WEXMAC 2.0 Performance Work Statement Revision 1.docx
DOCX document 110 KB Posted
- Attached to
- Naval Supply Systems Command (NAVSUP) Worldwide Expeditionary Multiple Award Contract (WEXMAC) 2. 0 Federal contract opportunity
- Solicitation number
- N0002324R0001
About this file
This document outlines the Naval Supply Systems Command's (NAVSUP) intent to award multiple Indefinite Delivery Indefinite Quantity contracts under the Worldwide Expeditionary Multiple Award Contract 2.0 (WEXMAC 2.0) to provide logistics services and supplies globally in support of humanitarian assistance, contingency operations, exercises, lodging, and ashore support. Key details include:
-
NAVSUP will conduct an Industry Day on March 27, 2024 in Mechanicsburg, Pennsylvania to discuss WEXMAC 2.0 requirements. Interested contractors must register by March 15, 2024.
-
WEXMAC 2.0 will make awards for 15 categories of services and supplies, including logistics management, material handling, lodging, life support, force protection, communications, transportation, and classes of supplies.
-
The base ordering period is five years for a maximum of $1.275 billion, and the option ordering period is an additional five years for $1.275 billion. Performance will occur worldwide, including in and outside the United States.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WEXMAC 2.0 Industry Day Brief.pdf | ||
| NSA - DIB Cybersecurity Services - WEXMAC 2.0 Industry Day Brief.pdf | ||
| WEXMAC 1.0 FPDS-NG DATA.xlsx | XLSX spreadsheet | |
| Draft WEXMAC 2.0 Solicitation (V2).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6264921D0029 – Performance Work Statement
| Page 10 of 49 |
| N6264921D0029 – Performance Work Statement |
| Page 10 of 49 |
Worldwide Expeditionary Multiple Award Contract (WEXMAC) Performance Work Statement (PWS)
The SUBCLIN and ELIN structure in this contract follows the below listed conventions. The SubCLINs match the categories of funding required/provided. For Example:
| Funding |
| SubCLIN |
| Logistics Management and Integration Services |
| 0001AA |
| Material Handling Equipment and Crane Services |
| 0001AB |
| Lodging Services |
| 0001AC |
| Life Support Services |
| 0001AD |
| Force Protection Services |
| 0001AE |
| Communications Services |
| 0001AF |
| Transportation Services |
| 0001AG |
| Other Services |
| 0001AH |
| Class I – Food, Rations, and Water Supplies |
| 0001AJ |
| Class II – Clothing Supplies |
| 0001AK |
| Class III – Petroleum, Oils, and Lubricants Supplies |
| 0001AL |
| Class IV – Fortification and Barrier Materials Supplies |
| 0001AM |
| Class VI – Personal Items Supplies |
| 0001AN |
| Class VIII – Medical Supplies |
| 0001AP |
| Other Supplies |
| 0001AQ |
The ELINs will further identify the specific requirement for the overarching category for the region as follows:
REGION
5 YEAR MAXIMUM ORDERING AMOUNT AND IGE
TOTAL
5 YEAR OPTION MAXIMUM ORDERING
AMOUNT AND IGE TOTAL
MAXIMUM ORDERING AMOUNT AND TOTAL IGE
| 01 |
| $25,000,000.00 |
| $25,000,000.00 |
| $50,000,000.00 |
| 02 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 03 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 04 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 05 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 06 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 07 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 08 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 09 |
| $100,000,000.00 |
| $100,000,000.00 |
| $200,000,000.00 |
| 10 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 11 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 12 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 13 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 14 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 15 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 16 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 17 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 18 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 19 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 20 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 21 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 22 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 23 |
| $25,000,000.00 |
| $25,000,000.00 |
| $50,000,000.00 |
| 24 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 25 |
| $50,000,000.00 |
| $50,000,000.00 |
| $100,000,000.00 |
| 26 |
| $25,000,000.00 |
| $25,000,000.00 |
| $50,000,000.00 |
| Total |
| $1,275,000,000.00 |
| $1,275,000,000.00 |
| $2,550,000,000.00 |
ELIN XX00:
XX= Region 00 = Specific requirement
Throughout the PWS below an “X” is used as a placeholder in the ELIN to show that the ELIN numbers will vary by region.
SECTION 1 - DESCRIPTION OF CONTRACTUAL SCOPE
1.1 The services and supplies provided through performance of this contract are to support Humanitarian Assistance/Disaster Relief (HA/DR) Support, Contingency Support, Exercise Support, Lodging Support, Logistics Support, and Ashore Support. These supplies and services consist of the following broad categories: logistics management and integration services, life support, force protection, communications, land transportation services, other services, and other supplies. The contractor shall provide logistic management and integration services, life support, force protection, communications, land transportation services, other services and other supplies, which include but are not limited to: trash removal, force protection, material handling, interpreters, fresh potable water, power supply, transportation, vehicle rental, forklift services, and communications.
1.2 Logistics management and integration services, life support, force protection, communications, land transportation services, other services, and other supplies provided by a contractor from a standard list of services and supplies at a Firm-Fixed-Price. The contractor is required to manage and integrate all services provided by, to include but not limited to, subcontractor and Host Nations authorities. Firm Fixed-Prices shall be established during the Request for Task Order Proposals (RTOP). The contractor shall ensure that ordered services and supplies conform to the general requirements of the contract pursuant to this PWS. If the RTOP includes services and supplies that are not within the general scope of this contract, the RTOP shall include a separate performance work statement for those services and supplies.
1.3 In performing this contract, the contractor shall comply with its terms and with laws or regulations of the country where performance occurs, to include applicable safety and health regulations, and shall obtain any insurances, licenses, or permits required by these laws or regulations. If there is a difference between the terms of this contract and laws or regulations of the country where performance occurs, the contractor shall promptly notify the Government if it believes that it will be unable to fully perform the specified tasks or provide the specified requirements because of problems, disputes, or complications with the respective country where performance occurs. The contractor’s proposal shall reflect and account for country specific price considerations known at the time of the proposal submission.
1.4 Authorized Ordering Activities of the Federal Government. If these activities are authorized, orders will be placed by any warranted Contracting Officer in the Authorized Ordering Activity. Contractors will be notified of the addition of an authorized ordering activity by contract modification to “Authorized Ordering Activity.”
1.5 The geographic scope and regions covered by this contract for contingency, exercises, humanitarian assistance, disaster relief, and logistics services includes ALL locations identified in Table 1 “Region and Locations”:
| Region 1: North America |
| MEXICO |
CANADA
GREENLAND
| Region 2: Caribbean & Bermuda |
| ARUBA |
ANGUILLA
BAHAMAS, THE
BONAIRE, SAINT EUSTATIUS, AND SABA
CURACAO
BARBADOS
BERMUDA
BRITISH VIRGIN ISLANDS
CAYMAN ISLANDS
CUBA
DOMINICAN REPUBLIC
DOMINICA
ANTIGUA AND BARBUDA
GRENADA
GUADELOUPE (FRANCE)
HAITI
JAMAICA
MARTINIQUE
MONSERRAT
NETHERLANDS ANTILLES
SAINT-BARHELEME
SAINT LUCIA
SAINT KITTS AND NEVIS
Region 3: Central America
Region 3: Central America
BELIZE
COSTA RICA
EL SALVADOR
GUATEMALA
HONDURAS
NICARAGUA
PANAMA
| Region 4: South America |
| ARGENTINA |
BOLIVIA
BRAZIL
CHILE
COLOMBIA
CURACAO (NETHERLANDS ANTILLES)
ECUADOR
FRENCH GUIANA
GUYANA
PARAGUAY
PERU
SURINAME
URUGUAY
VENEZUELA
| Region 5: Middle East |
| IRAQ |
ISRAEL
KUWAIT
LEBANON
OMAN
QATAR
SAUDI ARABIA
SYRIA
TURKEY
YEMEN
AFGHANISTAN
PAKISTAN
JORDAN
| Region 6: Bahrain |
| BAHRAIN |
| Region 7: United Arab Emirates |
| UNITED ARAB EMIRATES |
Region 8: Africa
Region 8: Africa
Region 8: Africa
ALGERIA
EGYPT
LIBYA
MOROCCO
TUNISIA
WESTERN SAHARA
BURUNDI
COMOROS
DJIBOUTI
ERITREA
ETHIOPIA
KENYA
MADAGASCAR
MALAWI
MAURITIUS
MAYOTTE
MOZAMBIQUE
RÉUNION
RWANDA
SEYCHELLES
SOMALIA
SUDAN
UGANDA
TANZANIA
ZAMBIA
ZIMBABWE
ANGOLA
CAMEROON
CENTRAL AFRICAN REPUBLIC
CHAD
CONGO
DEMOCRATIC REPUBLIC OF THE CONGO
EQUATORIAL GUINEA
GABON
SAO TOME AND PRINCIPE
SOUTHERN AFRICA
BOTSWANA
LESOTHO
CABO VERDE
COTE D'IVOIRE
NAMIBIA
SOUTH AFRICA
ESWATINI
BENIN
SOUTH SUDAN
BURKINA FASO
GAMBIA, THE
GHANA
GUINEA
GUINEA-BISSAU
LIBERIA
MALI
MAURITANIA
NIGER
NIGERIA
SENEGAL
SIERRA LEONE
TOGO
Region 9: Eastern Europe & Western Asia
Region 9: Eastern Europe & Western Asia
ALBANIA
BELARUS
CYPRUS
BOSNIA AND HERZEGOVINA
KAZAKHSTAN
KYRGYZSTAN
TAJIKISTAN
TURKMENISTAN
UZBEKISTAN
ARMENIA
AZERBAIJAN
BULGARIA
KOSOVO
CROATIA
GEORGIA
CZECH REPUBLIC
ESTONIA
MOLDOVA
GREECE
HUNGARY
LATVIA
LITHUANIA
MONTENEGRO
POLAND
RUSSIA
SERBIA
SLOVAKIA
SLOVENIA
ROMANIA
MACEDONIA
UKRAINE
| Region 10: Western Europe |
| AUSTRIA |
ANDORRA
BELGIUM
FAROE ISLANDS
DENMARK
FINLAND
FRANCE
GERMANY
ICELAND
IRELAND
ITALY
LUXEMBOURG
MALTA
LIECHTENSTEIN
NETHERLANDS
NORWAY
PORTUGAL
SAN MARINO
SPAIN
SWEDEN
SWITZERLAND
GIBRALTAR
UNITED KINGDOM
| Region 11: Mainland Asia |
| CHINA |
TAIWAN
HONG KONG
KOREA, SOUTH
NEPAL
MONGOLIA
| Region 12: Japan |
| JAPAN |
Region 13: Indian Ocean
Region 13: Indian Ocean
BANGLADESH
BHUTAN
BRITISH INDIAN OCEAN TERRITORY
INDIA
DIEGO GARCIA
MALDIVES
MYANMAR
| Region 14: Sri Lanka |
| SRI LANKA |
| Region 15: Australia & Oceania |
| ANTARCTICA |
TIMOR-LESTE
NEW ZEALAND
AUSTRALIA
| Region 16: Pacific Islands |
| PALAU |
FIJI
FRENCH POLYNESIA
KIRIBATI
MARSHALL ISLANDS
MICRONESIA, FEDERATED STATES OF
NAURU
NEW CALEDONIA
PAPUA NEW GUINEA
SOLOMON ISLANDS
TONGA
TUVALU
VANUATU
SAMOA
| Region 17: Philippines |
| PHILIPPINES |
| Region 18: Indonesia |
| INDONESIA |
| Region 19: Malaysia & Singapore |
| SINGAPORE |
MALAYSIA
| Region 20: Thailand |
| THAILAND |
| Region 21: Vietnam |
| VIETNAM |
| Region 22: Southeastern Asia |
| BRUNEI |
CAMBODIA
LAOS
| Region 23: Continental United States of America |
| CONTINENTAL UNITED STATES OF AMERICA |
| Region 24: Hawaii |
| HAWAII |
| Region 25: Pacific Ocean Outlying Territories of the United States of America |
| COMMONWEALTH OF THE NORTH MARIANA ISLANDS |
GUAM
AMERICAN SAMOA
| Region 26: Atlantic Ocean Outlying Territories of the United States of America |
| UNITED STATES VIRGIN ISLANDS |
PUERTO RICO
Table 1 “Region and Locations”
SECTION 2 – LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (SUBCLIN 0001AA)
2.1 LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (ELIN XX01)
2.1.1 The contractor shall provide logistics management and integration services to requesting activities covered by this contract. Logistics management and integration services requires the contractor to integrate, manage, and perform all services and provide all supplies necessary to fully comply with the tasks and responsibilities described in this contract unless a task or responsibility is specifically included in a separately-priced ELIN herein. Contractor’s responsibilities under the Logistics Management and Integration Services ELIN start with the period of performance.
