NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Continuation Page
PAGE 2 OF 16 WC-133M-15-RP-0008/A0001
Continued from Block 14...
Missouri local time on January 20, 2015.
Table of Contents
PAGE 3 OF 16 WC-133M-15-RP-0008/A0001
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 STATEMENT OF WORK (AMENDMENT A0001)
SECTION I CONTRACT CLAUSES
I. 1 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L. 1 1352.215-70 PROPOSAL PREPARATION (AMENDMENT A0001)
PAGE 4 OF 16 WC-133M-15-RP-0008/A0001
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 STATEMENT OF WORK (AMENDMENT A0001)
STATEMENT OF WORK
National Oceanic and Atmospheric Administration (NOAA)
Hurricane Research Platform Replacement for WP-3D Orion
Analysis of Alternatives Study
Revised December 22, 2014
1.0 GENERAL
The U.S. Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Office of Marine and Aviation Operations (OMAO), Aircraft Operations Center (AOC), MacDill AFB, Florida, operates two WP-3D Orion aircraft in support of NOAA and national research. The priority missions of these aircraft are hurricane research and surveillance during the hurricane season as well as national priority atmospheric research support the remainder of the year. These two aircraft, N42RF and N43RF, will be undergoing a Service Life Extension (SLE) program to extend their operational service lives out until 2030. It is the goal of OMAO to have a replacement platform operational by 01 January 2028 to conduct a smooth transition to the next generation NOAA Weather Research platform.
This Statement of Work (SOW) is prepared for an Analysis of Alternatives (AoA) for sensors and platforms that would be feasible for fleet induction in time to replace the NOAA WP-3Ds.
2.0 SCOPE
The goals of the AoA study for the replacement of the NOAA WP-3D aircraft are listed below.
All requirements, missions and references are in regard to those that are currently performed by the NOAA WP-3D aircraft (not NOAA light aircraft). Emphasis is on tropical cyclone data but the study should address the full range of possible NOAA missions; Office of Atmospheric Research (OAR) Hurricane, OAR Air Chemistry, OAR Climate, National Weather Service (NWS) Research and National Environmental Satellite Data and Information Services (NESDIS) Research, suitable for a heavy aircraft type platform that would be conducted by an airborne platform similar to the current WP-3D. The contractor is allowed to use internal procedures and processes as necessary, but must follow the guidelines under NOAA Administrative Order (NAO) 208-3 and 216-108. Contractor shall also follow best practices in regards to conducting a formal AoA. NOAA recommends the U.S. Air Force Office of Aerospace Studies (OAS) AoA Handbook (June 2013) as a guide.
Goals of the AoA Study
PAGE 5 OF 16 WC-133M-15-RP-0008/A0001
1. Conduct a study with input from NOAA Line Offices to determine priority of NOAA mission and data requirements that are currently covered by the NOAA WP-3D or would be covered in the future by a suitable replacement/replacements. Access to informal AoA conducted by the NOAA AOC in 2012 as well as the latest data and reports from the NOAA Technology, Planning and Integration for Observation (TPIO) group will be given.
2. Conduct a focused workshop with expert scientists from the research and operational tropical cyclone community to determine the physical processes, atmospheric variables and oceanic variables that need to be observed to improve hurricane forecasts.
3. Conduct a comprehensive review of current and past NOAA operational procedures, airborne platforms and instruments that are or would have been the responsibility of a WP-3D type asset.
4. Conduct a historical review of how heavy aircraft observations were incorporated into the tropical cyclone forecast process and identify trends.
5. Conduct an assessment of current and future needs for in situ and remotely sensed airborne observations to improve the understanding and prediction of tropical cyclones.
6. Conduct an assessment of current and future needs for in situ and remotely sensed airborne observations to achieve NOAA mission and data requirements.
7. Evaluate current and future developments in sensors and sensor platforms, to include, but not limited to Airborne Doppler Radar, Cloud Radars, Light Detection and Ranging Radars (LIDAR) that may be available to achieve NOAA mission and data requirements.
8. Evaluate next generation of expendables, to include, but not limited to dropwindsondes, Bathythermograph (BT) buoys, Conductivity Temperature and Depth (CTD) buoys, Airborne Expendable Bathythermograph (AXBT) buoys and small unmanned aerial vehicles (UAV) that may be available to achieve NOAA mission and data requirements.
9. Evaluate current and future developments in data collection sensed at and near airborne platform flight levels, to include, but not limited to atmospheric state parameters, Three- Dimensional (3D) winds, temperature profiles, cloud measurements, aerosol parameters, etc. that may be required to achieve NOAA mission and data requirements.
10. Assess sensors, instrumentation packages and airborne platforms that meet specific requirements of tropical cyclone observations for specific phases (genesis, development, intensification, decay).
11. Assess sensors, instrumentation packages and airborne platforms that meet overall requirements of tropical cyclone observations.
12. Assess sensors, instrumentation packages and airborne platforms that may meet future NOAA mission and data requirements.
13. Assess the Research and Development (R&D) efforts required to bring identified sensors, instruments and expendables identified to operational status by 2028.
PAGE 6 OF 16 WC-133M-15-RP-0008/A0001
14. Identify future optimal instrumentation suites and airborne platforms needed to improve the understanding and forecasting of tropical cyclones.
15. Identify future optimal instrumentation suites and airborne platforms needed to meet NOAA mission and data requirements.
16. Perform Life Cycle Cost (LCC) studies to determine LCC for identified airborne platforms.
17. Determine Rough Order of Magnitude (ROM) estimates for all identified instrumentation suites, sensor packages and overall platform solutions.
18. Conduct economic simulation studies to determine Cost Benefit Analysis (CBA) of identified platform solutions.
3.0 DELIVERY REQUIREMENTS
The following is a list of deliverables, including administrative deliverables, that will be required during the performance of this contract.
Final Study Plan (FSP) – within 30 days of contract award.
Study Master Schedule – within 30 days of contract award.
Monthly Study Status Reports – within 30 days of contract award and monthly thereafter.
The following are reports that will be required.
1. Report on the current state of airborne scientific instrumentation.
2. Report on current and past NOAA operational procedures, airborne platforms and instruments that are or would have been the responsibility of a WP-3D type asset.
3. Report that documents which physical processes, atmospheric variables and oceanic variables need to be observed to improve hurricane forecasts.
4. Report that documents which physical processes, atmospheric variables and oceanic variables need to be observed to meet future NOAA mission and data requirements.
5. Report identifying the need for airborne measurements to advance tropical cyclone research and forecasting.
6. Report identifying the need for airborne measurements to meet future NOAA mission and data requirements.
7. Report providing a detailed assessment of current and future needs for in situ and remotely sensed airborne observations to improve the understanding and prediction of tropical cyclones.
8. Report providing a detailed assessment of current and future needs for in situ and remotely sensed airborne observations to meet future NOAA mission and data requirements.
9. Report on sensors, instrumentation packages and airborne platforms that meet specific
PAGE 7 OF 16 WC-133M-15-RP-0008/A0001
requirements of tropical cyclone observations for specific phases (genesis, development, intensification, decay).
10. Report on sensors, instrumentation packages and airborne platforms that meet overall requirements of tropical cyclone observations.
11. Report on sensors, instrumentation packages and airborne platforms that may meet future NOAA mission and data requirements.
12. Report on the Life Cycle Cost of identified airborne platforms.
13. Report on the simulation studies used to determine the Cost Benefit Ratio of identified solutions.
14. Report documenting all sensors, instrumentation packages and platform options to include the effort required to make them operational, a timeline to make them operational, a ROM estimate to make them operational and what areas of the scientific data requirements they will address.
15. Final report detailing the options, strategies, risks, roadblocks and means for NOAA to replace the WP-3D aircraft by 2030 (with three year overlap in platforms).
4.0 QUALITY ASSURANCE
NOAA/OMAO may desire to have a representative witness, assist in the evolution, or monitor the work performed under this Contract. NOAA anticipates that the representative witness will travel to the Contractor’s location once every two months for a one-week period. The Contractor shall provide a workspace (small cubicle or desk) for the representative witness, as well as access to a telephone, internet, and printer during these intermittent visits throughout period of performance.
The Contractor shall keep the Contracting Officer Representative (COR) and/or the designated appointee apprised of the progress and schedule. NOAA shall have access to the data throughout the term of this Contract.
5.0 PROGRAM/STUDY MANAGEMENT
The contractor shall exercise technical direction and control of the engineering and analysis effort required to produce the formal Analysis of Alternatives study. This requirement shall include the necessary Program Management, Study Plan, Business and Contract Management, Subcontractor Management, Data Management, Quality Control and Engineering Specialties required to carry out that task and comply with this Statement of Work.
5.1 Final Study Plan
As a deliverable, the contractor shall prepare and provide, within 30 days of contract award, a Final Study Plan (FSP) that defines contractor organizational structure, program management systems and procedures, key personnel, and responsibilities and authority of senior
PAGE 8 OF 16 WC-133M-15-RP-0008/A0001
management staff assigned to this effort. NOAA has 14 days to review and comment on the FSP. Once approved, the FSP shall be incorporated into the contract. The Contractor shall prepare and submit a Work Breakdown Structure (WBS) indentured list and dictionary as part of the FSP. The Contractor shall use the approved WBS as the basis for organizing, scheduling, controlling and reporting the progress of the Work performed under the resulting Contract.
5.2 Master Schedule
The Contractor shall prepare and provide as part of the FSP a master schedule. The contractor shall maintain and update the master schedule. The master schedule shall detail the actual work and progress. Per best practices in the OAS AoA Handbook, the master schedule should be at the Level 3 WBS detail. The master schedule shall be included in all progress report submissions and presented during all progress review meetings.
5.3 Program Management
The Contractor shall provide a Study Director (SD). The SD shall have overall responsibility for contractual execution of all tasks to achieve schedule performance, technical compliance and quality of products and services delivered to NOAA under the resulting contract. The SD shall direct the business planning, organizing, coordinating, and control of all activities in accordance with the Study Master Schedule.
The contractor shall prepare and submit monthly Study Status Reports (SSR) to the Contracting Officer (CO) or designated representative. As a minimum, the report shall contain the following:
a. Activity summary
b. Major milestones
c. Open action items
d. Major activities planned for the succeeding month
e. Updated Master Schedule
This report shall be prepared in a narrative format suitable for reproduction. In addition to paper copy, submit electronically in a format compatible with Microsoft Word or Adobe Reader. Electronic submittal may be made via e-mail to the CO and COR. The monthly Study Status Reports shall be reviewed during the quarterly Study Management Reviews (SMR) with the contractor. Unforeseen issues that impact the critical path and completion date of the project shall be reported to the CO within five (5) business days of their discovery via email followed up by a telephone call or telephone call followed up by written notification via e-mail.
5.4 Contract Management
PAGE 9 OF 16 WC-133M-15-RP-0008/A0001
The contractor shall use existing processes and procedures for managing the resulting contract and any subcontracts to provide the services required. The Contractor shall administer the prime contract to include the tasks associated with formal customer communication, change proposal processing, and closure administration of the contract.
5.5 Data Management
The contractor shall direct and guide development and preparation of program-generated (informal and contracted) data. The contractor shall schedule, track, and monitor all data preparation, reports and delivery efforts. All data and reports generated will be the property of NOAA and may be shared with other government organizations and contractors for the benefit of the U.S. Government.
6.0 PROGRAM REVIEWS
NOAA anticipates conducting several types of study reviews. These reviews shall be conducted at the contractor's facility, a mutually agreed upon location or via a teleconference during the term of the contract to review study status. The contractor shall coordinate the development of an agenda to support the meeting and is responsible for the preparation and distribution of minutes and action items of the meeting to the Government for review within seven (7) calendar days after the meeting.
Contractor progress shall be measured against the master schedule and tasks shall be assessed during study reviews. Tasks that are late shall be listed with an explanation of why they are late and a discussion of remediation actions planned to alleviate the schedule delay.
