Welding Equipment and Supplies_RRCC 26-10-DQ.pdf
PDF 250 KB Posted
- Attached to
- RRCC 26-10-DQ Welding Equipment and Supplies
- Solicitation number
- DQ1 GJLA 2026000337 2
- Issued by
- Jefferson County, Colorado
About this file
This is a Documented Quote issued by Red Rocks Community College (RRCC) in Colorado for welding equipment and supplies to support the expansion of the welding program in partnership with Warren Technical School. The procurement seeks to double the available welding lab space by outfitting additional instructional areas with American Welding Society-based curriculum equipment. The specifications include three Siegmund Imperial System 28 welding tables (60 x 120 inches), 50 fast clamping bolts, 16 stop and clamping squares, 34 professional screw clamps, 22 and 24 stops in varying sizes, one BUG-O DC-IV drive unit, three Autoquip scissor lift tables, one Miller Electric FILTAIR SWX-S fume extraction system, and one Betenbender 4-foot hydraulic shear with productivity pack (these last two items must be bid together). All specified equipment brands are required to meet educational standards and match existing lab equipment. Vendors may quote any or all items, and the college reserves the right to make single or multiple awards by item, group, or in aggregate. The quote submission deadline is 5:00 PM Mountain Time on March 9, 2026, with an estimated award date of March 12, 2026 and desired purchase order start date of March 17, 2026. The anticipated term for completion of all deliveries is May 28, 2026, with no renewal options specified.
Pricing must be firm during the initial purchase order term and must include all delivery, shipping, and installation fees. Quotes are exclusive of federal and state taxes, for which the college holds exemption certificates. The procurement is federally grant-funded through the Carl D. Perkins Career and Technical Education Improvement Act of 2006. Award will be made to the responsible respondent whose acceptable quote is determined most advantageous to the State, with price/cost as the primary consideration and other factors including sample quality and lead time for delivery. Vendors must be currently registered in SAM.gov with no suspensions or debarments, and awarded respondents must provide proof of Good Standing with the Colorado Secretary of State and appropriate insurance certificates prior to purchase order execution. Service Disabled Veteran Owned Small Businesses (SDVOSBs) must submit U.S. Small Business Administration certification documentation and must be incorporated or organized in Colorado or maintain a Colorado place of business. All quotes should be submitted via email to Lynn Beltran, Director of Purchasing, at lynn.beltran@rrcc.edu.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 42225
Documented Quote
RRCC 26-10-DQ
Welding Equipment and Supplies
Posted: February 27, 2026
Version 42225 Documented Quote Page 1 of 14
TABLE OF CONTENTS
DOCUMENTED QUOTE
TABLE OF CONTENTS
1. SOLICITATION INFORMATION
A. Introduction B. Background, Overview and Goals C. Anticipated Term D. Schedule of Activities E. Procurement Point of Contact
2. REQUIREMENTS
A. Accessibility Requirements B. Insurance Requirements C. Mandatory/Minimum Requirements
3. SPECIFICATIONS
4. QUOTE SUBMISSION INFORMATION
A. Email Quote Submission Instructions B. Timeliness of Quote Submission C. Quote Format and Content D. Pricing
5. AWARD
A. Basis for Award (See Procurement Rule R-24-103-204-01) B. Negotiations C. Single Quote D. Notice of Award E. Documents After Award
6. GENERAL ADMINISTRATIVE INFORMATION
A. Colorado Vendor Self Service B. Modifications and/or Supplemental Information to the Solicitation C. Solicitation Cancellation and/or Rejection of Quotes D. Modifications or Withdrawal of Quotes E. Mistake and Minor Informalities in Respondent Quotes F. News Releases and Announcements G. Not a Legally Binding Offer H. Respondent Quote Content I. Quote Response Material Ownership J. Certification of Independent Price Determination K. Submission of Confidential or Proprietary Information L. Purchase Order M. Ethics and Conflicts of Interest N. Protested Solicitations and Awards O. Performance Outside of Colorado P. Service Disabled Veteran Owned Small Businesses (SDVOSB) (ref. §24-103-905, C.R.S., et seq Q. Vendor Assistance
Version 42225 Documented Quote Page 2 of 14
1. SOLICITATION INFORMATION
A. Introduction
On behalf of the State of Colorado, Red Rocks Community College (RRCC) is issuing this Documented Quote for obtaining welding equipment and supplies to support the welding program.
Federal Grant Funded Procurement:
The Supplemental Provisions (Exhibit B) are hereby incorporated into this bid document.
Perkins Career and Technical Education Grants: Funded wholly or partially through the Carl D. Perkins Career and Technical Education Improvement Act of
2006.
B. Background, Overview and Goals
RRCC and Warren Technical School are partnering to outfit additional welding lab spaces at the Warren Tech Central Campus. The equipment requested will double the amount of space available for welding instruction for our American Welding
Society-based curriculum in Shield Metal Arc Welding, Ox-Fuel Welding and
Cutting, Gas Tungsten Arc Welding, Gas Metal Arc Welding, and Flux Core Arc
Welding.
C. Anticipated Term
i. The anticipated term of the Purchase Order resulting from the award of this solicitation is to be completed by May 28, 2026.
ii. The State is not responsible for any goods delivered or services performed by the awarded Respondent without a State issued Purchase Order.
D. Schedule of Activities
i. This Schedule of Activities is for information and planning purposes only.
Schedules for Activities listed as “Estimated” may be subject to change depending on the needs of the State. All times are stated in Mountain Time
(MT), as adjusted for daylight savings.
a. The date of publication for this solicitation on Colorado VSS is February
27, 2026.
Version 42225 Documented Quote Page 3 of 14
b. All quotes must be submitted in the method described below no later than 5:00 PM, March 9, 2026.
c. The estimated date for award selection and notification is March 12, 2026.
d. The desired Purchase Order start date is March 17, 2026.
E. Procurement Point of Contact
i. The State’s sole point of contact for this solicitation is Lynn Beltran, Director of Purchasing, who may be reached via email at lynn.beltran@rrcc.edu.
2. REQUIREMENTS
A. Accessibility Requirements
i. All work performed as a result of this solicitation must comply with all applicable provisions of §§24-85-101, C.R.S., et seq., and the Accessibility
Standards for Individuals with a Disability, as established by the Office Of
Information Technology pursuant to §24-85-103 (2.5), C.R.S. and 3) all State of Colorado technology standards related to technology accessibility and with
Level AA of the most current version of the Web Content Accessibility
Guidelines (WCAG), incorporated in the State of Colorado technology standards.
B. Insurance Requirements
The awarded Respondent will be required to submit a certificate(s) of insurance on the standard Accord form evidencing insurance coverage as required by the
Insurance provision in the Purchase Order Terms and Conditions, available online at https://www.colorado.gov/pacific/osc/purchase-order-terms-conditions, prior to execution of the Purchase Order.
C. Mandatory/Minimum Requirements
ii. Specific brands, as listed, are required to meet educational standards and match existing lab equipment to be operational.
i. Delivery of all equipment must be completed prior to May 28, 2026.
ii. Vendor must be currently registered in SAM.gov with no suspensions or debarments.
mailto:lynn.beltran@rrcc.edu https://www.colorado.gov/pacific/osc/purchase-order-terms-conditions
Version 42225 Documented Quote Page 4 of 14
3. SPECIFICATIONS
**Specific brands as listed are required to meet educational standards and match existing lab equipment to be operational.
Three (3) Siegmund Imperial System 28 Welding Table Bundle, 60 x 120 inch
Manufacturer: Siegmund
• Table Size: 60 in × 120 in work surface
• Work Surface Thickness: 1 inch plate
• Hole Pattern: 28 mm diameter holes, 4 in (100 mm) grid spacing
• Surface Finish: Plasma nitride finish for corrosion resistance and anti-spatter
• Weight: Approx. 3,300 lb (with stationary legs)
Fifty (50) Siegmund System 28 Fast Clamping Bolt, Short, 95mm
• Application: Fast clamping / connecting bolt for joining Siegmund modular fixture components
• Hole Compatibility: 28 mm diameter system, designed for 100 mm grid spacing
• Fixture Compatibility: Designed for 25 mm table and fixture thickness;
compatible with select non-Siegmund tables of varying thickness
Sixteen (16) Siegmund System 28 Stop and Clamping Square, 175mm x 175mm
• Function: Modular stops and clamping squares for use as fixed stops or as components in adjustable welding fixtures
• Slot Design: Oblong slotted openings to allow positional adjustment and fixture flexibility
• System Compatibility: 28 mm diameter hole system on 100 mm grid spacing, designed for 25 mm table and fixture thickness
Thirty-four (34) Siegmund System 28 Professional Screw Clamp
• Type: Manual screw clamp for modular welding fixtures
• Dimensions: 310 mm height × 200 mm width
• Adjustment: Vertical and horizontal adjustment for full table reach
• System Compatibility: 28 mm diameter hole system, 100 mm grid spacing, Version 42225 Documented Quote Page 5 of 14
Twenty-two (22) Siegmund System 28 Stop, 225mm x 50mm, Nitrided
Manufacturer: Siegmund
• Function: Modular alignment stops for positioning workpieces on welding tables
• Design Features: Oblong adjustment slots and through-holes for mounting clamps, V-prisms, and other accessories
Twenty-four (24) Siegmund System 28 Stop, 150mm x 50mm
• Function: Modular stops for aligning and positioning workpieces anywhere on a welding table
• Design Features: Oblong slotted openings for adjustment; through-holes for attaching clamps, V-prisms, and accessories
One (1) BUGO DC-IV BUG-0343
Manufacturer: BUG-O Systems
• Drive Type: DC motor drive unit with solid-state speed control; rack-and-pinion output
• Power: 120 VAC, single-phase, 50/60 Hz input; 60 W at rated voltage
• Speed Range: 0.5–160 in/min (gear ratio dependent)
• Load Capacity: Up to 100 lb vertical load (gear ratio dependent)
• Physical Specifications: 7.12 in L × 6.75 in W × 6.63 in H; approx. 17 lb net weight
Three (3) Scissor Lift Table S35-060-0060
Manufacturer: Autoquip
• Travel: 60 inches
• Capacity: 6,000 lb
• Height: 8 in lowered / 68 in raised
• Platform Size: 32–60 in width × 87–120 in length (adjustable range)
Version 42225 Documented Quote Page 6 of 14
One (1) FILTAIR® SWX-S
Manufacturer: Miller Electric
• Processes Supported: MIG (GMAW), Flux-Cored (FCAW), TIG (GTAW), Stick
(SMAW)
• Airflow Capacity: 875 CFM nominal airflow
• Power: 110/115/120 VAC, single-phase, 60 Hz input
• Filtration / Media: 490 ft² self-cleaning filter media
• Arm & Mounting: 12 ft extraction arm; wall- or column-mounted configuration
These two items (in red) must be bid together:
One (1) Betenbender 4-foot Hydraulic Shear
Manufacturer: Betenbender Manufacturing
• Type: Hydraulic metal shear
• Cutting Capacity: 3/8 in (9.5 mm) mild steel
• Cutting Length: 52 inches
• Power / Motor: 20 HP motor; 208/230/460 VAC, three-phase
• Machine Specifications: 17 strokes per minute; approx. 11,000 lb weight;
overall dimensions 76 in L × 55 in W × 84 in H
One (1) Betenbender Hydraulic Shear Productivity Pack
Manufacturer: Betenbender Manufacturing
• Application: Factory-installed productivity upgrade package for Betenbender hydraulic shears
• Positioning System: NC control 5-station (Go-To) back gauge/positioner
• Material Support: 48 in support arms / front gauges
• Table & Hold-Downs: Solid bolt-on table segments with neoprene hold-down caps
• Lubrication: One-shot centralized lubrication system
4. QUOTE SUBMISSION INFORMATION
A. Email Quote Submission Instructions
i. Respondents shall submit Quotes via email to the Procurement Point of
Contact identified above. The Quote submission email should include the subject line “Quote submission from (Insert Respondent Name) for RRCC 26-
10-DQ, Welding Equipment and Supplies.
Version 42225 Documented Quote Page 7 of 14
ii. Quotes should be included as one or more attachments of commonly accessible file types.
B. Timeliness of Quote Submission
A Quote received after the submission deadline may, at the sole discretion of the
State, be rejected without further consideration.
C. Quote Format and Content
i. Vendors are to complete, sign and email the attached Vendor Response and
Price Sheet to the Procurement Point of Contact.
ii. Vendors may quote any or all items. The college reserves the right to make a single award or multiple awards by item, group, or in aggregate, whichever is in the best interest of the college. Failure to submit complete specifications with the bid may be sufficient cause to consider a bid non-responsive.
D. Pricing
i. Proposed pricing must remain firm during the initial term of the Purchase
Order.
ii. Pricing must include any fees associated with the delivery of goods or services, including, but not limited to, shipping and installation.
iii. All quotes shall be exclusive of any Federal or State taxes from which the college is exempt. Tax exemption certificates are issued upon request.
5. AWARD
A. Basis for Award (See Procurement Rule R-24-103-204-01)
i. This solicitation and the resulting Purchase Order will be awarded to the responsible Respondent whose acceptable Quote is determined to be the most advantageous to the State, with price/cost being the primary consideration. Other considerations may include, but are not limited to, sample quality, and lead time for delivery.
ii. “Acceptable” means that the goods or services submitted in the Respondent’s
Quote will meet the state’s needs, and that the price is fair and reasonable.
The determination of whether a Respondent’s Quote is acceptable is solely within the State’s discretion.
Version 42225 Documented Quote Page 8 of 14
B. Negotiations
The State may negotiate with any Respondent to clarify the Respondent’s Quote or to effect modifications that will make the Quote Acceptable or more advantageous to the State; however, any requirements identified in this solicitation may not be negotiated. Reference Procurement Rule R-24-103-204-01(d).
C. Single Quote
If only one Quote is received in response to this solicitation, an award may be made to the single Respondent if the procurement official finds that the price submitted is fair and reasonable and that other prospective Respondents had reasonable opportunity to respond to the solicitation. If the price submitted is not fair and reasonable and there is not adequate time for re-solicitation, the procurement official may enter into competitive negotiations in accordance with
Procurement Rule R-24-103-208-02.
D. Notice of Award
A notice of the intent to award will be announced on Colorado VSS.
E. Documents After Award
Prior to Contract or Purchase Order execution, the awarded Respondent must provide the State with proof of Good Standing with the Colorado Secretary of State and an insurance certificate documenting coverage as required by the Contract or
Purchase Order.
6. GENERAL ADMINISTRATIVE INFORMATION
A. Colorado Vendor Self Service
i. This solicitation is being published on Colorado Vendor Self Service (Colorado
VSS), so that Offerors who have an interest may submit a proposal in accordance with the terms of this solicitation.
a. Vendors can self-register for this system free of charge, or may click on
“Public Access” on the website to view solicitation documents and modifications without registering. Vendors are encouraged but not required to register prior to or at the time they submit their response.
The State also recommends that interested vendors check Colorado VSS on a regular basis throughout this solicitation process.
http://www.colorado.gov/vss
Version 42225 Documented Quote Page 9 of 14
B. Modifications and/or Supplemental Information to the Solicitation
i. Any modifications, amendments or supplemental information to the solicitation will be published on Colorado VSS. A modification notice will be published on Colorado VSS in the event that it becomes necessary to revise any part of this solicitation.
ii. It is the Respondent’s sole responsibility to check Colorado VSS on a regular basis, prior to the Quote submission deadline, as this is the primary means for communicating any clarifications or changes to solicitation content, timeline and/or requirements.
C. Solicitation Cancellation and/or Rejection of Quotes
i. In accordance with §24-103-301, C.R.S., and the related Procurement Rules, the State may cancel this solicitation, or any and all Quotes may be rejected in whole or in part, without penalty, at any time before a Contract or purchase order is executed, when it is in the best interest of the State. The reason and documentation supporting the decision to cancel the solicitation or reject Quote(s) shall remain confidential for the lesser of six months or until a Contract or purchase order is awarded by the State. Reference
Procurement Rule R-24-101-401-05.
ii. If the solicitation is canceled after Quotes are received, the Quotes that have been opened shall be retained in the procurement record, or if unopened, they will be disposed of, or returned to the Respondent upon request at the
Respondents’ expense.
D. Modifications or Withdrawal of Quotes
A Respondent may modify or withdraw its Quote by written notice to the
Procurement Contact prior to the established Quote submission deadline.
Withdrawal of a Respondent’s Quote following the Quote submission deadline and prior to award, may be allowed, in the State’s discretion. Withdrawal of a
Respondent’s Quote after award is not allowed. Reference Procurement Rules R-
24-103-201-08 and R-24-103-201-09.
Version 42225 Documented Quote Page 10 of 14
E. Mistake and Minor Informalities in Respondent Quotes
In certain circumstances, a Respondent may correct a mistake(s) in its Quote and/or the State may waive minor informalities. Reference Procurement Rule R-
24-103-201-08.
F. News Releases and Announcements
Respondents shall not issue any news releases, communications or announcements of any kind pertaining to this solicitation, without prior written approval by the
State.
G. Not a Legally Binding Offer
Neither this solicitation nor a Respondent’s Quote submitted in response to this solicitation constitute a legally binding offer. Reference Procurement Rule R- 24-
103-204-01(b).
H. Respondent Quote Content
The contents of the Quote of the awarded Respondent and any modifications to the Quote negotiated by the State included in the resulting Contract or Purchase
Order will become contractual obligations. Failure of the awarded Respondent to accept these obligations may result in cancellation of the award to that
Respondent.
I. Quote Response Material Ownership
All material submitted in response to this solicitation becomes property of the
State.
J. Certification of Independent Price Determination
By submitting a Quote, the Respondent certifies that the prices and other terms in the Quote have been arrived at independently without any consultation, communication, agreement with, or knowledge of the contents of the Quote by any other competing Respondent. For purposes of this paragraph, "consultation, communication, agreement with, or knowledge" does not include knowledge of prices or terms gained through availability of established price lists or catalogues made available to the public by the competing Respondents. No attempt has been made or will be made by the Respondent to induce any other person or firm to submit or not to submit a Quote for restricting competition. Reference §6-4-101, C.R.S., et seq., (Colorado Antitrust Act of 1992) as amended.
Version 42225 Documented Quote Page 11 of 14
K. Submission of Confidential or Proprietary Information
i. The State of Colorado is subject to the requirements of §24-72-200.1, C.R.S., et seq., Colorado Open Records Act.
ii. A Respondent may submit, as a part of its Quote, a written request for classification of certain portions of the Quote as a trade secret or other confidential or proprietary information. Material for which the Respondent is requesting confidentiality shall be readily identifiable and separated from other portions of the Quote to facilitate public inspection of the non-confidential portion of the Quote. Commingling of confidential and non-confidential information is not acceptable. Neither price information nor any information that will be included in a resulting Contract or purchase order will be considered confidential.
iii. The Respondent must include the rationale for any request to classify portions as a trade secret or confidential or proprietary, including references to the authority that allows for such treatment.
iv. A complete redacted Quote response should also be included along with an unredacted Quote and confidentiality justification.
v. In no event shall an entire Quote be classified as confidential. The
Procurement Official or his or her designee shall determine if the information identified in the Respondent’s request is exempt from disclosure in accordance with §24-72-204, C.R.S., and shall inform the Respondent in writing of his or her determination. If the Respondent does not agree with the determination, the Respondent may protest the determination in accordance with article 109 of the Colorado Procurement Code and the terms of this solicitation. Reference Procurement Rule R-24-101-401-03.
vi. Any additional Respondent information, which may be part of the evaluation/negotiation process and for which a Respondent claims confidentiality, is subject to the same requirements and processes identified above.
Version 42225 Documented Quote Page 12 of 14
L. Purchase Order
i. The State Purchase Order terms and conditions can be found online at https://osc.colorado.gov/spco/central-contracts-unit/purchase-order-terms-conditions.
No alternate Terms and Conditions will be accepted.
ii. The college does not pre-pay or provide payment prior to receiving the goods or services.
M. Ethics and Conflicts of Interest
i. The Respondent must disclose in its Quote any potential or actual conflict of interest in connection with a response to this solicitation. A conflict of interest may include, but is not limited to, access to any non-public information by the Respondent regarding the solicitation or its subject matter.
ii. The Respondent acknowledges that even the appearance of a conflict of interest may be harmful to the State’s interests. The Respondent shall disclose in its Quote whether there currently is, or potentially could be, the appearance of a conflict of interest regarding this solicitation, its staff, any proposed subcontractors or partners, or any related business with the State.
iii. Requirements set forth in this Section are continuing requirements throughout the solicitation process and, for the awarded Respondent, the
Contract or Purchase Order term, including any extensions. Reference §24-18-
201, C.R.S., et seq. (Proscribed Acts Related to Contracts and Claims); §24-
50-507, C.R.S.(Conflict of Interest); §18-8-301, C.R.S., et seq. (Bribery and
Corrupt Influence); §18-8-401, C.R.S., et seq. (Abuse of Public Office); §6-4-
101, C.R.S., et seq., (Colorado Antitrust Act of 1992); §24-109-105, C.R.S
.(Debarment and Suspension); and Procurement Rule R-24-101-107-01
(Ethics).
N. Protested Solicitations and Awards
An aggrieved party may file a protest concerning a Material Issue(s), at any phase of solicitation, including but not limited to, specifications, award or a disclosure of information marked confidential in the Quote. “Material issue” means a nontrivial defect in the solicitation or award that would prejudice the outcome of the https://osc.colorado.gov/spco/central-contracts-unit/purchase-order-terms-conditions https://osc.colorado.gov/spco/central-contracts-unit/purchase-order-terms-conditions
Version 42225 Documented Quote Page 13 of 14 procurement. The presence of multiple nonmaterial issues in a solicitation or award does not constitute a material issue unless the aggrieved party can establish that those nonmaterial issues together would prejudice the outcome of the procurement.” The protest shall be submitted to the Red Rocks Community
College Procurement Official within three (3) business days after such aggrieved person knows, or should have known, of the facts giving rise thereto. Reference
§24-109-102, C.R.S., as amended, and Procurement Rule R-24-109-102-01, et seq.
Protests should be submitted via email to lynn.beltran@rrcc.edu.
O. Performance Outside of Colorado
Awarded Respondent, per Section 24-102-206, C.R.S., prior to contracting shall disclose in a written statement whether it anticipates performing or subcontracting any services under the contract, where such subcontracted services will be performed under the contract, including any subcontracts, and whether any subcontracted services under the contract or any subcontracts are anticipated to be performed outside the United States or the state. If the prospective vendor anticipates services under the contract or any subcontracts will be performed outside the United States or the state, the vendor shall provide in its written statement a provision setting forth why it is necessary or advantageous to go outside the United States or the state to perform the contract or any subcontracts.
P. Service Disabled Veteran Owned Small Businesses (SDVOSB) (ref. §24-103-905, C.R.S., et seq
i. SDVOSB Respondents must submit documentation of certification issued through the U.S. Small Business Administration in their Quote. §24-103-905
C.R.S. sets a SDVOSB goal of at least 3% of all contracts by dollar value be awarded to SDVOSBs who must be incorporated or organized in Colorado or they must maintain a place of business or have an office in Colorado and must be officially registered and verified as a SDVOSB by the United States Small
Business Administration.
Q. Vendor Assistance
Any vendors needing support responding to solicitations may contact the Colorado
Supplier Diversity Navigator at the Statewide Equity Office of Supplier Diversity.
Services provided include assistance with responding to solicitations, mailto:lynn.beltran@rrcc.edu https://urldefense.proofpoint.com/v2/url?u=https-3A__dhr.colorado.gov_statewide-2Dequity-2Doffice_supplier-2Ddiversity&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=2K9kkYDPzg9W7wrnb9URPPzWuzXzmzc6oQUqmP_d9mA&m=UsSCoCc_Nnj_It7iTj2w9Xh-U0kW8zKwh7sIdTrgvW_OXQDDQG8CMBmOZsCmKo6l&s=AHk9LQL8xQKwtYW6AlMhIpKhc64M4gHnBm1wvGiKqhU&e=
Version 42225 Documented Quote Page 14 of 14 interpretation of solicitation documents, technical assistance referrals, availability of resources, construction bond assistance through the Construction Statewide
Bond Assistance Program, and free business directory listings and verifications through the Colorado Supplier Diversity Directory. The office can be reached during normal business hours by calling 303-866-5765 or emailing DPA_SupplierDiversityHelp@state.co.us.
https://urldefense.proofpoint.com/v2/url?u=https-3A__dhr.colorado.gov_supplier-2Ddiversity_construction-2Dand-2Dbond-2Dassistance&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=2K9kkYDPzg9W7wrnb9URPPzWuzXzmzc6oQUqmP_d9mA&m=UsSCoCc_Nnj_It7iTj2w9Xh-U0kW8zKwh7sIdTrgvW_OXQDDQG8CMBmOZsCmKo6l&s=zAjgTZu5BkDViYCi42ZSaaEFbnZ4EzaMtQulSrBPsw8&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__dhr.colorado.gov_supplier-2Ddiversity_construction-2Dand-2Dbond-2Dassistance&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=2K9kkYDPzg9W7wrnb9URPPzWuzXzmzc6oQUqmP_d9mA&m=UsSCoCc_Nnj_It7iTj2w9Xh-U0kW8zKwh7sIdTrgvW_OXQDDQG8CMBmOZsCmKo6l&s=zAjgTZu5BkDViYCi42ZSaaEFbnZ4EzaMtQulSrBPsw8&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__dhr.colorado.gov_supplier-2Ddiversity_colorado-2Dsupplier-2Ddiversity-2Ddirectory&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=2K9kkYDPzg9W7wrnb9URPPzWuzXzmzc6oQUqmP_d9mA&m=lJCgtcQ4bpjUYTb-DL2vTiTtjs5tP9GdjxCxohJukG4cRYarpnnyVjmEkozBFRPl&s=nq-3ZxXvzK0CyjE_Sukw4DfkzHfxneqrfzbnzxsO-hw&e= mailto:DPA_SupplierDiversityHelp@state.co.us
| Documented Quote |
| TABLE OF CONTENTS |
| 1. SOLICITATION INFORMATION |
| A. Introduction |
| B. Background, Overview and Goals |
| C. Anticipated Term |
| D. Schedule of Activities |
| E. Procurement Point of Contact |
| 2. REQUIREMENTS |
| A. Accessibility Requirements |
| B. Insurance Requirements |
| C. Mandatory/Minimum Requirements |
| 3. SPECIFICATIONS |
| **Specific brands as listed are required to meet educational standards and match existing lab equipment to be operational. |
| 4. QUOTE SUBMISSION INFORMATION |
| A. Email Quote Submission Instructions |
| B. Timeliness of Quote Submission |
| C. Quote Format and Content |
| D. Pricing |
| 5. AWARD |
| A. Basis for Award (See Procurement Rule R-24-103-204-01) |
| B. Negotiations |
| C. Single Quote |
| D. Notice of Award |
| E. Documents After Award |
| 6. GENERAL ADMINISTRATIVE INFORMATION |
| A. Colorado Vendor Self Service |
| B. Modifications and/or Supplemental Information to the Solicitation |
| C. Solicitation Cancellation and/or Rejection of Quotes |
| D. Modifications or Withdrawal of Quotes |
| E. Mistake and Minor Informalities in Respondent Quotes |
| F. News Releases and Announcements |
| G. Not a Legally Binding Offer |
| H. Respondent Quote Content |
| I. Quote Response Material Ownership |
| J. Certification of Independent Price Determination |
| K. Submission of Confidential or Proprietary Information |
| L. Purchase Order |
| M. Ethics and Conflicts of Interest |
| N. Protested Solicitations and Awards |
| O. Performance Outside of Colorado |
| P. Service Disabled Veteran Owned Small Businesses (SDVOSB) (ref. §24-103-905, C.R.S., et seq |
| Q. Vendor Assistance |
File details come from the government source that posted it. Updated .