WEDGE MDE EX Drawing 75D-WAGL_4103_28_1.pdf

PDF 868 KB Posted

Attached to
USCGC Sewage and Gray Water Systems - Clean and Inspect, Diesel and Boiler Exhaust Cleaning
Solicitation number
70Z02925QNEWO0110
Issued by

About this file

This is a technical drawing package from the Office of Naval Engineering showing detailed exhaust piping modifications for ship installations. The 8-page drawing set (number 75D-WAGL_4103_28_1) contains engineering specifications and diagrams for exhaust piping systems in various ship compartments including the engine room, state room, and weather deck areas.

The drawings include detailed material lists, general notes about welding standards and installation requirements, and multiple cross-sectional views showing exhaust stack configurations, muffler assemblies, and piping connections. Key technical details include specifications for expansion joints, wall penetrations, stack supports, and exhaust sampling ports. The drawings contain precise measurements, part numbers, and assembly instructions for components like flanges, gaskets, and mounting brackets. This appears to be part of the engineering documentation package referenced in the associated Coast Guard solicitation for cleaning and inspecting exhaust systems on the USCGC WEDGE.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

75D-WAGL_4103_28_1_-_-

75D-WAGL_4103_28_2_-_-
75D-WAGL_4103_28_3_-_-
75D-WAGL_4103_28_4_-_-
75D-WAGL_4103_28_5_-_-
75D-WAGL_4103_28_6_-_-
75D-WAGL_4103_28_7_-_-
75D-WAGL_4103_28_8_-_-

File details come from the government source that posted it. Updated .