Text version
DIVISION 2 SECTION 02311
SITEWORK ROAD GRADING
2020 BFO WESTON HILLS ROAD GRADING 02311 - 1 of 3
SECTION 02311
ROAD GRADING
PART 1 GENERAL
1.1 SUMMARY
A. Description of Work: Furnishing labor, equipment, supplies, and materials to grade and restore gravel and dirt roadways as specified on the plans, maps, exhibits, and as specified herein. Work shall be performed in accordance with the specifications and contract.
The road sections include seven (7) areas, one of approximately 300 linear feet and others up to 100 linear feet each and are not contiguous. Weston Road in located in Campbell County, Wyoming.
B. Contractor shall ensure there is no additional disturbance to the road, shoulder, or adjacent landscape while moving equipment and motor grader between the road sections. The Contractor shall coordinate the grading of the road sections with the BLM in order to best determine when to perform work with precipitation and moisture conditions.
All road sections are primitive two-track, user created, and have minimal aggregate surfacing. The road sections shall be restored to a useable condition.
1.2 DEFINITIONS
A. Fill Material: Pit run material shall be mineral soil free from peat, frozen material, brush, trees, roots over 50 mm (2 inches) in diameter and rocks over 100 mm (4 inches) in greatest diameter.
1.3 QUALITY ASSURANCE
A. Failure Criteria: Not limited to the following:
1. Formation of pools of moisture where positive drainage is indicated on the drawings or as specified herein.
2. Settlement of fill.
1.4 PROJECT/SITE CONDITIONS
A. Environmental Conditions: Do not attempt to grade frozen or saturated material. The
Contractor shall coordinate the grading of the roads with the BLM in order time the work with precipitation and moisture content. Work will be postponed until conditions are favorable to minimize damage.
PART 2: PRODUCTS
2.1 EQUIPMENT AND MATERIALS
A. General: See definitions.
1. Road Grading Equipment: The Contractor shall provide a motor grader with a minimum 150 horsepower and twelve-foot blade. The cutting edges of the blade shall be in good condition, free from deformation due to excessive wear. All
2020 BFO WESTON HILLS ROAD GRADING 02311 - 2 of 3 controls, including brakes, shall be in proper working condition to allow full control of the grading at all times.
PART 3: EXECUTION
3.1 PERFORAMANCE STANDARDS AND INSTALLATION
A. Grading
1. When not otherwise indicated, material shall be level, or uniform slopes between points where elevations are given, or between such points and existing finished grades. Abrupt change in slopes shall be rounded and blended. Finish grading shall match and blend into existing topography and promote positive drainage away from road surface. Site drainage shall be considered of prime importance.
2. Maximum graded side slope: 3H:1V B. Compaction Methods: Fill material shall be spread over the full area of the cross section of the fill to a maximum layer thickness of 6 inches (150 mm). Wheel tracking the fill may be used to obtain the required degree of compaction.
C. Traffic Control:
1. The Contractor shall conform to MUTCD requirements for control of traffic in the work zone.
3.2 FIELD QUALITY CONTROL
A. The Owner reserves the right to conduct testing at any time.
B. Unless otherwise specified on the plans, provide positive drainage. The contractor will grade and compact such that no ponding greater than 4” deep nor larger than 1 sq. ft.
occurs.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Measurement of topsoil stripping and replacement, grading, scarification, compaction, seeding shall be made per section of road grading completed in place as identified on the drawings, exhibits, figures, and as identified herein.
4.2 BASIS OF PAYMENT
A. Payment for each item shall be considered as full compensation for furnishing all labor, materials, tools, equipment, and other incidentals necessary to complete each component of the Work described in this Section.
2020 BFO WESTON HILLS ROAD GRADING 02311 - 3 of 3
B. All components of the Work described in this section not called out as pay items shall be considered subsidiary items of Work. No separate measurement and payment shall be made for subsidiary items.
C. Payment for Work described in this Section shall be based on the Contract unit price for each component of the Work in place, complete, and accepted as shown below:
Item Basis of Payment Grade and Repair Road Linear Feet (LF)
END OF SECTION
WESTON HILLS ROAD GRAVEL 02503-2
£¤14 £¤16
Gillette
128 129 132 141
¬«51¬«50
¬«59
§̈¦90
Weston Hills Gravel Project
Weston Hills Recreation Area _̂ Weston Turnoff
Weston Hills Gravel Project:
Exit 124 of Interstate-90 Turn East on HWY. 59 at Gillette Airport Approximately: 30.3 miles +/- North of Gillette on HWY.
GPS Coordinates: 105°3'21.94"W 44°12'37.899"N
Airport
Weston Hills Recreation Area
0 4 8 12 Miles
ITEM
NO. SECTION ITEM UNIT
BID
QUANTITY BID UNIT PRICE TOTAL BID PRICE
1A 2310 Grade and Repair Road LF 900
2A 2310 Pit Run TN 300.00
SUBTOTAL SCHEDULE A
SUBTOTAL SCHEDULE A
TOTAL BASE BID
PREPARERS SIGNATURE:
DATE:
REVIEWERS SIGNATURE:
DATE:
HIGH PLAINS DISTRICT - BUFFALO FIELD OFFICE
BID SCHEDULE
2020 BFO WESTON HILLS ROAD
SCHEDULE A (WESTON HILLS ROAD)
| Section02311 RoadGradingBFO WestonHills20200821 |
| 1.1 SUMMARY |
| A. Description of Work: Furnishing labor, equipment, supplies, and materials to grade and restore gravel and dirt roadways as specified on the plans, maps, exhibits, and as specified herein. Work shall be performed in accordance with the specificatio... |
| The road sections include seven (7) areas, one of approximately 300 linear feet and others up to 100 linear feet each and are not contiguous. Weston Road in located in Campbell County, Wyoming. |
| B. Contractor shall ensure there is no additional disturbance to the road, shoulder, or adjacent landscape while moving equipment and motor grader between the road sections. The Contractor shall coordinate the grading of the road sections with the BL... |
| All road sections are primitive two-track, user created, and have minimal aggregate surfacing. The road sections shall be restored to a useable condition. |
| 1.2 DEFINITIONS |
| A. Fill Material: Pit run material shall be mineral soil free from peat, frozen material, brush, trees, roots over 50 mm (2 inches) in diameter and rocks over 100 mm (4 inches) in greatest diameter. |
| 1.3 QUALITY ASSURANCE |
| A. Failure Criteria: Not limited to the following: |
| 1. Formation of pools of moisture where positive drainage is indicated on the drawings or as specified herein. |
| 2. Settlement of fill. |
| 1.4 PROJECT/SITE CONDITIONS |
| A. Environmental Conditions: Do not attempt to grade frozen or saturated material. The Contractor shall coordinate the grading of the roads with the BLM in order time the work with precipitation and moisture content. Work will be postponed until co... |
| 2.1 EQUIPMENT AND MATERIALS |
| A. General: See definitions. |
| 3.1 PERFORAMANCE STANDARDS AND INSTALLATION |
| A. Grading |
| 1. When not otherwise indicated, material shall be level, or uniform slopes between points where elevations are given, or between such points and existing finished grades. Abrupt change in slopes shall be rounded and blended. Finish grading shall ma... |
| 2. Maximum graded side slope: 3H:1V |
| B. Compaction Methods: Fill material shall be spread over the full area of the cross section of the fill to a maximum layer thickness of 6 inches (150 mm). Wheel tracking the fill may be used to obtain the required degree of compaction. |
| C. Traffic Control: |
| 1. The Contractor shall conform to MUTCD requirements for control of traffic in the work zone. |
| 3.2 FIELD QUALITY CONTROL |
| A. The Owner reserves the right to conduct testing at any time. |
| B. Unless otherwise specified on the plans, provide positive drainage. The contractor will grade and compact such that no ponding greater than 4” deep nor larger than 1 sq. ft. occurs. |
| 4.1 METHOD OF MEASUREMENT |
| A. Measurement of topsoil stripping and replacement, grading, scarification, compaction, seeding shall be made per section of road grading completed in place as identified on the drawings, exhibits, figures, and as identified herein. |
| 4.2 BASIS OF PAYMENT |
| A. Payment for each item shall be considered as full compensation for furnishing all labor, materials, tools, equipment, and other incidentals necessary to complete each component of the Work described in this Section. |
| B. All components of the Work described in this section not called out as pay items shall be considered subsidiary items of Work. No separate measurement and payment shall be made for subsidiary items. |
| C. Payment for Work described in this Section shall be based on the Contract unit price for each component of the Work in place, complete, and accepted as shown below: |
| Item Basis of Payment |
| Section 2503GAggregateSurfacing BFO Westonhills20200821 |
| Engineering_WestonHills_Gravel |
| BidSched BFOWeston20200821 |
| Bid Schedule |
File details come from the government source that posted it. Updated .