About this file
This document comprises civil construction plans and specifications for a new parking lot at Washington Elementary School in Medford, Oregon, prepared by Powell Engineering and Consulting for the Medford School District 549C in coordination with the City of Medford. The project involves construction of a new asphalt parking lot with associated site improvements including grading, drainage, utility work, erosion control measures, and landscape/irrigation components on tax lot 15000 at 610 S. Peach Street. The project scope encompasses site demolition of existing playground equipment, concrete, asphalt, curbs, and fencing; installation of storm drainage infrastructure including a 24-inch beehive control structure and drainage swales; construction of curb and gutter with standard vertical curb details; medium-duty asphalt paving with aggregate base and subbase layers; and implementation of comprehensive erosion and sediment control measures during construction. The plans include detailed specifications for concrete work requiring 3,300 PSI compressive strength, specific joint spacing requirements, ADA-compliant accessible parking and pathway design with slope limitations not exceeding 1.5 percent, and material specifications referencing Oregon Department of Transportation standards and Rogue Valley Sewer Services guidelines.
The project requires contractor compliance with multiple regulatory standards including Oregon Standard Drawings, City of Medford adopted standards, and the 2018 APWA Standard Specifications for Public Works Construction. Contractors must pre-qualify with the City of Medford prior to construction, obtain building permits for private utility construction, and notify the Oregon Utility Notification Center at least two business days before commencing excavation. All contractors and subcontractors shall submit traffic control plans for approval at least five working days prior to starting work and coordinate with utility companies regarding any required relocations. The project specifications mandate material testing by certified testers, hydrostatic pressure testing of all pressure main lines at 100 PSI with allowable loss of 5 PSI maximum, and submission of as-built record drawings and operation/maintenance instructions before final acceptance. The irrigation system warranty requires all irrigation pipes to remain free of leaks for one year from final acceptance, with the installer responsible for repairing plantings, paving, and improvements damaged by leaks or settlement exceeding one inch during the warranty period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 26-56-20 Washington Parking Lot.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 12
C0.0
CIVIL COVER
SHEET
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
dw g
La st S av e:
F eb ru ar y 9, 5:
P
M lo t D at e:
F eb ru ar y
, 2
2:
B y:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T below.
R
Know what's Call before you dig.
VICINITY MAP
C0.0 OVERALL COVER SHEET
C1.0 CIVIL GENERAL NOTES
C1.1 EXISTING CONDITIONS
C1.2 SITE DEMOLITION PLAN
C2.1 EROSION CONTROL PLAN
C2.2 ESC DETAILS
C3.0 CIVIL SITE, DRAINAGE, AND UTILITY PLAN
C4.0 GRADING PLAN
C6.0 PROJECT DETAILS
C8.0 CIVIL SPECIFICATIONS
C8.1 CIVIL SPECIFICATIONS
L0.01 LANDSCAPE SPECIFICATIONS
L0.02 LANDSCAPE SPECIFICATIONS
L2.01 PLANTING PLAN
L3.01 IRRIGATION PLAN
NOT TO SCALE
OWNER
MEDFORD SCHOOL DISTRICT 549C
ANDY CHASTEEN
713 SUMMIT AVE
MEDFORD, OR 97501
SURVEYOR
PARIANI LAND SURVEYING
17 SOUTH PLATT AVE. SUITE C
EAGLE POINT, OR 97524
541-890-1131
LANDSCAPE ARCHITECT
ARKITEK
JANE ALEXANDERR
426 A STREET
ASHLAND, OR 97520
541-591-9988
CIVIL ENGINEER
POWELL ENGINEERING AND CONSULTING
TODD POWELL, P.E.
46 N. FRONT ST SUITE 200
MEDFORD, OR 97501
(541) 613-0723
GOVERNING AGENCY
CITY OF MEDFORD
200 SOUTH IVY
MEDFORD, OR 97501
CONTACT INFO:
PROJECT OVERVIEW
SCALE: 1" = 30' - 0"
DRAWING INDEX:
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE
RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR
952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES
FROM THE CENTER BY CALLING 1-800-522-2404. IF YOU HAVE
ANY QUESTIONS ABOUT THE RULES, YOU MAY CONTACT THE
CENTER. YOU MUST NOTIFY THE CENTER AT LEAST TWO
BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION.
EXISTING UNDERGROUND UTILITIES ILLUSTRATED IN
THESE PLANS ARE APPROXIMATED BASED ON MAPS
OBTAINED FROM THE CITY OF MEDFORD PUBLIC WORKS,
OR HAVE BEEN LOCATED BY A UTILITY LOCATE
COMPANY. LAYOUT INDICATED IS NOT TO BE RELIED ON
AS BEING EXACT OR COMPLETE. ALL LINES WITHIN
PROJECTED WORK ZONE SHALL BE FIELD VERIFIED AS
REQUIRED PRIOR TO CONSTRUCTION.
UTILITY STATEMENT:
CONTRACTOR SHALL OBTAIN A
BUILDING PERMIT FOR PRIVATE
UTILITY CONSTRUCTION.
LOCATION MAP
NOT TO SCALE
PROJECT
LOCATION
CIVIL CONSTRUCTION PLANS
FOR
WASHINGTON ELEMENTARY SCHOOL
NEW PARKING LOT
LOCATED IN:
SECTION 25, T.37S, R2W, W.M.
TAX LOT 15000
MEDFORD, OREGON
EXISTING SCHOOL
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CB4
AutoCAD SHX Text
CB3
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
7' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
6' WOOD FENCE
AutoCAD SHX Text
ALLEY
AutoCAD SHX Text WESTSIDE COMPASSIONATE MINISTRIES WESTSIDE COMPASS MIN INC. 522 S PEACH ST INTS NO. 2001-01517 TAX LOT 12400
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
JB
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
EXPIRES: 12/31/26
AutoCAD SHX Text
PROJECT LOCATION
C1.0
CIVIL GENERAL
NOTES
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, 9:
A t D at e:
F eb ru ar y
9, :5
AM
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
1. DEQ 1200-C PERMIT IS NOT REQUIRED.
2. UNLESS DIRECTED OTHERWISE, REMOVE CLEARED AND GRUBBED MATERIAL FROM
THE SITE AND DISPOSE AT AN APPROVED LOCATION.
3. PRIOR TO THE START OF CONSTRUCTION, VERIFY GRADES AT SAWCUT LOCATIONS
AND MATCHING OF EXISTING GRADE LOCATIONS.
4. MINIMIZE TRAFFIC ON SOIL AREAS DURING WET WEATHER. IF THE SITE SOILS ARE
EXPOSED DURING WET WEATHER, THE USE OF CRUSHED ROCK PLACED AS
ENGINEERED FILL IN THE BOTTOM OF THE EXCAVATIONS MAY BE NECESSARY TO
PROTECT THE SUBGRADE. TAKE ALL PRECAUTIONS TO LIMIT SURFACE DISTURBANCE
AND PROTECT THE SITE GRADING AREA FROM EROSION AND RUNOFF.
5. UNLESS OTHERWISE NOTED, THE SAMPLING AND TESTING OF MATERIALS FOR USE ON
THE JOBSITE SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ALL TESTING OF
MATERIALS AND WORKMANSHIP SHALL BE PERFORMED BY A CERTIFIED TESTER.
RESULTS OF THE TESTS SHALL BE SENT DIRECTLY TO THE PROJECT ENGINEER AS
WELL AS THE CONTRACTOR, BY THE LABORATORY. LOCATION AND FREQUENCY OF
TESTS SHALL BE DESIGNATED BY THE GENERAL CONTRACTOR.
6. ALL CUT AND FILL SLOPES SHALL BE MAXIMUM OF 2:1.
1. ALL STRIPING AND SIGNAGE SHALL BE PER MUTCD
STANDARDS OR AS DIRECTED BY THE LOCAL AUTHORITY.
2. ALL STRIPING AND MARKINGS INSIDE PUBLIC RIGHT OF
WAY SHALL BE PER LOCAL AUTHORITY STANDARDS.
3. ALL STRIPING SHALL MEET ADA REQUIREMENTS.
STRIPING NOTES
GRADING NOTES
ALL WORK SHALL BE IN CONFORMANCE WITH ALL FEDERAL, STATE, AND SOCIAL CODES.
SPECIFICATIONS AND STANDARDS SHALL MEAN, AND ARE INTENDED TO BE, THE LATEST
EDITION, AMENDMENT OR REVISION OF SUCH REFERENCE STANDARD IN EFFECT AS OF THE
DATE OF THE CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO TO FOLLOWING:
OREGON STANDARD DRAWINGS (ODOT)
CITY OF MEDFORD (COM) ADOPTED STANDARD DETAILS AND SPECIFICATIONS
ROGUE VALLEY SEWER SERVICES (RVSS) STORMWATER MANAGEMENT MANUAL, LATEST
EDITION. SANITARY SEWER STANDARD DETAILS AND SPECIFICATIONS.
APPLICABLE CODES
below.
R
Know what's Call before you dig.
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE
OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET
FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY
OBTAIN COPIES OF THESE RULES FROM THE CENTER BY CALLING
1-800-522-2404. IF YOU HAVE ANY QUESTIONS ABOUT THE RULES,
YOU MAY CONTACT THE CENTER. YOU MUST NOTIFY THE CENTER
AT LEAST TWO BUSINESS DAYS, BEFORE COMMENCING AN
EXCAVATION.
GENERAL NOTES ABBREVIATIONS:
1. PROVIDE A MINIMUM 8' TRANSITION SECTION WHEN JOINING CURBS OF
DIFFERENT CROSS SECTIONS.
2. CONCRETE SHALL NOT BE PLACED UNTIL FORMS HAVE BEEN INSPECTED AND
APPROVED.
3. CONCRETE SHALL BE COMMERCIAL GRADE RETAINING THE FOLLOWING
CHARACTERISTICS: ENTRAINED AIR – 4.0% TO 7.0%; SLUMP – 5 INCHES OR LESS;
COMPRESSIVE STRENGTH – MINIMUM 3,300 PSI AT 28 DAYS; TEMPERATURE –
MINIMUM 50°F TO MAXIMUM 90°F.
4. ALL CONCRETE STRUCTURES REINFORCED WITH REBAR SHALL BE VIBRATED
TO REMOVE VOIDS.
5. SURFACE SHALL HAVE A FINISHED TEXTURE THAT WILL NOT BE SLICK WHEN
WET (MEDIUM BROOM FINISH). CURING COMPOUND MAY BE APPLIED
IMMEDIATELY AFTER CONCRETE IS FINISHED. WHITE PIGMENT RECOMMENDED,
CLEAR ACCEPTABLE.
6. AN EDGING TOOL SHALL BE USED ON ALL EDGES AND JOINTS.
7. PROVIDE CONTRACTION JOINTS AT 15’ INTERVALS AND “DUMMY” TOOLED
JOINTS AT 5’ INTERVALS ON CURBS, SIDEWALKS AND APPROACHES.
CONTRACTION JOINT GROOVES SHALL BE AT MINIMUM, 1 ½” DEEP OR
ONE-THIRD THE THICKNESS OF THE CONCRETE.
8. PROVIDE EXPANSION JOINTS OPPOSITE ABUTTING EXPANSION JOINTS IN
ABUTTING CONCRETE, AT EACH POINT OF TANGENCY IN THE STRUCTURE
ALIGNMENT, BETWEEN DRIVEWAYS AND CONCRETE PAVEMENT, AROUND
POLES, POSTS, BOXES AND OTHER FIXTURES WHICH PROTRUDE THROUGH OR
AGAINST THE STRUCTURES, AT ALL BCR’S AND ECR’S, AT MAXIMUM OF 100’
INTERVALS. EXPANSION JOINT MATERIAL SHALL BE OF THE BITUMINOUS,
PREFORMED FILLER TYPE NOT LESS THAN ½” WIDE, PLACED FLUSH OR NO
MORE THAN 1/8” BELOW THE CONCRETE SURFACE.
9. STRAIGHT LINE EDGES SHALL NOT VARY MORE THAN ¼” UNDER A
TWELVE-FOOT STRAIGHT EDGE.
10. CURE AND PROTECT CONCRETE AFTER PLACING AND FINISHING. KEEP
STRUCTURES FREE FROM CONTACT, STRAIN AND PUBLIC TRAFFIC FOR AT
LEAST SEVEN DAYS OR LONGER AS DIRECTED. MIXES TO EXPEDITE CURING
MAY BE USED WITH APPROVAL OF CITY ENGINEER.
11. CONCRETE SHALL BE REMOVED TO THE NEAREST CONTRACTION JOINT, COLD
JOINT OR CRACK WITHIN 4’ OF THE REPLACEMENT AREA. CONCRETE SHALL BE
SAW CUT WITH A SMOOTH, UNIFORM JOINT PROVIDED.
12. EXISTING A/C SHALL BE REMOVED/REPLACED ALONG ENTIRE CURB SECTION TO
A MINIMUM 18” WIDTH UNLESS APPROVED BY ENGINEER OF RECORD.
CONCRETE NOTES
AC ASPHALT
APWA AMERICAN PUBLIC WORKS ASSOCIATION
ASTM AMERICAN STANDARD TEST METHOD
AWWA AMERICAN WATER WORKS ASSOCIATION
BC BACK OF CURB
BR BOTTOM OF RAMP
BS BOTTOM OF STAIRS
BW BOTTOM OF WALL
CMP CORRUGATED METAL PIPE
CO CLEANOUT RISER
C CONCRETE
DEQ DEPARTMENT OF ENVIRONMENTAL QUALITY
DIP DUCTILE IRON PIPE
DWG DRAWING
(E) EXISTING
EG EXISTING GRADE
EOC EDGE OF CONCRETE
EOP EDGE OF PAVEMENT
FF FINISHED FLOOR
FG FINISHED GRADE
FL FLOW LINE
G GAS
GB GRADE BREAK
GC GENERAL CONTRACTOR
GRD GROUND
GRVL GRAVEL
HDPE HIGH-DENSITY POLYETHYLENE
HP HIGH POINT
IE INVERT ELEVATION
LP LOW POINT
MAX MAXIMUM
ME MATCH EXISTING
MIN MINIMUM
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES
(N) NEW
NAVD NORTH AMERICAN VERTICAL DATUM
ODOT OREGON DEPARTMENT OF TRANSPORTATION
P PROPOSED
PERF PERFORATED PIPE
PLY PLAYGROUND SURFACE
PVC POLYVINYL CHLORIDE
PVR PAVER
RCP REINFORCED CONCRETE PIPE
RE RIM ELEVATION
REQ'D REQUIRED
ROW RIGHT-OF-WAY
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SDE STORM DRAINAGE EASEMENT
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
STD STANDARD
SW SIDEWALK
TBR TO BE REMOVED
TC TOP OF CURB
TR TOP OF RAMP
TOW TOP OF WALL
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
W WATER
1. WORK AND MATERIALS SHALL CONFORM TO THE PROVISIONS OF THE CURRENT "STANDARD SPECIFICATIONS FOR CONSTRUCTION", ODOT/AMERICAN PUBLIC WORKS ASSOCIATION (APWA), UNLESS OTHERWISE COVERED BY THE SPECIFICATIONS WRITTEN FOR THIS PROJECT OR THE
CITY SPECIFICATIONS.
2. ALL WORK PERTAINING TO THIS PROJECT SHALL BE SUBJECT TO INSPECTION BY THE PROJECT ENGINEER AND/OR CITY ENGINEER. PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL CONTACT THE CITY AND PROJECT ENGINEER TO SCHEDULE A PRE-CONSTRUCTION
CONFERENCE.
3. PRIOR TO ANY SITE DISTURBING ACTIVITY INCLUDING CLEARING, LOGGING OR GRADING, THE SITE BOUNDARIES & CLEARING LIMITS AS SHOWN ON THESE PLANS SHALL BE LOCATED AND FIELD IDENTIFIED BY THE PROJECT SURVEYOR AND ALL ESC MEASURES SHALL BE
INSTALLED AS IDENTIFIED ON THE EROSION & SEDIMENT CONTROL PLAN.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. ALL SITE WORK IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE APPROVED PLANS. ANY DEVIATION FROM THESE PLANS WILL REQUIRE PRIOR APPROVAL FROM THE OWNER, ENGINEER AND APPROPRIATE PUBLIC AGENCIES PRIOR TO PERFORMING THE
CHANGES IN THE FIELD.
6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN.
THE CONTRACTOR SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (DIAL 811) AT LEAST TWO BUSINESS DAYS PRIOR TO CONSTRUCTION. THE APPLICANT OR HIS REPRESENTATIVE AND THE ENGINEER SHALL BE CONTACTED IMMEDIATELY IF CONFLICTS
EXIST.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY
IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT.
8. THE CONTRACTOR SHALL KEEP OFF-SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. STREET WASHING WILL NOT BE ALLOWED
WITHOUT PRIOR CITY APPROVAL.
9. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO INITIATING WORK. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER WHEN CONFLICTS OCCUR BETWEEN THE PLANS AND FIELD CONDITIONS. CONFLICTS SHALL BE RESOLVED PRIOR TO PROCEEDING WITH CONSTRUCTION. REVISIONS SHALL BE FORMALLY APPROVED BY THE APPLICANT AND PROJECT ENGINEER PRIOR TO
MAKING CHANGES IN THE FIELD.
10. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ANY UTILITY RELOCATIONS WITH UTILITY
COMPANIES.
11. ALL NEW UTILITIES SHALL BE INSTALLED UNDERGROUND.
12. CONTRACTOR SHALL DOCUMENT AND RECORD FIELD CHANGES, PIPE INVERT, PIPE SLOPE, AND ANY OTHER CRITICAL AS-CONSTRUCT DATA. AS-BUILT DRAWINGS AND FINAL REPORTS WILL BE REQUIRED BEFORE FINAL APPROVAL.
13. WORK IN CITY RIGHT-OF-WAY REQUIRES AN ENCROACHMENT PERMIT FROM THE LOCAL AUTHORITY.
14. WORK IN ANY STATE RIGHT-OF-WAY REQUIRES A MISCELLANEOUS PERMIT FROM OREGON DEPARTMENT OF TRANSPORTATION.
15. APPROVED PERMANENT TRAFFIC CONTROL SIGNS AND MARKINGS WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE INSTALLED PRIOR TO
FINAL APPROVAL.
16. DURING PROJECT CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL TEMPORARY CONSTRUCTION SIGNS, TRAFFIC
CONTROL SIGNS, DELINEATORS AND TEMPORARY MARKINGS AS REQUIRED.
17. ACCESS BY EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
18. ALL CLEARED AND GRUBBED MATERIAL SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND DISPOSED AT AN APPROVED LOCATION.
19. ALL AREAS WITH ABANDONED UTILITY LINES, STORM DRAINS, UNDERGROUND TANKS, ETC. WHICH MAY PROVIDE VOID SPACE BENEATH THE SURFACE SHALL BE REMOVED. WHEN APPROVED BY THE ENGINEER THE VOID SPACE MAY BE FILED WITH APPROVED MATERIAL. ALL TANKS OR HAZARDOUS MATERIALS SHALL BE DEALT WITH IN ACCORDANCE TO ALL LOCAL, STATE AND FEDERAL LAWS.
20. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY GRADES AT SAWCUT LOCATIONS AND MATCHING OF EXISTING
GRADE LOCATIONS.
21. CONTRACTOR IS RESPONSIBLE FOR ANY ASPHALT GRINDING, OVERLAY AND SLURRY SEAL. ALL SPECIFICATIONS SHALL COMPLY WITH ALL
LOCAL AUTHORITY REQUIREMENTS.
22. CONSTRUCTION SHALL CONFORM TO THE 2018 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION PUBLISHED BY THE
OREGON CHAPTER OF APWA, AND THE CURRENT AMENDMENTS OF THE APPROVING AGENCY.
23. ALL CONCRETE SHALL BE 3300 PSI AT 28 DAYS UNLESS OTHERWISE SPECIFIED.
24. CONTRACTOR SHALL BE RESPONSIBLE TO CLEAN AND/OR MAINTAIN EXISTING PUBLIC STREETS OF SOIL OR OTHER DEBRIS DEPOSITED BY CONSTRUCTION OPERATIONS AND REPAIR ALL STREETS DAMAGED BY CONSTRUCTION OPERATIONS IN A TIMELY MANNER TO AVOID
INCONVENIENCES OR HAZARDS TO THE PUBLIC.
25. CONTRACTOR SHALL NOTIFY OREGON UTILITY NOTIFICATION CENTER AT 1-800-332-2344, AND THE CITY OF MEDFORD ENGINEERING
DEPARTMENT 48 HOURS PRIOR TO BEGINNING WORK.
26. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE PRE-QUALIFIED WITH THE CITY OF MEDFORD PRIOR TO ANY CONSTRUCTION OF
THIS PROJECT.
27. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN AND SECURE APPROVAL OF THE PLAN FROM THE AGENCY AT LEAST FIVE (5)
WORKING DAYS PRIOR TO STARTING WORK.
28. THE CONTRACTOR SHALL NOT PERFORM WORK WITHOUT AGENCY INSPECTIONS WHERE INSPECTIONS ARE REQUIRED BY THE
SPECIFICATIONS.
29. WHERE CONNECTING TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXPOSE THE END OF THE EXISTING PIPE AND ALLOW THE ENGINEER TO VERIFY EXACT LOCATION AND ELEVATION BEFORE LAYING ANY NEW PIPE ON THAT SYSTEM.
30. REQUESTS BY THE CONTRACTOR FOR CHANGES TO THE PLANS MUST BE APPROVED BY THE CONSULTING ENGINEER AND THE AGENCY'S
ENGINEER BEFORE CHANGES ARE IMPLEMENTED.
31. WHEN PERFORMING EXCAVATIONS, THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF ORS 757.541 TO 757.571, WHICH INCLUDE REQUIREMENTS THAT THE CONTRACTOR HAND-EXPOSE (POTHOLE) UNDERGROUND FACILITIES AND USE REASONABLE CARE TO AVOID
DAMAGING THEM.
32. PLACEMENT OR STORAGE OF SPOILS FROM THE SEWER LINE TRENCHES IS NOT PERMITTED ON HARD SURFACE STREETS WITHIN PUBLIC RIGHT-OF-WAY. SPOILS STORED IN OTHER RIGHT-OF-WAY AREAS SHALL BE COVERED TO PREVENT EROSION.
33. FORMS OF ADEQUATE SIZE AND CONFIGURATION TO MEET CONCRETE THICKNESS REQUIREMENTS SHALL BE USED AROUND OUTSIDES
OF OUTSIDE-DROP MANHOLES.
34. GRANULAR MATERIALS SHALL BE OBTAINED FROM A SOURCE APPROVED BY THE CITY OF MEDFORD. THE CONTRACTOR SHALL NOTIFY
THE CITY ENGINEER OF THE MATERIAL
ADA NOTES
1. ALL ADA ACCESSIBLE FACILITIES SHALL BE INSTALLED PER THE CURRENT ADA REQUIREMENTS AND SHALL COMPLY WITH 405 ANSI ICC A117.1.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THAT THE ACCESSIBLE PATH OF TRAVEL AND ACCESSIBLE PARKING STALLS AND ACCESS
AISLES COMPLIES WITH AMERICAN DISABILITIES ACT AND ALL LOCAL CODES.
3. THE ACCESSIBLE PATH OF TRAVEL AS INDICATED ON PLANS IS A BARRIER FREE ACCESS ROUTE WITHOUT ANY ABRUPT LEVEL CHANGES EXCEEDING ½” BEVELED AT 1:2 MAX SLOPE, OR VERTICAL CHANGES NOT EXCEEDING ¼” MAX AND AT LEAST 48” WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM, AND SMOOTH. CROSS SLOPE DOES NOT EXCEED 2% AND SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5% UNLESS OTHERWISE NOTED.
4. ALL ADA PARKING STALLS AND ACCESS AISLES SHALL BE CONSTRUCTED WITH A SLOPE NOT TO EXCEED 1.5% IN ANY DIRECTION. PARKING STALLS AND ACCESS AISLES WITH AS-BUILT SLOPES EXCEEDING 2.0% IN ANY DIRECTION WILL NOT PASS FINAL INSPECTION.
5. IF SPOT ELEVATIONS ON PLANS ARE NOT CONSISTENT WITH THESE ADA REQUIREMENTS, NOTIFY ENGINEER OF RECORD PRIOR TO PLACEMENT OF
ACCESSIBLE ROUTE
STORM DRAIN NOTES
1. ALL STORM SEWER PIPE SHALL MEET THE OREGON STATE PLUMBING
SPECIALTY CODE.
2. ALL PIPE SHALL BE PLACED ON STABLE EARTH, OR IF IN THE OPINION OF THE
PROJECT ENGINEER THE EXISTING FOUNDATION IS UNSATISFACTORY, THEN IT
SHALL BE EXCAVATED BELOW GRADE AND BACKFILLED WITH A GRAVEL
MATERIAL TO SUPPORT THE PIPE.
3. THE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN
LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM DEPTH 8"-9",
THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST
EXTEND FOR ONE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF
THE TRENCH. MATERIALS TO COMPLETE THIS FILL OVER PIPE SHALL BE THE
SAME AS DESCRIBED.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE,
INLET, AND CATCH BASIN FRAMES AND GRATES TO GRADE JUST PRIOR TO
PAVING. MANHOLE GRATE SLOPES SHALL MATCH SLOPE OF FINISHED GRADE
ASPHALT.
5. CULVERT ENDS AT OUTFALLS SHALL BE BEVELED TO MATCH SIDE SLOPES.
FIELD CUT OF CULVERT ENDS IS PERMITTED WHEN APPROVED BY THE CITY
ENGINEER OR HIS DESIGNATED REPRESENTATIVE. CULVERT OUTFALLS SHALL
BE RIP RAPPED WITH A PAD MINIMUM OF 12" THICK, EXTENDING MINIMUM OF 6'
FROM DISCHARGE POINT.
6. ALL STEEL PIPES, CULVERTS, TANKS AND OTHER STEEL PARTS OF ANY STORM
DRAINAGE SYSTEM SHALL BE GALVANIZED OR HAVE A TREATMENT 1 ASPHALT
COATING OR BETTER AS SPECIFIED IN THE ODOT STANDARD SPECIFICATIONS.
ALUMINUM AND CONCRETE PIPES AND STRUCTURES DO NOT REQUIRE A
TREATMENT 1 COATING.
7. STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE PIPE AND
CATCH BASINS SHALL BE FLUSHED AND CLEANED PRIOR TO CITY ACCEPTANCE.
8. ALL PIPES SHALL HAVE A MINIMUM OF 18" COVER AT THE TOP OF THE BELL, OR
SHALL HAVE MINIMUM COVER PER THE MANUFACTURER'S SPECIFICATIONS,
WHICHEVER IS GREATER.
9. CATCH BASIN STATIONS AND OFFSETS ARE MEASURED TO CENTER OF GRATE.
10. 100-FT MAX LINEAR RUN BETWEEN CLEANOUTS. 135° MAX AGGREGATE
HORIZONTAL CHANGE IN DIRECTION WITHOUT CLEANOUT.
CONCRETE
HMAC PAVING
NEW RIP RAP
FIRE DEPARTMENT CONNECTION
LEGEND:
EXIST. FIRE HYDRANT
EXIST. WATER VALVE
EXIST. BLOW OFF
EXIST. WATER METER
EXIST. HOSE BIB
EXIST. IRRIGATION VALVE
EXIST. AIR RELEASE VALVE
LIGHTS
EXIST. STORM DRAIN MANHOLE
EXIST. CLEANOUT
EXIST. SANITARY SEWER MANHOLE
SIGN (TRAFFIC, INFORMATION)
EXIST. MAILBOX
EXIST. SANITARY SEWER
EXIST. STORM DRAIN
EXIST. WATER
EXIST. GAS
EXIST. ELECTRIC
EXIST. OVERHEAD POWER
PROPOSED CONTOUR
EXIST. TELEPHONE
EXIST. CURB AND GUTTER
GAS
EXIST. FIBER OPTIC
EXIST. CENTERLINE
EXIST. RIGHT OF WAY
EXIST. CONTOUR
FLOW LINE
ELECTRIC
WATER
STORM DRAIN
SANITARY SEWER
BOLLARD
CONCENTRIC MANHOLE
IRRIGATION WATER METER
SANITARY SEWER CLEANOUT
CURB INLET
CATCH BASIN INLET
CONTROL STRUCTURE MANHOLE
STORM DRAIN CLEANOUT
FIRE HYDRANT
WATER VALVE
WATER METER
END PLUG
TEE
AIR RELEASE VALVE
BLOWOFF DEVICE ASSEMBLY
PROPOSED RIGHT OF WAY
CURB AND GUTTER
BACKFLOW DEVICE
PROPERTY LINE
ATRIUM DRAIN / BUBBLER
HANDICAP PARKING SYMBOL
PARALLEL PARKING STRIPING
BICYCLE LANE SYMBOL
AREA DRAIN
DYH
IRRIGATION
FIRE SERVICE LINE
EXIST. IRRIGATION
EXIST. FIRE SERVICE LINE
FIBER OPTIC LINE
PUBLIC WATER LINE
PRIMARY ELECTRIC
SECONDARY ELECTRIC
CONSTRUCTION NOTES AND MATERIAL SPECIFICATIONS FOR STORMWATER FACILITIES
GENERAL STORMWATER CONSTRUCTION NOTES
1. All Stormwater facilities must be constructed per the Design Manual, or as approved by the local jurisdiction.
2. Call the reviewing agency 48 hours in advance of constructing this facility so construction observation may be performed to identify variations in the field that may affect design and verify proper construction.
3. For infiltration facilities, exposed facility subgrade shall be fenced to prohibit impacts from construction (including materials and equipment storage). If unprotected subgrade has been exposed to rainfall, scarify the surface to a depth of 4 inches to restore filtration capacity.
4. Placement of amended native or imported soil mix shall occur as follows:
o Conduct excavation, fine grading and placement work only when the facility and soil to be placed is dry. Do not place if soil is saturated.
o Place soil in 8 inch maximum lifts.
o Lightly compact each lift, (e.g. a water filled landscape roller) to achieve 85% compaction. Do not compact with heavy machinery or vibratory compaction.
5. All ground within the facility must be stabilized with one of the options below, also see Material Specifications for Stormwater Facilities.
o Hydroseeding - Hydroseeding with tackifier.
o Matting - Matting shall be used to hold the soil in place until vegetation becomes established. If hand seeding, place seed and then install erosion control matting. If planting, install erosion control matting and then install plants through the matting. Matting is not required on slopes 4H:1V or shallower, or on slopes that have been hydroseeded.
Matting must be biodegradable.
o Mulch - Mulch is not allowed below the water quality ponding depth or within the flow path of an inlet or outfall. Mulch shall be spread over bare soil or in a ring around plants. Ensure that mulch does not touch plant stems.
6. If soil is placed during the wet season the facility must be stabilized within one week of soil installation.
CONSTRUCTION NOTES FOR VEGETATED STORMWATER BMPS
7. Build and vegetate as early as possible to establish plantings prior to directing stormwater runoff to the BMP.
8. Contact approving jurisdiction 48 hours in advance of planting so that the jurisdiction can review soil installation and plant placement prior to plant installation.
CONSTRUCTION NOTES FOR PERVIOUS SURFACE STORMWATER BMPS
9. Contact the approving agency 48 hours prior to placing geotextile fabric. The approving agency may call the engineer of record in advance of constructing this facility so construction observation may be performed to identify variations in the field that may affect design and verify proper construction.
MATERIAL SPECIFICATIONS FOR STORMWATER FACILITIES
1. Growing media must be Imported Planting Soil or Amended Native Soil at the depths shown on the Standard Drawings and meet the following specifications:
a) Imported Water Quality Mixture - Is based on the ODOT “Water Quality
Mixture” 01012, and shall be comprised of soil meeting the gradation in the table below and compost meeting ODOT Standard Specification Section 03020.
Mix the soil and compost so the Imported Water Quality Mixture:
- Is comprised of between 20%-25% compost and between 75%-80% soil.
- Has a pH between 5.5 and 8.0.
- Does not have clumps greater than 3 inches in any direction.
b) Amended Native Soil - Add compost so that the top 18 inches is roughly 30% compost meeting ODOT Standard Specification Section 03020.
i) The approving jurisdiction may request evidence that the Amended Native Soil or Imported Water Quality Mixture meets specification prior to placement.
If requested, test data for the soil mix shall be provided by an accredited laboratory with current certification. The date of the analyses must be no more than 90 days prior to submittal. The report must include the following:
- Name and address of the laboratory
- Phone, contact and email address of the laboratory
- Test data, including date and name of the test procedure
- Source of the topsoil
2. Mulch shall be a 2 inch thick layer of dye, pesticide, and weed free shredded wood chips or coarse compost.
3. Stormwater facility geotextiles shall be ODOT Drainage Geotextiles Type 1, non-woven, per Standard Specification Section 03020. Geotextile under the road base in 4.5.3 shall be Subgrade Geotextile meeting ODOT Standard Specification Section 02320.
4. Impermeable liners may be a 30 mil (minimum) low density polyethylene (ldpe), 30 mil (minimum) ethylene propylene diene monomer (epdm) or bentonite clay mat per manufacturer guidance.
a. Stormwater facilities with liners that are planted with shrubs must have 24 inches of imported soil.
5. Unless otherwise approved, rock for Pervious Surface BMP's and Stormwater Facilities shall be crushed rock per ODOT Standard Specification Sections 00430.11 (Granular Drain Backfill Material) or 02690.20 (Course Aggregate) and meet the following gradations:
RVSS GENERAL NOTES
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
EXPIRES: 12/31/26
AutoCAD SHX Text
MB
AutoCAD SHX Text
WM
AutoCAD SHX Text
IRV
AutoCAD SHX Text
SDCO
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text
HB
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
IR
AutoCAD SHX Text
BD
AutoCAD SHX Text
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
SSCO
AutoCAD SHX Text
BF
AutoCAD SHX Text C
AutoCAD SHX Text D
F
C1.1
EXISTING
CONDITIONS
SURVEY NOTES
TOPOGRAPHIC MAP SHOWN
AS A REFERENCE ONLY.
CONTACT PARIANI LAND SURVEYING
FOR ADDITIONAL INFORMATION.
1) BOLD/ ELEMENTS TO BE DEMOLISHED AND HAULED
OFF TO AN APPROVED DISPOSAL GROUND.
2) TBR = "TO BE REMOVED"
3) CONTRACTOR TO COORDINATE ALL EXISTING UTILITY
RELOCATION AND/OR REMOVALS WITH THE
APPROPRIATE FRANCHISE UTILITY PRIOR TO
CONSTRUCTION.
4) SEE LANDSCAPE PLANS FOR TREE REMOVAL AND
PROTECTION.
5) SEE IRRIGATION PLANS FOR EX. IRRIGATION DEMO.
C1.2
SITE DEMO
PLAN
PLAN VIEW - SITE DEMOLITION PLAN
SCALE: 1" = 10' - 0" (24x36)
0 10 20
1" = 10'
DEMO KEY
RED
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, 9:
A t D at e:
F eb ru ar y
9, :5
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
EX. PLAYGROUND TBR
EX. CONCRETE TBR
EX. SHEDS TO BE RELOCATED
EX. FENCE TBR
EX. ASPHALT TBR
EX. STRIPING TBREX. CURB TBR
EX CURB REMAINS
EX. FENCE TBR
EX. PLAYGROUND
BORDER TBR
TRENCH AND ASPHALT PATCH
FOR STORM CONNECTION
SAWCUT LINE (TYP)
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text
PLAYGROUND
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
SHED
AutoCAD SHX Text
SHED
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN
AutoCAD SHX Text
LINK
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CB4
AutoCAD SHX Text
CB3
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
ALLEY
AutoCAD SHX Text WESTSIDE COMPASSIONATE MINISTRIES WESTSIDE COMPASS MIN INC. 522 S PEACH ST INTS NO. 2001-01517 TAX LOT 12400
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
JB
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
EXPIRES: 12/31/26
C2.1
EROSION
CONTROL PLAN
INSTALL TEMPORARY CONSTRUCTION
ENTRANCE (TCE) PER PER ODOT DETAIL
RD1000 ON SHEET C2.2.
INSTALL INLET PROTECTION ON EXISTING
CATCH BASINS PER ODOT DETAIL
RD1010 ON SHEET C2.2.
INSTALL CONCRETE WASH OUT PER
DETAIL 240, ON SHEET C2.1. cw
ESCP LEGEND
EX. SURFACE FLOW DIRECTION
PLAN VIEW - EROSION CONTROL PLAN
SCALE: 1" = 10' - 0" (24x36)
IT IS THE INTENT OF THIS TEMPORARY EROSION AND SEDIMENT CONTROL PLAN THAT
STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND
TO MAINTAIN WATER QUALITY. ANY AND ALL MEASURES NECESSARY TO DO SO SHALL BE
EMPLOYED BY THE CONTRACTOR.
1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR
SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON
THE SITE AND THAT POLLUTED OR SILT-LADEN RUNOFF DOES NOT LEAVE THE SITE
OR ENTER INTO ANY CREEK, STREAM, WETLAND OR WATER BODY ON THE SITE.
2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE
METHODS, "BEST MANAGEMENT PRACTICES" (BMPS), FOR STORM WATER
TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF THE STATE AND
LOCAL JURISDICTION.
3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES
TO THE PROJECT ENGINEER. IN THE EVENT THAT THE INSTALLED WATER QUALITY
CONTROL MEASURES ARE INEFFECTIVE AT CONTROLLING EROSION AND SEDIMENT,
THE CONTRACTOR SHALL IMMEDIATELY REPORT TO AND CONSULT WITH THE
PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION
ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SEDIMENT CONTROL MEASURES,
SHALL CEASE UNTIL SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER
CONTROL.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS
AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES
IN ANTICIPATION OF THE WEATHER.
5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE
STORED ON SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES
AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW BALES OR OTHER
MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC.
6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL
MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE
IMPLEMENTATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL
MEASURES ABOVE ALL OTHERS.
ESCP RESPONSIBILITY
WET WEATHER CONSTRUCTION
THE SITE SOILS ARE CONSIDERED VERY MOISTURE SENSITIVE AND, AS SUCH, ARE
SUSCEPTIBLE TO DISTURBANCE BY CONSTRUCTION EQUIPMENT, PARTICULARLY
DURING PERIODS OF WET WEATHER. DURING WET WEATHER, THE CONTRACTOR
SHALL MINIMIZE TRAFFIC ON PREPARED SOIL SUBGRADE AREAS. IF THE SITE SOILS
ARE EXPOSED DURING WET WEATHER, THE USE OF CRUSHED ROCK PLACED AS
ENGINEERED FILL IN THE BOTTOM OF THE EXCAVATIONS MAY BE NECESSARY TO
PROTECT THE SUBGRADE. THE GRADING CONTRACTOR SHALL TAKE ALL
PRECAUTIONS TO LIMIT SURFACE DISTURBANCE AND PROTECT THE SITE GRADING
AREA FROM EXCESSIVE RUNOFF EROSION.
INSTALL ROCK CHECK DAM PER ODOT
DETAIL RD1005 ON SHEET C2.2.
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, :3 t D at e:
F eb ru ar y
9, 2:
T od d
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
TEMPORARY
SANITARY FACILITY
LOCATION
EQUIPMENT
STAGING
AREA
0 10 20
1" = 10' cw cw 240220
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CB4
AutoCAD SHX Text
CB3
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
7' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
6' WOOD FENCE
AutoCAD SHX Text
ALLEY
AutoCAD SHX Text WESTSIDE COMPASSIONATE MINISTRIES WESTSIDE COMPASS MIN INC. 522 S PEACH ST INTS NO. 2001-01517 TAX LOT 12400
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
JB
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
C2.2
ESC
DETAILS
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, 5:
t D at e:
F eb ru ar y
, 2
2:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
12 12
0 10 20
1" = 10' C3.0
SITE, DRAINAGE,
& UTILITY PLANPLAN VIEW - SITE, DRAINAGE, AND UTILITY PLAN
SCALE: 1" = 10' - 0" (24x36)
KEYNOTES
STANDARD VERTICAL CURB.
CURB AND GUTTER.
MEDIUM ASPHALT PAVING SECTION.
C6.0
C6.0
C6.0
GENERAL NOTES
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, 5:
t D at e:
F eb ru ar y
, 2
2:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
1. ALL ROADWAY SIGNS WITHIN THE PUBLIC RIGHT OF
WAY TO BE FURNISHED AND INSTALLED BY
CONTRACTOR. COORDINATE WITH CITY OF
MEDFORD, PUBLIC WORKS DEPT.
2. ALL SIGN POSTS SHALL BE PERFORATED STEEL
SQUARE TUBE (PSST) PER ODOT STD DRAWING
TM681
3. PARKING LOT LIGHT POLES AND LUMINARIES SHALL
BE COORDINATED AND INSTALLED THROUGH
DISTRICT ELECTRIC DEPARTMENT
19.00' 24.00' 19.00'
9.00'
20.00'
6.5'
1.15'
R = 30' R = 10'
PARKING STALL
COUNT (TYP)
RVSS APPROVED SIMPLIFIED APPROACH
TO STORMWATER MANAGEMENT
RAINGARDEN SIZING CALCS:
TOTAL NEW IMPERVIOUS AREAS = 8,204 SF
MIN. RAINGARDEN SIZE = 8,204 x 0.05 = 411 SF
SHOWN RAINGARDEN SIZE = 425 SF
EX. PUBLIC ALLEY
(GRAVEL)
S.
P
EA
C
H S
T.
EX. SCHOOL
BUILDING
EX. SCHOOL
PARKING LOT
EX. SCHOOL
PARKING LOT
NEW SCHOOL
PARKING LOT
ADJACENT PROPERTY
PROPERTY
LINE (TYP)
PROPERTY
LINE (TYP)
EX. FENCE TO
REMAIN (TYP)
EX. SIDEWALK
EX
. S
ID
EW
AL
K
BEEHIVE
OVERFLOW
STRUCTURE
CONNECT
TO EX. CB
SAWCUT EX.
ASPHALT.
STORM DRAIN CLEANOUT
"BEEHIVE" A-3 CONTROL STRUCTURE
6-4 C6.0
LEGEND
STORM DRAIN PIPE (SIZE AS INDICATED):
COVER LESS THAN 12" => DUCTILE IRON OR TYPE 5 RCP
COVER 12" TO 18" => C900 PVC
COVER >18" => PVC
CURB OPENING 304
C6.0
C6.0
598 SAWCUT EXISTING ASPHALT
PER ODOT DETAILS RD300 & RD302
375 WHITE PAINTED DIRECTIONAL ARROW
375 (TYP)
375 (TYP)
EX. CURB
REMAINS
9.00'
2.00'
EX. FENCE TO
REMAIN (TYP)
NEW PARKING
LOT LIGHT
EX. PARKING LOT
LIGHT TO REMAIN.
CURB RAMP
383 4" WHITE STRIPING PER MUTCD
STANDARDS
383 (TYP)
rd300 C6.0 rd302 C6.0
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text P
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CB2
AutoCAD SHX Text
CB4
AutoCAD SHX Text
CB3
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
3' CHAIN LINK FENCE
AutoCAD SHX Text
7' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
6' WOOD FENCE
AutoCAD SHX Text
S PEACH ST
AutoCAD SHX Text
ALLEY
AutoCAD SHX Text WESTSIDE COMPASSIONATE MINISTRIES WESTSIDE COMPASS MIN INC. 522 S PEACH ST INTS NO. 2001-01517 TAX LOT 12400
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
JB
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
FL = 1411.31
RE = 1412.30
1412.34
FL
1414.56
EG
1414.80
EG
1413.14
EG
1414.51
TC1414.65
TC
1414.72
TC
1414.80
TC
1414.45
TC
1414.80
TC
1414.75
TC
1414.73
TC
1414.88
TC
1414.73
TC
1413.86
TC
1413.81
TC
1413.34
FL
1412.92
TC
1412.89
TC
1413.05
TC
1413.10
TC
1413.12
TC1413.36
TC
1413.36
TC
1413.36
TC
1413.52
TC
1415.15
TC
1414.99
TC
1414.99
TC
1415.62
TC
1415.46
TC
1414.92
TC 1415.36
TC
1415.36
TC
1415.36
TC
1415.40
TC
1414.96
TC/AC
1412.40
FL
1414.96
AC
1414.91
AC
1415.00
TC/C
1411.40
FL
1.
5%
1.
5%
1.
8%
1.
5%
1.8% 1.0% 1.0%
2.
4%
1.0%
1.0%
0 10 20
1" = 10'
C4.0
GRADING
PLAN
PLAN VIEW - GRADING PLAN
SCALE: 1" = 10' - 0" (24x36)
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
P L
C 1-
C 5.
S av e:
F eb ru ar y 9, 5:
t D at e:
F eb ru ar y
, 2
2:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
4' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CB4
AutoCAD SHX Text
CB3
AutoCAD SHX Text
5' CHAIN LINK FENCE
AutoCAD SHX Text
7' CHAIN LINK FENCE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
6' WOOD FENCE
AutoCAD SHX Text
ALLEY
AutoCAD SHX Text WESTSIDE COMPASSIONATE MINISTRIES WESTSIDE COMPASS MIN INC. 522 S PEACH ST INTS NO. 2001-01517 TAX LOT 12400
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
WOOD RETAINING WALL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
JB
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
PROJECT
DETAILS
VEGETATION PER
PLANTING PLAN
FLOW AREA
MAX SIDE SLOPES:
3H:1V - VEGETATED
4H:1V - GRASSY
6"-12" TYP
PONDING DEPTH
OUTFALL STRUCTURE
PER PLAN
NON-PERFORATED
OUTFLOW PIPE TO
APPROVED DISCHARGE
POINT PER PLANS.
MULCH/EROSION CONTROL
MATTING PER PLANS
UNDISTURBED NATIVE SOIL
AMENDED NATIVE SOIL 18" MIN.
IMPORTED SOILS 12" MIN.
FINISH GRADE
PER PLANS
OVERFLOW RIM
ELEV. PER PLANS
6" MIN. FREEBOARD
OR PER JURISDICTION
SCALE: NTS
INFILTRATION RAIN GARDEN SECTION451
C6.0
DRIER
MODERATE
MOIST
MODERATE
DRIER
Water Quality Conveyance Swale Planting Schematic
BMP 8.03
Scale: NTS
DRIER
MODERATE
MOIST
LEGEND:
PLANT SPECIES APPROPRIATE
FOR MOISTURE ZONE:
INDICATES GRADE BREAK
MOISTURE ZONE
TOP OF WQ CONVEYANCE
SWALE, ELEVATION MAY VARY
BOTTOM OF WQ CONVEYANCE
SWALE, ELEVATION MAY VARY
EXTENT OF MOISTURE ZONE
MOISTURE ZONE DESCRIPTION
MATURE PLANT SPREAD, TYP
NOTES:
1. THIS DETAIL IS PROVIDED AS A SCHEMATIC EXAMPLE OF THE
RANDOM PLANT PLACEMENT AND 90% COVERAGE AFTER
ESTABLISHMENT PERIOD DESIRED TO REDUCE EROSION AND
WEEDS.
2. INSTALL PLANTS PER PLANS, ACCORDING TO LANDSCAPE
DESIGN PLANT TABLE, WHICH SHOULD INCLUDE PLANT
SPECIES, SPACING, AND QUANTITIES IN EACH MOISTURE ZONE.
3. MOISTURE ZONES VARY FROM THOSE SHOWN DEPENDING ON
GRADING PLAN, LOCATION OF INLET(S) AND OUTLET(S) AND
FACILITY SHAPE.
SECTION , A-A
A
A
MOIST
MODERATE
DRIER
MODERATE
DRIER
IMPORTED PLANTING SOIL
OR AMENDED NATIVE SOIL
FLOWFLOW
PLAN VIEW
PROFILE VIEW
MULCH/EROSION CONTROL
MATTING PER PLANS
Rogue Valley Stormwater Design
Manual
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
C 6.
S av e:
F eb ru ar y 9, 2:
t D at e:
F eb ru ar y
9, 2:
T od d
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
TGeneral Notes for Vegetated BMPs
1. Excluding construction of the facility itself, exposed stormwater treatment area subgrade shall be fenced to prohibit impacts from construction
(including materials and equipment storage).
2. Build and vegetate as early as possible to establish plantings prior to directing stormwater runoff to the BMP.
3. Call the reviewing agency 48 hours in advance of constructing this facility so construction observation may be performed to identify variations in the field that may affect design and verify proper construction.
4. Over-excavate within the BMP to allow for placement of amended or imported soil up to final grade.
5. Amended native or imported soil mix shall be the "Water Quality Mixture" specified in Oregon Standard Specifications for Construction Special
Provision Section 01012.12.
6. Placement of amended native or imported soil mix shall occur as follows:
a. Conduct excavation, fine grading and placement work only when the facility and the soil to be placed is dry. Do not place if soil is saturated.
b. If unprotected soil has been exposed to rainfall, scarify the surface to a depth of 4 inches to restore filtration capacity.
c. Place soil in 8 inch maximum lifts (i.e. depths).
d. Lightly compact each lift, (e.g. a water filled landscape roller) to achieve 85% compaction. Do not compact with heavy machinery or vibratory compaction.
7. If soil is placed during the wet season and the facility will not be planted within one week of soil installation, install Oregon Standard Specifications for Construction, Special Provision 00280 Type E erosion control matting.
8. Contact approving jurisdiction 48 hours in advance of planting so that the jurisdiction can review soil installation and plant placement prior to plant installation.
9. Mulch shall be:
a. Placed in areas shown on the approved plan
b. Shredded wood chips or course compost
c. Dye, pesticide and weed free
d. Spread in a minimum two inch layer over bare soil or in a ring around plants
e. Not touching plant stems
10. Side slopes outside of flow area shall be permanently stabilized with mulch and vegetation.
11. The approved jurisdiction may request evidence the the amended native or imported soil mix meets specification prior to placement.
12. If requested, test data for the soil mix shall be provided by an accredited laboratory with current certification. The date of the analysis must be no more than 90 days prior to submittal. The report must include the following:
a. Name and address of the laboratory
b. Phone, contact and email address of the laboratory
c. Test data, including date and name of the test procedure
d. Source of the topsoil
SCALE: NTS
DETAIL - 24" BEEHIVE CONTROL STRUCTURE410
RIM ELEVATION
= 1412.30
4"-1" OPEN GRADED
AGGREGATE
12" DEEP, 4'x4' PAD2" CORED OPENING
6" SUMP
BOTTOM ELEV = 1411.31
SUMP
(12" +/-)
FG
(PER PLAN)
OUTLET PIPE @
0.50% MIN.
2'-1"
FILTER FABRIC
2'-7"
6"
3'-3"
BEEHIVE GRATE WITH
LOCKING CABLE TIE-DOWN
MANHOLE MONO BASE
4" MIN.
2.00'
R=1" 6"
6"
9"
12"
1.5"
6"
4"-0" CRUSHED ROCK BASE
95% COMPACTION
R=1"R=1"
R=1/2"
6"
6"
1"
6"
24"
12"
1.5" 18"
6"
4"-0" CRUSHED ROCK BASE
95% COMPACTION
SCALE: NTS
VERTICAL CURB301 SCALE: NTS
CURB & GUTTER302
1. CONTRACTOR TO SUBMIT ASPHALT MIX TO ENGINEER FOR REVIEW AND APPROVAL PRIOR
TO PAVING. MIX SHALL CONSIST OF AN ODOT LEVEL 2, 1/2" DENSE GRADED MIX.
2. ASPHALT SUBMITTAL SHALL ENSURE MAXIMUM RECLAIMED ASPHALT PAVEMENT (RAP) OF
20%.
3. CONSTRUCTION OF ASPHALT SHALL BE COMPLETED IN CONFORMANCE WITH THE CURRENT
OREGON DEPARTMENT OF TRANSPORTATION'S STANDARD SPECIFICATIONS FOR
CONSTRUCTION, INCLUDING SECTION 00745.
4. AGGREGATE BASE AND SUBBASE SHALL BE INSTALLED IN MAXIMUM 6" LIFTS AND
MECHANICALLY COMPACTED TO MINIMUM 95% OF THE MAXIMUM DENSITY IN ACCORDANCE
WITH THE AASHTO T-99 METHOD.
5. AGGREGATE BASE SHALL MEET ODOT SPECIFICATIONS FOR DENSE-GRADED AGGREGATE
BASE ROCK.
6. JUST PRIOR TO INSTALLING AGGREGATE BASE ROCK THE SUBGRADE SHALL BE PROOF
ROLL TESTED WITH A LOADED DUMP TRUCK TO SHOW A MAXIMUM 1/4" DEFLECTION.
SUBGRADE MATERIAL THAT DOES NOT PASS PROOF ROLL TESTING SHALL BE REMOVED
AND ADDITIONAL CRUSHED ROCK INSTALLED.
NOTES
SCALE: NTS
AC SECTION - MEDIUM321
3" OF HMAC PAVING
6" OF AGGREGATE BASE
(3/4" -0" CRUSHED ROCK)
8" OF AGGREGATE SUBBASE
(4" -0" CRUSHED ROCK)
COMPACTED SUBGRADE
NON-WOVEN 5-OZ GEOTEXTILE FABRIC
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
SPECIFICATIONS
C8.0
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
C 8.
S av e:
F eb ru ar y
, 2
:0 t D at e:
F eb ru ar y
, 2
2:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
SPECIFICATIONS
C8.1
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N D
AT
E
DRAWN BY:
DESIGNED BY:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
D ra w in g N am e:
S :\P
EC
S ha re d
- D oc um en ts
\A ll
St af f\P ro je ct s\ C ur re nt P ro je ct s\
M
SD
W
ES
P L\
D ra w in gs \C
AD
D
\W
ES
C 8.
S av e:
F eb ru ar y
, 2
:0 t D at e:
F eb ru ar y
, 2
2:
N an cy
TDP
TDP
46 N. Front St., Suite 200 Medford, OR 97501
541.613.0723 phone www.powellengineeringconsulting.com
JOB NO.
25-035
ISSUE DATE:
LAND USE SET
02/09/26
N O
CHECKED BY: TDP
COPYRIGHT © 2026 Powell Engineering and Consulting, LLC. This document, and the ideas and designs incorporated herein, as an instrument of professional service, shall remain the property of Powell Engineering and Consulting, and is not to be reproduced, published, or used in whole or in part, for any other project or purpose without the express written authorization of Powell Engineering and Consulting, LLC.
M E
D F
O R
D S
C H
O O
L D
IS
T
R
IC
T
C
W A
SH
IN
G
TO
N E
LE
M
EN
TA
R Y
SC
H
O O
L
M A
P
-2 W
-2 5D
C , T
A X
LO
T
S.
P
EA
C H
S T.
, M
ED
FO
R
D , O
R
N
EW
P A
R K
IN
G
L O
T
AutoCAD SHX Text
56425PE
AutoCAD SHX Text
OREGON
Project Number
Date
Issuance
Drawing Title
Sheet No
Revisions
Consultant
No. Description Date
Stamp
Pr oj ec t
25-035
02/05/26
LAND USE
M
ED
FO
R
D S
C H
O O
L D
IS
TR
IC
T
W
AS
HI
NG
TO
N
EL
EM
EN
TA
RY
S
CH
OO
L
NE
W P
AR
KI
NG
LO
T
S
PE
AC
H S
T, M
ED
FO
R D
O R design and architecture, llc arkitek:
426 a street ashland, or 97520 tel: 541.591.9988 design and architecture, llc arkitek:
426 a street ashland, or 97520 tel: 541.591.9988
SPECIFICATIONS
L0.01
SECTION 32 84 00 - PLANTING IRRIGATION