Well 6 Capacity Enhancement.pdf
PDF 289 KB Posted
- Attached to
- Well 6 Capacity Enhancement
- Solicitation number
- ITB 27-004
- Issued by
- Brazos County, Texas
About this file
This is a Scope of Work document for the City of College Station, Texas, regarding Well 6 Capacity Enhancement. The project involves lowering and replacing existing pumps to maximize the capacity of an existing well, replacing and upsizing the existing motor, and constructing a new motor control center to accommodate anticipated power demands. The document outlines the technical specifications, performance requirements, and contractor responsibilities necessary to complete these improvements to the municipal water supply infrastructure.
The document establishes detailed engineering standards and quality requirements for all work performed, including specifications for pump installation, motor specifications, and electrical system components. Contractors must demonstrate competency in water well rehabilitation and electrical system installation, with particular attention to ensuring system reliability and adherence to applicable codes and regulations. The contract terms, specific pricing information, bid submission deadlines, site visit requirements, and award timeline are referenced in related bidding documents associated with this procurement opportunity from the City of College Station.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .