QUESTIONS_ _ANSWERS_for_BOXES.docx
DOCX document 14 KB Posted
- Solicitation number
- WC133W13RQ0679KC
About this file
Questions and Answers to the box requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| tuck_front_with_ears.JPG | JPG image | |
| 5_inch.JPG | JPG image | |
| 3_inch.JPG | JPG image | |
| RFQ_FOR_BOXES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION:
1. Can you please clarify the folding top that you want? Tuck front or Full Flaps?
ANSWER:
Tuck front for items 001-003, full flaps for item 0010, and RSC for all others.
QUESTION:
2. How do you want the foam secured to the box? Glue, tape, nothing or other adhesive?
ANSWER:
Foam will be glued to box.
QUESTION:
3. For CLIN 001-003: Do you want a tuck front with side ears or a tuck front panel flap that tucks into the front of the box with no side ears?
ANSWER:
Tuck front with ears as per picture (attached)
QUESTION:
4. Please clarify the thickness of the convoluted foam in CLINS 001- 003.
ANSWER:
For items 001 and 002, convoluted antistatic foam to be 3" thick when fitted together as per 3 inch picture. Item 003, convoluted antistatic foam will be same, but have a gap as box is wider per 5 inch picture.
QUESTION:
5. How will the foam be affixed to the box? Glued, taped, loose?
ANSWER:
Glued to box
QUESTION:
6. Are CLINS 001-003 to be assembled prior to shipping? If not do you want the foam inserts packaged separately?
ANSWER:
Items 001-003 will be assembled prior to shipment