6.1 Monthly Study Status Reviews (SRR)
Monthly SSRs shall be conducted each month another Review is not held during the term of the contract to review study status. The contractor shall coordinate the development of an agenda to support the meeting and is responsible for the preparation and distribution of minutes and action items of the contractor's portion of the meeting to the Government for review within seven calendar days after the meeting. This meeting will be held via a teleconference unless both parties agree to an alternative, mutually agreed upon location.
6.2 Quarterly Study Management Reviews (SMR)
Quarterly SMRs shall be conducted each quarter to review study status. The contractor shall coordinate the development of an agenda to support the review and is responsible for the preparation and distribution of minutes and action items of the meeting to the Government for review within seven calendar days after the meeting. The Government will provide the meeting space and telephone access for the Quarterly SMRs. The Contractor shall
PAGE 10 OF 16 WC-133M-15-RP-0008/A0001
coordinate the Quarterly SMR participant list, internet access for up to 15 participants, and all Quarterly SMR documents. This meeting will be held in Silver Spring, MD; Tampa, FL;
Boulder, CO or Miami, FL.
7.0 SUBMITTAL OF INVOICES:
The Contractor shall submit invoices to the OMAO/Platform Acquisition Division, Attention:
_____________, COR, Contract No. ____________ (To be supplied at time of award), 8403 Colesville Road, Silver Spring, MD 20910. All invoices will be reviewed by the COR to determine that all services shown on the invoice have been received, accepted and ready for invoice payment release. The Contractor may be required to fax a bi-weekly financial progress report/partial invoice on all expenditures that will be invoiced to the Government. This report may not be the final invoice. However, the format may be the same. Partial invoices will only be processed after COR and CO acceptance.
PAGE 11 OF 16 WC-133M-15-RP-0008/A0001
SECTION I
CONTRACT CLAUSES
I. 1 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)
(Reference 52.219-9)
PAGE 12 OF 16 WC-133M-15-RP-0008/A0001
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L. 1 1352.215-70 PROPOSAL PREPARATION (AMENDMENT A0001)
1352.215-70 Proposal Preparation (APR 2010)
(a) General Instructions. Proposals are expected to conform to solicitation provisions and be prepared in accordance with this section. To aid in evaluation, the proposal shall be clearly and concisely written, neatly presented, indexed (cross-indexed as appropriate), and logically assembled.
All pages of each part shall be appropriately numbered and identified with the name of the offeror, the date of the offer, and the solicitation number.
Each volume shall be clearly marked by volume number and title.
(b) Original Proposal and Electronic Copies. The offeror shall submit one
(1) printed “hard copy” original of its complete proposal to the address listed in Block 9 of Standard Form 33. Additionally, the offeror shall provide one (1) electronic copy of its proposal, contained on one (1) CD/DVD.
The offeror’s CD/DVD shall contain each proposal volume as a separate electronic file. The electronic files shall be compatible with Adobe Reader.
(c) Overall Arrangement of Proposal.
(1) VOLUME I--BUSINESS PROPOSAL
(i) Volume I, Business Proposal, consists of the actual offer to enter into a contract to perform the desired work. It also includes required representations, certifications, and acknowledgments, if applicable;
justifications for noncompetitive proposed subcontracts; identification of technical data to be withheld; and any other required administrative information.
(ii) Format and Content. Volume I, Business Proposal, shall include the following documents (in the order listed):
(A) Proposal Form:
(1) Use of the Form--The Proposal Form (Standard Form 33), is to be executed fully and used as the cover sheet (or first page) of Volume I. Include one (1) original signed copy of the form in the original Volume I.
(2) Acceptance Period--The acceptance period entered on the Proposal Form by the offeror shall not be less than 90 days, which shall apply if no other period is offered.
(3) Signature Authority--The person signing the Proposal Form must have the authority to commit the offeror to all of the provisions of the proposal, fully recognizing that the Government has the right, by terms of the Solicitation, to make an award without discussion if it so elects.
(4) Teaming Agreements with Subcontractors. If the offeror is relying on subcontractor experience or qualifications, a copy of the fully executed Subcontracting Teaming Agreement shall be included in Volume I. The Subcontracting Teaming Agreement shall include a letter of commitment to utilize the subcontractor in performance of a contract resulting from this solicitation when
PAGE 13 OF 16 WC-133M-15-RP-0008/A0001
use of that subcontractor would not prohibit the Prime Contractor from being in compliance with all government requirements.
(5) Joint Ventures. If the offeror is submitting a proposal as a joint venture, a copy of the fully executed Joint Venture agreement shall be included in Volume I. Joint Ventures are considered as Prime Contractors.
(2) VOLUME II--TECHNICAL PROPOSAL
(i) General.
(A) Volume II, technical proposal, consists of the offeror's proposal delineating its capabilities and how it intends to perform contract requirements. The Technical proposal will be evaluated in accord with the criteria contained in Section M.
(B) In order that the technical proposal may be evaluated strictly on the merit of the material submitted, no contractual price information is to be included in Volume II.
(C) The technical proposal must be typed with one inch margins, 12 pitch type (or equivalent) and printed, unreduced in size, on 8 1/2'' by 11'' paper, not exceeding 150 pages, exclusive of past performance information submitted for Factor 34. Charts, graphs, tables, figures, diagrams, and schematics may use a font size smaller than 12 pitch; however, all text shall be legible and easily read. Any pages in excess of 150 will be disregarded, and will not be included in the proposal evaluation. Failure of the offeror to comply with the page limitations, resulting in the excess pages not being evaluated, shall not constitute grounds for a protest.
(ii) Format and Content. Volume II, Technical Proposal, shall include the following contents:
(A) Table of Contents
(B) List of Tables and Figures
(C) Technical Proposal. The offeror shall clearly address each of the technical evaluation criteria in Section M.
(D) Exceptions and Deviations. This section shall identify and explain any exceptions or deviations taken to any part of the solicitation or conditional assumptions made with respect to the technical requirements of the solicitation. Offerors should note that taking exceptions to the Government's requirements may indicate an unwillingness or inability to perform the contract, and the proposal may be evaluated as such.
(iii) Specific areas to be addressed:
(A) Evaluation Factor 1--Study Approach. Offeror should provide details on how they will organize, staff and manage the study in
PAGE 14 OF 16 WC-133M-15-RP-0008/A0001
order to conduct all studies, provide all interim reports and final report within schedule. Details must include, but are not limited to:
(1) Overall Preliminary Study Plan and schedule.
(2) Basic timing, variety and quantity of labor hours in the various disciplines. Disciplines may include, but are not limited to, Finance, Logistics, Supply, Engineering, Research and Development and Program Management.
(3) Sequencing of interim studies and reports to support overall schedule.
(4) Overall plan on when and how various meetings, town halls or site visits will be conducted in order to support schedule.
(5) Name and background of Study Director.
(B) Evaluation Factor 2--Previous Experience. Provide at least three (3) and not more than five (5) examples of projects that demonstrate the offeror’s and/ or its proposed team members’ (Subcontractor or Joint Venture member) experience in performance of work similar to that described in Section C of the solicitation. In order for a team member’s experience to be considered, a fully executed Subcontracting Teaming Agreement or Joint Venture Agreement must be included with the offeror’s proposal (See instructions for submitting Volume I). The following information should be included for each project submitted:
(1) Client Organization Name and Contact Information. Include the name of the company/organization/agency for which the work was performed as well as the name and telephone number of the client’s point of contact. Indicate whether the offeror was the prime contractor, subcontractor, Joint Venture member, etc. If the offeror was not the prime contractor, provide the name of the prime contractor.
(2) Contract number under which the offeror performed the work.
(3) Total dollar amount of the contract. If the offeror was a subcontractor, provide the total dollar amount of the prime contract and the total dollar amount of the subcontract.
(4) Contract award date, period of performance start date and completion date. If the project is still underway, provide the projected completion date.
(5) Description of the work performed, including any major accomplishments, by the offeror that demonstrates relevance to the work described in Section C of the Solicitation.
(C) Evaluation Factor 3--Past Performance. For each of the projects submitted under Factor 2, Previous Experience, the offeror should
PAGE 15 OF 16 WC-133M-15-RP-0008/A0001
provide a Past Performance Questionnaire (PPQ) to a representative of the client that can provide the client’s opinion of the offeror’s past performance for the project. The PPQ form to be used is included in Section J of the solicitation. A sample cover letter to accompany the PPQ is also included in Section J. Ensure correct phone numbers and email addresses are provided for the client point of contact.
Offerors and/or team members should submit the PPQ form to the client for each project and request that the form be completed and submitted directly to the Government at the following email address:
michael.s.dolly@noaa.gov. The only information in the email subject line MUST be the solicitation number WC133M-15-RP-0008. NOTE: All PPQs must be received by the Government at the email address above No Later Than the date and time specified for receipt of proposals.
For each of the projects submitted under Factor 2, to ensure the Government has all relevant past performance information, the offeror should submit copies of Federal/DoD/Army/Navy/Air Force performance review that are likely already in the Agency’s databases or likely within the Agency’s arm’s reach, i.e. Contractor’s copy of Contractors Performance Appraisal Retrieval System (CPARS) reports or Past Performance Information Retrieval System (PPIRS) information, if applicable. The offeror should also provide the CAGE codes for the prime contractor and all team members whose experience is being relied on for Factor 2.
The offeror should compile all past performance information for each project submitted under Factor 2 and should organize the information by project and in the same order as the projects submitted in Factor
2. This will allow the reviewers to match the past performance information with the associated Factor 2 project. NOTE: PPQs and other requested past performance documents submitted for Factor 3 are not included in the page count.
While the Government may elect to consider data from other sources in evaluation of Factor 3, the burden of providing detailed, current, accurate, and complete past performance information rests with the offeror. The offeror is responsible for ensuring that the completed PPQs are submitted by the date and time specified for receipt of proposals and should follow up with clients to ensure timely submittal of the PPQs. The Government may contact and interview the client’s representative of the PPQ and reserves the right to interview other individuals acting for the client’s representative if the client’s representative is not available.
(3) VOLUME III--PRICE PROPOSAL
(i) Price proposals must generally adhere to the pricing structure established in Section B, Schedule of Prices.
(ii) If the offeror intends to submit invoices and receive payment on partial deliveries, the offeror shall provide a list of items to be delivered and the unit price for each item.
PAGE 16 OF 16 WC-133M-15-RP-0008/A0001
(ii) Each offeror's price proposal must be based on the offeror's own technical proposal, the Government's specifications, and other contractual requirements. If the prices to be used are based on a published price list or catalog, the offeror shall so state, and provide a copy of the document with its price proposal. If the prices are to be based on established market prices, not otherwise published, or are prices applicable only to the proposed contract, the offeror shall so state.
(iii) The Government expects that this contract will be awarded based upon adequate price competition. However, in order to determine that offered prices are fair and reasonable, the Government reserves the right to request that the offeror provide cost breakdowns to support proposed prices. Information to support unit prices should include, but not be limited to, the following:
(A) Salary/wage information with associated payroll expenses, for personnel to be used in performance of the contract;
(B) Cost for equipment, supplies, and consumable materials;
(C) A breakout of related support costs, such as equipment maintenance, rental, transportation, etc.;
(D) Overhead costs;
(E) General Administrative expenses; and
(F) Profit
(End of provision)
Descript: The purpose of this amendment is to extend the deadline for receipt of offers, add the clause at 52.219-9 Small Business Subcontracting Plan and make revisions to Section C and Section L. Deleted text is formatted with Strikethrough. New text is underlined.
Offers will be received until 2:00 pm Kansas City, ...See Continuation Page
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 16 |
| DocNo: A0001 |
| EffDate: DEC 22, 2014 |
| ReqNo: NMAN8400-15-00015 |
| ProjNo: |
| IssuedByCode: AJ830023 |
| IssuedBy: NOAA/AGO/EAD |
601 E 12TH STREET
ROOM 1734
KANSAS CITY MO 64106
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: WC-133M-15-RP-0008 |
| SolDate: DEC 02, 2014 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |