Statement of Work for WP-3D PMS Pylon Manufacturing Revised August 24, 2015

I. Requirements

General – The NOAA Aircraft Operations Center (AOC) requires the fabrication of a left-hand set of parts in accordance with drawings 34047, 348048, 348049, 348050, 348052 and associated Engineering Change Orders (see section VII below for complete required parts list). The fabrication of the structural parts and composite parts will include all machining and tooling services, procurement of materials, inspection of parts (dye penetrant inspected), and finishing the parts with the required primer. The parts shall also come with letters of conformance indicating the parts were manufactured in accordance with all applicable Federal Aviation Regulations (FAR) by a certified manufacturing facility. The parts shall be delivered to AOC unassembled.

II. Government Furnished Information (GFI) –

PDF drawings 34047, 348048, 348049, 348050, 348052 and associated Engineering Change Orders.

Upon award, solid works files for the above drawings.

Drawings are proprietary and may only be used for this contract.

III. Government Furnished Equipment (GFE) – AOC Pylon suitable for composite lay ups will be furnished to the contractor within 120 days after award. Two (2) bearings will be furnished to the contractor within 30 days after award.

IV. Deliverables – Parts and quantities necessary to assemble a left-hand (port) PMS pylon with certificates of conformance from an FAA PMA certified/authorized manufacturing facility.

V. Delivery Date – 240 days after award

VI. Acceptance – Deliverables shall be sent to:

NOAA / AOC / SEB

Attn: Pylon COTR 7917 Hangar Loop Drive, Hangar 5 MacDill AFB, FL 33621

Invoices shall be sent to:

NOAA / AOC / SEB

Attn: Pylon COTR P.O. Box 6829 MacDill AFB, FL 33608-0829

VII. Revison / Clarification to parts required.

a. The following parts shall be manufactured and delivered to AOC:

348049-1 Main Spar 1 each Drill both aft clevis and insert bearing 348049-3 Outboard spar 1 each 348049-5 Inboard spar 1 each 348049-7 Lower spar 1 each 348049-9 End plate 3 each

348049-11 Outboard wing fitting 1 each Note ECO trim size, also drill holes for wing attachment and guide holes for spar attachment 348049-13 Outboard wing fitting 1 each Note ECO trim size, also drill holes for wing attachment and guide holes for spar attachment.

348049-15 Conical washer 0 each None needed, extras exist from previous effort 348052-1 Strut tube 4 each Note ECO change of material 2 are spares 348052-3 Rod End fitting 8 each 4 are spares 348052-5 Rod Clevis 4 each 2 are spares

b. Composite parts shall be manufactured by taking lay ups from a pylon that AOC shall supply on a schedule agreeable to both parties but no later than 240 days after award.

348050-101 LE Fairing 2 each 1 is a spare 348050-103 TE Fairing 2 each 1 is a spare 348050-105 LE Outboard Fairing 2 each 1 is a spare 348050-107 TE Outboard Fairing 2 each 1 is a spare 348050-109 TE Inboard Fairing 2 each 1 is a spare 348050-111 LE Inboard Fairing 2 each 1 is a spare