West Branch - Pool Replacement Schedule 9.17.18 (1).pdf
PDF 337 KB Posted
- Solicitation number
- RFP WBR 180000003503 1
- Issued by
- Oscoda County, Whitmore Lake CDP, Michigan
About this file
This document is a pool replacement schedule prepared for the West Branch municipality, outlining the timeline and phasing for a comprehensive pool replacement project. The schedule details a multi-phase approach to replacing the existing pool facility, with work planned across several stages to minimize disruption to operations. The project encompasses the demolition of the current pool structure and construction of a new facility, with specific attention to phasing to allow for continued use of alternative facilities during construction. Key milestones are identified with target dates in 2018 and beyond, establishing the sequence in which various project components will be executed, including site preparation, construction commencement, and facility completion.
The document presents a strategic approach to managing the pool replacement initiative by breaking the project into manageable phases with defined timelines. The schedule serves as a planning tool to coordinate construction activities and establish realistic expectations for project completion. The document does not contain specific pricing information, contract terms, or funding details, but rather functions as an operational timeline document to guide the municipality and potential contractors through the sequential steps required for successful project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WBRC BP 3 Bid Announcement (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .