West Park Bandshell Demolition.pdf
PDF 2 MB Posted
- Attached to
- Demolition of West Park Bandshell
- Solicitation number
- 4791
- Issued by
- Washtenaw County, Michigan
About this file
This Invitation to Bid (ITB) is issued by the City of Ann Arbor Community Services Area, Parks and Recreation Services, seeking a qualified contractor for the demolition of the West Park Bandshell. The project scope includes removal of the existing park shelter, wood retaining wall, and stamped concrete path, followed by installation of a new HMA (hot mix asphalt) path and landscaping restoration. Work items encompass general demolition and disposal (27,345 cubic feet), asbestos and lead paint abatement, erosion control measures, utility disconnections (storm sewer, sanitary sewer, and water main), HMA removal and installation, site excavation and grading, dewatering, contaminated material handling, landscaping bed preparation, and planting of native species including white oak, tuliptree, bur oak, swamp tupelo, and birch trees, along with perennials and seed mixes totaling over 4,450 plant units. The bid deadline is July 9, 2026, at 2:00 PM local time, with questions due by June 29, 2026, at 5:00 PM. The contract performance period is 224 consecutive calendar days from the Notice to Proceed, with liquidated damages of $500 per day for delays. Bidders must submit one original bid, one copy, and one USB drive containing a scanned copy in a sealed envelope to the City of Ann Arbor Procurement Unit, 301 East Huron Street, Ann Arbor, Michigan 48104.
Bid security of 5 percent of the total bid price is required in the form of a certified check or bid bond from a surety licensed in Michigan. The City intends to award the contract to the lowest responsible bidder and reserves the right to accept or reject any or all bids. All contractors must comply with prevailing wage requirements under Chapter 14 of the Ann Arbor City Code and living wage provisions under Chapter 23, with payroll records required for verification. Contractors must provide comprehensive insurance documentation including workers' compensation, commercial general liability ($1,000,000 per occurrence), motor vehicle liability ($1,000,000 per occurrence), and umbrella/excess liability ($1,000,000) prior to work commencement. Performance and labor/material bonds equal to 100 percent of the contract amount are required. The City is exempt from state sales and federal excise taxes. Successful bidders must execute a contract within 10 days of award notification and comply with non-discrimination requirements, conflict of interest disclosures, and environmental commitments as outlined in the City's procurement policies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ANN ARBOR
INVITATION TO BID
WEST PARK BANDSHELL DEMOLITION
ITB No. 4791
Due Date: JULY 9, 2026 at 2:00 PM (Local Time)
City of Ann Arbor Community Services Area/ Parks and Recreation Services
Issued By:
Procurement Unit
301 E. Huron Street Ann Arbor, MI 48104
TABLE OF CONTENTS
INSTRUCTIONS TO BIDDERS
INVITATION TO BID
BID FORMS
CONTRACT
BOND FORMS
GENERAL CONDITIONS
STANDARD SPECIFICATIONS
DETAILED SPECIFICATIONS
ATTACHMENTS
City of Ann Arbor Vendor Conflict of Interest Disclosure Form City of Ann Arbor Non-Discrimination Ordinance Declaration Form and Notice City of Ann Arbor Living Wage Ordinance Declaration of Compliance and Notice City of Ann Arbor Prevailing Wage Declaration of Compliance
INSTRUCTIONS TO BIDDERS
General The purpose of this Invitation to Bid (ITB) is to select a firm to provide construction services for the demolition of the West Park Bandshell. Work for this project involves the removal of the existing park shelter, wood retaining wall and stamped concrete path, as well as installation of a new HMA path and landscaping.
Work to be done under this Contract is generally described through the detailed specifications and must be completed fully in accordance with the contract documents. All work to be done under this Contract is located in or near the City of Ann Arbor and should completed within 224 days from the Notice to Proceed. Liquidated damages of five hundred dollars per day ($500/day) will apply.
Any Bid which does not conform fully to these instructions may be rejected.
Preparation of Bids Bids should be prepared providing a straight-forward, concise description of the Bidder’s ability to meet the requirements of the ITB. Bids shall be written in ink or typewritten. No erasures are permitted. Mistakes may be crossed out and corrected and must be initialed and dated in ink by the person signing the Bid.
Bids must be submitted on the "Bid Forms" provided with each blank properly filled in. If forms are not fully completed it may disqualify the bid. No alternative bid will be considered unless alternative bids are specifically requested. If alternatives are requested, any deviation from the specification must be fully described, in detail on the "Alternate" section of Bid form.
Each person signing the Bid certifies that he/she is the person in the Bidder’s firm/organization responsible for the decision as to the fees being offered in the Bid and has not and will not participated in any action contrary to the terms of this provision.
Bid Security Each bid must be accompanied by a certified check or Bid Bond by a surety licensed and authorized to do business within the State of Michigan, in the amount of 5% of the total of the bid price.
Questions or Clarification / Designated City Contacts All questions regarding this ITB shall be submitted via email. Emailed questions and inquires will be accepted from any and all prospective Bidders in accordance with the terms and conditions of the ITB.
All questions shall be due on or before June 29, 2026 @ 5:00 p.m. and should be addressed as follows:
Specification/Scope of Work questions emailed to Madison Merzlyakov, mmerzlyakov@a2gov.org Bid Process and Compliance questions emailed to Colin Spencer, CSpencer@a2gov.org
Any error, omissions or discrepancies in the specification discovered by a prospective contractor and/or service provider shall be brought to the attention of Colin Spencer at cspencer@a2gov.org after discovery as possible. Further, the contractor and/or service provider shall not be allowed to take advantage of errors, omissions or discrepancies in the specifications.
Addenda If it becomes necessary to revise any part of the ITB, notice of the Addendum will be posted to Michigan Inter-governmental Trade Network (MITN) www.mitn.info and/or City of Ann Arbor web site www.A2gov.org for all parties to download.
Each Bidder must in its Bid, to avoid any miscommunications, acknowledge all addenda which it has received, but the failure of a Bidder to receive, or acknowledge receipt of; any addenda shall not relieve the Bidder of the responsibility for complying with the terms thereof.
The City will not be bound by oral responses to inquiries or written responses other than written addenda.
Bid Submission All Bids are due and must be delivered to the City of Ann Arbor Procurement Unit on or before July 9, 2026, at 2:00 p.m. (Local time). Bids submitted late or via oral, telephonic, telegraphic, electronic mail or facsimile will not be considered or accepted.
Each Bidder must submit one (1) original Bid, one (1) Bid copy and one (1) USB drive that contains a scanned copy of the paper bid submission in a sealed envelope clearly marked:
ITB No. 4791 – West Park Bandshell Demolition.
Bids must be addressed and delivered to:
Procurement Unit, c/o Customer Services, 1st Floor 301 East Huron Street Ann Arbor, MI 48104
All Bids received on or before the Due Date will be publicly opened and recorded immediately.
No immediate decisions are rendered.
The following forms provided within this ITB Document should be included in submitted bids.
• Vendor Conflict of Interest Disclosure Form
• City of Ann Arbor Non-Discrimination Ordinance Declaration of Compliance
• City of Ann Arbor Living Wage Ordinance Declaration of Compliance
• City of Ann Arbor Prevailing Wage Declaration of Compliance
Bids that fail to provide these forms listed above upon bid opening may be rejected as non-responsive and may not be considered for award.
Hand delivered bids may be dropped off to City Customer Service or in the Purchasing drop box located in the Ann Street (north) vestibule/entrance of City Hall which is open to the public Monday through Friday from 8am to 5pm (except holidays). The City will not be liable to any Bidder for any unforeseen circumstances, delivery or postal delays. Postmarking to the Due Date will not substitute for receipt of the Bid. Each Bidder is responsible for submission of their Bid.
Additional time for submission of bids past the stated due date and time will not be granted to a single Bidder; however, additional time may be granted to all Bidders when the City determines in its sole discretion that circumstances warrant it.
Award The City intends to award a Contract(s) to the lowest responsible Bidder(s). On multi-divisional contracts, separate divisions may be awarded to separate Bidders. The City may also utilize alternatives offered in the Bid Forms, if any, to determine the lowest responsible Bidder on each division, and award multiple divisions to a single Bidder, so that the lowest total cost is achieved for the City. For unit price bids, the Contract will be awarded based upon the unit prices and the lump sum prices stated by the bidder for the work items specified in the bid documents, with consideration given to any alternates selected by the City. If the City determines that the unit price for any item is materially different for the work item bid than either other bidders or the general market, the City, in its sole discretion, in addition to any other right it may have, may reject the bid as not responsible or non-conforming.
The acceptability of major subcontractors will be considered in determining if a Bidder is responsible. In comparing Bids, the City will give consideration to alternate Bids for items listed in the bid forms. All key staff and subcontractors are subject to the approval by the City.
Official Documents The City of Ann Arbor officially distributes bid documents from the Procurement Unit or through the Michigan Intergovernmental Trade Network (MITN). Copies of the bid documents obtained from any other source are not Official copies. Addenda and other bid information will only be posted to these official distribution sites. If you obtained City of Ann Arbor Bid documents from other sources, it is recommended that you register on www.MITN.info and obtain an official Bid.
Taxes Municipalities are exempt from Michigan State Sales and Federal Excise taxes. Do not include such taxes in the bid figure(s). The City will furnish the successful bidder with tax exemption certificates when requested.
Withdrawal of Bids After the time of opening, no Bid may be withdrawn for the period of one-hundred and twenty
(120) days.
Contract Time Time is of the essence in the performance of the work under this Contract. The available time for work under this Contract is indicated on page C-2, Article III of the Contract. If these time requirements cannot be met, the Bidder must stipulate on Bid Form Section 3 - Time Alternate its schedule for performance of the work. Consideration will be given to time in evaluating bids.
Liquidated Damages A liquidated damages clause, as given on page C-2, Article III of the Contract, provides that the
Contractor shall pay the City as liquidated damages, and not as a penalty, a sum certain per day for each and every day that the Contractor may be in default of completion of the specified work, within the time(s) stated in the Contract, or written extensions.
Liquidated damages clauses, as given in the General Conditions, provide further that the City shall be entitled to impose and recover liquidated damages for breach of the obligations under Chapter 112 of the City Code.
The liquidated damages are for the non-quantifiable aspects of any of the previously identified events and do not cover actual damages that can be shown or quantified nor are they intended to preclude recovery of actual damages in addition to the recovery of liquidated damages.
Non-Discrimination Requirements
All contractors proposing to do business with the City shall satisfy the non-discrimination administrative policy adopted by the City Administrator in accordance with the Section 9:158 of the Ann Arbor City Code. Breach of the obligation not to discriminate shall be a material breach of the contract. Contractors are required to post a copy of Ann Arbor’s Non-Discrimination Ordinance attached at all work locations where its employees provide services under a contract with the City.
Wage Requirements The Attachments provided herein outline the requirements for payment of prevailing wages or of a “living wage” to employees providing service to the City under this contract. The successful bidder must comply with all applicable requirements and provide documentary proof of compliance when requested.
Pursuant to Resolution R-16-469 all public improvement contractors are subject to prevailing wage and will be required to provide to the City payroll records sufficient to demonstrate compliance with the prevailing wage requirements. Use of Michigan Department of Transportation Prevailing Wage Forms (sample attached hereto) or a City-approved equivalent will be required along with wage rate interviews.
For laborers whose wage level are subject to federal, state and/or local prevailing wage law the appropriate Davis-Bacon wage rate classification is identified based upon the work including within this contract. The wage determination(s) current on the date 10 days before responses are due shall apply to this contract. The U.S. Department of Labor (DOL) has provided explanations to assist with classification in the following resource link: www.wdol.gov.
For the purposes of this RFP the Construction Type of Heavy will apply.
Conflict Of Interest Disclosure The City of Ann Arbor Purchasing Policy requires that prospective Vendors complete a Conflict of Interest Disclosure form. A contract may not be awarded to the selected Vendor unless and until the Procurement Unit and the City Administrator have reviewed the Disclosure form and determined that no conflict exists under applicable federal, state, or local law or administrative regulation. Not every relationship or situation disclosed on the Disclosure Form may be a disqualifying conflict. Depending on applicable law and regulations, some contracts may awarded on the recommendation of the City Administrator after full disclosure, where such action is allowed by law, if demonstrated competitive pricing exists and/or it is determined the award is in the best interest of the City. A copy of the Vendor Conflict of Interest Disclosure Form is attached.
Major Subcontractors The Bidder shall identify each major subcontractor it expects to engage for this Contract if the work to be subcontracted is 15% or more of the bid sum or over $50,000, whichever is less. The Bidder also shall identify the work to be subcontracted to each major subcontractor. The Bidder shall not change or replace a subcontractor without approval by the City.
Debarment Submission of a Bid in response to this ITB is certification that the Bidder is not currently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from participation in this transaction by any State or Federal departments or agency. Submission is also agreement that the City will be notified of any changes in this status.
Disclosures After bids are opened, all information in a submitter’s bid is subjected to disclosure under the provisions of Michigan Public Act No. 442 of 1976, as amended (MCL 15.231 et seq.) known as the “Freedom of Information Act.” The Freedom of Information Act also provides for the complete disclosure of contracts and attachments thereto except where specifically exempted.
Bid Protest All Bid protests must be in writing and filed with the Purchasing Agent within five (5) business days of any notices of intent, including, but not exclusively, divisions on prequalification of bidders, shortlisting of bidders, or a notice of intent to award. Only bidders who responded to the solicitation may file a bid protest. The bidder must clearly state the reasons for the protest. If a bidder contacts a City Service Area/Unit and indicates a desire to protest an award, the Service Area/Unit shall refer the bidder to the Purchasing Agent. The Purchasing Agent will provide the bidder with the appropriate instructions for filing the protest. The protest shall be reviewed by the City Administrator or designee whose decision shall be final.
Any inquiries or requests regarding this procurement should be only submitted in writing to the Designated City Contacts provided herein. Attempts by a bidder to initiate contact with anyone other than the Designated City Contacts provided herein that the prospective bidder believes can influence the procurement decision, e.g., Elected Officials, City Administrator, Selection Committee Members, Appointed Committee Members, etc., may lead to immediate elimination from further consideration.
Cost Liability The City of Ann Arbor assumes no responsibility or liability for costs incurred by the Bidder prior to the execution of a contract with the City. By submitting a bid, a bidder agrees to bear all costs incurred or related to the preparation, submission and selection process for the bid.
Reservation of Rights The City of Ann Arbor reserves the right to accept any bid or alternative bid proposed in whole or in part, to reject any or all bids or alternatives bids in whole or in part and to waive irregularity and/or informalities in any bid and to make the award in any manner deemed in the best interest of the City.
Environmental Commitment The City of Ann Arbor recognizes its responsibility to minimize negative impacts on human health and the environment while supporting a vibrant community and economy. The City further recognizes that the products and services the City buys have inherent environmental and economic impacts and that the City should make procurement decisions that embody, promote and encourage the City’s commitment to the environment.
The City strongly encourages potential vendors to bring forward tested, emerging, innovative, and environmentally preferable products and services that are best suited to the City’s environmental principles. This includes products and services such as those with lower greenhouse gas emissions, high recycled content, without toxic substances, those with high reusability or recyclability, those that reduce the consumption of virgin materials, and those with low energy intensity.
As part of its environmental commitment, the City reserves the right to award a contract to the most responsive and responsible bidder, which includes bids that bring forward products or services that help advance the City’s environmental commitment. In addition, the City reserves the right to request that all vendors report their annual greenhouse gas emissions, energy consumption, miles traveled, or other relevant criteria in order to help the City more fully understand the environmental impact of its procurement decisions.
INVITATION TO BID
Guy C. Larcom Municipal Building Ann Arbor, Michigan 48107
Ladies and Gentlemen:
The undersigned, as Bidder, declares that this Bid is made in good faith, without fraud or collusion with any person or persons bidding on the same Contract; that this Bidder has carefully read and examined the bid documents, including City Nondiscrimination requirements, Vendor Conflict of Interest Form, Living Wage requirements, Prevailing Wage requirements, Instructions to Bidders, Bid Forms, Purchase Order Terms and Conditions, General Conditions, Detailed Specifications, and all Addenda, and understands them. The Bidder declares that it conducted a full investigation of the work proposed and is fully informed as to the nature of the work and the conditions relating to the work's performance.
The Bidder acknowledges that it has not received or relied upon any representations or warrants of any nature whatsoever from the City of Ann Arbor, its agents or employees, and that this Bid is based solely upon the Bidder's own independent business judgment.
In accordance with these bid documents, and Addenda numbered , the undersigned, as Bidder, proposes to deliver to the City all product/services herein described for the amounts set forth in the Bid Forms.
The Bidder declares that it has become fully familiar with the liquidated damage clauses for completion times and for compliance with City Code Chapter 112, understands and agrees that the liquidated damages are for the non-quantifiable aspects of non-compliance and do not cover actual damages that may be shown and agrees that if awarded the Contract, all liquidated damage clauses form part of the Contract.
Bidder further agrees that the cited provisions of Chapter 14 and Chapter 23 form a part of this Contract.
The Bidder declares that it has become familiar with the City Conflict of Interest Disclosure Form and certifies that the statement contained therein is true and correct.
The Bidder encloses a certified check or Bid Bond in the amount of 5% of the total of the Bid Price. The Bidder agrees both to contract for the work and to furnish the necessary Bonds and insurance documentation within 10 days after being notified of the acceptance of the Bid.
If this Bid is accepted by the City and the Bidder fails to contract and furnish the required Bonds and insurance documentation within 10 days after being notified of the acceptance of this Bid, then the Bidder shall be considered to have abandoned the Contract and the certified check or Bid Bond accompanying this Bid shall become due and payable to the City.
If the Bidder enters into the Contract in accordance with this Bid, or if this Bid is rejected, then the accompanying check or Bid Bond shall be returned to the Bidder.
In submitting this Bid, it is understood that the right is reserved by the City to accept any Bid, to reject any or all Bids, to waive irregularities and/or informalities in any Bid, and to make the award in any manner the City believes to be in its best interest.
SIGNED THIS DAY OF , 202__.
Bidder’s Name Authorized Signature of Bidder
Official Address (Print Name of Signer Above)
Telephone Number Email Address for Award Notice
LEGAL STATUS OF BIDDER
(The Bidder shall fill out the appropriate form and strike out the other three.)
Bidder declares that it is:
* A corporation organized and doing business under the laws of the State of
, for whom , bearing the office title of , whose signature is affixed to this Bid, is authorized to execute contracts.
NOTE: If not incorporated in Michigan, please attach the corporation’s Certificate of Authority
• A limited liability company doing business under the laws of the State of ___________, whom ______________ bearing the title of _____________ whose signature is affixed to this bid, is authorized to execute contract on behalf of the LLC.
* A partnership, organized under the laws of the state of _____________ and filed in the county of _____________, whose members are (list all members and the street and mailing address of each) (attach separate sheet if necessary):
* An individual, whose signature with address, is affixed to this Bid: ________________ (initial here) Authorized Official
___________________________________________ Date ______________, 202_
(Print) Name _______________________________ Title _____________________________
Company: ____________________________________________________________________
Address: _____________________________________________________________________
Contact Phone ( ) ____________________ Fax ( ) ___________________________
Email _________________________________
BID FORM
Section 1 – Schedule of Prices
VENDOR NAME: _________________________________________
BASE BID
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL COST
1 General Conditions, Max. $10,000 1 L Sum
2 Digital Audio Visual Coverage 1 L Sum
Pedestrian Type II Barricade, Temp, Furn & Oper
8 EA
4 Erosion Control Inlet Protection, Fabric Drop 2 EA
5 Erosion Control, Silt Fence 293 Lft
6 Erosion Control, Mud Mat 45 Syd
DS_Demolition & Disposal of Building (Scrap Value Not Incl.)
27,345 Cft
DS_Asbestos & Lead Paint Abatement and Disposal - Allowance
1 L Sum
9 HMA, Any Thickness, Rem 90 syd
Construction Fencing and Pedestrian Traffic Control
1 L Sum
11 Tree Protection Fence 184 Lft
12 Storm Sewer Pipe, 8 In Dia., Rem 20 Lft
13 Sanitary Sewer Pipe, 4 In. Dia. Rem 15 Lft
14 Water Main Pipe, 1 In Dia, Abandon 50 Lft
15 HMA Wearing Course, 1.5 In., 5E03 7 Ton
16 HMA Base Course, 2.5 In., 4E03 11 Ton
17 Aggregate Base, 6 In, 21AA, CIP 80 Syd
18 Earth Excavation 481 Cyd
19 Machine Grading 900 Syd
20 Embankment 485 Cyd
21 Dewatering 1 L Sum
Non-Hazardous Contaminated Material Handling and Disposal
344 Cyd
23 Project Clean-Up and Restoration 1 L Sum
24 DS_Basin Planting Bed Preparation 405 Syd
25 DS_White Oak (Quercus alba) 3 Ea
26 DS_Tuliptree (Liriodendron tulipifera) 2 Ea
27 DS_Bur Oak (Quercus macrocarpa) 1 Ea
28 DS_Swamp Tupelo (Nyssa biflora) 1 Ea
DS_Parkland Pillar White Birch (Betula platyphylla 'jefpark')
24 EA
30 DS_Perennials/Sedges (2" Plant plugs) 4,450 EA
31 DS_Ferns/Perennials/Sedges (1 Gal Pot) 950 EA
32 DS_Upland Seed Mix w/ 4" Topsoil & Mulch 1,100 Syd
33 DS_Turf Restoration w/ 4" Topsoil & Mulch 350 Syd
34 Permits 1 L Sum
Total Base Bid Amount: $______________________
ALTERNATES
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL COST
A1
Detailed Specifications_In lieu of Parkland Pillar White Birch (Betula platyphylla 'jefpark'), provide River Birch (Betula nigra).
This cost REPLACES the cost listed for Line Item 29.
24 Ea
Total Bid Amount w/ Alternates: $______________________
Section 2 – Material, Equipment and Environmental Alternates
The Base Bid proposal price shall include materials and equipment selected from the designated items and manufacturers listed in the bidding documents. This is done to establish uniformity in bidding and to establish standards of quality for the items named.
If the Contractor wishes to quote alternate items for consideration by the City, it may do so under this Section. A complete description of the item and the proposed price differential must be provided. Unless approved at the time of award, substitutions where items are specifically named will be considered only as a negotiated change in Contract Sum.
If an environmental alternative is bid the City strongly encourages bidders to provide recent examples of product testing and previous successful use for the City to properly evaluate the environmental alternative. Testing data from independent accredited organizations are strongly preferred.
Item Number Description Add/Deduct Amount
If the Bidder does not suggest any material or equipment alternate, the Bidder MUST complete the following statement:
For the work outlined in this request for bid, the bidder does NOT propose any material or equipment alternate under the Contract.
Signature of Authorized Representative of Bidder _______________________ Date _________
Section 3 – Time Alternate
If the Bidder takes exception to the time stipulated in Article III of the Contract, Time of Completion, page C-2, it is requested to stipulate below its proposed time for performance of the work.
Consideration will be given to time in evaluating bids.
If the Bidder does not suggest any time alternate, the Bidder MUST complete the following statement:
For the work outlined in this request for bid, the bidder does NOT propose any time alternate under the Contract.
Signature of Authorized Representative of Bidder ______________________ Date _________
Section 4 – Major Subcontractors
For purposes of this Contract, a Subcontractor is anyone (other than the Contractor) who performs work (other than or in addition to the furnishing of materials, plans or equipment) at or about the construction site, directly or indirectly for or on behalf of the Contractor (and whether or not in privity of Contract with the Contractor), but shall not include any individual who furnishes merely the individual’s own personal labor or services.
Contractor agrees that all subcontracts entered into by the Contractor shall contain similar wage provision to Section 4 of the General Conditions covering subcontractor’s employees who perform work on this contract.
For the work outlined in these documents the Bidder expects to engage the following major subcontractors to perform the work identified:
Subcontractor (Name and Address) Work Amount
If the Bidder does not expect to engage any major subcontractor, the Bidder MUST complete the following statement:
For the work outlined in this request for bid, the bidder does NOT expect to engage any major subcontractor to perform work under the Contract.
Signature of Authorized Representative of Bidder_________________________ Date _______
Section 5 – References
Please list at least three references with whom you have had similar contracts during the past three years.
1. Company or City ________________________________________________
Contact Name ________________________________________________
Telephone Number ________________________________________________
E-mail ________________________________________________
2. Company or City ________________________________________________
Contact Name ________________________________________________
3. Company or City ________________________________________________
Contact Name ________________________________________________
SAMPLE STANDARD CONTRACT
If a contract is awarded, the selected contractor will be required to adhere to a set of general contract provisions which will become a part of any formal agreement. These provisions are general principles which apply to all contractors of service to the City of Ann Arbor such as the following:
CONTRACT
THIS CONTRACT is between the CITY OF ANN ARBOR, a Michigan Municipal Corporation, 301 East Huron Street, Ann Arbor, Michigan 48104 (“City”) and (“Contractor”)
(An individual/partnership/corporation, include state of incorporation) (Address)
Based upon the mutual promises below, the Contractor and the City agree as follows:
ARTICLE I - Scope of Work
The Contractor agrees to furnish all of the materials, equipment and labor necessary; and to abide by all the duties and responsibilities applicable to it for the project titled ITB# 4791 West Park Bandshell Demolition in accordance with the requirements and provisions of the following documents, including all written modifications incorporated into any of the documents, all of which are incorporated as part of this Contract:
Non-discrimination and Living Wage Declaration of Compliance Forms (if applicable) Vendor Conflict of Interest Form Prevailing Wage Declaration of Compliance Form (if applicable) Bid Forms Contract and Exhibits Bonds
General Conditions Standard Specifications Detailed Specifications Plans Addenda
ARTICLE II - Definitions
Administering Service Area/Unit means Community Services Area / Parks and Recreation Services
Project means ITB# 4791 West Park Bandshell Demolition
Supervising Professional means the person acting under the authorization of the manager of the Administering Service Area/Unit. At the time this Contract is executed, the Supervising Professional is: Adam Fercho whose job title is Park Planner & Landscape Architect. If there is any question concerning who the Supervising
Professional is, Contractor shall confirm with the manager of the Administering Service Area/Unit.
Contractor’s Representative means ___________________ [Insert name] whose job title is [Insert job title].
ARTICLE III - Time of Completion
(A) The work to be completed under this Contract shall begin immediately on the date specified in the Notice to Proceed issued by the City.
(B) The entire work for this Contract shall be completed within two hundred twenty-four (224) consecutive calendar days.
(C) Failure to complete all the work within the time specified above, including any extension granted in writing by the Supervising Professional, shall obligate the Contractor to pay the City, as liquidated damages and not as a penalty, an amount equal to $500.00 for each calendar day of delay in the completion of all the work.
If any liquidated damages are unpaid by the Contractor, the City shall be entitled to deduct these unpaid liquidated damages from the monies due the Contractor.
The liquidated damages are for the non-quantifiable aspects of any of the previously identified events and do not cover actual damages that can be shown or quantified nor are they intended to preclude recovery of actual damages in addition to the recovery of liquidated damages.
ARTICLE IV - The Contract Sum
(A) The City shall pay to the Contractor for the performance of the Contract, the unit prices as given in the Bid Form for the estimated bid total of:
Dollars ($ )
(B) The amount paid shall be equitably adjusted to cover changes in the work ordered by the Supervising Professional but not required by the Contract Documents.
Increases or decreases shall be determined only by written agreement between the City and Contractor.
ARTICLE V - Assignment
This Contract may not be assigned or subcontracted any portion of any right or obligation under this contract without the written consent of the City. Notwithstanding any consent by the City to any assignment, Contractor shall at all times remain bound to all warranties, certifications, indemnifications, promises and performances, however described, as are required of it under this contract unless specifically released from the requirement, in writing, by the City.
ARTICLE VI - Choice of Law
This Contract shall be construed, governed, and enforced in accordance with the laws of the State of Michigan. By executing this Contract, the Contractor and the City agree to venue in a court of appropriate jurisdiction sitting within Washtenaw County for purposes of any action arising under this Contract. The parties stipulate that the venue referenced in this Contract is for convenience and waive any claim of non-convenience.
Whenever possible, each provision of the Contract will be interpreted in a manner as to be effective and valid under applicable law. The prohibition or invalidity, under applicable law, of any provision will not invalidate the remainder of the Contract.
ARTICLE VII - Relationship of the Parties
The parties of the Contract agree that it is not a Contract of employment but is a Contract to accomplish a specific result. Contractor is an independent Contractor performing services for the City. Nothing contained in this Contract shall be deemed to constitute any other relationship between the City and the Contractor.
Contractor certifies that it has no personal or financial interest in the project other than the compensation it is to receive under the Contract. Contractor certifies that it is not, and shall not become, overdue or in default to the City for any Contract, debt, or any other obligation to the City including real or personal property taxes. City shall have the right to set off any such debt against compensation awarded for services under this Contract.
ARTICLE VIII - Notice
All notices given under this Contract shall be in writing, and shall be by personal delivery or by certified mail with return receipt requested to the parties at their respective addresses as specified in the Contract Documents or other address the Contractor may specify in writing. Notice will be deemed given on the date when one of the following first occur: (1) the date of actual receipt; or
(2) three days after mailing certified U.S. mail.
ARTICLE IX - Indemnification
To the fullest extent permitted by law, Contractor shall indemnify, defend and hold the City, its officers, employees and agents harmless from all suits, claims, judgments and expenses including attorney’s fees resulting or alleged to result, in whole or in part, from any act or omission, which is in any way connected or associated with this Contract, by the Contractor or anyone acting on the Contractor’s behalf under this Contract. Contractor shall not be responsible to indemnify the City for losses or damages caused by or resulting from the City’s sole negligence. The provisions of this Article shall survive the expiration or earlier termination of this contract for any reason.
ARTICLE X - Entire Agreement
This Contract represents the entire understanding between the City and the Contractor and it supersedes all prior representations, negotiations, agreements, or understandings whether written or oral. Neither party has relied on any prior representations in entering into this Contract.
No terms or conditions of either party’s invoice, purchase order or other administrative document shall modify the terms and conditions of this Contract, regardless of the other party’s failure to object to such form. This Contract shall be binding on and shall inure to the benefit of the parties to this Contract and their permitted successors and permitted assigns and nothing in this Contract, express or implied, is intended to or shall confer on any other person or entity any legal or equitable right, benefit, or remedy of any nature whatsoever under or by reason of this Contract.
This Contract may be altered, amended or modified only by written amendment signed by the City and the Contractor.
ARTICLE XI – Electronic Transactions
The City and Contractor agree that signatures on this Contract may be delivered electronically in lieu of an original signature and agree to treat electronic signatures as original signatures that bind them to this Contract. This Contract may be executed and delivered by facsimile and upon such delivery, the facsimile signature will be deemed to have the same effect as if the original signature had been delivered to the other party.
[Signatures on next page]
(Signatures continue on following page)
[INSERT CONTRACTOR NAME HERE] CITY OF ANN ARBOR
By: /AA_CLM_Signature1/ By: /AA_CLM_Signature4/
Name: Name: Milton Dohoney Jr.
Title: Title: City Administrator
Date: /AA_CLM_DateSigned1/ Date: /AA_CLM_DateSigned4/
Approved as to substance:
By: /AA_CLM_Signature2/
Name: Jordan Roberts
Title:
Public Services Area
Administrator
Date: /AA_CLM_DateSigned2/
Approved as to form:
By: /AA_CLM_Signature3/
Name: Atleen Kaur
Title: City Attorney
Date: /AA_CLM_DateSigned3/
CITY OF ANN ARBOR
By: /AA_CLM_Signature5/
Name: /AA_CLM_FullName5/
Title: Mayor
Date: /AA_CLM_DateSigned5/
By: /AA_CLM_Signature6/
Name: /AA_CLM_FullName6/
Title: City Clerk
Date: /AA_CLM_DateSigned6/
PERFORMANCE BOND
(1) of (referred to as
"Principal"), and , a corporation duly authorized to do business in the State of Michigan (referred to as "Surety"), are bound to the City of Ann Arbor, Michigan (referred to as "City"), for $ , the payment of which Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by this bond.
(2) The Principal has entered a written Contract with the City entitled
, for RFP No. ______and this bond is given for that Contract in compliance with Act No. 213 of the Michigan Public Acts of 1963, as amended, being MCL 129.201 et seq.
(3) Whenever the Principal is declared by the City to be in default under the Contract, the Surety may promptly remedy the default or shall promptly:
(a) complete the Contract in accordance with its terms and conditions; or
(b) obtain a bid or bids for submission to the City for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the lowest responsible bidder, arrange for a Contract between such bidder and the City, and make available, as work progresses, sufficient funds to pay the cost of completion less the balance of the Contract price; but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth in paragraph 1.
(4) Surety shall have no obligation to the City if the Principal fully and promptly performs under the Contract.
(5) Surety agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder, or the specifications accompanying it shall in any way affect its obligations on this bond, and waives notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work, or to the specifications.
(6) Principal, Surety, and the City agree that signatures on this bond may be delivered electronically in lieu of an original signature and agree to treat electronic signatures as original signatures that bind them to this bond. This bond may be executed and delivered by facsimile and upon such delivery, the facsimile signature will be deemed to have the same effect as if the original signature had been delivered to the other party.
SIGNED AND SEALED this day of , 202_.
(Name of Surety Company) (Name of Principal)
By (Signature)
By (Signature)
Its (Title of Office)
Its (Title of Office)
Atleen Kaur, City Attorney
Name and address of agent:
LABOR AND MATERIAL BOND
(1) of (referred to as "Principal"), and , a corporation duly authorized to do business in the State of Michigan, (referred to as "Surety"), are bound to the City of Ann Arbor, Michigan (referred to as "City"), for the use and benefit of claimants as defined in Act 213 of Michigan Public Acts of 1963, as amended, being MCL 129.201 et seq., in the amount of
$ , for the payment of which Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by this bond.
(2) The Principal has entered a written Contract with the Cityentitled
, for RFP No. ______ ; and this bond is given for that Contract in compliance with Act No. 213 of the Michigan Public Acts of 1963 as amended;
(3) If the Principal fails to promptly and fully repay claimants for labor and material reasonably required under the Contract, the Surety shall pay those claimants.
(4) Surety's obligations shall not exceed the amount stated in paragraph 1, and Surety shall have no obligation if the Principal promptly and fully pays the claimants.
(5) Principal, Surety, and the City agree that signatures on this bond may be delivered electronically in lieu of an original signature and agree to treat electronic signatures as original signatures that bind them to this bond. This bond may be executed and delivered by facsimile and upon such delivery, the facsimile signature will be deemed to have the same effect as if the original signature had been delivered to the other party.
SIGNED AND SEALED this day of , 202_
(Name of Surety Company) (Name of Principal)
By (Signature)
By
(Signature)
Its (Title of Office)
Its
Atleen Kaur, City Attorney
Name and address of agent:
GENERAL CONDITIONS
Section 1 - Execution, Correlation and Intent of Documents
The contract documents shall be signed in 2 copies by the City and the Contractor.
The contract documents are complementary and what is called for by any one shall be binding.
The intention of the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. Materials or work described in words which so applied have a well-known technical or trade meaning have the meaning of those recognized standards.
In case of a conflict among the contract documents listed below in any requirement(s), the requirement(s) of the document listed first shall prevail over any conflicting requirement(s) of a document listed later.
(1) Addenda in reverse chronological order; (2) Detailed Specifications; (3) Standard Specifications; (4) Plans; (5) General Conditions; (6) Contract; (7) Bid Forms; (8) Bond Forms; (9) Bid.
Section 2 - Order of Completion
The Contractor shall submit with each invoice, and at other times reasonably requested by the Supervising Professional, schedules showing the order in which the Contractor proposes to carry on the work. They shall include the dates at which the Contractor will start the several parts of the work, the estimated dates of completion of the several parts, and important milestones within the several parts.
Section 3 - Familiarity with Work
The Bidder or its representative shall make personal investigations of the site of the work and of existing structures and shall determine to its own satisfaction the conditions to be encountered, the nature of the ground, the difficulties involved, and all other factors affecting the work proposed under this Contract. The Bidder to whom this Contract is awarded will not be entitled to any additional compensation unless conditions are clearly different from those which could reasonably have been anticipated by a person making diligent and thorough investigation of the site.
The Bidder shall immediately notify the City upon discovery, and in every case prior to submitting its Bid, of every error or omission in the bidding documents that would be identified by a reasonably competent, diligent Bidder. In no case will a Bidder be allowed the benefit of extra compensation or time to complete the work under this Contract for extra expenses or time spent as a result of the error or omission.
Section 4 - Wage Requirements
Under this Contract, the Contractor shall conform to Chapter 14 of Title I of the Code of the City of Ann Arbor as amended; which in part states "...that all craftsmen, mechanics and laborers employed directly on the site in connection with said improvements, including said employees of subcontractors, shall receive the prevailing wage for the corresponding classes of craftsmen, mechanics and laborers, as determined by statistics for the Ann Arbor area compiled by the United States Department of Labor. At the request of the City, any contractor or subcontractor shall provide satisfactory proof of compliance with the contract provisions required by the Section.
Pursuant to Resolution R-16-469 all public improvement contractors are subject to prevailing wage and will be required to provide to the City payroll records sufficient to demonstrate compliance with the prevailing wage requirements. A sample Prevailing Wage Form is provided in the Appendix herein for reference as to what will be expected from contractors. Use of the Prevailing Wage Form provided in the Appendix section or a City-approved equivalent will be required along with wage rate interviews.
Where the Contract and the Ann Arbor City Ordinance are silent as to definitions of terms required in determining contract compliance with regard to prevailing wages, the definitions provided in the Davis-Bacon Act as amended (40 U.S.C. 278-a to 276-a-7) for the terms shall be used.
If the Contractor is a “covered employer” as defined in Chapter 23 of the Ann Arbor City Code, the Contractor agrees to comply with the living wage provisions of Chapter 23 of the Ann Arbor City Code. The Contractor agrees to pay those employees providing Services to the City under this Contract a “living wage,” as defined in Section 1:815 of the Ann Arbor City Code, as adjusted in accordance with Section 1:815(3); to post a notice approved by the City of the applicability of Chapter 23 in every location in which regular or contract employees providing services under this Contract are working; to maintain records of compliance; if requested by the City, to provide documentation to verify compliance; to take no action that would reduce the compensation, wages, fringe benefits, or leave available to any employee or person contracted for employment in order to pay the living wage required by Section 1:815; and otherwise to comply with the requirements of Chapter 23.
Contractor agrees that all subcontracts entered into by the Contractor shall contain similar wage provision covering subcontractor’s employees who perform work on this contract.
Section 5 - Non-Discrimination
The Contractor agrees to comply, and to require its subcontractor(s) to comply, with the nondiscrimination provisions of MCL 37.2209. The Contractor further agrees to comply with the provisions of Section 9:158 of Chapter 112 of Title IX of the Ann Arbor City Code, and to assure that applicants are employed and that employees are treated during employment in a manner which provides equal employment opportunity.
Section 6 - Materials, Appliances, Employees
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation, and other facilities necessary or used for the execution and completion of the work. Unless otherwise specified, all materials incorporated in the permanent work shall be new, and both workmanship and materials shall be of the highest quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials.
The Contractor shall at all times enforce strict discipline and good order among its employees, and shall seek to avoid employing on the work any unfit person or anyone not skilled in the work assigned.
Adequate sanitary facilities shall be provided by the Contractor.
Section 7 - Qualifications for Employment
The Contractor shall employ competent laborers and mechanics for the work under this Contract.
For work performed under this Contract, employment preference shall be given to qualified local residents.
Section 8 - Royalties and Patents
The Contractor shall pay all royalties and license fees. It shall defend all suits or claims for infringements of any patent rights and shall hold the City harmless from loss on account of infringement except that the City shall be responsible for all infringement loss when a particular process or the product of a particular manufacturer or manufacturers is specified, unless the City has notified the Contractor prior to the signing of the Contract that the particular process or product is patented or is believed to be patented.
Section 9 - Permits and Regulations
The Contractor must secure and pay for all permits, permit or plan review fees and licenses necessary for the prosecution of the work. These include but are not limited to City building permits, right-of-way permits, lane closure permits, right-of-way occupancy permits, and the like.
The City shall secure and pay for easements shown on the plans unless otherwise specified.
The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the contract documents are at variance with those requirements, it shall promptly notify the Supervising Professional in writing, and any necessary changes shall be adjusted as provided in the Contract for changes in the work.
Section 10 - Protection of the Public and of Work and Property
The Contractor is responsible for the means, methods, sequences, techniques and procedures of construction and safety programs associated with the work contemplated by this contract. The Contractor, its agents or sub-contractors, shall comply with the "General Rules and Regulations for the Construction Industry" as published by the Construction Safety Commission of the State of Michigan and to all other local, State and National laws, ordinances, rules and regulations pertaining to safety of persons and property.
The Contractor shall take all necessary and reasonable precautions to protect the safety of the public. It shall continuously maintain adequate protection of all work from damage, and shall take all necessary and reasonable precautions to adequately protect all public and private property from injury or loss arising in connection with this Contract. It shall make good any damage, injury or loss to its work and to public and private property resulting from lack of reasonable protective precautions, except as may be due to errors in the contract documents, or caused by agents or employees of the City. The Contractor shall obtain and maintain sufficient insurance to cover damage to any City property at the site by any cause.
In an emergency affecting the safety of life, or the work, or of adjoining property, the Contractor is, without special instructions or authorization from the Supervising Professional, permitted to act at its discretion to prevent the threatened loss or injury. It shall also so act, without appeal, if authorized or instructed by the Supervising Professional.
Any compensation claimed by the Contractor for emergency work shall be determined by agreement or in accordance with the terms of Claims for Extra Cost - Section 15.
Section 11 - Inspection of Work
The City shall provide sufficient competent…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .