WCHSHVAC Addendum _2 11_9_26.doc
DOC document 2 MB Posted
- Attached to
- Addendum #2
- Solicitation number
- PE-55083-NONST-2027-000000002
- Issued by
- Georgia
About this file
This is Addendum No. 2 to the Replacement of Existing HVAC Units project at Wilkinson County High School's Gym & Auditorium located at 11481 Georgia Highway 57, McIntyre, Georgia 31054. The addendum addresses questions submitted by the electrical contractor regarding routing of electrical conduits and feeders from the existing transformer to new circuit breakers, as well as routing from the new circuit breakers to the new DOAS-3 unit. The contractor is required to saw cut and remove existing concrete walks as needed, install electrical work, backfill, tamp earth, and pour 4-inch thick concrete to match existing surfaces. For exterior routing to the DOAS-3 unit, the contractor must provide outdoor-rated, wet-location cast metal conduit bodies and pull boxes compliant with NEC 358.26 regarding 90-degree bend limits, utilizing type LB, LL, LR, T, or C fittings as field conditions dictate. All downspouts must be modified to extend around new conduit with paint modifications to match existing downspouts, and all new conduit, pull boxes, and anchorage must be prepped, primed, and painted to match the existing brick color.
The addendum also modifies Sheet A1.01 Legend to clarify that if existing walls are not sealed to the deck above as shown on the drawings, the contractor shall include this work in the base bid following field verification of all conditions. A $7,500 allowance has been established for this wall sealing work and must be included in the contractor's bid submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
November 9, 2026
ADDENDUM NO. 2
REPLACEMENT OF EXISTING HVAC UNITS at
WILKINSON COUNTY HIGH SCHOOL’S GYM & AUDITORIUM
11481 Georgia Highway 57 McIntyre, Georgia 31054
QUESTIONS FROM ELECTRICAL CONTRACTOR:
1. How are the new electrical conduits and feeders from the existing transformer to the new Circuit Breakers ECB (shown on Sheet E0.02) to be routed?
ANSWER
“Contractor shall saw cut and remove the existing concrete walk as required and install the electrical work, backfill, tamp the earth, and pour 4” thick concrete to match the existing concrete walk.”
2. How is the new electrical service from the new Circuit Breakers ECB (Shown on E0.02) to be routed to the new DOAS-3 unit?
ANSWER
“Route the new conduit on the exterior of the building as illustrated in the following photos. For routing of conduit to serve DOAS-3, provide necessary outdoor rated / wet location, cast metal conduit bodies / pull boxes to comply with NEC 358.26 regarding 90 degree bend limits. Contractor to provide type LB, LL, LR, T, or C fittings as required based on conduit routing and field conditions. Modify all downspouts as necessary, and shown in “Downspout Offset” detail below, to extend around new conduit; paint modifications as required, to match existing downspouts. Prep, prime, and paint all new conduit, pull boxes, anchorage, etc. to match the existing brick color.”
CHANGES TO THE DRAWINGS:
SHEET A1.01
LEGEND, LAST SENTENCE
[CHANGE NOTE TO READ: If existing walls are not sealed to the deck above, as shown on the drawings, contractor shall include this work in the base bid. Field Verify all conditions. Contractor shall include a $7,500 allowance for this work.]
END OF ADDENDUM NO. 2