2.1.2.1 The services and supplies represented on RTOP exhibits are the only services and supplies that shall be included on RTOP proposals. RTOP exhibits only provide requested services and supplies from the requesting activity. All other direct/indirect costs, to include services and supplies not included in the RTOP exhibit but required to execute the task order visit, shall be incorporated into the Logistics Management and Integration Services.
2.1.2.2 The contractor shall not include any other direct or indirect costs as separate exhibit line items in RTOP proposals.
2.1.3.1 If requested by the Government, the contractor shall ensure all services (land based and afloat) are available for inspection on the scheduled date and time requested by the Government. The Government shall provide the Contractor 48 hours’ notice prior to requested inspection.
2.1.3.2 The exhibit spreadsheets and specific portions of this PWS include force protection services and equipment, which the contractor shall bid on a fixed-price basis with their initial offer for the basic contract. Once a task order has been awarded, the contractor shall reconfirm with the requesting activity that these force protection requirements meet the requesting activity’s requirements prior to beginning performance. Any requests for additional force protection requirements shall be coordinated through the KO or Authorized Ordering Officer via Contracting Officer’s Representative (COR). If any other activity or individual orders force protection services (e.g. NCIS, DAO) not covered in the task order, contractors are required to immediately inform the requesting activity and KO or Authorized Ordering Officer of such and must obtain written or verbal confirmation prior to beginning performance of those services. Organizations such as NCIS and DAO are not Authorized Ordering Officers under this contract unless specific authorization has been given by the KO in writing. Therefore, they have no contractual authority to place orders. The contractor shall ensure compliance with Section 4 – Force Protection in PWS.
2.1.4.3 If a Morale, Welfare, and Recreation (MWR) contract has been awarded which covers the location of the requesting activity’s visit, then the contractor must refer all MWR requests to the authorized MWR contractor. If there is an MWR contract, the MWR contractor is the requesting activity’s sole representative for this service. Under no circumstances shall the contractor assist the requesting activities’ personnel in booking these services if an MWR representative is servicing the requesting activity. In the absence of an MWR contract, the contractor shall provide advance information on the full scope of all recreational/liberty activities available in local area and assist the requesting activity, as necessary, to identify the vendors. Information (with associated costs) shall include, but is not limited to, visitor tips, transportation, sightseeing tours, entertainment, sporting events, and lodging. Payment for services shall be made by the requesting activity to the vendor rather than through contractor. Any potential issue shall be resolved directly between the requesting activity and the local vendor. This service is included under the Logistics Management and Integration Services ELIN and the contractor shall not charge additional fees for this service. Under no circumstances shall the contractor assist the requesting activity’s personnel in booking these services. If MWR information is required to be provided by the contractor, the Government will identify during the RTOP solicitation.
2.1.4.4 Within 72 hours after the task order award, the contractor shall provide the Requesting Activity, COR, and KO the following information:
1. All emergency telephone numbers: police, hospitals, firefighters.
2. Closest local hospital address, phone number, and Hospital’s Echelons to Care.
3. Local, State, and National agencies that must be called for hazardous material and/or spills.
4. Contractor Point of Contact (POC) information, including 24-hour contact phone numbers for the duration of the period of performance.
5. Mobilization plan
6. Subcontractor information (Company Name, Address, Point of Contact Name, Email Address) for all services not performed by the contractor.
2.1.5.1 Contractor shall brief the requesting activity about ordered services upon start of the period of performance. This briefing shall include what was ordered and scheduled times and dates for delivery. The contractor shall coordinate with the requesting activity on the schedule and mobilization plan.
2.1.5.2 Contractor shall ensure the Government is able to inspect all services (land based and afloat) during the period of performance including the mobilization and preparations taken to perform such services.
2.1.5.3 Contractor shall be available on call at all times (24 hours per day, seven days per week) to assist the requesting activity with requirements and to resolve problems within the context of this PWS. When requested in the RTOP solicitation and task order, contractor shall have one (1) representative present throughout the period of performance that is authorized to execute change orders and new orders with subcontractor. The contractor’ representative shall have the authority to act on the behalf of the contractor. When requested in the RTOP solicitation and task order, contractor shall visit the place of performance at least once a day when requested.
2.1.6.1 Written receipt for inspection of all completed services shall be obtained during the performance of the task order. The invoicing instructions are contained in section G-2 Invoicing Instructions of the contract.
2.1.7.1 Contractor shall exercise due diligence to prevent, contain, and respond to spills of hazardous material, hazardous substances, hazardous waste, sewage, regulated gas, petroleum, lubrication oil, and other substances regulated by environmental law. Contractor shall maintain spill cleanup equipment and materials at the work site. In the event of a contractor caused spill, contractor shall take prompt, effective action to stop, contain, curtail, or otherwise limit the amount, duration, and severity of the spill/release, and shall contain and clean up these spills without cost to Government. 2.1.7.2 Contractor are responsible for verbal and written notifications. Spill response shall be in accordance with local regulations.
2.1.7.3 If Government assistance is requested or required, contractor shall reimburse Government for such assistance. If the Government must initiate its own spill cleanup procedures, contractor shall reimburse Government for all costs incurred, including sample analysis of materials, equipment, labor, and spill waste disposal for contractor responsible spills when:
1. Contractor has not begun spill cleanup procedure within one hour of spill discovery/occurrence; or
2. If, in Government's judgment, contractor’ spill cleanup is not adequately abating life threatening situation and/or is a threat to any body of water or environmentally sensitive areas.
2.1.7.4 All equipment which contains liquid and/or liquid containers on the work sites shall be placed on secondary containment and such containment system shall be free of any uncontained liquid/residue and debris. Any leaking equipment shall be removed from the place of performance until the unit is fixed. All drips, drops and spills shall be cleaned immediately when detected and reported.
2.1.8.1 Contractor shall provide standard receipt documents for all supplies, materials, and services provided to the requesting activity. The standard receipt shall include the following:
1. Contractor official company name, address, email and phone contact information
2. Contract Number
3. Delivery/Task Order Number
4. Requesting Activity’s name
5. Location of Services
6. Subcontractor/vendor (providing the service) official name and contact information
7. Type of service, material, or equipment provided
8. Quantity provided
9. Method of delivery of service, material, or equipment provided
10. Date service provided
11. Applicable “legible” Receipt Inspector and contractor POC names and signatures
2.1.8.2 Contractor shall sign the receipt document validating that the services were delivered. Neither the requesting activity Receipt Inspector nor contractor shall collect and hold receipts to validate all at once at the end of the period of performance. Receipt of services, material, and equipment shall be validated and signed for each day they are received, on the day received. This certification of receipts does not replace or supersede the contract process of accepting contractor’ invoices as detailed in contract section G-2 Invoicing Instructions.
2.1.9 ELIN XX01 Logistics Management and Integration Services Unit of Issue is DAY (DY).
2.2 EVENT SUPPORT SITE (ELIN XX02)
2.2.1 The Event Support Site consists of the following:
1. 250 chairs;
2. 50 long tables (approximately 2 meters in length);
3. One (1) large BBQ grill with the supporting supplies and equipment (at least 576 square inches);
4. Open or Closed Tents (assorted sizes) which, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux. The tents must be anchored down and strong enough to withstand inclement weather;
5. Three (3) Ice Coolers (70 liters);
6. Three (3) Mist Fans or Space Heaters;
7. 20 110-220VAC US outlets with surge protection;
8. Four (4) Portable Sanitary Facility;
9. Four (4) Portable Hand Washing Station;
10. Daily cleaning of the equipment and the Event Support Site area; and
11. Transportation, repositioning, mobilization, demobilization, stand-by fee, and labor required to perform the above.
2.2.2 Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. Unit Price shall include transportation, set-up, dismantling and labor, necessary consumables to include fuel to operate the power source, mobilization and demobilization.
2.2.3 ELIN XX02 Event Support Site Unit of Issue is DAY (DY).
2.3 REFRIGERATOR UNIT (ELIN XX03)
2.3.1 Contractor shall provide one (1) 40-FT refrigerator unit or two (2) 20-FT refrigerator units, with required power to operate the units.
2.3.2 ELIN XX03 Refrigerator Unit of Issue is DAY (DY).
2.4 CHAIRS (ELIN XX04 - XX05)
2.4.1 Contractor shall provide chairs that are clean and sturdy with maximum weight capacity at least 250 lbs.
2.4.2 The following ELINs are included:
ELIN XX04: SET OF 5 CHAIRS
ELIN XX05: SET OF 10 CHAIRS
2.4.3 ELIN XX04 - XX05 Chairs Unit of Issue is DAY (DY).
2.5 TABLES (ELIN XX06 - XX07)
2.5.1 Contractor shall provide tables that are clean and sturdy. Tables shall be at least 6 feet in length and 2 feet in width.
2.5.2 The following ELINs are included:
ELIN XX06: SET OF 5 LONG TABLES
ELIN XX07: SET OF 10 LONG TABLES
2.5.3 ELIN XX06 – XX07 Tables Unit of Issue is DAY (DY).
2.6 LARGE BBQ GRILLS (ELIN XX08)
2.6.1 Contractor shall provide one (1) large BBQ Grill with the supporting supplies and equipment included. BBQ Grill shall be at least 576 square inches (3,716 square centimeters). The large BBQ Grill shall be electric or propane grill. Supplies and equipment shall include, but are not limited to, stainless steel spatula, fork, basting brush, and tongs. Contractor shall ensure large BBQ Grill and equipment is cleaned in accordance with CDC guidelines prior and after the period of performance.
2.6.2 ELIN XX08 Large BBQ Grills Unit of Issue is DAY (DY).
2.7 OPEN TENT (NON-FORCE PROTECTION) (ELIN XX09)
2.7.1 One (1) unit encompasses assorted sizes that, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux. The open tent shall have 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. The tent shall be anchored down and strong enough to withstand inclement weather.
2.7.2 ELIN XX09 Open Tent Unit of Issue is DAY (DY).
2.8 CLOSED TENT (NON-FORCE PROTECTION) (ELIN XX0A)
2.8.1 One (1) unit encompasses assorted sizes that, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux. The closed tent shall have 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. The tent shall be enclosed on all sides with an entry door. The tent shall be anchored down and strong enough to withstand inclement weather.
2.8.2 ELIN XX0A Closed Tent Unit of Issue is DAY (DY).
2.9 20-FT TRAILER OFFICE (ELIN XX0B)
2.9.1 Contractor shall provide a 20-FT Trailer Office to include two (2) desks, 10 chairs, air conditioning, and 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting and 20 110-220VAC US outlets with surge protection to power miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). 20 110-220VAC US outlets with surge protection shall have surge protection. Power strips/boards may be used. Power strips/boards shall have surge protection. The power source shall emit sound levels of less than 84 decibels.
2.9.2 ELIN XX0B 20-FT Trailer Office Unit of Issue is DAY (DY).
2.10 ICE COOLER (ELIN XX0C)
2.10.1 Contractor shall provide one (1) Ice Cooler with a capacity of least 70 liters. Ice cooler shall have lid and locking mechanism.
2.10.2 ELIN XX0C Ice Cooler Unit of Issue is DAY (DY).
2.11 MIST FANS (PORTABLE COOLING DEVICES) (ELIN XX0D)
2.11.1 Contractor shall provide one (1) Mist fan to include tank, water, and power source to operate the Mist Fan. Unit Price shall include transportation, set-up, dismantling and labor, necessary consumables to include fuel to operate the power source, repositioning, mobilization, and demobilization.
2.11.2 Mist Fans shall be rated 600 cubic feet per minute (CFM).
2.11.3 ELIN XX0D Mist Fans (Portable Cooling Devices) Unit of Issue is DAY (DY).
2.12 PORTABLE SANITARY FACILITIES (ELIN XX0E)
2.12.1 Contractor shall provide one (1) portable sanitary facility, which includes one (1) western style toilet and one (1) urinal to include toilet paper and hand sanitizer. Contractor shall ensure facilities are continuously monitored to ensure portable sanitary facilities are clean, sanitary, and toilet paper is available. Contractor shall check portable sanitary facilities at least every three (3) hours to ensure cleanliness and re-stock supplies (i.e. toilet paper). Evidence such as keeping and updating an inspection checklist inside the portable sanitary facilities units is required. Unit Price shall include cleaning and waste removal to ensure clean and sanitary conditions. Unit Price shall include toilet paper and hand sanitizer. Contractor shall dispose of waste in accordance with local government’s laws.
2.12.2 Contractor shall provide American Disabilities Act (ADA) compliant portable sanitary facilities when requested on the RTOP.
2.12.3 ELIN XX0E Portable Sanitary Facilities Unit of Issue is DAY (DY).
2.13 PORTABLE HAND WASH STATION (ELIN XX0F)
2.13.1 Contractor shall provide one (1) hand wash station. Portable hand wash station shall include faucet body, necessary plumbing, potable water, and hand paper dispenser. Unit Price shall include sanitizing hand liquid soap and potable water to operate the hand wash station. Contractor shall ensure facilities are continuously monitored to ensure portable hand wash stations are clean, sanitary, and liquid soap is available. Unit Price shall include hand paper and hand paper dispenser to allow personnel to dry hands.
2.13.2 ELIN XX0F Portable Hand Wash Station Unit of Issue is DAY (DY).
2.14 PORTABLE ELECTRIC GENERATORS (ELIN XX0G – XX0K)
2.14.1 Contractor shall provide portable, gasoline powered, electric generator capable of supplying power to portable lighting and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). Generators shall include a circuit breaker protector including four (4) 50-FT extension cords with enough power boards to support 20 110-220VAC US outlets with surge protection. Contractor shall ensure portable electric generator is available for inspections and testing prior to arrival of requesting activity.
2.14.2 Contractor shall provide uninterrupted power. Contractor shall ensure generators are delivered with all necessary parts in accordance with the operator’s manual and must have a full tank of fuel. The U.S. Government shall not be responsible for returning generators with a full tank or pay to refuel the equipment at the end of the Period of Performance. Contractor shall be responsible to refueling generators. The contractor shall provide 24 hour repair and /or replacement services for the equipment.
2.14.3 The following ELINs are included:
ELIN XX0G: 5 KILOWATT GENERATOR
ELIN XX0H: 12.5 KILOWATT GENERATOR
ELIN XX0J: 50 KILOWATT GENERATOR
ELIN XX0K: 100 KILOWATT GENERATOR
2.14.4 ELIN XX0G – XX0K Portable Electric Generators Unit of Issue is DAY (DY).
2.15 EVENT LOT (INCLUDES TENTS, TABLES, CHAIRS, LIGHTING, AND CEILING FANS) (ELIN XX0L – XX0V)
2.15.1 Contractor shall provide open/closed tents with accessory equipment. The tent package shall include an open/closed tent, lighting, trash cans, ceiling fans, tables and chairs, electrical hookups, cable for power supply, and a generator with fuel already filled to maximum capacity that emits sound levels of less than 84 decibels. Contractor shall provide daily cleaning of the tent and a three-meter perimeter around the tent. Cleaning includes removing trash, sweeping, and mopping up spills. Contractor shall remove all provided equipment upon completion of services.
2.15.2 Event Lot shall include:
1. 20 chairs at least 250 lbs. capacity;
2. 10 long tables (at least 6 feet in length and 2 feet in width);
3. Three (3) Mist Fans or Space Heaters;
4. 20 110-220VAC US outlets with surge protection;
5. One (1) Portable Sanitary Facility;
6. One (1) Portable Hand Washing Station;
7. Transportation, repositioning, mobilization, demobilization, stand-by fee and labor required to perform the above.
2.15.3 The following ELINs are included:
ELIN XX0L: EVENT LOT (OPEN TENTS) - MINIMUM 20 PERSON CAPACITY
ELIN XX0M: EVENT LOT (OPEN TENTS) - MINIMUM 50 PERSON CAPACITY
ELIN XX0N: EVENT LOT (OPEN TENTS) - MINIMUM 100 PERSON CAPACITY
ELIN XX0P: EVENT LOT (OPEN TENTS) - MINIMUM 150 PERSON CAPACITY
ELIN XX0Q: EVENT LOT (OPEN TENTS) - MINIMUM 300 PERSON CAPACITY
ELIN XX0R: EVENT LOT (CLOSED TENTS) - MINIMUM 20 PERSON CAPACITY
ELIN XX0S: EVENT LOT (CLOSED TENTS) - MINIMUM 50 PERSON CAPACITY
ELIN XX0T: EVENT LOT (CLOSED TENTS) - MINIMUM 100 PERSON CAPACITY
ELIN XX0U: EVENT LOT (CLOSED TENTS) - MINIMUM 150 PERSON CAPACITY
ELIN XX0V: EVENT LOT (CLOSED TENTS) - MINIMUM 300 PERSON CAPACITY
2.21.4 ELIN XX0L - XX0V Event Lot Unit of Issue is DAY (DY).
2.16 PORTABLE HEATERS (ELIN XX0W-XX0X)
2.16.1 Contractor shall provide one (1) portable heater to include tank(s), power supply and/or fuel to operate the portable heater. Portable heater shall be able to provide heat 200 square foot area. Portable heater shall have control valve adjust temperature to desired level. Portable heater shall have automatic emergency shut-off.
2.16.2 The following ELINs are included:
ELIN XX0W INDOOR PORTABLE HEATER. At least 6000 British thermal unit (BTU) ELIN XX0X OUTDOOR PORTABLE HEATER. At least 12000 BTU
2.16.3 ELIN XX0W-XX0X Portable Heaters Unit of Issue is DAY (DY).
2.17 CONCRETE MIXER (ELIN XX0Y)
2.17.1 Contractor shall provide concrete mixer with mixing drum capacity of 6-7 cubic foot (when required, the specific size will be specified with each deliver order/task order), meaning it can mix stated volume of concrete at one time for US Government personnel to operate. Contractor shall be responsible for cleaning concrete mixer.
2.17.2 ELIN XX0Y Concrete Mixer Unit of Issue is DAY (DY).
2.18 PRATIQUE AGRICULTURAL (ELIN XX0Z)
2.18.1 Contractor shall provide for quarantine services to include equipment and personnel inspections as required by local authorities.
2.18.2 ELIN XX0Z Pratique Agricultural Unit of Issue is DAY (DY).
2.19 CUSTOMS DUTY/CLEARANCE - BILL OF LADING (ELIN XX10)
2.19.1 Contractor shall receive the package for the requesting activity and clear it through customs when the requesting activity has arrived and berthed or anchored in the respective port. Any damages shall be reported to the requesting activity prior to acceptance.
2.19.2 Each Bill of Lading shall be separated.
2.19.3 ELIN XX10 Customs Duty/Clearance – Bill of Lading Unit of Issue is EACH (EA).
2.20 INTERPRETER SERVICES (ELIN XX11-XX12)
2.20.1 Contractor shall provide interpreter services when ordered. Interpreters shall have sufficient proficiency in both written and spoken English and the predominant local language and have the ability to carry on a casual, fluent conversation in both languages. For specific engagements (as outlined at the task order level), the interpreter shall have adequate proficiency to translate technical aspects of the assigned engagement. The minimum amount of hours for interpreter services shall be four (4) hours. If the unit of issue is DAY (DY), the contractor shall provide interpreter services for 24 hours per day. If any interpreter is required to be replaced, the Contractor shall provide a replacement interpreter within 24 hours. If an interpreter is deemed unacceptable by the Government, the contractor shall replace the unacceptable interpreter within 24-hours of Government’s notice at no additional cost to the Government. The Government will provide a start time and location for each interpreter the day prior to service start date. The contractor shall not deviate from the start time and location unless approved by a Government representative or DKO.
2.20.2 The contractor shall provide meals and lodging for all interpreters. The contractor shall ensure interpreters are granted access to all places of performance in support of this requirement. The contractor shall ensure interpreters have transportation to all events if required. The contractor shall ensure interpreters are prepared to perform work on time at each event. Contractor shall ensure interpreters working hours and schedule complies with all local laws.
2.20.3 The contractor shall provide a list of interpreters to the Government Representative and DKO at least two (2) days before the assignment for each engagement. The list shall contain names, phone numbers, emails, and specific qualifications of the approved interpreters. The Government reserves the right to provide a required template for the contractor to provide the list of interpreters per engagement.
2.20.4 ELIN XX11 Interpreter Services (Hourly) units of issues is HOUR (HR).
2.20.5 ELIN XX12 Interpreter Services (Daily) unit of issue is DAY (DY).
2.21 LOGISTICS SUPPORT TO GOVERNMENT TEAMS (ELIN XX13)
2.21.1 Contractor shall provide logistics support during the requesting activity’s visits to a place of performance. Government teams may conduct surveys in a variety of ports in the area of responsibility. Government may require the assistance of contractor in the ports to be surveyed. Contractor assistance shall include providing logistical support as requested by the Government, coordinating access and interviews with local officials and support Contractor, and coordinating necessary translation services for the team,.
2.21.2 Logistics Management and Integration (ELIN XX01) shall not be priced in conjunction with Logistics Support to Government Teams (ELIN XX13).
2.21.3 ELIN XX13 Logistics Support to Support Teams Unit of Issue is LOT (LT).
2.22 FILLED SANDBAGS (ELIN XX14)
2.22.1 Contractor shall provide five 15 pound filled sandbags.
2.22.2 Price is to be per sandbag per DAY (DY).
2.22.3 ELIN XX14 Sandbags Unit of Issue is DAY (DY).
2.23 CONSTRUCTION SITE FENCING (ELIN XX15)
2.23.1 Contractor shall provide construction site fencing that is orange in color and no less than 4 feet high. Contractor shall include all necessary equipment to ensure construction site fencing is able to free stand. Construction site fencing shall be provided in accordance with ASTM F3342-19 or equivalent local standard.
2.23.2 ELIN XX15 Construction Site Fencing Unit of Issue is Meter (MR)
2.24 PORTABLE AIR CONDITIONER UNIT (ELIN XX16)
2.24.1 Contractor shall provide one (1) portable air conditioner unit to power supply and/or fuel to operate. Portable air conditioner shall be able to provide cooling 200 square foot area. Portable air conditioner shall have control valve adjust temperature to desired level. Portable conditioner shall have automatic emergency shut-off.
2.24.2 ELIN XX16 Air Conditioner Unit of Issue is DAY (DY).
2.25 TUG/TOW BOATS (ELIN XX17)
2.25.1 Vessel with sufficient bollard pull capable of towing 300-1200 sq. /m, and or weighing up to 200 tons of varying configurations.
2.25.2 Contractor shall provide rental of Tug boats, tow boats and or tender vessels, with or without operators as determined by the customer.
2.25.3 ELIN XX17 Tug/Tow Boats Unit of Issue is DAY (DY).
2.26 TUG SERVICES (ELIN XX18)
2.26.1 Contractor shall arrange Tug Services as requested in RTOP. Contractor shall coordinate with the Tug Services as necessary to ensure that the services are available as required and at the times requested. Tugs shall be properly fendered.
2.26.2 ELIN XX18 Tug Services Unit of Issue is JOB (JB)
2.27 BARGE (ELIN XX19)
2.27.1 The Contractor shall furnish barges as specified at the RTOP level and shall furnish all labor, materials, equipment, transportation, supervision and incidental or related work and services necessary to provide a barge (also referred to as a floating pier, a jetty or platform pontoon or dock).
2.27.2 The Contractor may be required to use barge to transport US Government property from one location to another. Additional information shall be provided at the RTOP level.
2.27.3 ELIN XX19 Unit of Issue will be determined on the RTOP solicitation.
2.28 WATER FERRY/TAXI SERVICES (ELIN XX1A – XX1F)
.28.1 The Contractor shall provide water taxis to transfer personnel from one location to another, pursuant to local procedures and ordinances. Location(s) will be provided at the RTOP level. At the commencement of service, the contractor will be required to advise the requesting activity of scheduled breaks and any changes to the taxi service schedule. Except during inclement weather, water taxi service shall be continuous.
2.28.2 The hourly rate shall include a qualified driver and an operator, any other helpers or crew members required by local authorities, all insurance, fuel, holiday surcharges, overtime and other operating expenses. Service begins when the first water taxi is alongside the designated pick-up point and ends when the last passenger disembarks from the water taxi at the designated drop-off point as ordered by the requesting activity. However, when required to arrive early for inspection as a force protection measure, service begins at time of inspection.
2.28.3 If contractor cannot provide the size of water taxi ordered, contractor shall provide a larger size water taxi, or a combination of water taxis, that in total capacity equates to the size of the water taxi ordered at no additional cost to the government
2.28.4 The contractor shall ensure that all water taxis are fully licensed, registered, and insured, including adequate liability insurance, in accordance with local laws and regulations. The contractor shall ensure that the water taxi is in sound mechanical condition and meets all safety standards required by local laws and regulations to preclude breakdown and injury. Maintenance, safety, and other periodical inspections shall be performed as required by the applicable local laws and regulations. Apart from compliance with local laws and regulations, contractor shall meet all additional requirements as set forth in the RTOP.
2.28.5 The following ELINs are included:
ELIN XX1A: WATER TAXI, MINIMUM 10 PERSON
ELIN XX1B: WATER TAXI MINIMUM 36 PERSON
ELIN XX1C: WATER TAXI MINIMUM 75 PERSON
ELIN XX1D: WATER TAXI MINIMUM 125 PERSON
ELIN XX1E: WATER TAXI MINIMUM 250 PERSON
ELIN XX1F: WATER TAXI MINIMUM 500 PERSON
2.28.6 ELIN XX1A – XX1F Water Ferry/Taxi Services Unit of Issue is HOUR (HR).
2.29 MOBILE CRANE SERVICES FOR BARGE LIFT (ELIN XX1G)
2.29.1 Contractor shall provide mobile crane services (shore and or floating cranes) for loading and offloading of barge vessels 300-1200 sq. /m with operator(s) and safety observer(s).
2.29.2 ELIN XX1G Mobile Crane Services for Barge Lift Unit of Issue is DAY (DY).
2.30 BARGES AND LIGHTERS CARGO PURPOSES (ELIN XX1H)
2.30.1 Contractor shall provide 300-1200 sq. /m Barge vessel variations including but not limited to: Front Loading Ramp, Beach Landing Capability, Ship to Shore, Shore to Shore, Flat Bottom, etc.
2.30.2 The contractor shall provide rental of Car Floats and other Transportation Barges, Depot Barges; Scows, with or without operators as determined on RTOP solicitation and task order.
2.30.3 ELIN XX1H Barges and Lighters Cargo Purposes Unit of Issue is DAY (DY).
2.31 OTHER LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (ELIN XX1JXX1T)
2.31.1 Other Logistics Management and Integration Services may be other additional services not established in the expressed in the named ELIN(s). These services and shall be identified on the RTOP. The identified services on the RTOP shall either cite the applicable paragraph in the PWS or provide a separate PWS.
2.31.2 ELIN XX1J-XX1T Other Logistics Management and Integration Services Unit of Issue shall be determined on RTOP.
SECTION 3 – MATERIAL HANDLING EQUIPMENT, CRANE SERVICES, AND CONSTRUCTION EQUIPMENT (SUBCLIN 0001AB)
3.1 FORKLIFT AND K LOADER SERVICES (ELIN XX1U – XX20)
3.1.1 Contractor shall provide forklift services with operator(s). Upon request, contractor shall provide information concerning forklift/lifting capacity to the requesting activity. The forklifts provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The forklifts shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.
3.1.2 The following ELINs are included:
ELIN XX1U: FORKLIFT SERVICES – UP TO 4 TONS
ELIN XX1V: FORKLIFT SERVICES WITH 8 FOOT FORKS– 5 TO 8 TONS
ELIN XX1W: FORKLIFT SERVICES WITH 8 FOOT FORKS - 9 TO 20 TONS
ELIN XX1X: ALL TERRAIN FORKLIFT SERVICES WITH 8 FOOT FORKS – UP TO 4 TONS
ELIN XX1Y: ALL TERRAIN FORKLIFT SERVICES WITH 8 FOOT FORKS – 5 TO 8 TONS
ELIN XX1Z: ALL TERRAIN FORKLIFT SERVICES – 9 TO 20 TONS
ELIN XX20: K LOADER - 10-20 TONS
3.1.3 ELIN XX1U – XX20 Forklift Services Unit of Issue is DAY (DY).
3.2 MOBILE CRANE SERVICES (ELIN XX20 – XX27)
3.2.1 Contractor shall provide mobile crane services (shore and floating cranes) with operator(s) and safety observer(s). The cranes provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The cranes shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.
3.2.2 The following ELINs are included:
ELIN XX21: MOBILE CRANE SERVICES - UP TO 15 TONS
ELIN XX22: MOBILE CRANE SERVICES - 16 TO 40 TONS
ELIN XX23: MOBILE CRANE SERVICES - 41 TO 75 TONS
ELIN XX24: MOBILE CRANE SERVICES - 76 TO 100 TONS
ELIN XX25: MOBILE CRANE SERVICES - 101 TO 120 TONS
ELIN XX26: MOBILE CRANE SERVICES - 121 TO 160 TONS
ELIN XX27: MOBILE CRANE SERVICES - 161 TO 200 TONS
3.2.3 The contractor shall ensure the requested crane capacity takes into account location of requesting activity, boom length, and all other variables. The contractor’ failure to account for all known variables shall not warrant an equitable adjustment.
3.2.4 The Mobile Crane Services shall be suitable for their intended use, to include but not limited to all necessary equipment, (such as crane pallet bars/slings, and platform etc.), and shall be operated with due care and within all operating safety limits.
3.2.5 ELIN XX20 – XX27 Mobile Crane Services Unit of Issue is DAY (DY).
3.3 CRANE PALLET BARS/SLINGS AND CRANE PLATFORM (ELIN XX28 – XX2C)
3.3.1 Contractor shall provide crane pallet bars/slings and platform capable of handling multiple pallet lifts at a time. Pallet bars/slings and all other rigging equipment shall comply with the appropriate host country safety standards; operational limitations and any applicable restrictions shall be posted on the equipment. The pallet bars/slings and platform provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Compatibility requirements and accessories will be specified at the RTOP level.
3.3.2 The following ELINs are included:
ELIN XX28: CRANE PALLET BARS/SLINGS SERVICES - UP TO 15 TONS
ELIN XX29: CRANE PALLET BARS/SLINGS SERVICES - 16 TO 40 TONS
ELIN XX2A: CRANE PALLET BARS/SLINGS SERVICES - 41 TO 75 TONS
ELIN XX2B: CRANE PALLET BARS/SLINGS SERVICES - 76 TO 100 TONS
ELIN XX2C: CRANE PLATFORM
3.3.3 ELIN XX28 – XX2C Crane Pallet Bars/Slings and Crane Platform Unit of Issue is DAY (DY).
3.4 MANLIFT SERVICES WITHOUT OPERATOR (ELIN XX2D – XX2G)
3.4.1 Contractor shall provide a manlift without operator. The contractor shall provide manlift for the conveyance of persons which consists of platforms or brackets mounted on, or attached to, an endless belt, cable, chain or similar method of suspension; such belt, cable, or chain operating in a substantially vertical direction and being supported by and driven through pulleys, sheaves, or sprockets at the top and bottom. Contractor shall perform daily maintenance checks on the manlift prior to 0730 each morning.
Contractor shall conduct training on safety and operating procedures for requesting activity personnel. The manlift shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Contractor shall maintain documentation of requesting activity personnel acknowledgement of the training. Weight capacity of least 1000 lbs. Government may change weight capacity at the RTOP solicitation and task order.
3.4.2 The following ELINs are included:
ELIN XX2D: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 60 FT REACH
ELIN XX2E: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 90 FT REACH
ELIN XX2F: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 120 FT REACH
ELIN XX2G: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 135 FT REACH
3.4.3 ELIN XX2D - XX2G Manlift Services without Operator Unit of Issue is DAY (DY).
3.5 MANLIFT OPERATOR (ELIN XX2H)
3.5.1 If the requesting activity orders the manlift operator or if the operator is required by local laws and regulations (it shall be noted in response to the RTOP), the price for the operator is per hour for a minimum of four (4) hours of continuous service. Operator shall have all local licenses and training required to operate Manlift.
3.5.2 ELIN XX2H Manlift Operator Unit of Issue is HOUR (HR).
3.6 SCISSOR LIFTS (ELIN XX2J)
3.6.1 Contractor shall provide scissor lifts also known as a sky lift, fully fueled, that have been properly maintained and serviced. If a scissor lift does not meet the requirements of this contract, the Government shall have the right to reject the scissor lift for performance of services. Contractor shall ensure that each scissor lift is jointly inspected before and after use by contractor and an authorized representative of the Government. The Government shall not consider any claim for damage to a scissor lift, which has not been inspected. If the scissor lift is not operable when required under this contract, contractor shall provide, at no additional expense, a replacement scissor lift within three (3) hours that complies in all respects with this contract. Contractor shall replenish the fuel and perform daily maintenance checks on the scissor lift prior to 0730 AM each morning. Contractor shall conduct training on safety and operating procedures for requesting activity personnel. Contractor shall maintain documentation of requesting activity personnel acknowledgement of the training. The scissor lift shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Minimum height is 20 feet. Weight capacity of least 1000 lbs. Government may change weight capacity at the RTOP solicitation and task order.
3.6.2 ELIN XX2J Scissor Lifts Unit of Issue is DAY (DY).
3.7 MANBASKET (ELIN XX2K)
3.7.1 Contractor shall provide a manbasket, also known as a crane basket that has been properly maintained, serviced, and certified. The manbasket shall be used with either a crane or forklift and have a self-closing swing door with a safety chain to secure to the forklift carriage. If a manbasket does not meet the requirements of this contract, the Government shall have the right to reject the manbasket for performance of services. Contractor shall ensure that each manbasket is jointly inspected before and after use by contractor and an authorized representative of the Government. The Government shall not consider any claim for damage to a manbasket which has not been inspected. If the manbasket is not operable when required under this contract, contractor shall provide, at no additional expense, a replacement man lift within three (3) hours that complies in all respects with this contract shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Weight capacity of least 1000 lbs. Government may change weight capacity at the RTOP solicitation and task order.
3.7.2 ELIN XX2K Manbasket Unit of Issue is DAY (DY).
3.8 CONSTRUCTION EQUIPMENT SERVICES WITH OPERATOR (ELIN XX2L – XX35)
3.8.1 Contractor shall provide construction equipment services with operator(s). The construction equipment provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The construction equipment shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.
3.8.2 The following ELINs are included:
ELIN XX2L: D8 BULLDOZER
ELIN XX2M: D7 BULLDOZER
ELIN XX2N: D9 BULLDOZER
ELIN XX2P: SKID STEER WITH BUCKET AND AUGER ATTACHMENT
ELIN XX2Q: FRONT END LOADER
ELIN XX2R: EXCAVATOR
ELIN XX2S: FUEL TRUCK
ELIN XX2T: WATER DISTRIBUTOR TRUCK
ELIN XX2U: SCRAPER 22 CYD
ELIN XX2V: GRADER
ELIN XX2W: ARC WELDER TRAILER
ELIN XX2X: DUMP TRUCK 15 TON
ELIN XX2Y: CONCRETE SAW FOR SKID STEER
ELIN XX2Z: VIBRATORY ROLLER 4 TON
ELIN XX30: VIBRATORY ROLLER 10 TON
ELIN XX31: VIBRATORY ROLLER 9 WHEEL
ELIN XX32: MILLING MACHINE
ELIN XX33: ASPHALT PAVER
ELIN XX34: EMULSION DISTRIBUTOR TRUCK
ELIN XX35: SAW RADIAL WOOD TRAILER
3.8.3 ELIN XX2L – XX35 Construction Equipment Services Unit of Issue is DAY (DY).
3.9 CONSTRUCTION EQUIPMENT SERVICES WITHOUT OPERATOR (ELIN XX36 – XX3R)
3.9.1 Contractor shall provide construction equipment services without operator(s). The construction equipment provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The construction equipment shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.
3.9.2 The following ELINs are included:
ELIN XX36: D8 BULLDOZER
ELIN XX37: D7 BULLDOZER
ELIN XX38: D9 BULLDOZER
ELIN XX39: SKID STEER WITH BUCKET AND AUGER ATTACHMENT
ELIN XX3A: FRONT END LOADER WITH
ELIN XX3B: EXCAVATOR
ELIN XX3C: FUEL TRUCK
ELIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .