Drawing_package_1..pdf
PDF 17 MB Posted
- Solicitation number
- WBV085-14-S-0003
About this file
Drawing Package1 for WBV085-14-S-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_package_2..pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLESHEET
COVER SHEET
INDEX OF DRAWINGS
GENERAL
L E
S S T
H A
N
IN
T
H
IC
K N
E S
S
C O
N C
R E
T E S
E C
T
IO
N E
Q U
A L T
O O
R
A N
D L
E S
S T
H A
N
IN
T
H
IC
K N
E S
S
C O
N C
R E
T E S
E C
T
IO
N G
R E
A T
E R T
H A
N
G R
E A
T E
R T
H A
N
IN
T
H
IC
K N
E S
S
C O
N C
R E
T E S
E C
T
IO
N E
Q U
A L T
O O
R
SPACING
(M
IN
(M
(M
18 14
25 19
31 24
37 28
54 42
62 47
69 53
77 59
85 65
24 18
32 25
40 31
48 37
70 54
80 62
90 69
110 85
12 12
15 12
18 14
22 17
32 25
37 28
42 32
46 36
51 39
14 12
19 15
24 18
29 22
42 32
48 37
54 42
60 46
66 51
BAR SIZE
MINIMUM EMBEDMENT MINIMUM LAP LENGTH
TOP OTHER TOP OTHER TOP OTHER TOP OTHER
LENGTH, INCHES INCHES
MINIMUM EMBEDMENT MINIMUM LAP LENGTH
LENGTH, INCHES INCHES
BASIC TABLE ALTERNATE TABLE
REINFORCEMENT EMBEDMENT AND SPLICE TABLES - 4000 PSI
REINFORCEMENT EMBEDMENT AND SPLICE TABLES - 3000 PSI
BASIC TABLE ALTERNATE TABLE
MINIMUM EMBEDMENT MINIMUM LAP LENGTH MINIMUM EMBEDMENT MINIMUM LAP LENGTH
LENGTH, INCHES INCHES LENGTH, INCHES INCHES
BAR SIZE
TOP OTHER TOP OTHER TOP OTHER OTHERTOP
21 16
28 22
36 27
43 33
62 48
71 55
80 62
89 68
98 75
28 21
37 28
46 36
56 43
81 62
93 71
127 98
13 12
17 13
21 16
26 20
37 29
43 33
48 37
53 41
59 45
17 13
22 17
28 21
33 26
49 37
44 43
50 48
56 53
61 59
CONCRETE NOTES:
REINFORCEMENT CLEARANCE DETAIL
NTS
SECTION OR DETAIL SYMBOL
A
A A
A
3. REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH (Fy) OF 60,000 PSI.
LOCATIONS SHALL BE APPROVED BY THE CONTRACTING OFFICER.
THE INTEGRITY OF THE CONCRETE STRUCTURE. THESE ADDITIONAL CONSTRUCTION JOINT
SHOWN, CONSTRUCTION JOINTS SHALL BE PLACED AT LOCATIONS LEAST LIKELY TO IMPAIR
4. CONSTRUCTION JOINTS SHALL BE PROVIDED WHERE SHOWN ON THE DRAWINGS. WHERE NOT
EXTERNAL CORNERS, AND VERTICAL EXPANSION JOINTS.
NOTES:
MUST BE AT LEAST 2.5 BAR DIAMETERS.
B) DISTANCE FROM THE CENTER OF A BAR TO THE NEAREST CONCRETE SURFACE
A) CENTER-TO-CENTER BAR SPACING LATERALLY IS AT LEAST 5 BAR DIAMETERS.
2. THE ALTERNATE TABLE MAY BE USED IF ALL OF THE FOLLOWING CONDITIONS ARE MET:
OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR.
RESPECT TO A HORIZONTAL PLANE WHICH ARE PLACED SUCH THAT MORE THAN 12 INCHES
4. TOP BARS ARE HORIZONTAL BARS AND BARS INCLINED LESS THAN 45 DEGREES WITH
BARS. IF EPOXY-COATED BARS ARE USED, SEE ACI 318 FOR ADDITIONAL CONSIDERATIONS.
5. THE TABLES SHOWN ABOVE ARE FOR NORMAL WEIGHT CONCRETE AND UNCOATED REINFORCING
APPROPRIATE GUIDANCE.
TO-CENTER BAR SPACING LATERALLY IS LESS THAN 3 BAR DIAMETERS, SEE ACI 318 FOR
3. IF CONCRETE COVER OR EDGE DISTANCE IS LESS THAN 1 BAR DIAMETER OF THE CENTER-
5. UNLESS OTHERWISE NOTED, PROVIDE 3/4" CHAMFER AT ALL EXPOSED JOINTS, EDGES,
MUST BE AT LEAST 2 BAR DIAMETERS.
B) DISTANCE FROM THE CENTER OF A BAR TO THE NEAREST CONCRETE SURFACE
A) CENTER-TO-CENTER BAR SPACING LATERALLY IS AT LEAST 3 BAR DIAMETERS.
1. USE THE BASIC TABLE IF ALL OF THE FOLLOWING CONDITIONS ARE MET:
CONCRETE REINFORCING STEEL INSTITUTE.
7. REINFORCING BAR DESIGNATION NUMBERS CONFORM TO THE NUMBERING SYSTEM OF THE
8. REINFORCING BARS SHALL BE CONTINUOUS AT ALL CORNERS UNLESS OTHERWISE NOTED.
OFFICER.
OTHER OBSTRUCTIONS, SHALL BE BENT OR SHIFTED AS DIRECTED BY THE CONTRACTING
9. REINFORCEMENT, WHERE NECESSARY TO AVOID OPENINGS, PIPES, EMBEDDED ITEMS AND
SPLICES REQUIRED BY THE CONTRACTING OFFICER, WILL BE AT THE CONTRACTOR’S EXPENSE.
SPLICES OTHER THAN THOSE SHOWN ON THE DRAWINGS AND OTHER THAN ANY ADDITIONAL
ESSENTIAL TO CONSTRUCTIBILITY, SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER.
ALLOWED TO MAKE SPLICES IN ADDITION TO THOSE INDICATED IN THE DRAWINGS, WHERE
SHALL BE BASED ON THE SMALLER BAR BEING LAPPED. THE CONTRACTOR WILL BE
EMBEDMENT LENGTHS WHERE LENGTHS ARE NOT OTHERWISE INDICATED. SPLICE LENGTHS
10. THE EMBEDMENT AND SPLICE TABLE SHALL BE USED IN DETERMINING LAP SPLICES AND
NOTED.
AND SURFACES COVERED BY BACKFILL SHALL BE CLASS "D" FINISH, UNLESS OTHERWISE
11. ALL EXTERIOR FORMED SURFACES NOT COVERED BY BACKFILL SHALL BE CLASS "A" FINISH
GENERAL NOTES:
STEEL NOTES:
DRAWINGS AND SUBMITTED BY THE CONTRACTOR FOR APPROVAL.
REQUIRED. DETAILED INFORMATION SHALL BE SHOWN ON THE SHOP
WELDING SOCIETY AND INDICATE ONLY SIZE AND TYPE OF WELDS
4. WELDING SYMBOLS SHOWN ARE THOSE ADOPTED BY THE AMERICAN
ALLOWANCES MUST BE MADE FOR MACHINING.
5. DIMENSIONS SHOWN OR CALLED FOR ARE THE FINAL DIMENSIONS;
WELDING SOCIETY STRUCTURAL WELDING CODE. SEE SPECIFICATIONS.
TECHNIQUE, WHERE APPLICABLE, SHALL CONFORM TO THE AMERICAN
3. ALL WELDING SHALL BE ELECTRIC WELDING. WORKMANSHIP AND
OF THE CONTACT, UNLESS OTHERWISE NOTED.
BY RUNNING A CONTINUOUS 1/8" FILLET WELD ALONG ALL EDGES
IN CONTACT, ALL SUCH CONTACTS SHALL BE SEALED WATERTIGHT
2. TO PREVENT CORROSION BY MOISTURE BETWEEN STEEL SURFACES
SECONDARY REINFORCEMENT
FACE OF CONCRETE
PRIMARY REINFORCEMENT
IDENTIFICATION
SECTION OR DETAIL
VOLUMES
SECTION WITHIN
TAKEN
SECTION OR DETAIL
DWG. NO. WHERE
VOLUMES
SECTION WITHIN
DRAWN
SECTION OR DETAIL
DWG. NO. WHERE
ON SAME DWG.
TAKEN AND DRAWN
IDENTIFICATION,
SECTION OR DETAIL
G E
N E
R A
L N
O T
E S
IN
D
E X O
F D
R A
W
IN
G S A
N D
G-001
G-002
G-003
A-C001
A-C002
A-M001
C-C001
C-C002
C-S001
C-S002
C-S003
C-S004
D-C001
D-C002
D-C003
D-C004
D-C005
INDEX OF DRAWINGS AND GENERAL NOTES
LOCATION MAP, VICINITY MAP, AND BENCHMARKS
WBV 24 - SITE PLAN
WBV 24 - SCOUR PROTECTION REPAIR
WBV 33 - SITE PLAN
WBV 33 - CONCRETE REPAIRS
WBV 33 - DISCHARGE PIPE ADJUSTMENT
WBV 33 - WALKWAY BRACING INSTALLATION (1 OF 2)
WBV 33 - WALKWAY BRACING INSTALLATION (2 OF 2)
WBV 3B - SITE PLAN
WBV 3B - SCOUR PROTECTION REPAIR AT MONOLITH 158
WBV 3B - SCOUR PROTECTION REPAIR AT MONOLITHS 159 AND 161
WBV 3B - SCOUR PROTECTION REPAIR DETAILS (1 OF 2)
WBV 3B - SCOUR PROTECTION REPAIR DETAILS (2 OF 2)
3000 PSI AT 28 DAYS, 90 DAYS IF POZZOLAN IS USED.
2. CONCRETE SCOUR PROTECTION SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH (f’c) OF
002G-
UNLESS OTHERWISE NOTED.
ALL OTHER STRUCTURAL STEEL MEMBERS SHALL BE ASTM A572, GRADE 50
1. ALL STRUCTURAL STEEL HOT ROLLED W-SECTIONS SHALL BE ASTM A992.
G-004 MISCELLANEOUS CONSTRUCTION DETAILS
A-U001
C-U001
D-U001
WBV 33 - WALKWAY AND DISHCHARGE PIPE REPAIR PLAN
A-E001
WBV 24 - VALVE BOX SUMP PUMP AND ACCESS PAD
WBV 24 - ONE-LINE DIAGRAM WITH SUMP PUMP
ACCORDANCE WITH SP-66, AMERICAN CONCRETE INSTITUTE DETAILING MANUAL - 2004.
6. ALL BENDS OF REINFORCEMENT AND ALL BAR SPACERS AND SUPPORTS SHALL BE IN
WBV 24 - UTILITY DISPOSITION AND RIGHT-OF-WAY
WBV 3B - UTILITY DISPOSITION AND RIGHT-OF-WAY (1 OF 5)
D-U002 WBV 3B - UTILITY DISPOSITION AND RIGHT-OF-WAY (2 OF 5)
D-U003 WBV 3B - UTILITY DISPOSITION AND RIGHT-OF-WAY (3 OF 5)
WBV 33 - UTILITY DISPOSITION AND RIGHT-OF-WAY
D-C006
D-C007
- WBV 3B HERO PUMP STATION TO ALGIERS CANAL, EAST OF HARVEY CANAL FLOODWALLS
- WBV 33 ESTELLE NO. 1 PUMPING STATION
- WBV 24, SEGNETTE STATE PARK FLOODWALL
PROTECTION PROJECTS:
12. ALL WORK INCLUDED IN THIS PROJECT WILL BE COMPLETED AT THE FOLLOWING NEWLY CONSTRUCTED FLOOD
LEGAL LIMITS OF FEDERAL, STATE AND LOCAL ROADS.
11. ALL HAULING TRUCKS SHALL ABIDE BY REQUIRED WEIGHT LIMITS. THE CONTRACTOR SHALL ABIDE BY ALL
10. THE CONTRACTOR SHALL KEEP ALL STATE AND FEDERAL HIGHWAYS CLEAN DURING CONSTRUCTION.
RESPONSIBILITY AT NO COST TO GOVERNMENT.
OF CONTRACTING OFFICER. GRADING OF RUTS AND IRREGULARITIES IS CONTRACTOR
ACCESS TO JOB SITE. ADDITION OF CRUSHED STONE SHALL ONLY BE WITH APPROVAL
9. ACCESS ROADS SHALL BE ROUTINELY MAINTAINED TO PROVIDE CONTINUOUS
8. NORTH AMERICAN DATUM 1983 (NAD83) USED FOR HORIZONTAL CONTROL.
OUT OF SCALE.
SCALED. N.T.S. IS SHOWN ONLY WHERE DRAWING IS OBVIOUSLY
7. DRAWINGS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE
SHOWN TO SCALE.
6. DIMENSIONS AND/OR ELEVATIONS MARKED N.T.S. ARE NOT
IN THE FIELD.
APPROXIMATE. CONTRACTOR SHALL VERIFY ACTUAL DIMENSIONS
5. DIMENSIONS AND/OR ELEVATIONS MARKED THUS (+/-) ARE
4. AZIMUTHS SHOWN ARE GEODETIC AND ARE MEASURED CLOCKWISE FROM THE NORTH.
VERTICAL DATUM OF 1988 (NAVD88), 2004.65 EPOCH.
3. ELEVATIONS SHOWN ARE IN U.S. SURVEY FEET AND REFLECT NORTH AMERICAN
REFLECT U.S. SURVEY FEET.
2. ALL DISTANCES, STATIONING, AND OFFSETS ARE HORIZONTAL (GRID) AND
NORTH AMERICAN DATUM OF 1983:2011 (NAD83:2011).
TO THE LOUISIANA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE (1702),
1. COORDINATES SHOWN ARE IN U.S. SURVEY FEET AND ARE REFERENCED
D-U004 WBV 3B - UTILITY DISPOSITION AND RIGHT-OF-WAY (4 OF 5)
D-U005 WBV 3B - UTILITY DISPOSITION AND RIGHT-OF-WAY (5 OF 5)
D-C008 WBV 3B - REPAIRS IN FLOODWALL REACH
RESERVED
RESERVED
28 DAYS, 90 DAYS IF POZZOLAN IS USED, UNLESS OTHERWISE NOTED.
1. STRUCTURAL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH (f’c) OF 4,000 PSI AT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
U S
H
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
A
OU
B A
A
G .I.W
.W
ALG
IE
R S C
AN
AL
HERO CANAL
D E S
BAYOU
BO
EUF
MAYRONNE
LAPALCO
L A
R O
S E
B A
Y O
U
B A
R D
E A
U X
H A
R V
E Y
B
Y
R A T
R
IA
B A
Y O
U S
E G
N E
T T E
MI
LL
AUDON
CANAL
B A
Y O
U
B A
Y O
U
MARRERO
HARVEY P.S.
HERO P.S.
C A N
A L
BLVD.
OLD WESTWEGO P.S.
NEW WESTWEGO P.S.
MT. KENNEDY P.S.
L A
F
IT
T E
C A
N A
L
WESTMINSTER P.S.
OLD ESTELLE P.S.
H W
Y
BAR
ATAR
IA
D E S
T R
E H
A N A
V E
F A
M
IL
L E S
COUSINS P.S.
AMES P.S.
NEW ESTELLE P.S.
1 0 1 2
PUMPING STATION
WHITNEY-BARATARIA
LAPALCO BRIDGE
HARVEY CANAL @
(BARATARIA PRESERVE)
HISTORICAL PARK PRESERVE
JEAN LAFITTE NATIONAL
FLOODGATE
HARVEY CANAL
SCALE IN MILES
G-
N
IC
O L E
B
E N
C H
M A
R K
S
L O
C A
T
IO
N M
A P
V
IC
IN
IT
Y M
A P
WBV 24
WBV 33
WBV 3b
LOCATION MAP
A T
C H
A F
A L A
Y A
R
IV
E R
A R K A N S A S
SHREVEPORT
MONROE
R
IV
E R
R
IV
E R
VICKSBURG
NATCHEZ
ALEXANDRIA
R E
D
R
IV
E R
LAKE CHARLES
BATON ROUGEL O U I S I A N A
M I S S I S S I P P I
T E X A S
LAKE
PONTCHARTRAIN
LAKE BORGNE
G U L F O F M E X I C O
M
IS
S
IS
S
IP
P I
CITY
MORGAN
VICINITY MAP
LOCATION
PROJECT
ORLEANS
NEW
O U
A C
H
IT
A
N
DESIGNATION ELEVATIONDESCRIPTION
2004.65) (N.A.V.D.88
-2.75
ONLY)
INFORMATION
(FOR
MVN 49
ONLY)
INFORMATION
(FOR
MVN 48
2004.65) (N.A.V.D.88
-1.38
(PRIMARY)
MVN 42
ONLY)
INFORMATION
(FOR
MVN 41
2004.65) (N.A.V.D.88
-2.97
ONLY)
INFORMATION
(FOR
MVN 43
2004.65) (N.A.V.D.88
0.34
2004.65) (N.A.V.D.88
-3.25
(PID = BBCT89)
180 DEGREES AND THE CORNER OF A CYCLONE FENCE AT 46 FT AT 325 DEGREES.
PIPE AT 12 FT AT 90 DEGREES, THE CENTERLINE OF A GRAVEL ROAD AT 25 FT AT
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 88 FT, REFERENCED BY AN 8 INCH
2004.65) (N.A.V.D.88
-3.73
LONGITUDE: 90°04’58.06896"
LATITUDE: 29°49’39.71448"
NORTHING: 484997.33
EASTING: 3677343.93
LONGITUDE: 90°04’13.98699"
LATITUDE: 29°49’39.68181"
NORTHING: 485036.61
EASTING: 3681226.36
CORNER OF CONCRETE APRO, AND 10.2 FT SW FROM CARSONITE ORANGE POST.
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 80 FT, LOCATED 80 FEET NW OF
LONGITUDE: 90°03’45.5449"
LATITUDE: 29°50’29.51335"
NORTHING: 490097.73
EASTING: 3683675.5
LEVEE MARKER W830.
OF HARVEY CANAL APPROX 140 FT WEST OF PROTECTED SIDE LEVEE TOE NEAR
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 84 FT, LOCATED ON WEST BANK
LONGITUDE: 90°04’02.26218"
LATITUDE: 29°49’41.23208"
NORTHING: 485204.6
EASTING: 3682257.26
LONGITUDE: 90°03’23.41568"
LATITUDE: 29°49’47.63963"
NORTHING: 485889.78
EASTING: 3685671.32
LINE CROSSING. (PID = BBCW12)
SIDE TOE OF LEVEE APPROX 150 FT SW OF LEVEE RAMP, AND 20 FT NE OF PIPE
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 80 FT, LOCATED ON PROTECTED
LONGITUDE: 90°03’13.96422"
LATITUDE: 29°50’19.05925"
NORTHING: 489072.72
EASTING: 3686468.28
400 FT EAST OF PUMP STATION. (PID = BBCW19)
BANK OF BAYOU BARATARIA, APPROX 120 FT WEST OF PETERS RD, AND APPROX
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 88 FT, LOCATED AT NORTH TOP
THE C/L OF LEVEE AT SOUTH END OF C/L OF PIPE LINE CROSSING. (PID = BBCW13)
STAINLESS STEEL ROD DRIVEN TO A DEPTH OF 88.0 FT, LOCATED 132 FT EAST OF
WBV 33
WBV 33
WBV 33
WBV 3B
WBV 3B
WBV 3B
PROJECT
TABULATION OF BENCHMARKS
(PRIMARY)
PBM HARDY
PROJECT BENCHMARKS.
2. BENCHMARK VERIFICATION REQUIREMENTS ARE AS PER GENERAL PROVISIONS, SECTION 01100,
1. AT EACH SITE, ONLY THE PRIMARY BENCHMARK PROVIDED ABOVE SHALL BE USED FOR CONSTRUCTION.
NOTES:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
G-004
M
IS
C E
L L
A N
E O
U S C
O N
S T
R U
C T
IO
N D
E T
A
IL
S
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
BELOW GROUND
FENCE, EMBEDDED 6"
ATTACHED TO HOG WIRE
36" SILT FENCE FABRIC
6"
M A
X
(M
IN
IM
U M
10’ O.C.
6"
"4
(M
IN
IM
U M
M A
X
GROUND
EMBEDDED 6" BELOW
36" SILT FENCE
OR STEEL T- POSTS
7’ LONG X 3-1/2" DIA.
ROUNDED WOOD POSTS
OR STEEL T- POSTS
7’ LONG X 3-1/2" DIA.
ROUNDED WOOD POSTS
ZINC COATED HOG WIRE MESH
47" FABRIC FOR SAFETY FENCE
10’ O.C.
(EMBED IN TRENCH)
SILT FENCE
FLOODSIDE
TRENCH
6"D X 4"W
NOTE
J-HOOK OR SPUR DETAIL
SILT AND SAFETY FENCE
SILT FENCE
N.T.S.
N.T.S.
N.T.S.
A TYPICAL J-HOOK IS A SHOWN IN THE DIAGRAM BELOW.
LIMIT AND ALONG THE TOE OF EMBANKMENTS OR SLOPES.
THE SILT FENCE THAT ARE LOCATED WITHIN THE PROJECT
THE J-HOOKS OR SPURS SHALL BE INSTALLED ON ALL PARTS OF
AND FORCE STORMWATER TO FLOW THROUGH THE SILT FENCE.
OR SLOPE TO CREATE SMALL POCKETS THAT TRAP SILT
THE SILT FENCE SHOULD TURN BACK INTO THE FILL
A CONTINUOUS RUN WITHOUT J-HOOKS OR SPURS.
1. THE CONTRACTOR SHALL NOT INSTALL SILT FENCE IN
5’
SCALE:
20’
PANEL MATS
(1’ X 1’ X 20’) BOLTED IN 4’
RACK NEW TIMBER MATTING
TOP OF TRUCK WASHDOWN
(1’ X 1’ X 12’) BOLTED IN 4’ PANEL MATS
NEW TIMBER MATTING
BASE OF TRUCK WASH RACK
PROFILE PLAN VIEW
20’
TEMPORARY PIPELINE CROSSING BRIDGE
C/L
12" CLEAR
5’
NOTES:
W
ID
T H V
A R
IE
N.T.S.
18’-0"
PIPELINE NOTES:
BRIDGE
REQUIRED AT EDGE OF
HIGH VISIBILITY MARKERS
BRIDGE
REQUIRED AT EDGE OF
HIGH VISIBILITY MARKERS
EXISTING PIPELINE
6" MIN. CLEARANCE FOR DRAINAGE
CRUSHED STONE
IV ON 20H
12" X 4’-0" X 12’ (2 REQUIRED)
TIMBER MAT
GROUND LINE
CRUSHED STONE
IV ON 20H
SCALE:N.T.S.
TRUCK WASHDOWN RACK
(6 REQUIRED)
12" X 4’ X 18’
TIMBER MATS
3’ (MIN.)
(TYPICAL)
TO TRUCK WASHDOWN RACK
FOR INGRESS AND EGRESS
RAMP (CRUSHED STONE)
CONTRACTOR TO PROVIDE
ON EITHER SIDE.
THE 5’ CLEARANCE SHOULD EXTEND FROM THE OUTSIDE PIPELINE
PIPELINES ARE TOO CLOSE TO WARRANT MULTIPLE BRIDGES,
CENTERED OVER THE PIPELINE. IN THE CASE WHERE
CROSSING BRIDGE. EACH BRIDGE SHALL BE
UTILITY PRIOR TO CONSTRUCTING THE PIPELINE
INSPECTION TRENCH TO POSITIVELY LOCATE EACH
4. CONTRACTOR SHALL EXCAVATE AND BACKFILL AN
CROSS THE PIPELINE AT THIS BRIDGE.
ALL EQUIPMENT (LIGHT & HEAVY) SHALL ONLY
AT ALL TIMES DURING THE CONSTRUCTION.
SATISFY THE CRITERIA OF 5’ (MIN.) AND 48" CLEAR
PIPELINES. ANY ALTERNATE DESIGN MUST
ALTERNATE DEISGN FOR BRIDGING OVER THE
3. CONTRACTOR MAY SUBMIT FOR APPROVAL AN
BEGINNING INSTALLATION OF THE PIPELINE MAT.
REPRESENTATIVE (HUEY LEVRON - 504-415-0590) BEFORE
ACTIVITIES WITH THE FACILITY OWNER’S
2. CONTRACTOR SHALL COORDINATE CONSTRUCTION
AT THE WBV 3B SITE. SEE SHEET D-C001 FOR DETAILS.
1. PIPELINE MATTING MAY BE REQUIRED AT 22" CHEVRON GASLINE
CONTRACTING OFFICER.
2. DISPOSE OF MUD AS DIRECTED BY
1. SLOPE TIMBER MATTING TO DRAIN.
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
N
S T
A
S T
A
V A
L V
E B
O X R
E P
A
IR
RIGHT OF W
AY
PROJECT BASELINE
RIGHT OF W
AY
MARCELLO CANAL
RIGHT OF WAY
RIGHT OF WAY
S C
O U
R P
R O
T E
C T
IO
N R
E P
A
IR
FLOOD SIDE
SEGNETTE BLVD.
AVE.
DRAKE
L A P
A L C
O B
L V
D
OVERALL SITE PLAN
TO HWY.
ACCESS ROAD
W
S
S
NEW
6" W
ATER LINE (2,820’)
W
S
OF CONTACT IS MR. ANTHONY MARANGE, MANAGER, (504) 736-7140.
6. THE WORK SHALL BE COMPLETED IN COORDINATION WITH BAYOU SEGNETTE STATE PARK. POINT
5. RIGHT-OF-WAY AND UTILITY INFORMATIONS PROVIDED ON COORDINATES SHEET A-U001.
4. KEEP ALL ROADWAYS USED BY THE CONTRACTOR CLEAN DURING CONSTRUCTION.
SOUTH OF LAPALCO BLVD.
3. ACCESS TO THE SITE IS BY VEHICLE FROM SEGNETTE BLVD. ACCESS ROAD IS APPROX. 0.1 MI.
SPECIFICATIONS.
THE VALVE BOX IN ACCORDANCE WITH SHTS. A-M001 AND A-E001 AND THE CONTRACT
CONTRACT SPECIFICATIONS. AT B/L STA. 519+20 (APPROX.) A SUMP PUMP SHALL BE INSTALLED IN
THE SCOUR PROTECTION SHALL BE REPAIRED IN ACCORDANCE WITH SHT. A-C002 AND THE
2. TWO SEPERATE REPAIRS REQUIRED AT THIS PROJECT LOCATION. AT B/L STA. 515+05 (APPROX.), ED NO. 09-027
FILE NO. H -4-47865
CONTRACT NO. W912P8-10-C-0026 (BY DAVID BOLAND, INC.)
1. WORK TO BE COMPLETED AT THE SITE OF WBV 24 SEGNETTE STATE PARK FLOODWALL:
GENERAL NOTES:
V :4
H
V :4
H
FE-1
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTIONPUMP STATION
DRAINAGE
EXISTING
X X
LIMITS OF CONSTRUCTION
1V:3H
1V:3H
(2 E
A
.0
M O
N O
B -1
B -1
LIMITS OF CONSTRUCTION
1V:4H 1V:4H
MONO B-5
MONO B-20
(7 EA. @ 40’ = 280’)
MONO. B-1 THRU B-7
(3 .7
M O
N O
B -8
(4 .0
M O
N O
B -9
(4 .0
M O
N O
B -1
X
1V:4H
1V:3H
1V:4H
LCNF-1
X
FLOOD SIDE
POLE
EXIST. POWER POLE
EXIST. POWER
PROJECT BASELINE
WTHC-58
V :4
H
NEW T-WALL
LIMITS OF EXISTING LEVEE BOARD R/W
LIMITS OF EXISTING LEVEE BOARD R/W
1V:3H
NEW T-WALL
N
MARCELLO CANAL
E-1
TO REMAIN
EXIST. POWER LINE
1V:3H 1V:3H
(3 .2
M O
N O
B -1
(3 .0
M O
N O
B -1
(2 .0
M O
N O
B -1
(4 .0
M O
N O
B -1
(7 EA. @ 40.0’ = 280.00’)
MONO. B-18 THRU B-24
V :1
H
V :4
H
EXIST. BERM TOE OUT
NEW BERM TOE OUT
B /L S
T A .0
PROTECTION
NEW 6" SCOUR
STATION TO THE SOUTH
SHALL NOT DISRUPT THE EXISTING DRAINAGE TO THE PUMPING
MUDWAVE CREATED BY THE BERM EMBANKMENT WORK
NOTE:
PROTECTED SIDE
V :1
H
V :1
H
M O
N O
H -1 .0
(2 .5
M O
N O
B -1
1V:4H
B /L S
T A .6
W /L
W /L
.7
W /L
.7
W /L
.6
W /L
.6
W /L
.8
W /L
.8
W /L
.8
W /L
.8
W /L
.3
W /L
.3
W /L
.3
W /L
.3
W /L
W/L-10
W/L-8
W/L-7
W/L-6
W/L-5 W/L-4
W/L-3
W/L-2
W/L-1
LIMITS OF EXISTING LEVEE
NEW BERM TOE OUT
1V:4H
1V:40H 1 V :4
H
ASPHALT ROAD EDGE (TYP.)
MATCH BERM TOE OUT W/
(179.86’) SEE SHT. S-319 THRU S-321
MONO. C-1 THRU C-5
POLE
EXIST. POWER
M O
N O S -1 .0
W/L-9
W/L-7W/L-7
LIMITS OF EXISTING LEVEE
R
(T Y P
.0
R
LIMITS OF NEW CUL DE SAC ASPHALT PAVING
STA. 523+08, SEE SHT.C-307
SEE SHT. C-316
NEW ACCESS ROAD,
OF THIS AREA
SEE SHT. C-307 FOR DETAILS
V :4
H
V :4
H
SHEET E-601 FOR ONE-LINE DIAGRAM.
SITE PLAN,
SHEET E-101 FOR ELECTRICAL
AND MARK-UP PANEL DETAILS,
SEE SHEET C-317 FOR VALVE BOX
(125 FT. X 50 FT)
STAGING AREA
M A
T C
H L
IN
E S
T A
L
IM
IT
S O
F W
O R
K
T A B /L
A-C001
W B
V
S
IT
E P
L A
N
T O S
E G
N E
T T
E B
L V
D
A C
C E
S S R
O A
D
REPAIR 1
REPAIR,
PROTECTION
SCOUR
REPAIR 2
VALVE BOX REPAIR,
PARTIAL SITE PLAN
A-C002
W B
V
S
C O
U R P
R O
T E
C T
IO
N R
E P
A
IR
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
SCOUR PROTECTION NOTES:
5. STOP REINFORCEMENT APPROX. 2" BEFORE JOINT.
4. CONTINUE REINFORCEMENT THROUGH CONTRACTION JOINT.
AND SHALL BE REINFORCED WITH #4 BARS AT 12" O.C..
CONCRETE PAVEMENT AT THE LEVEE/FLOODWALL TRANSITION
3. REINFORCING STEEL AND DOWELS SHALL BE INCLUDED FOR ALL
COINCIDENT WITH SHEET PILE INTERLOCK OR WALL EXP. JOINT.
2. TRANSVERSE EXPANSION JOINTS AT 30’ (MAX.) SPACING AND
LONGITUDINAL AND LATERAL FOR ALL CONCRETE SLABS.
1. CONTRACTION JOINTS SHALL BE SPACED 10 FT O.C.
NOT TO SCALE
SAWCUT COMPLETED SAWCUT JOINT
")8 1" (– 2
")8
1" (– 2
CONTRACTION JOINT
"8
"8
1 FLOWING INTO SAWCUT
JOINT SEALANT FROM
REQUIRED TO PREVENT
NON-ABSORPTIVE MATERIAL
SEALANT
ELASTOMERIC
EXPANSION JOINT
1’-0"
" 3
SURFACE OF PAVEMENT
EXPANSION TUBE
JOINT FILLER
PREMOLDED
ELASTOMERIC SEALANT
JOINT, SEE NOTE
REINFORCEMENT AT
TERMINATE
NOT TO SCALE
1/8" R
"2
@ 12" O.C.
" DIA. SMOOTH DOWEL4
318" -
2" CHAMFER
4*
NOT TO SCALE
CUT EXISTING DOWELS FLUSH WITH FLOODWALL BASE SLAB
EL. 6.0, T-WALL BASE SLAB
6" SCOUR PROTECTION#4 BARS AT 12" O.C.
SCOUR PROTECTION/BASE SLAB DETAIL
COMPACTED FILL
AND SCOUR PROTECTION
PAPER BETWEEN BASE SLAB
INSTALL 30 LB. FELT ROOFING
* MATCH EXISTING GRADE (APPROX. 4H:1V)
ASPHALT (16 LF)
INSTALL COLD MIX
10’
THIS SHEET
SLAB DETAIL
PROTECTION/BASE
SEE SCOUR
REPAIR PROCEDURE
(APPROX. 3 FT. X 3 FT.), SEE
REPAIR SPALLED CONCRETE
REPAIR (20 LF)
JOINT SEALANT
REPAIR (50 LF)
JOINT SEALANT
EXISTING GRADES)
JOINTS (MATCH
WITH EXPANSION
PANEL. REINSTALL
SAW CUT AND REMOVE
EXPANSION JOINT
CONTRACTION JOINT
OBSERVATION PORT
UNDERLYING VOIDS.
AND PLACE COLD MIX ASPHALT, COMPACTING TO COMPLETELY FILL THE GAP AND ANY
FILLED USING COLD MIX ASPHALT. REMOVE THE WOOD FILLER STRIPS IN THEIR ENTIRETY
4. IN LOCATIONS NOTED "INSTALL COLD MIX ASPHALT", THE HORIZONTAL GAP SHALL BE
STRIP MUST BE REMOVED AND COLD MIX ASPHALT USED TO FILL THE GAP.
SEALANT CAN BE FOUND TO SATISFY BOTH PERFORMANCE REQUIREMENTS, THE FILLER
MUST BOTH FILL THE GAP AND PROVIDE SUFFICIENT FLEXIBILITY TO BRIDGE THE GAP. IF NO
WITH A SEALANT MEETING THE REQUIREMENTS OF ASTM D6690 TYPE IV. THE SEALANT
3. IN LOCATIONS NOTED "JOINT SEALANT REPAIR", THE HORIZONTAL GAP SHALL BE FILLED
HD-50 OR APPROVED EQUAL. CURE IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTION.
THE MANUFACTURER’S INSTRUCTIONS. REPLACE CONCRETE WITH DAYTON SUPERIOR
PARTICLES. APPLY BONDING AGENT MEETING ASTM C 1059 TYPE II IN ACCORDANCE WITH
LB. HAMMERS. PRESSURE WASH THE SURFACE TO REMOVE ALL DUST AND FRACTURED
LEAST 1" BEYOND THE DAMAGED CONCRETE. CHIP OUT DAMAGED CONCRETE WITH MAX. 15
TAILED SAW-CUTS IN A RECTANGULAR PATTERN AROUND THE DAMAGED AREA AND AT
2. AT SPALLED CONCRETE, DEFINE AREA TO BE REPAIRED BY PLACING MIN. 1" DEEP DOVE
NOTES ON THIS SHEET.
1. EXISTING SCOUR PROTECTION SHALL BE REPAIRED IN ACCORDANCE WITH DETAILS AND
REPAIR PROCEDURE:
FLOODSIDE
PROTECTED SIDE
SCOUR PROTECTION REPAIRS
SCALE: 1" = 10’
PHOTO 1 PHOTO 2
PHOTO 1)
REPAIR AREAS (SEE
PHOTO 2)
REPAIR AREA (SEE
A-M001
M
D P
L
A N
D A
C C
E S
S P
D
B
V
V
A L
V E B
O X S
U M
P P
U M
P
NEW ORLEANS DISTRICT
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E
W O
R L E
A N
S D
IS
T R
IC
T
N E
W O
R L E
A N
S L
O U
IS
IA
N A
H -4 -4
D A
V
ID
P L
O V
E T
T P .E
D P
L
D E
C E
M B
E R
A N
S I
D
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H E
S
T O H
A R
V E
Y P
R O J E
C T S
W B
V -8
M
IS
C
R E
P A
IR
S F
O R V
A R
IO
U S W
E S
T W
E G
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
A
F E
B
T Y
P
T Y
P
EL.EV. 5.0
FIELD VERIFY
TYP.
PLAN
ELEVATION
SEE NOTE 3
PUMP OUT RECESS
SEE NOTE 2
SUMP PUMP WITH FLOAT SWITCH
SEE NOTE 2
SUMP PUMP WITH FLOAT SWITCH
POWER. SEE NOTE 4.
FOR SUMP PUMP
SHUT OFF SWITCH
GFCI OUTLET AND
POWER. SEE NOTE 4.
FOR SUMP PUMP
SHUT OFF SWITCH
GFCI OUTLET AND
SEE NOTE 5
EXISTING BOTTOM SLAB
SEE NOTE 5
EXISTING BUTTERFLY VALVE 18"
6’-0"Lx3’-0" SEE NOTE 5
EXISTING ACCESS COVER
10’-0"
" 8
11’-4"
10’-0"
6’-3"
SEE NOTE 5.
CONCRETE WALL
EXISTING REINFORCED
SEE NOTE 5.
EXISTING PIPE 18"
SEE NOTE 5.
(TYP. 4 PLCS.)
EXISTING 6" DRAIN
(TYP.) SEE NOTE 5.
EXISTING PIPE SUPPORT
6’-0"Lx3’-0". SEE NOTE 5.
EXISTING ACCESS COVER
ACTUATOR. SEE NOTE 5.
EXISTING ELECTRICAL
6"
SEE NOTE 3
PUMP OUT RECESS
SEE NOTE 1
1’Lx1’Wx1-1/2"H
SCOUR PAD
CONCRETE
FIELD VERIFY
EXISTING GROUND
VALVE BOX REPAIR
SCALE: 1/2" = 1’
M A
X
SEE NOTE 1
1’Lx1’Wx1-1/2"H
SCOUR PAD
CONCRETE
NOTE 2)
W/T 90 DEGREE ELBOW (SEE
(CONFORMING TO ASTM F628)
1’x1-1/2" SCH 40 ABS PIPE
SUMP PUMP DISCHARGE
AS PART OF THIS CONTRACT.
ELECTRIC VALVE ACTUATORS NOT TO BE CONSTRUCTED
18" DISCHARGE PIPES, BUTTERFLY VALVES AND
EXISTING CONCRETE VALVE BOX WITH ACCESSWAY5.
SUCH THAT NO EXTENSION OF POWER PUMP CORD IS NECESSARY.
TO BE USED FOR PUMP POWER CONNECTION. MOUNT GFCI
FIELD VERIFY LOCATION OF EXISTING CONDUIT
AND SWITCH AS SPECIFIED IN THIS CONTRACT.
INSTALL GFCI (GROUND FAULT CIRCUIT INTERRUPTER) OUTLET 4.
INSTALL PUMP DIRECTLY ON FLOOR
FIELD VERIFY LOCATION. IF RECESS IS ABSENT
PUMP OUT RECESS 12"x12"x2" DEEP.3.
AROUND PVC DISCHARGE WITH GROUT.
AS SPECIFIED IN THIS CONTRACT. SEAL PENETRATION
GOULDS MODEL LSP0311AV OR APPROVED EQUAL
INSTALL SUMP PUMP WITH DISCHARGE LINE,2.
CONCRETE SCOUR PAD AND CONCRETE ACCESS PAD.
CLEAN AND PREPARE EXISTING SURFACE FOR PLACEMENT OF 1.
NOTES:
SEE NOTE 1
WITH #3 BARS AT 10" AT MID HEIGHT)
3’-0"Lx3’-0"Wx9"H (REINFORCE
ACCESS PAD
CONCRETE
SEE NOTE 1
#3 BARS AT 10" AT MID HEIGHT)
3’-0"Lx3’-0"Wx9"H (REINFORCE WITH
CONCRETE ACCESS PAD
A-E001
N
E -L
IN
E D
IA
G R
A M W
IT
H S
U M
P P
U M
P W
B V
M
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
OUTLET
GFCI
SWITCH
FLOAT
ACTING
DOUBLE
PUMP
SUMP
FIELD VERIFY
EXISTING CONDUIT
MV
MV
M
MM
C C
3P20
R TD
OPEN
OPENING
CLOSING
CLOSED
FAILURE
START/STOP
PUMP NO. 1
3P60
M
MM
3P20
R TD
OPEN
OPENING
CLOSING
CLOSED
FAILURE
START/STOP
PUMP NO. 2
2P15
480 - 120/240V
3KVD
CONTROL XFMR
VALVE NO. 1
MOTOR OPERATED
VALVE NO. 2
MOTOR OPERATED
"C
G
"C
G
A
A
A
G
R
A
A
A
G
R
20/1
VALVE/PUMP CONTROL PANEL
ONE LINE DIAGRAM
18" BUTTERFLY VALVE CONTROL PANEL
SEE SHEETS E-101, C-101, AND C-317 FOR DETAILS.
PUMPS WILL BE CONTROLLED FROM VALVE CONTROL PANEL.
OFF PUSH BUTTON AND INSTALL BLANK ON EXISTING PUMPS.
REMOVE HAND-OFF-AUTO SELECTOR SWITCH ON PUSH BUTTON,
NOTES:
1.
2.
A.
B.
C.
D.
NEW BREAKERSTARTER (TYP.)
EXISTING MOTOR
TRANDUCER (TYP.)
NEW CURRENT
3.
NO. 1 STARTER
EXISTING PUMP
NO. 2 STARTER
EXISTING PUMP
PANEL
BREAKER
EXISTING
"C
"C
20/1 20/1 20/1
SWITCH
SHUT-OFF
M
EXISTING CONCRETE VALVE BOX
NEW CIRCUIT FOR SUMP PUMP
B C
B C
A
A
SUPPLY
POWER
UNINTERUPTED
NC NC
POWER
CONTROL
3#12
3#12
(0-)
(0)
(0-2 SEC.)
(3-0 SEC.)
(0-3 SEC.)
(120V)
(120V)
GROUND
CHASIS
WITH SET POINT THAT WILL MONITOR MOTOR LOAD.
POSITIVE PUMP "RUN" SIGNAL WILL COME FROM CURRENT TRANSDUCER
BE ON AND VALVE WILL CLOSE.
START SEQUENCE), IF MOTOR DOES NOT RUN, THE FAILURE LIGHT WILL
A TIMING RELAY WILL ALLOW FOR PUMP TO START AND RUN (DURING
AS SOON AS VALVE IS FULLY CLOSED THE PUMP MOTOR WILL STOP.
UPON STOP PUSH BUTTON PRESSED, VALVE WILL START TO CLOSE,
PUMP MOTOR WILL RUN.
AND VALVE WILL START TO OPEN. WHEN VALVE IS FULLY OPEN THE
UPON START PUSH BUTTON PRESSED, PUMP MOTOR WILL ENERGIZED
DESCRIPTION OF OPERATION
C-10
C-11
L-4
AZ 25°48’00.3"
EXISTING LEVEE BOARD R/W
EXISTING LEVEE BOARD R/W
LIMITS OF CONSTRUCTION
EXISTING LEVEE BOARD R/W
VALVES AND VALVE BOX
EXISTING BUTTERFLY
ACCESS ROAD TO SEGNETTE BLVD.
PUMP STATION
EXISTING
N
S T
A .8
E X
IS
T
R O
A D
LIMITS OF CONSTRUCTION
L
IM
IT
S O
F C
O N
S T
R U
C T
IO
N
P.I. B/L STA. 519+00.00
A-U001
W B
V
U
T
IL
IT
Y D
IS
P O
S
IT
IO
N A
N D R
IG
H T -O
F -W
A Y
P.I. STA. 512+83.62
P.I. STA. 522+36.11
PROTECTED SIDE
C-1
C-2
L-1
L-2
C-3
C-4 C-5
C-8 C-9
C-12
L-3
P.I. B/L STA. 519+50.00
P.I. B/L STA. 520+50.89
WTHC-57
WTHC-58
FE-1
16’
FLOOD SIDE
S T
A .0
L
IM
IT
S O
F C
O N
S T
R U
C T
IO
N
D-1
X-X
BASELINE
EXISTING R/W
UTILITY NUMBER
LEGEND
L-XX
C-XX
LIMITS OF CONSTRUCTION
XY FOR LIMITS OF CONSTRUCTION P.I.
AZ.27°01’14.8"
C-13
C-6 C-7
E-1
XY FOR EXISTING LEVEE BOARD R/W P.I.
S T
A .0
NOTE: SEE PLAN SHEETS FOR LOCATIONS AND AZIMUTHS
P.I. B/L Station Offset
L-1
L-2
523+00.00
L-4
3650176.6417
3650500.7562
3650464.2098
3650494.1667
X Y
L-3
502315.7343
502159.0506
503214.9197
503273.6607
514+20.00
250.00’ R
STATION
512+83.62
526+00.00
TO
514+20.00 250.00’ R
304.85’ L
300.00’ L
523+00.00
LEVEE BOARD RIGHTS OF WAY P.I.s (L)
P.I. B/L Station OffsetX YSTATION
C-1
C-2
C-4
C-3
512+83.62
526+00.00
TO
C-5
C-6
C-7
C-8
C-9
C-10
C-11
C-12
C-13
3650176.6417 502315.7343 514+20.00 110.50’ L
71.50’ R514+20.003650299.5078 502276.5130
519+00.00 110.06’ L
519+00.003650341.1778 502769.5373
3650385.6723 502748.1331
159.41’ L
519+51.003650362.8529 502814.5949 159.51’ L
3650407.4339
3650451.2275
3650488.2026
3650469.5919
3650666.8259
3650693.8096
3650499.5488
3650561.7239
502793.1491
502883.7400
502914.2075
503082.5687
502895.0606
502972.0161
503141.3097
503109.4560
519+51.00
520+50.89
520+50.89
522+36.11
110.00’ L
180.00’ L
110.25’ L
180.00’ L
522+36.11
522+36.11
40.00’ R
70.07’ R
523+00.00
523+00.00
180.00’ L
110.00’ L
DESCRIPTION OWNER DISPOSITIONAPPROX. STATIONITEM NO.
2 EA., 16" DIA. STEEL DISCHARGE PIPES
13.8KV OVERHEAD POWER LINES
EXISTING CHAIN LINK FENCE AND GATES
D-1
E-1
FE-1
519+22
AS SHOWN
518+40 +/-
SEGNETTE STATE PARK
ENTERGY
WEST JEFF LEVEE DISTRICT
DO NOT DISTURB
DO NOT DISTURB
DO NOT DISTURB
512+83.62
522+36.11
531+38.97
WTHC-58
952.495
902.950
3651035.6000
3650625.4231
3650210.9089502277.3652
503134.8253
503939.1295
WTHC-57
POINT EASTING (X)NORTHING (Y)BEARING
N 25°48’00.3" E
LENGTH (FT.)STATION
N 27°01’14.8" E
BASELINE (B/L
MATCH LINE
EXISTING FACILITIES
LIMITS OF CONSTRUCTION (C)
WTHC-59 (NOT SHOWN)
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
100’0 50’
SCALE:1"=50’
SECTION 16
T14S 23E
RIGHT-OF-WAY
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
BANK LINE
BANKLINE
G
ESTELLE PUMPING STATION
OUTFALL CANAL
ESTELLE
PUMPING
STATION
BRIDGE
G G
G G G
G
G G G
G G G
G
G G
ID
G E
22’’ GAS PIPELINE, BRIDEGLINE GAS CO. (DO NOT DISTURB)
LEVEE C/L
X
X X
X X
X X
FENCE
EXIST.
GATE
WIDE SWING
14’
X X
X
UM
U M
OP OVERHEAD POWERLINES
OT OVERHEAD TELEPHONE LINES
UE
UM
G UNDERGROUND GAS PIPELINE
UNDERGROUND ELECTRIC CONDUIT
UNDERGROUND GAGE MONITORING CABLE
UE
LEVEE
DIESEL FUEL TANK
FUEL LINES
UNDERGROUND
(95’RT)
STA792+01B/L
HV-22
X
SOIL BORING
UTILITY POLE
CANAL
C
N
A L
P
IP
E L
C
N A
L
S T
A
L
AND PLATFORM
EMERGENCY GENERATOR
BENCH MARK
FLOOD SIDE
PROTECTED SIDE
N
SCALE: 1’’ = 40’-0’’
GENERAL SITE PLAN
T R
A N
S
IT
IO
N
BASIN SLAB
NEW DISCHARGE
N E
W
800+00
PROJECT BASELINE STA. 2+99.14=
USACE BASELINE STA. 803+54.43
PAVING
NEW 6" CONC.
STA. 2+38.70 B/L
254.48’ RT.=
157.86’ RT.=
STA. 2+96.75 B/L
157.17’ RT.=
STA. 4+82.15 B/L
242.59’ LT.=
STA. 6+52.96 B/L
239.15’ LT. =
STA. 7+33.55 B/L
BASELINE
BERM
NEW STABILITY
AZ=90°03’02"
AZ=87°45’04"
AZ=64
°22
’58
AZ=90°11’28"
AZ=64
°14
’3 2"
A Z
°4 ’0
STA. 500+00.00 W/L
BEGIN NEW T-WALL
A Z
°0 ’1
AZ=87°32’15"
STA. 503+00.13 W/L
STA. 501+14.72 W/L
244.04’ RT.=
STA. 2+38.06 B/L
STA. 500+10.45 W/L
STA. 508+93.56 W/L
END NEW T-WALL
STA. 508+12.90 W/L
BEGIN PROJECT
"SAFE HOUSE"
EXIST.
(ON GEOTEXTILE)
SLOPE
RIP-RAP LINED
NEW 6" CONC. SLOPE PAVING
NEW 6" CONC. SLOPE PAVING
DISCHARGE PIPES
NEW EXTENSION OF
NEW STABILITY
BERM
END PROJECT
168.29’ LT.=
STA. 506+25.59 W/L
STA. 4+81.01 B/L
AVE.
TO DESTRAHAN
O P
X
O P
X
X
OP
X X X
OP
OP
OP
OP
X
X
O P
X
OP
OP
7. LOW CLEARANCE ON OVERHEAD POWERLINES MAY LIMIT ACCESS TO SITE.
POINT OF CONTACT WILL BE MR. ALI PIRSALEHY, ASST. DIRECTOR, (504)-736-6730.
6. THE WORK SHALL BE COMPLETED IN COOPERATION WITH JEFFERSON PARISH DEPARTMENT OF DRAINAGE. THE
5. COORDINATES FOR RIGHTS-OF-WAY ARE SHOWN ON SHT. C-R001 THROUGH C-R003.
APPROVAL. STAGING AREA SHALL BE LOCATED WITHIN EXISTING RIGHT-OF-WAY LIMITS.
4. CONTRACTOR SHALL SUBMIT PROPOSED LOCATION FOR STAGING AREA TO CONTRACTING OFFICER FOR
THE WEST SIDE OF THE HARVEY CANAL. GO APPROXIMATELY 3.1 MILES AND TURN LEFT AT THE ACCESS ROAD.
3. ACCESS TO THE SITE IS BY VEHICLE. FROM LAPALCO BLVD. TURN SOUTH ONTO DESTREHAN AVE. LOCATED ON
OF WALKWAY BRACING (C-S002 THRU C-S003).
DISCHARGE PIPE ADJUSTMENT (C-S001), PLACEMENT OF ADDITIONAL FLOODSIDE FILL (C-C003) AND INSTALLATION
2. WORK AT THIS LOCATION SHALL INCLUDE CONCRETE FLOODWALL AND SCOUR PROTECTION REPAIRS (C-C002), ED NO. ED-???
FILE NO. H-4-46551
CONTRACT NO. W912P8-09-D-0042-0002 (PURNELL CONSTRUCTION CO., LLC)
1. WORK TO BE COMPLETED AT THE SITE OF WBV 33 ESTELLE NO. 1 PUMPING STATION:
NOTES:
CLEARANCE)
(APPROX. 25 FT.
POWER LINES
OVERHEAD
13 FT. CLEARANCE)
LINES (APPROX.
OVERHEAD POWER
1-800-272-3020)
(BRIDGE LINE GAS DIST. LLC
EXIST. NATURAL GAS PIPELINE
C-C001
W B
V
S
IT
E P
L A
N
TRUCK WASH DOWN RACK
ADJUSTMENT
DISCHARGE PIPE
WALKWAY BRACING
INSTALL ADDITIONAL
REPAIR
CONCRETE
MISC. REPAIR
CONCRETE
MISC.
REPAIR
CONCRETE
MISC.
STAGING AREA
(100 FT. X 25 FT.)
HERBICIDE
RIPRAP WITH
EXISTING
SPRAY
COOPERATION IS REQUIRED OF ALL PARTIES TO ENSURE TIMELY COMPLETION OF WORK.
6. OTHER CONTRACTORS MAY PERFORM CONCURRENT WORK AT THE PUMP STATION. COORDINATION AND
POINT OF CONTACT WILL BE MR. MITCH THERIOT, DIRECTOR, (504)-736-6751.
5. THE WORK SHALL BE COMPLETED IN COOPERATION WITH JEFFERSON PARISH DEPARTMENT OF DRAINAGE. THE
4. RIGHT-OF-WAY AND UTILITY INFORMATION IS PROVIDED ON SHEET C-U001.
THE WEST SIDE OF THE HARVEY CANAL. GO APPROXIMATELY 3.1 MILES AND TURN LEFT AT THE ACCESS ROAD.
3. ACCESS TO THE SITE IS BY VEHICLE. FROM LAPALCO BLVD. TURN SOUTH ONTO DESTREHAN AVE. LOCATED ON
(C-C002), DISCHARGE PIPE ADJUSTMENT (C-S002), AND INSTALLATION OF WALKWAY BRACING (C-S003 AND C-S004).
2. WORK AT THIS LOCATION SHALL INCLUDE CONCRETE FLOODWALL, SCOUR PROTECTION AND RIPRAP REPAIRS
FILE NO. H-4-46551
CONTRACT NO. W912P8-09-D-0042-0002 (PURNELL CONSTRUCTION CO., LLC)
1. WORK TO BE COMPLETED AT THE SITE OF WBV 33 ESTELLE NO. 1 PUMPING STATION:
NOTES:
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
SITE PLAN
N
B R
ID
G E
FLOOD SIDE
PROTECTED SIDE
MONOLITH 9 REPAIR
MONOLITHS 11 AND 15 REPAIR
MONOLITH 4 REPAIR
MONOLITHS 14 THROUGH 22 REPAIR
MATCH ADJACENT CONCRETE.
TAMPING, RODDING, RAMMING, ETC. AND STRUCK OFF TO
BE THOROUGHLY COMPACTED INTO THE PREPARED VOID BY
CONSISTENCY THAT WILL PERMIT PLACING. MORTAR SHALL
ADDITION OF WATER UNTIL IT OBTAINS THE STIFFEST
REMIXED OVER A PERIOD OF AT LEAST 30 MINUTES WITHOUT
WILL LEAVE THE HANDS DRY. THE MORTAR SHALL BE
PRESSURE OF THE HANDS AND WILL NOT EXUDE WATER BUT
STICK TOGETHER WHEN MOLDED INTO A BALL BY SLIGHT
WITH ONLY ENOUGH WATER SO THAT THE MORTAR WILL
CEMENT AND TWO AND ONE-HALF PARTS FINE AGGREGATE
DRY-PACKED MORTAR SHALL CONSIST OF ONE PART
FLOODWALL STEM. FILL HOLES WITH DRY PACKED MORTAR.
CHIP OUT EXISTING NAILS (APPROX. 80 TOTAL) IN
PROCEDURE:
CONCRETE SPALL IS APPROX. 3.5 FT X 1.5 FT.
CURE IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTION.
PLACING AS STATED IN THE MANUFACTURER�S INSTRUCTIONS.
MATERIAL AND A SCRUB COAT SHALL BE APPLIED PRIOR TO
CONDITION AT THE TIME OF PLACEMENT OF THE REPAIR
CONCRETE SHALL BE IN A SATURATED SURFACE DRY
ACCORDANCE WITH THE MANUFACTURER�S INSTRUCTIONS. THE
(OR APPROVED EQUAL) EXTENDED WITH PEA GRAVEL IN
REPLACEMENT CONCRETE SHALL BE DAYTON SUPERIOR HD-50
REPAIR EXCEEDS 2", FORMWORK SHALL BE USED AND THE
MANUFACTURER�S INSTRUCTIONS. IF THE DEPTH OF THE
EQUAL MIX AND PLACE IN ACCORDANCE WITH THE
BASF ZERO-C VERTICAL OVERHEAD MORTAR OR APPROVED
DUST AND FRACTURED PARTICLES. REPLACE CONCRETE WITH
DAMAGE. PRESSURE WASH THE SURFACE TO REMOVE ALL
BE LEFT/CUT ACROSS THE ENTIRE JOINT TO PREVENT FUTURE
CONCRETE REPAIR INSTITUTE. A 1/2� EXPANSION JOINT SHALL
PROFILE OF CSP-7 AS DEFINED BY THE INTERNATIONAL
PREPARE THE SURFACE TO A MINIMUM CONCRETE SURFACE
" BEHIND THE BAR. 4
3SHALL BE REMOVED A MINIMUM OF
HAMMER. IF REINFORCING STEEL IS EXPOSED, CONCRETE
HAMMER IS USED, THE HAMMER SHALL BE MAX. 15 LB.
CONCRETE. REMOVE ALL DAMAGED CONCRETE. IF A CHIPPING
DAMAGED AREA AND AT LEAST 1" BEYOND THE DAMAGED
TAILED SAW-CUTS IN A RECTANGULAR PATTERN AROUND THE
DEFINE AREA TO BE REPAIRED BY PLACING MIN. 1/2" DEEP DOVE
PROCEDURE:
40 SF.
DURING DEMOLITION. EXISTING PANEL IS APPROXIMATELY
DOWELS INTO ADJECENT PANELS SHALL NOT BE DAMAGED
PROTECTION. SEE SHEET B-C004 FOR DETAILS. EXISTING
JOINTS AND REPLACED WITH 6� REINFORCED SCOUR
EXISTING PANEL SHALL BE REMOVED BETWEEN EXPANSION
PROCEDURE:
12" FROM THE PROTECTED SIDE FACE OF THE FLOODWALL.
30 TOTAL). INSPECTION PORTS SHALL BE LOCATED APPROX.
INSTALLED IN EACH SCOUR PROTECTION PANEL (APPROX.
LSSRB SECTION 701. ONE INSPECTION PORT SHALL BE
PORTS. FLOWABLE FILL SHALL BE IN ACCORDANCE WITH
PORT PER MONOLITH UNTIL IT SEEPS OUT OF ADJACENT
THE PANEL. FLOWABLE FILL SHALL BE PUMPED INTO ONE
PLUG AND SHALL EXTEND THROUGH THE FULL DEPTH OF
SHALL BE 6" DIA. GALVANIZED PIPE WITH FLUSH SOCKET
PORTS AND PUMP FLOWABLE FILL. INSPECTION PORTS
PROCEDURE: DRILL INJECTION HOLES, INSTALL INSPECTION
C-C002
W B
V
C
O N
C R
E T
E R
E P
A
IR
S
(MONOLITH 9 - FLOOD SIDE)
REPAIR CONCRETE SPALL
(MONOLITH 11 - PROTECTED SIDE)
REPAIR NAIL HOLES IN FLOODWALL
(MONOLITH 15 - PROTECTED SIDE)
REPAIR NAIL HOLES IN FLOODWALL
PROTECTION (MONOLITHS 14 - 22)
INSTALL FLOWABLE FILL BENEATH SCOUR
PROTECTED SIDE)
(MONOLITH 4 -
PROTECTION PANEL
REPLACE SCOUR
(MONOLITHS 1 THRU 11)
TERRESTRIAL USE, OR APPROVED EQUAL
CUSTOM HERBICIDE FOR AQUATIC AND
SPRAY EXISTING RIPRAP WITH ROUNDUP
SCALE: 1" = 40’
SITE PLAN
o s h e e t_ s e e d .d g n
C-S001
P
IP
E R
E P
A
IR
P
L A
N W
B V
W
A L
K W
A Y A
N D D
IS
C H
A R
C-S001
C-S003C-S001
C
C-S003C-S001
B
C-S003 A
A
(SEE C-S002)
PIPE SUPPORT
DISCHARGE
SUCTION CANAL
PUMP NO. 1
BRIDGE
EXIST.
N
DISCHARGE CANAL
CRUSHED STONE
CRUSHED STONE
STEEL WALKWAY
GALVANIZED
T-WALL
SHOWN ON SHT. C-S002.
BETWEEN PIPE AND PIPE SADDLE. DETAILS FOR ADJUSTEMENT ARE
2. DISCHARGE PIPE SUPPORT SHALL BE ADJUSTED TO ADDRESS GAP
AND C-S004.
WALKWAY. DETAILS FOR BRACING ARE SHOWN ON SHTS. C-S003
1. ADDITIONAL BRACING SHALL BE INSTALLED FOR THE GALV. STEEL
NOTES:
6’-0"
4’- 0"
PLAN
PIPE
48" DISCHARGE
PIPE
48" DISCHARGE
PIPE
54" DISCHARGE
PIPE
48" DISCHARGE
SCALE: 1" = 10’-0"
VALVE (TYP.)
BUTTERFLY
EXISTING
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
DISCHARGE PIPE
FLOOD SIDE
PROTECTED SIDE
LONGITUDINAL SECTION OF DISCHARGE PIPE A
PIPE SUPPORT
(SEE C-S002)
GALVANIZED STEEL WALKWAY
SCALE: 1" = 10’-0"
o s h e e t_ s e e d .d g n
C-S002
B
V
D
IS
C H
A R
G E P
IP
E A
D J
U S
T M
E N
T
NEOPRENE PAD
EXISTING 12" PLATE
(OR APPROVED EQUAL)
TEFLON SLIDE PLATE
HP14X89 (TYP.)
CUT H-PILES
–3
120°
SEE DETAIL 1
DETAIL 1
" PLATE2
13" X
" PLATE (TYP.)4
316" X 16" X
BOTH SIDES (TYP.)
" STIFFENERS2
11" X
STEEL PIPE
STEEL PIPE
STEEL PIPE
" CAP PLATE (TYP.)2
11" X
" PLATE2
13" X
54" Ø PUMPS 2 - 4
48" Ø PUMP 1
STEEL PIPE
" PL4
3INSERT 16" X 16" X
W12X40
CONTINUOUS
CUT BEAM
SUPPORT
CUT BEAM
SUPPORT
(THIS STEP)
SEE NOTE 1
(THIS STEP)
PIPE SUPPORT. SEE NOTE 2
SUPPORT FOR EXISTING
CONTACT AREA
EXISTING CONDITIONS
STEP 2
SECTION A
SECTION B
STEP 3
" PLATE2
A B
STEP 1
NOTE:
1. EXISTING GAP BETWEEN PIPE AND
SADDLE NOT SHOWN FOR CLARITY
NOTES:
1. INSTALL GROUT, NEOPRENE AND TEFLON. TEFLON
SHALL BE BONDED TO THE NEOPRENE WHICH SHALL
BE EXPOXY BONDED TO THE GROUT.
2. CONCTRACTOR SHALL SUPPORT THE TEFLON AND
NEOPRENE AGAINST PIPE PRIOR TO PLACEMENT OF
THE NONSHRINK GROUT.
3. THE NEOPRENE AND TEFLON SHALL BE –12" THICK
AND 3" WIDE.
4. GROUT SHALL BE FIVESTAR DP EPOXY GROUT (HIGH
FLOW), OR APPROVED EQUAL.
5. NEOPRENE SHALL CONFORM TO LSSRB 1018.14 FOR
ELASTOMERIC BEARING PADS.
6. TEFLON SLIDE PLATE (OR APPROVED EQUAL) SHALL
HAVE A MIN. SHORE D HARDNESS OF 57 AND A MIN.
TENSILE STRENGTH OF 2000 PSI.
(MIN. 2" THICK)
NONSHRINK GROUT
REVIEW AND APPROVAL.
DESIGN SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR
2.SUPPORT SHALL BE DESIGNED TO CARRY 1,600 LBS. SUPPORT
". 2
1BE CUT SUCH THAT GAP IS APPROXIMATELY 3
INCREASE GAP BETWEEN PIPE AND SADDLE. PILE SUPPORTS SHALL
AND REMOVE A PORTION OF THE EXISTING PILE SUPPORTS TO
1. SUPPORT DISCHARGE PIPE AND CUT CONTINUOUS W12 X 40. CUT
NOTE:
BE APPLIED TO THE STEEL H-PILES.
CONTRACT SPECIFICATIONS. IF NECESSARY, TOUCH UP PAINT SHALL ALSO
" PLATE SHALL BE COATED WITH COAL TAR EPOXY AS PER 4
32. 16" X 16" X
TEFLON. REWELD SUPPORT PILES.
1. DROP SADDLE SUFFICIENTLY TO INSTALL GROUT, NEOPRENE, AND
NOTE:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
T
A L L
A T
IO
N O
F
W B
V
W
A L
K W
A Y B
R A
C
C-S003
C-S001C-S003
C-S001C-S003
C-S001C-S003
" = 1’-0"8
3SCALE:
" = 1’-0"8
3SCALE:
" = 1’-0"8
3SCALE:
SECTION A
SECTION B
SECTION C
(TYP.)
HP14x89
EXIST.
(TYP.)
1/2" PLATE
(TYP.)
1/2" PLATE
COLUMN (TYP.)
STEEL PIPE
(TYP.)
STEEL PIPE
C/L OF PIPE
COLUMN (TYP.)
STEEL PIPE
L 2 1/2"X2 1/2" X 1/2"
PLATE (TYP.)
1/2" SPACER
(TYP.)
1/2" PLATE
PLATE (TYP.)
1/2" SPACER
C10x15.3
STEEL GRATING
1 1/2" GALVANIZED
HANDRAIL
W12x40
PLATES (TYP.)
STIFFENER
1/2"
FLANGE
NEW BLIND
HANDRAIL
W12x40
W12x40
EL. 9.5
GRATING
TOP OF
X 1/2" (TYP.)
L 2 1/2"X2 1/2"
PLATES (TYP.)
STIFFENER
1/2"
DETAIL 1
3’-3" 6’-0"
3’-0"
(CLR.)
3’-3" 6’-0"
3’-0"
(CLR.)
5’-0" 5’-0" 5’-0" 5’-0" 5’-0" 5’-0" 5’-0" 5’-0"
PLATE (TYP.)
1/2" STIFFENER
W12x40 (TYP.)
PIPE
54" DISCHARGE PIPE
48" DISCHARGE
W12x40 (TYP.)
(TYP.)
C/L OF PIPE C/L OF PIPE C/L OF PIPE
L 2 1/2"X2 1/2" X 1/2" (TYP.)
X 1/2" (TYP.)
L 2 1/2"X2 1/2"
DETAILS ON C-S004.
EAST/WEST BRACING SHOWN IN SECTIONS B AND C. SEE BRACING
3.TYPICAL NORTH/SOUTH BRACING SHOWN IN SECTION A. TYPICAL
REPAIR GALVANIZING IN ACCORDANCE WITH ASTM A780.
GALVANIZING BY GRINDING 1" CLEAR ON EITHER SIDE OF NEW WELD.
2. PRIOR TO WELDING TO EXISTING WALKWAY MEMBERS, REMOVE
1. ALL NEW BRACING STEEL SHALL BE HOT DIPPED GALVANIZED.
NOTES:
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
PLATES (TYP.)
1/2" STIFFENER
DETAIL 1
SCALE: 1" = 1’-0"
W12x40
PLATE (TYP.)
16"x16"x1/2"
X 1/2"
L 2 1/2" X 2 1/2"
P 1/2"L
P 1/2"L
W12x40
STEEL PIPE
6"x1/2" PLATE
X 1/2"
L 2 1/2" X 2 1/2"
3’-7" 3’-0" 2’-7"
(TYP.)
C-S004
S
T A
L L
A T
IO
N O
F
W B
V
W
A L
K W
A Y B
R A
C
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R fiof Engineers
US Army Corps of Engineers
US Army Corps
NEW ORLEANS DISTRICT
H -4 -4
M
IS
S
IS
S
IP
P I
V A
L L E
Y D
IV
IS
IO
N
N E
W O
R L E
A N
S D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
L E
C
D P
L
D A
V
ID
P L
O V
E T
T P .E
D E
C E
M B
E R
A N
S I
D
F E
B
J E
F F
E R
S O
N A
N D P
L A
Q U
E M
IN
E S P
A R
IS
H L
O U
IS
IA
N A
W E
S T
W E
G O T
O H
A R
V E
Y P
R O J E
C T S
W B
V -8
W
B V M
IS
C
R E
P A
IR
S F
O R V
A R
IO
R R
IC
A N
E P
R O
T E
C T
IO
N P
R O J E
C T
W E
S T
B A
N K A
N D V
IC
IN
IT
Y
N E
W O
R L E
A N
S L
O U
IS
IA
N A
W B
V -1
-S -0
6"
1/ 2"
(M
IN
W.P.
P 1/2"L
L 1/ 2"
X /2
X /2
TY
P
LP 1/2"
C10 X 15.3
W.P.
L 2 1/2"X 2 1/2"
X
1/2" (TY
P
P 1/2"L
6"
W12 X 40
4 1/2" (M
IN
W.P.
5"
/2
(M
IN
/2
(M
IN
W12 X 40
LP 1/2"
L /2 "X /2
X /2 " (T
Y P
L /2 "X /2
X /2 " (T
Y P
L /2 "X /2
X /2 (T
Y P
WELD DETAIL 4
SCALE: 3" = 1’-0"
SCALE: 3" = 1’-0"
3/8"
3/8"
SCALE: 3" = 1’-0"SCALE: 3" = 1’-0"SCALE: 3" = 1’-0"
WELD DETAIL 1 WELD DETAIL 3 WELD DETAIL 5
DETAIL 2 - TYPICAL
CROSS BRACE SPACER
PLATE
5/16
5/16
3/8"
5/16
5/16
5/16
5/165/16
5/16
5/16
5/16
5/16
5/16
3/8
L /2 "X /2
X /2 (T
Y P
1/2" SPACER
PLATE
3/16
3/165/16
5/16
TYP.
1/2" STIFFENER
PLATE (EACH SIDE
OF WEB)
16" DIA. HOLE FOR 38" DIA.
BOLT
2" PLATE STIFFENER
(EACH SIDE OF WEB)
W.P.
5"
EL. 1.0
STEEL PIPE
COLUMN (TYP.)
1/2" PLATE
(TYP.)
1/2" SPACER
PLATE (TYP.)
STEEL PIPE
(TYP.)
1/2" PLATE
(TYP.)
C10 X 15.3
DETAIL 2
DETAIL 1
DETAIL 2
DETAIL 3
1/2" SPACER
PLATE (TYP.)
SCALE: 38" = 1’-0" SCALE: 38" = 1’-0"
W12x40
TYPICAL EAST/WEST
CROSS BRACE ELEVATION
TYPICAL NORTH/SOUTH
CROSS BRACE ELEVATION
(BETWEEN DISCHARGE PIPES)
DETAIL 4
DETAIL 5
1/2" STIFFENER
PLATE (TYP.)
1/2" STIFFENER
PLATE (TYP.)
TOP OF
GRATING
EL. 9.5
W12x40 (TYP.)
L 2 1/2"X2 1/2" X 1/2"
(APPROX. 7’-9" LONG*)
L 2 1/2"X2 1/2" X 1/2"
(APPROX. 11’-0" LONG*)
*CONTRACTOR SHALL FIELD VERIFY LENGTH.
3-REQUIRED
8-REQUIRED
(4-FACING, 4 - OPPOSITE HAND)
File details come from the government source that posted it. Updated .