Weiler_Fuel_1.jpg
JPG image 295 KB Posted
- Attached to
- Weiler Road Fuel Management
- Solicitation number
- 2026-IFB-00345
- Issued by
- San Mateo County, California
About this file
This is an Invitation for Bid (IFB) issued by the County of San Mateo Parks Department for understory fuels reduction and wildfire management services at Weiler Ranch Road in Pacifica, California. The project encompasses a 3-acre treatment area requiring mechanical mastication and manual hand removal to reduce wildfire fuel continuity and enhance public safety. Specific deliverables include removal of approximately 2 acres north of Weiler Ranch Road (brush and trees less than 12 inches in diameter up to 100 feet from the road edge), approximately 1 acre south of the road (brush and trees less than 10 inches in diameter within 25 feet of the roadway), removal of approximately 20 eucalyptus trees near the San Pedro Valley Shop entrance, and removal of 6 larger-diameter eucalyptus trees between Weiler Ranch Road and San Pedro Creek, with all debris chipped and hauled from the site except for masticated debris less than 3 inches in diameter and under 4 feet in length. A mandatory pre-bid meeting is scheduled for March 4, 2026, at 9:00 a.m. at 710 Oddstad Boulevard, Pacifica, California. Questions and comments are due by March 11, 2026, at 5:00 p.m., with bid submissions due by March 13, 2026, at 5:00 p.m. via the OpenGov portal. Bidders must demonstrate a minimum of 5 years' experience in related work and provide proof of not being excluded, suspended, or debarred from the System for Award Management (SAM).
Evaluation is based solely on total bid price, with responsive and responsible bidders ranked from lowest to highest cost. Contractors must maintain comprehensive general liability insurance of $1,000,000, motor vehicle liability insurance of $1,000,000, and professional liability insurance of $1,000,000, with the County named as additional insured. The County applies a Procurement Preference for Local Businesses and Local Non-Profits Ordinance, allowing bidders to self-attest to local business or non-profit status for potential preference consideration. The contract is subject to prevailing wage requirements if classified as public work under California Labor Code Section 1720 and must comply with the County's Living Wage Ordinance if applicable. Contractors must provide a completed W9 tax form, all relevant certificates and licenses, and evidence of workers' compensation insurance before commencing work. Bids remain active for 60 calendar days after the bid due date or until County acceptance, whichever is earlier. The County reserves the right to terminate the contract for cause with 10 days' notice to cure or for convenience with 30 days' written notice. No specific award value or budget range was disclosed in the procurement documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Weiler_Road_Fuel_Management_(Addendum_#2_Revision).pdf | ||
| Weiler_Road_Fuel_Management_(Addendum_#2_Revision).pdf | ||
| Weiler_Road_Fuel_Management_(Addendum_#2_Revision).pdf | ||
| Weiler_Road_Fuel_Management_(Addendum_#1_Revision).pdf | ||
| Weiler_Road_Fuel_Management.pdf | ||
| Weiler_Fuel_1.jpg | JPG image | |
| Weiler_Fuel_1.jpg | JPG image | |
| Weiler_Fuel_1.jpg | JPG image | |
| Weiler_Fuel_1.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .