WBV30Specs.pdf
PDF 8 MB Posted
- Attached to
- WBV-30 WESTMINSTER PS FRONTING PROTECTION
- Solicitation number
- WBV030-09-H-0006
About this file
Specifications for WBV-30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am_0002.pdf | ||
| AMENDMENT FOR POSTPONEMENT.pdf | ||
| wbvPlans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ed 08-014
Task Order for Hubzone MATOC
WBV030-09-H-0006
US Army Corps of Engineers ® New Orleans District
Hurricane Protection Project
WBV-30
Fronting Protection Westminster Pump Station
Jefferson Parish, Louisiana
Construction Solicitation and Specifications
31 July 2009
Ed 08-014
Task Order for Hubzone MATOC WBV030-09-H-0006
FOR: Hurricane Protection Project, WBV-30, Fronting Protection Westminster Pump
Station Jefferson Parish, Louisiana Ed 08-014
PROPOSALS DUE: 18 August 2009, 2:00 p.m. local time, USACE Room 163
I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM
THIS SOLICITATION.
II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.
Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
III. (DFARS 204.7302) Prospective contractors must be registered in the CCR database prior to award of a contract. By regulation, no DoD contract can be awarded to any contractor that is not registered in the Department of Defense “Central Contractor Registration” (CCR). If your company is not currently registered in the CCR you may do so by simply going to http://www.ccr.gov. You will be required to provide your company’s Dun and Bradstreet number.
If you do not already have a D&B number, one can be obtained simply by calling Dun and Bradstreet at (800) 333-0505.
OFFERORS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY
THIS SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS
IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of construction of reinforced concrete floodwalls; levee construction; clearing and grubbing; painting; establishment of turf; placing stone, bedding, geotextile; driving steel sheet piling, steel H-piles; excavation, structural excavation and backfill;
surfacing; drainage systems; electrical systems; dewatering; installing butterfly valves; demolition;
construction of temporary retaining structures and temporary flood protection; and other incidental work.
CAUTION TO OFFERORS: In delivery of hand-carried offers, offerors are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time. Such delays DO NOT permit acceptance or consideration of late bids.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE
WITH THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH
REQUIREMENTS MANUAL", DATED SEPTEMBER 2008.
ATTENTION:
Effective January 1, 2005, all Contractors who submit an offer/bid are required to register in the Online Representations and Certifications Applications (ORCA). See FAR Clauses 25.204-7 and 52.204-8 for required information. The Web site for ORCA is http://orca.bpn.gov. ORCA registration replaces some of the Representations and Certifications normally found in Section 0600.
PTC-i Ed 08-014
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00010 Solicitation, Offer and Award (SF-1442) Bidding Schedule
00700 Contract Clauses
DIVISION 1 - GENERAL REQUIREMENTS
01100 General Provisions 01 32 16.00 20 Construction Progress Documentation 01 33 00 Submittal Procedures 01 42 00 Source for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 10 Contractor Quality Control 01 53 00.01 12 Temporary Flood Protection 01 53 00.02 12 Temporary Retaining Structures 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Rack 01 78 02.00 10 Closeout Submittals
DIVISION 2 – EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 3 - CONCRETE
03 11 14.00 12 Formwork for Concrete 03 15 13.00 12 Expansion Joints and Waterstops in Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-in-Place Structural Concrete 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction
DIVISION 5 - METALS
05 50 03.00 12 Metalwork Fabrication and Miscellaneous Provisions
PTC-ii Ed 08-014
DIVISION 9 – FINISHES
09 97 02.01 12 Painting: Coal Tar Epoxy System
Division 22 – PLUMBING
22 14 13.13 Facility Storm Discharge Piping
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 09 13.00 12 Valves Actuators 23 20 00.00 12 Piping Specialties
DIVISION 26 - ELECRTICAL
26 20 00 Electrical Distribution System 26 51 00 Lighting
DIVISION 31 - EARTH WORK
31 05 19.04 12 Separator Geotextile 31 05 19.05 12 High Strength Reinforcement Geotextile 31 11 00.00 12 Clearing and Grubbing 31 23 00.00 12 Excavation 23 16.16 12 Structural Excavation And Backfill 31 23 19.00 12 Dewatering 31 24 00.00 12 Embankment 31 41 16.00 12 Steel Sheet Piling 31 62 16.00 12 Steel H-Piles
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 00.00 12 Surfacing (Granular) 32 31 13 Chain Link Fences 32 92 19.04 12 Turf Establishment and Maintenance
DIVISION 33 - UTILITIES
33 46 16 Subdrainage System
PTC-iii Ed 08-014
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 20 19.00 12 Hydraulic Butterfly Valves 35 31 19.04 12 Riprap And Bedding Construction 35 43 38.00 12 Concrete Scour Protection
DIVISION 40 - PROCESS INTEGRATION
40 95 13.01 12 Valve Control Panels
00010-3 Ed 08-014
SECTION 00010 – TASK ORDER BIDDING SCHEDULE
Hurricane Protection Project, WBV-30 Fronting Protection Westminster Pumping Station
Jefferson Parish, Louisiana
Item
DESCRIPTION
Estimated Quantity
Unit
Unit Price
Amount
0001 Mobilization and Demobilization 1 LS
0002 Work Platform 1 LS
Videotape and Photographic Documentation
1 LS
0004 Temporary Flood Protection 1 LS
0005 TRS Installation, Maintenance, and Removal 1 LS
0006 Truck Wash-Down Rack 3 EA
0007 Demolition 1 LS
0008 Reinforced Concrete Floodwall 1 LS
Discharge Pipe, Fittings, Valves, and Access Platforms
1 LS
0010 Electrical Work 1 LS
0011 Separator Geotextile 270 SY
0012 High Strength Reinforcement Geotextile 14,970 SY
0013 Sacrificial Reinforcement Geotextile 1,800 SY
0014 Clearing and Grubbing 1 LS
0015 Structural Excavation 1 LS
0016 Construction Dewatering 1 LS
0017 Embankment, Compacted Fill 14,000 CY
0018 Piling, Steel Sheet, Type PZ
22 18,338 SF
0019 Piling, Steel Sheet , Type PZ
27 5,542 SF
0020 Furnish and Deliver Steel H- Pile (HP 14X73) 20,840 LF
00010-4 Ed 08-014
Item
DESCRIPTION
Quantity
Unit
Unit Price
Amount
0021 Drive Steel H-Pile (HP
14X73) 20,840 LF
0022 Chain Link Fence 340 LF
0023 Chain Link Fence Gates 2 EA
0024 Seeding and Mulching 2.6 AC
0025 Lime Soil Amendment (Optional) 5.2 TON
0026 Sulfur Soil Amendment (Optional) 0.1 TON
0027 Fertilizer
0027AA First 620 LBS 620 LBS
0027AB All Over 620 LBS 310 LBS
0028 Structure Drainage System 1 LS
0029 Riprap Bedding 90 CY
0030 Riprap 420 TON
0031 Concrete Scour Protection 1,180 SY
0032 Valve Control Panels 1 LS
0033 Flood Events 2 EA
TOTAL: $
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL
BE DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See
FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7)
00010-5 Ed 08-014 days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as optional items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the options by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
00010-6 Ed 08-014
EVALUATION OF SUBDIVIDED ITEMS. (EFARS 52.211-5000 - MAR 95).
Item No. 27 is subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS. (EFARS
52.211-5001 - MAR 95).
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item No. 27.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item No. 27 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity .
c. If the quantity of work performed under Item No. 27 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
NOTICE TO CONTRACTOR
This solicitation contains two sets of goals for minority participation in construction crafts on this contract. They are the New Orleans Hometown Plan and the New Orleans Standard Metropolitan Statistical Area (SMSA).
Contractor will determine the goals applicable to him by the following:
Hometown Plan applies only to those contractors who are signatory to the Hometown Plan and utilizing crafts signatory to the plan.
New Orleans Standard Metropolitan Statistical Area (SMSA) applies to all contractors in the New Orleans SMSA area not signatory to the Hometown Plan, or utilizing crafts not signatory to the plan.
Federal Register/Vol. 45, No. 194/Friday, October 3, 1980
SOLICITATION PROVISION
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION
TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY
The Bidder’s attention is called to “EQUAL OPPORTUNITY” and “LOCAL AFFIRMATIVE ACTION PLAN” clauses of the contract.
The acceptable ranges of minority manpower utilization, expressed in percentage terms, are as follows:
Goals for Minority Goals for Female Timetables Participation for Participation in
Each Trade______ Each Trade_____
Indefinitely 20% - 23 % 6.9%
The Bidder shall, within 5 days after a request therefor by the Contracting Officer of his duly authorized representative, submit the following information.
(a) A list of the construction trades he intends to use, either directly or through subcontractors at any tier, in the performance of work covered by this solicitation;
(b) A list of the labor organizations with which he has collective bargaining agreements and which are signatories to the Hometown Plan with respect to trades for which specific commitments to goals of minority manpower utilization are set forth in the Hometown Plan;
(c) A list of the labor organizations with which he has collective bargaining agreements and which are not signatories to the Hometown Plan or which are signatories thereto but with respect to trades for which no specific commitments to goals of minority manpower utilization are set forth in the Hometown Plan, and
(d) A list of all current construction work or contracts to which he is a party in any capacity in the covered area.
As used in this NOTICE and the contract to result from this solicitation:
(a) “Hometown Plan” or “Plan” means the NEW ORLEANS Plan, consisting of “An Agreement for Implementation of Employment of Minorities in the New Orleans Building Construction Industry.”
(b) “The covered area” means Orleans, Jefferson, St. Bernard, St.
Tammany, St. Charles, St. John, Lafourche, Plaquemines, Washington, Terrebonne, Tangipahoa*, Livingston** and St.
James*** Parishes, Louisiana.
(c) “Director, OFCC” means the Director, Office of Federal Contract Compliance, United States Department of Labor, or any person to whom he delegates authority; and
(d) “Minority” means Negro, Spanish-surnamed American, Oriental, and American Indian, and includes both men and women.
* Area covered is east of the Illinois Central Railroad.
** Area covered is southeast of the line from a point of the Livingston &
Tangipahoa Parish line adjacent from New Orleans and Baton Rouge.
*** Area covered is southeast of a line drawn from the town of Gramercy to the point of intersection of St. James, Lafourche and Assumption Parishes.
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY (APRIL 1984)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation Goals for Female Participation for Each Trade for Each Trade
SMSA Counties MS 19.2% 6.9% SMSA Counties LA 31.0% 6.9% Non-SMSA Counties 27.7% 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in the geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed.
Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Program office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,” and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract. Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Director, Office of Federal Contract Compliance Programs, within 10 working days following award of a construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notifications shall list the –
(1) Name, address, and telephone number of the subcontractor;
(i) Employer identification number of the subcontractor;
(2) Estimated dollar amount of the subcontract;
(3) Estimated starting and completion dates of the subcontract;
and
(4) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is (FAR 52.222-23) Economic Area 113, New Orleans, LA as follows:
Standard Metropolitan Statistical Area
(SMSA) Counties:
0920 Biloxi – Gulfport, MS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 19.2% MS Hancock; MS Harrison; MS Stone
5560 New Orleans, LA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 31.0% LA Jefferson; LA Orleans; LA St. Bernard; LA St. Tammany
Non-Standard Metropolitan Statistical Area
(Non-SMSA) Counties - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.7% LA Assumption; LA Lafourche; LA Plaquemines; LA St. Charles;
LA St. James; LA St. John the Baptist; LA Tangipahoa;
LA Terrebonne; LA Washington; MS Forrest; MS Lamar; MS Marion;
MS Pearl River; MS Perry; MS Pike; MS Walthall
00700-a ED 08-014
Section Table of Contents
SECTION 00700 – CONTRACT CLAUSES
1. ........COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
2. ........LIQUIDATED DAMAGES
3. ........CONTRACT DRAWINGS AND SPECIFICATIONS
4. ........PHYSICAL DATA
5. ........IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY
00700-1 Ed 08-014
SECTION 00700 – CONTRACT CLAUSES
1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(FAR 52.211-10 - APR 1984)
The Contractor shall be required to
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 518 calendar days after the date of receipt by him of notice to proceed. The time stated for completion shall include final cleanup of the premises.
NOTE. The Contractor is hereby informed that time allowed for completion of work has been established as the shortest reasonable duration and that he/she shall make any and all provisions necessary (multiple crews, overtime, concurrent operations, etc.) to accomplish the work within the available time period.
2. LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12 – SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,560.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
3. CONTRACT DRAWINGS AND SPECIFICATIONS (DFARS 252.236-7001 –
AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall --
00700-2 Ed 08-014
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general --
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Hurricane Protection Project G-001 thru G-006; B-620 WBV-30, Fronting Protection, thru B-624; C-101 thru Westminster Pumping C-107; C-201, C-202, Station, Jefferson Parish, C-301 thru C-304, C-501 Louisiana thru C-506, C-601;
SD-100; S-100, S-101,
S-200, S-400 thru S-412, S-500 thru S-502; S-600;
MD-001, M-101, M-301;
E-101, E-501 thru E-503, E-601
(End of Clause)
NOTE: PLAN DRAWING SIGNATURES: The plan drawings accompanying this solicitation have been submitted and approved by the individuals shown in the title blocks on the plans. The actual signatures of the individuals shown on the plans are on
00700-3 Ed 08-014 file and are available for inspection at U.S. Army Engineer District, New Orleans, Corps of Engineers, Attn: CEMVN-ED, P.O. Box 60267, New Orleans, Louisiana 70160- 0267, and access thereto may be had upon request.
4. PHYSICAL DATA (FAR 52.236-4 - APR 1984)
Data and information furnished or referred to below is for the Contractor's information.
The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and borings. Field notes, graphic boring logs, field and laboratory test results, and other data on which this information is based are available at U.S. Army Engineer District, New Orleans, Corps of Engineers, Attn: CEMVN-ED, P.O. Box 60267, New Orleans, Louisiana 70160-0267, and access thereto may be had upon request.
(b) Weather Conditions. Data on weather conditions may be obtained from the National Weather Service.
(c) Transportation Facilities. Access to the pumping station vicinity shall be via state routes as much as possible. From Lapalco Boulevard the construction site can be reached by traversing Westminster Boulevard to Rue Louis Phillipe. The pumping station access road begins at the bridge at the west end of Rue Louis Phillipe and then travels south along the levee right-of-way to the pumping station. Alternative access is available from Lapalco Boulevard approximately 6900 ft east of the pumping station. An existing gravel levee access road exists parallel to a north-south canal. Take this road south crossing the Grand Cross Canal using an existing bridge. Turn west and travel 6900 feet along the levee right-of-way to the pumping station.
A pipeline crossing near the bridge on the alternate access route will require a timber mat bridge.
Levee right-of-way disturbed by construction vehicles will require regrading and turf establishment to preconstruction conditions.
(d) The Contractor is responsible for keeping streets free of mud, tracking, spillage and/or other surface pollution from his equipment and operations.
Contractor shall take whatever means required (i.e., street cleaners, manual labor, water trucks with sprayers) as often as needed to maintain clean streets near the work site. All debris resulting from street cleaning operations shall be hauled off-site and disposed of properly.
(e) Estimates of quantities involved in certain items of work for which bids are being solicited on a lump sum or job basis have been made for the use of the
00700-4 Ed 08-014
Government. Copies of these quantity estimates may be viewed/obtained by contacting the District Commander, Attn: Contracting Officer, same address as stated in subparagraph (a) above. It is expressly understood that the accuracy of these estimates is in no way warranted and that the furnishing of this information to a bidder will not relieve him of his responsibility to estimate the quantities involved.
5. IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY (FAR 52.245-3
1984 APR)
(a) The Government will furnish to the Contractor the property identification in the Schedule to be incorporated or installed into the work or used in performing the contract. The listed property will be furnished f.o.b. barge at the place specified in the contract Schedule or f.o.b. truck at the project site. The Contractor is required to accept delivery, pay any demurrage or detention charges, and unload and transport the property to the job site at its own expense. When the property is delivered, the Contractor shall verify its quantity and condition and acknowledge receipt in writing to the Contracting Officer within 24 hours of delivery any damage to or shortage of the property as received. All such property shall be installed or incorporated into the work at the expense of the Contractor, unless otherwise indicated in this contract.
(b) Each item of property to be furnished under this clause shall be identified in the Schedule by quantity, item, and description
6. GOVERNMENT-FURNISHED PROPERTY SCHEDULE
In lieu of the second and third sentences of paragraph (a) of the Contract Clause entitled "IDENTIFICATION OF GOVERNMENT FURNISHED PROPERTY", the property listed below will be furnished to the Contractor by the Government: The Contractor shall be obtain the material from the Supply Contractor’s storage facility as stated in Section 01100, paragraph entitled SPECIAL PROVISIONS
FOR GOVERNMENT FURNISHED SHEET PILING.
PROPERTY SCHEDULE
Item No. Description
1 Steel Sheet Piles (PZ-22) or equivalent
84 LF at 20' long 280 LF at 25' long 120 LF at 35' long 145 LF at 45' long
General Decision Number: LA080008 07/24/2009 LA8
Superseded General Decision Number: LA20070012
State: Louisiana
Construction Type: Heavy
Counties: Jefferson, Orleans, Plaquemines, St Bernard, St Charles, St James, St John the Baptist and St Tammany Counties in Louisiana.
HEAVY CONSTRUCTION PROJECTS (Includes flood control, water & sewer lines, and water wells. Also includes elevated storage tanks in all listed parishes except St. James. Excludes industrial construction-chemical processing, power plants, and refineries.)
Modification Number Publication Date 0 02/08/2008 1 05/09/2008 2 06/06/2008 3 07/04/2008 4 09/05/2008 5 01/16/2009 6 02/13/2009 7 03/13/2009 8 05/15/2009 9 06/12/2009 10 07/10/2009 11 07/24/2009
CARP1846-006 02/01/2006
Rates Fringes
CARPENTER
(formbuilding/formsetting).......$ 19.92 5.00 Millwright/Piledriverman.........$ 19.92 5.00
ELEC0130-005 12/01/2008
JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES, AND ST. JOHN THE BAPTIST PARISHES
Rates Fringes
ELECTRICIAN (including low voltage wiring)..................$ 25.00 8.33
ELEC1077-002 03/01/2009
ST. TAMMANY PARISH
ELECTRICIAN (including low voltage wiring)..................$ 21.50 6.26
ENGI0406-018 07/01/2008
Rates Fringes
POWER EQUIPMENT OPERATOR
Bulldozer...................$ 20.76 5.70 Mechanic....................$ 22.31 5.70
PLAS0567-003 07/01/2008
JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JOHN THE BAPTIST, AND ST. TAMMANY PARISHES
Cement Mason/Concrete Finisher...$ 19.73 3.24
PLAS0812-003 06/01/2004
ST. JAMES PARISH
Rates Fringes
Cement Mason/Concrete Finisher...$ 21.85 0.00
PLUM0060-002 06/01/2009
JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES (Southeastern Portion), ST. JOHN THE BAPTIST, and ST.
TAMMANY PARISHES
PLUMBER/PIPEFITTER (excluding pipe laying).....................$ 25.77 8.68
PLUM0198-005 07/01/2009
ST. JAMES PARISH (Northwestern Portion)
Rates Fringes
PLUMBER (excluding pipe laying)..........................$ 24.44 7.89
* SULA2004-007 05/13/2004
CARPENTER (all other work).......$ 13.75 2.60
Laborers:
Common/Landscape............$ 9.88 0.00 Fence.......................$ 11.24 0.00 Flagger.....................$ 8.58 0.00 Mason Tender................$ 7.25 0.00 Pipelayer...................$ 9.84 0.00
PIPEFITTER (excluding pipelaying)......................$ 17.52 4.51
Power equipment operators:
Backhoe/Excavator...........$ 14.42 0.00 Crane.......................$ 16.34 3.30 Dragline....................$ 16.50 0.00 Front End Loader............$ 13.89 0.00 Oiler.......................$ 10.03 0.00
Truck drivers:
Dump........................$ 11.01 0.00 Pickup......................$ 12.25 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
01100-a Ed 08-014
Section Table of Contents
SECTION 01100 - GENERAL PROVISIONS
1. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 1
2. DAMAGE TO WORK 2
3. SAFETY PROVISIONS 2
4. INSPECTOR'S FIELD OFFICE 7
5. PROJECT SIGN 8
6. RIGHTS-OF-WAY 8
7. CERTIFICATES OF COMPLIANCE 9
8. ENVIRONMENTAL LITIGATION 10
9. UTILITIES AND IMPROVEMENTS 10
10. PERMISSIBLE HOURS OF WORK 12
11. U.S ARMY CORPS OF ENGINEERS CRD-C STANDARDS 12
12. AGGREGATE SOURCES 12
13. STONE SOURCES 14
14. CLAY SOURCES 16
15. SPECIAL PROVISIONS FOR GOVERNMENT FURNISHED SHEET PILING 18
16. FORMAT OF SURVEYS 19
17. PROJECT BENCHMARKS 20
18. COMMERCIAL WARRANTY 20
19. ACCESS PLAN 20
20. PAYMENT FOR MATERIALS STORED OFFSITE 21
21. COORDINATION OF FACILITY WORK 21
22. STAGING 22
23. RIGHT-OF-WAY RESTRICTIONS 22
24. NORMAL OPERATION OF WESTMINSTER PUMP STATION 22
25. FLOODING, DAMAGES AND EVACUATION REQUIREMENTS 23
26. EVACUATION REQUIREMENTS 23
27. ELEVATED WORK PLATFORM(S) 25
28. VIDEOTAPE AND PHOTOGRAPHIC DOCUMENTATION 26
29. EMERGENCY GAP CLOSURE PLAN 27
30. FIELD VERIFICATION OF UTILITY LOCATIONS 28
31. EXISTING FACILITIES 28
32. DAMAGED STRUCTURES AND ROADWAYS 29
01100-1 Ed 08-014
SECTION 01100 - GENERAL PROVISIONS
1. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
(a) This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause in Section 00700, entitled Default (Fixed Price Construction) (FAR 52.249-10). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
(b) The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS
BASED ON (5) DAY WORK WEEK
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
(c) Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work.
Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
(d) The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), and shall be calculated chronologically from the first to the last day of each month, and shall be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and
01100-2 Ed 08-014 issue a modification in accordance with the Contract Clause in Section 00700, entitled Default (Fixed Price Construction) (FAR 52.249-10).
2. DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the Contract Clause in Section 00700, entitled Permits and Responsibilities (FAR 52.236-7). However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit price or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there is no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment shall be made pursuant to the Contract Clause in Section 00700, entitled Changes (FAR 52.243-4). All costs associated with flooding of the dewatered areas, including flooding due to the operation of each pumping station, shall be paid for at the contract unit price for “Flood Events”.
3. SAFETY PROVISIONS
The safety provisions as specified herein refer to the Sept 2008 edition of EM 385-1-
1. The current document can be found at http://www.usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf.
(a) Accident Reporting and Recordkeeping. Refer to EM 385- 1-1, Section 01.D.
Reports shall be submitted on ENG Form 3394. Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or his/her representative within one working day after the accident occurs. All data reported must be complete, timely and accurate. A follow-up report shall be submitted when the estimated lost time days differs from the actual lost time days.
(b) Accident Prevention Program. (See the Contract Clause in Section 00700, entitled Accident Prevention (AAP) (FAR 52.236-13).) Within 15 days after receipt of Notice of Award of the contract, and at least 7 days prior to the prework conference, four copies of the Accident Prevention Program shall be submitted to the Contracting Officer for review and acceptance. The program shall be prepared in the following format:
(1) Executed MVN Form 385-43 (Latest Edition), Administrative Plan (available upon request), see Appendix A of EM 385-1-1.
01100-3 Ed 08-014
(2) Executed MVN 385-43/1 (Latest Edition), Accident Prevention Plan Checklist and MVN Form 385-43/2 (Latest Edition), Activity Hazard Analysis (available upon request), see Figure 1-1 of EM 385-1-1.
(3) A copy of company policy statement regarding accident prevention.
(4) When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be included on MVN Form 385-10 (Latest Edition), Fuel Oil Transfer, (available upon request). (Refer to 33 CFR 156).
The Contractor shall have on the construction site during working hours a trained Site Safety and Health Officer (SSHO) in accordance with paragraph 01.A.17 of EM 385-1-1. The Contractor shall not commence physical work at the site until the Contracting Officer, or his/her authorized representative has accepted the program. The Contractor may submit its Activity Hazard Accident Prevention Program only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase. Also refer to Section 1 of EM 385-1-1.
(c) Comprehensive Hazard Communication Program. The Contractor shall develop, implement, and maintain at the workplace a written, Comprehensive Hazard Communication Program (see Section 01.B.06 of EM 385-1-1) that includes identification of potential hazards as prescribed in 29 CFR Part
1910.1200 and/or 1926.59, effects of exposure and control measures to be used for chemical products and physical agents that may be encountered during the performance of work on this contract, provisions for container labeling, Material Safety Data Sheets, and employee training program, and other criteria in accordance with 29 CFR Part 1910.1200 and/or 1926.59. Training shall include communication methods and systems to be used (i.e., voice, hand signals, radios or other means), and training in the use and understanding of material safety data sheets and chemical product hazard warning labels. Prior to bringing hazardous substances, as defined in 29 CFR 1910.1200 and/or 1926.59, onto the job site, a copy of the Hazard Communication Program and the Material Safety Data Sheets of each substance shall be submitted to the Contracting Officer and made available to the Contractor's employees as part of its Accident Prevention Program. A site map shall be attached to the inventory showing where the inventoried hazardous substances are stored. The inventory list and site map shall be updated monthly to assure accuracy.
(d) Daily Inspections. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the jobsite in accordance with Section 01 45
04.00 10, "CONTRACTOR QUALITY CONTROL". The reports shall be records
01100-4 Ed 08-014 of the daily inspections and resulting actions. Each report shall include, as a minimum, the following:
(1) Phase(s) of construction underway during the inspection.
(2) Locations of areas where inspections were made.
(3) Results of inspections, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.
(e) Safety Sign. The Contractor shall furnish, erect, and maintain a safety sign at the site where indicated by the Contracting Officer. The sign shall conform to the requirements of this paragraph and the drawing included at the end of this section. The lettering shall be black, the safety circle and cross green, and the background white. When placed on a floating plant, the sign may be half size.
The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current. The sign coordinator is Mary Pizzuto @ 504.862.2000.
(f) Ground Fault Protection. Electrical equipment used on this contract shall be equipped with ground fault circuit interrupters in accordance with EM 385-1-1, Section 11.C.05.
(g) Haul Roads. Whenever practical, one-way haul roads shall be used on this contract. Haul roads built and maintained for this work shall comply with the following:
(1) One-way haul roads for off-the-road equipment; e.g., belly dumps, scrapers, and off-the-road trucks shall have a minimum usable width of 25-feet. One-way haul roads for over-the- road haulage equipment only (e.g., dump trucks, etc.) may be reduced to a usable width of 15-feet.
When the Contracting Officer determines that it is impractical to obtain the required width for one-way haul roads (e.g., a road on top of a levee), a usable width of not less than 10-feet may be approved by the Contracting Officer, provided a positive means of traffic control is implemented. Such positive means shall be signs, signals, and/or signalmen and an effective means of speed control.
(2) Two-way haul roads for off-the-road haulage equipment shall have a usable width of 60-feet. Two-way haul roads for over-the-road haulage equipment only may be reduced to a usable width of 30-feet.
(3) Haul roads shall be graded and otherwise maintained to keep the surface free from potholes, ruts, and similar conditions that could result in unsafe operation.
01100-5 Ed 08-014
(4) Grades and curves shall allow a minimum sight distance of 200-feet for one-way roads and 300-feet for two-way roads. Sight distance is defined as the centerline distance an equipment operator (4.5-feet above the road surface) can see an object 4.5-feet above the road surface.
When conditions make it impractical to obtain the required sight distance (e.g., ramps over levees), a positive means of traffic control shall be implemented.
(5) Dust abatement shall permit observation of objects on the roadway at a minimum distance of 300-feet.
(6) Haul roads shall have the edges of the usable portion marked with posts at intervals of 50-feet on curves and 200-feet maximum elsewhere.
Such markers shall extend 6-feet above the road surface and, for nighttime haulage, be provided with reflectors in both directions.
(h) Safety Fence. The Contractor shall provide, erect, and maintain a temporary safety fence around the limits of work. The fabric for the safety fence shall be zinc coated hog wire mesh at least 47 inches high. Posts shall be round wood posts and shall be at least 6 1/2 feet long, 3 1/2 inches in diameter, and may be untreated. Posts shall extend at least 48 inches above ground and shall be spaced at 10 feet on center. Swing gates shall be at least 12 feet wide by 47 inches high. The swing gate frame shall be fabricated of either 1-3/8-inch O.D.
tubular steel, or 1/4-inch angle iron brace with an adjustable brace wire to prevent sagging. Gates shall be fitted with hinges and shall be supported by 1- 3/8-inch O.D. tubular steel posts embedded in 3-feet of concrete. The fabric from the gates shall be the same as that for the fence. All gates shall be closed and padlocked at the end of each work day. When necessary, an owner of a facility located within the limits of work will obtain keys from the levee district. The Contractor shall provide and maintain on the fence "KEEP OUT" signs every 100 feet facing out from the work. Details of the safety fencing and location shall be submitted to the Contracting Officer for approval. No separate measurement or payment will be made for this work. Payment for all work associated with the safety fence shall be distributed amongst the existing bid items.
(i) Hurricane Plan. A detailed plan for protection and evacuation of personnel and the construction site, in the event of an impending hurricane or storm, is required as an enclosure to the Contractor's Accident Prevention Program. This plan shall be submitted to the Contracting Officer, or his/her representative, for review prior to the preconstruction conference. The plan shall include at least the
(1) The time each phase of the plan will be put in effect. The time shall be the number of hours remaining for the storm to reach the worksite if it continues at the predicted speed and direction.
01100-6 Ed 08-014
(2) The estimated time necessary to secure and evacuate the site including any emergency flood protection.
(3) The safe harbor for personnel and plant specifically identified.
(4) The name of the boat which will be used to move the plant, its type, capacity, speed, and availability.
(5) The estimated time necessary to move the plant to the safe harbor after movement is started.
(j) Hazardous Energy Protection. The Contractor shall develop, implement and maintain at the workplace, a written Control of Hazardous Energy (Lockout/Tagout) System. Refer to Section 12 of EM 385-1-1.
(k) Handling Sheet Piling: The Contractor’s personnel shall not sit or place themselves on top of the sheet piling during the handling, installation, and removal of the piling.
(l) Cranes. The Contractor (including subcontractors) shall have cage boom guards, insulating links, or proximity warning devices on cranes that will be working adjacent to power lines. These devices shall not alter the requirements of any other regulation of this part - even if such device is required by law or other regulation. Insulating links shall be capable of withstanding a 1-minute dry low frequency dielectric test of 50,000 volts, alternating current (EM 385-1-1, Section 11.E.08). Calibration records or stamped date of required manufacturer inspection of proximity warning devices shall be kept on the crane. Additionally, prior to any work commencing an Activity Hazard Analysis (EM 385-1-1, Fig.1-1) identifying and satisfying EM 385-1-1, Section 11.A.02, 11.E.03, 11.E.04 and 11.E.05 requirements shall be submitted and accepted by the Contracting Officer.
(m) Contractor shall employ a competent person at each project to function as the Site Safety and Health Office (SSHO). The SSHO will manage the Contractor’s APP. (This may be a collateral duty responsibility unless specified differently in the contract.) See EM 385-1-1 Appendix A. paragraphs 4 and 7.
The person(s), as a minimum, must have completed the 10-hour OSHA Construction safety class or an equivalent course applicable to the work to be performed and given by qualified instructors. Such training shall have been within the last three (3) years. An SSHO shall be on-duty at all times when work is being performed and shall be responsible for enforcing and implementing the Contractor’s Safety and Health Program in accordance with the accepted APP.
(n) Pumping Station Security. The Contractor shall at all times maintain the existing level of security at the pumping station. All gates shall be kept locked. If a gate is opened for access, the Contractor shall immediately close and lock the gate upon gaining access to/from the site. The Contractor shall submit for
01100-7 Ed 08-014 approval a plan to remove any of the existing fences or gates, including fencing shown on the drawings to be removed. The plan shall show the proposed location of the removed fencing and the location of the required temporary fencing necessary to secure the site. Temporary fencing shall meet the same level of security as the existing permanent fencing. Any removed fencing or gates shall be replaced with new fencing and gates. No separate measurement or payment will be made for the work describes in this paragraph. Payment shall be included in the contract prices for the items of which the work is incidental.
4. INSPECTOR'S FIELD OFFICE
(a) The Contractor shall furnish, throughout the contract period, for the exclusive use of the Government employees, a temporary waterproof building, or trailer, to be utilized as a field office. It shall be conveniently located at the site of construction and shall be independent of any building, or trailer, used by the Contractor. Toilet facilities and potable water, including bottled water with water cooler, shall be provided within the Inspector's office.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .