This addendum modifies the Webberville Community Schools Network Refresh Project invitation to bid. The addendum clarifies that the District will accept complete proposals for equipment and installation as well as partial bids for equipment only, installation only, or refurbished equipment, though all bids must clearly identify the scope offered, any exclusions, and whether equipment is refurbished. A mandatory walkthrough remains required for all bidders to review existing site conditions. The network switch specifications have been corrected to specify Aruba CX 6300M series switches instead of the erroneously referenced CX 6200M series, with quantities unchanged: 14 units of model JL659A (48-port), 4 units of model JL660A (24-port), and 1 unit of model JL658A (24-port SFP+), plus one spare switch and licensing for the 18 deployed switches.

Power supply specifications have been revised to require JL086A power supplies (100-240 VAC) for the JL659A and JL660A switches, with 2 units per switch (totaling 28 and 8 units respectively) and JL085A power supplies for the JL658A switch with 2 units, resulting in a total of 38 power supplies across all 19 switches. For newly established bidders, relevant professional experience and references of the project lead or key personnel, including experience gained with previous employers, will be considered, with bidders required to clearly distinguish individual experience from company work and provide at least three references. All other invitation to bid terms and conditions remain unchanged.

View the file

Other files

File Type Posted
Webberville - Network Refresh Project.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO 1

Webberville Community Schools – Network Refresh Project

Complete and Partial Bids and Refurbished Equipment The ITB requests a complete proposal for equipment and installation. However, the District will open and examine all timely submitted bids, including proposals for equipment only, installation only, or refurbished equipment.

Examination of a bid does not guarantee acceptance or award. Bidders must clearly identify the scope offered, any exclusions, and whether proposed equipment is refurbished.

Mandatory Walkthrough The walkthrough remains mandatory for all bidders, including those proposing equipment only, because the ITB requests a complete equipment and installation proposal requiring review of existing site conditions.

Correction to Network Switch Specifications In the System Requirements – Specifications section, references to the Aruba CX 6200M series were included in error. All requested switches shall be Aruba CX 6300M series, or equivalent. The specified part numbers and quantities remain unchanged:

Quantity Part Number Corrected Description 14 JL659A Aruba CX 6300M 48-port Smart Rate PoE switch with four SFP56 uplink ports, or equivalent 4 JL660A Aruba CX 6300M 24-port Smart Rate PoE switch with four SFP56 uplink ports, or equivalent 1 JL658A Aruba CX 6300M 24-port SFP+ switch with four SFP56 uplink ports, or equivalent

The requirements for one spare switch and licensing for the 18 deployed switches remain unchanged.

Power Supply Specifications The requirement to supply JL085A power supplies for all switches is replaced with the following:

Switch Model Required Power Supply Per Switch Total JL659A — 14 switches JL086A, 100–240 VAC, or equivalent 2 28 JL660A — 4 switches JL086A, 100–240 VAC, or equivalent 2 8 JL658A — 1 switch JL085A, or equivalent 2 2

A total of 38 power supplies shall be provided across the 19 switches, including the spare. All power supplies must be compatible with the switch supplied.

Relevant Professional Experience and References For newly established businesses, the District will consider relevant professional experience and references for the proposed project lead or key personnel, including experience gained with a previous employer. Bidders must identify the projects, dates, previous employer, individual’s responsibilities, and reference contact information, clearly distinguishing individual experience from work completed by the bidding company. The requirement to provide at least three references remains in effect.

All other ITB terms and conditions remain unchanged.

Complete and Partial Bids and Refurbished Equipment
Mandatory Walkthrough
Correction to Network Switch Specifications
Power Supply Specifications
Relevant Professional Experience and References