE, HANGAR 4, BLDG 1714

CONTRACT #

12 March 2020

STATEMENT OF OBJECTIVES: Provide all necessary work to replace the existing fluorescent lighting within the entire Wheel and Tire shop with brighter LED lights. The current lighting is too dim and not properly distributed throughout the work center, particularly over the inspection area of the shop. To fix this, the contractor will install brighter LED light fixtures and arrange them in a manner to produce even, bright light throughout all areas of the shop.

GENERAL: Provide all supervision, plant labor, transportation, equipment, and materials and perform all necessary engineering and operations to accomplish the following.

· (Office Area) Remove 11 2x2 lay in ceiling lights and replace with 12 new 2x2 LED lay in lights.

· The additional lay in light is to be located above where an exterior window was blocked off.

· (W&T Storage/Inspection Area) Remove 22 4ft fluorescent strip fixtures and replace with 15 new low bay LED fixtures.

· Fixtures to be installed in a manner to evenly distribute and enhance the light throughout the area, increasing the currently available light in the W&T Inspection area.

· (W&T Assembly Area) Remove 18 4ft fluorescent strip fixtures and replace with new 8ft LED strip fixtures. The layout of the current lighting configuration is acceptable and rearrangement of the new lights will not be necessary.

· All lights in all areas must be dimmable and associated wiring and switches must be installed.